Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “installation tests”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

Design, Prototyping, Fabrication and Test of the Mu2e AC-Dipole Magnet

Fermilab Magnet Systems is building three High-frequency AC-Dipole Magnets for the Mu2e experiment at Fermilab. These magnets are composed of three single-loop one-meter-long ferrite loaded segments. The excitation consists of a copper tube, which is also used as a means for its cooling with the inherited challenges of Voltage and Frequency uncoupling. These magnets are designed to operate either at 300 kHz or 4.4 MHz via resonance tuning. Following the completion of the design, prototyping, and analysis phases, all ferrites and other components were procured, and the magnets were fabricated to meet vacuum compatibility requirements using strict procedures. Each magnet undergoes thorough baking and testing before being installed in the experiment. This paper discusses the magnets' role in proton background suppression as it represents a unique and essential device for the Mu2e experiment at Fermilab. We present the magnet design choices, modeling approach, and the challenges encountered during fabrication. Additionally, we outline the power supply driving mechanism, the testing that was performed, and our results.

Elementi, Luciano [Fermilab] (ORCID:00000002766372↗

SPC-71260 Rev 0 MARVEL Heat Extraction Subsystem Secondary Coolant Equipment (SCE) Design/Build

A. The Microreactor Applications Research Validation and Evaluation (MARVEL) reactor will offer experimental capabilities that are not currently available at DOE’s national laboratories. Idaho National Laboratory (INL), operated for the U.S. Department of Energy (DOE) by Battelle Energy Alliance, LLC (BEA) (Contractor hereafter) is procuring services for the design, analysis, fabrication, testing and delivery of a Secondary Coolant Equipment system (SCE). This specification contains the requirements for design, analysis, fabrication, testing and delivery of the SCE as described herein. The MARVEL reactor is a microreactor which uses eutectic sodium-potassium alloy (NaK) as a primary coolant. The primary coolant is circulated through four primary loops by natural convection of the coolant. In each loop is a closed well which will accommodate an intermediate heat exchanger (IHX) for extracting heat from the loop. These wells will be referred to in this specification as the “IHX wells.” It is intended for the IHX containment to also be filled with NaK. The MARVEL design team has determined that a Heat Extraction System (HES) using pumped NaK will be used to extract heat from the IHXs and deliver it to a downstream system for power generation or alternate process heat users. This Heat Extraction System will enable MARVEL operations including the ability to test, demonstrate, and address issues related to installation, startup, and operations. In addition, it will allow down-stream utilization of process heat for various uses. The objective of this specification is to develop the final design for the HES Secondary Coolant Equipment system (SCE) that will be used as the core of the HES. This system provides control of the NaK circulation between the MARVEL reactor and the subsequent process heat utilization systems. It does not include design of the Intermediate Heat Exchangers and piping inside the T-REXc pit in which the reactor is located. B. The MARVEL microreactor will be installed in the Transient Reactor Test Facility (TREAT) building in the Transient Reactor Test (TREAT) Micro-Reactor Experiment Cell (T-REXc) C. An INL Subcontractor has developed a conceptual design for this system per SPC-71145, referred to in that specification as the Process Heat Extraction System. SPC-71260 is based on the pumped NaK loop concept developed under SPC-71145. D. The SCE system design and (as option scope) fabrication shall be provided by the awardee of the subcontract (Subcontractor hereafter) pertaining to this Specification. Prior to shipment, the SCE will be fabricated, assembled, and tested at the Subcontractor’s facility. After successful completion of acceptance testing, the SCE and associated equipment will be shipped to the Materials and Fuels Complex (MFC) at the INL (Contractor’s Facility hereafter) to be installed by others in TREAT/T-REXc.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Wind-Tunnel Investigation of the Effects on the Aerodynamic Characteristics of Modifications to a Model of a Bomb Mounted on a Wing-Fuselage Model and to a Model of the Bomb Alone

An investigation was conducted in the Langley high-speed 7- by 10-foot tunnel to determine effects of modifications to a bomb model (particularly with regard to drag) when mounted on a wing-fuselage model and tested at Mach numbers from 0.70 to 1.10. In addition, the static longitudinal stability characteristics of several configurations of a larger scale model of the bomb alone were obtained over a Mach number range from 0.50 to 0.95. The results obtained for the wing-fuselage-bomb model indicate that large reductions in installation drag were obtained for the wing-fuselage-bomb model when the flat nose of the basic bomb was replaced by rounded or pointed noses of various calibers. Shortening the mounting pylon gave further decreases in the installation drag. The tests of the bomb alone indicated that only the flat-nose configurations were stable over the greater part of the Mach number range. Nose-shape modifications which improved the drag also caused the bombs to become unstable at low angles of attack. The stability of the low-drag bomb configurations could be improved by lengthening the cylindrical portion of the body behind the center of gravity.

King, Thomas J., Jr.↗

Novel use of flu surveillance data: Evaluating potential of sentinel populations for early detection of influenza outbreaks

Influenza causes significant morbidity and mortality each year, with 2–8% of weekly outpatient visits around the United States for influenza-like-illness (ILI) during the peak of the season. Effective use of existing flu surveillance data allows officials to understand and predict current flu outbreaks and can contribute to reductions in influenza morbidity and mortality. Previous work used the 2009–2010 influenza season to investigate the possibility of using existing military and civilian surveillance systems to improve early detection of flu outbreaks. Results suggested that civilian surveillance could help predict outbreak trajectory in local military installations. To further test that hypothesis, we compare pairs of civilian and military outbreaks in seven locations between 2000 and 2013. We find no predictive relationship between outbreak peaks or time series of paired outbreaks. This larger study does not find evidence to support the hypothesis that civilian data can be used as sentinel surveillance for military installations. We additionally investigate the effect of modifying the ILI case definition between the standard Department of Defense definition, a more specific definition proposed in literature, and confirmed Influenza A. We find that case definition heavily impacts results. In conclusion, this study thus highlights the importance of careful selection of case definition, and appropriate consideration of case definition in the interpretation of results.

59 BASIC BIOLOGICAL SCIENCES↗

RSRA flight development test in the airplane configuration

The Rotor Systems Research Aircraft (RSRA) was flown in the airplane configuration. Eleven successful flights were made from May 8 to October 3, 1984. The takeoff and landing method was demonstrated and the resultant parameters were obtained. Control power data were obtained. In addition, main rotor hub drag, airplane configuration acoustics data, and aircraft stability data were obtained. Hub drag, acoustics, and stability will be separately reported in more detail. The tail rotor was installed for all tests.

Erickson, R. E.↗

An Investigation of Digital Instrumentation and Control System Failure Modes

A study sponsored by the Nuclear Regulatory Commission study was conducted to investigate digital instrumentation and control (DI&C) systems and module-level failure modes using a number of databases both in the nuclear and non-nuclear industries. The objectives of the study were to obtain relevant operational experience data to identify generic DI&C system failure modes and failure mechanisms, and to obtain generic insights, with the intent of using results to establish a unified framework for categorizing failure modes and mechanisms. Of the seven databases studied, the Equipment Performance Information Exchange database was found to contain the most useful data relevant to the study. Even so, the general lack of quality relative to the objectives of the study did not allow the development of a unified framework for failure modes and mechanisms of nuclear I&C systems. However, an attempt was made to characterize all the failure modes observed (i.e., without regard to the type of I&C equipment under consideration) into common categories. It was found that all the failure modes identified could be characterized as (a) detectable/preventable before failures, (b) age-related failures, (c) random failures, (d) random/sudden failures, or (e) intermittent failures. The percentage of failure modes characterized as (a) was significant, implying that a significant reduction in system failures could be achieved through improved online monitoring, exhaustive testing prior to installation, adequate configuration control or verification and validation, etc.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Milestone report - M4FT-14OR03120217 - Initiate very low iodine concentration adsorption tests

The objective of this effort was to design and install a system to allow the testing of sorbent materials under simulated vessel off-gas (VOG) conditions. The test system consisted of a gas supply system that allows the mixing of dry air, humidified air, and low levels of iodine. The iodine is supplied by a KIN-TEK Flexstream Gas Standards Generator. The sorbents are placed in three separate glass sorbent housings. The first housing is a thin bed, subdivided into four quadrants. The second housing holds a deep bed, followed by a third housing that holds a second thin bed. The first thin bed will allow periodic samples to be taken to examine the effect of time-on-line on sorbent performance. The second bed (deep bed) will allow a determination of the DF for the sorbent over time by the analysis of the third thin bed, which will be replaced at intervals during the multi-month test period. This system was been installed in the south hood of laboratory 38 in Building 4505, and the necessary safety documentation has been revised to reflect the addition of the KIN-TEK iodine generator.

47 OTHER INSTRUMENTATION↗

Exploration Mission Particulate Matter Filtration Technology Performance Testing in a Simulated Spacecraft Cabin Ventilation System

Human deep space exploration missions will require advances in long-life, low maintenance airborne particulate matter filtration technology. As one of the National Aeronautics and Space Administrations (NASA) developments in this area, a prototype of a new regenerable, multi-stage particulate matter filtration technology was tested in an International Space Station (ISS) module simulation facility. As previously reported, the key features of the filter system include inertial and media filtration with regeneration and in-place media replacement techniques. The testing facility can simulate aspects of the cabin environment aboard the ISS and contains flight-like cabin ventilation system components. The filtration technology test article was installed at the inlet of the central ventilation system duct and instrumented to provide performance data under nominal flow conditions. In-place regeneration operations were also evaluated. The real-time data included pressure drop across the filter stages, process air flow rate, ambient pressure, humidity and temperature. In addition, two video cameras positioned at the filtration technology test articles inlet and outlet were used to capture the mechanical performance of the filter media indexing operation under varying air flow rates. Recent test results are presented and future design recommendations are discussed.

particulate matter filtration↗

Design and development of pressure and repressurization purge system for reusable space shuttle multilayer insulation system

The manufacturing tasks for the program included the fabrication and assembly of an epoxy fiberglass purge bag to encapsulate an insulated cryogenic propellant tank. Purge, repressurization and venting hardware were procured and installed on the purge bag assembly in preparation for performance testing. The fabrication and installation of the superfloc multilayer insulation (MLI) on the cryogenic tank was accomplished as part of a continuing program. An abstraction of the results of the MLI fabrication task is included to describe the complete fabrication requirements for a reusable cryogenic propellant space storage system.

Source record↗

Transonic wind-tunnel tests of a lifting parachute model

Wind-tunnel tests have been made in the Langley transonic dynamics tunnel on a 0.25-scale model of Sandia Laboratories' 3.96-meter (13-foot), slanted ribbon design, lifting parachute. The lifting parachute is the first stage of a proposed two-stage payload delivery system. The lifting parachute model was attached to a forebody representing the payload. The forebody was designed and installed in the test section in a manner which allowed rotational freedom about the pitch and yaw axes. Values of parachute axial force coefficient, rolling moment coefficient, and payload trim angles in pitch and yaw are presented through the transonic speed range. Data are presented for the parachute in both the reefed and full open conditions. Time history records of lifting parachute deployment and disreefing tests are included.

Foughner, J. T., Jr.↗

Preparation for Retrievals from Sellafield Legacy Ponds Installation of the Gantry Refurbishment System

Retrieval of sludge and fuel from the First Generation Magnox Fuel Storage Pond, and its safe long term storage is one of the NDA's top priorities in the UK clean up programme. The plant is currently undergoing a series of major modifications in preparation for the retrievals operations. The most visible example of these modifications is the Gantry Refurbishment System (GRS), a major work platform which has recently been lifted onto the pond long travel girders used by the Skip Handler. This paper describes the design, manufacture, works test, and site installation of this major piece of equipment. The installation lift, involving the use of an 800Te crane was one of the largest lifts undertaken at Sellafield. The GRS is a mobile platform structure which is designed to be pushed or pulled along the long travel girders by the Skip Handler. Its principle function is to provide a safe and shielded working platform from which to undertake refurbishment of the Skip Handler long travel girders and support structure. The potential hazards and consequences resulting from the modification were fully understood and controls were put in place to ensure that the risk of carrying out the work was as low as reasonably practicable. The work was authorised by the NII, Sellafield Nuclear Safety Committee and an independent readiness review panel. Despite less than perfect weather in the run up to the lift, the GRS was successfully and safely lifted onto the pond on 18 October 2006, the culmination of three years of planning, engineering and construction. (authors)

42 ENGINEERING↗

DOE Cold Climate Heat Pump Challenge Field Validation: Data Collection and Analysis Plan

This document details the data collection, storage, and analysis plan and methodologies for conducting the field validation portion of DOE’s Cold Climate Heat Pump (CCHP) Challenge. The study is focused on validating the in-field heating performance of prototypical CCHPs that have successfully demonstrated that they meet or exceed the Challenge specification in a laboratory setting. The units that have passed laboratory testing will be installed in real homes along with sensors and loggers for monitoring performance over an entire heating season. Data collected through monitoring will be cleaned and stored in a secure database. The data will be analyzed for calculating the key metrics defined by the Challenge including heating capacities at low outdoor air temperatures (below 32 °F), efficiency in terms of the Coefficient of Performance (COP), switchover temperatures and auxiliary heat staging. Demand Response (DR) capabilities will also be tested using specially designed DR events. In most cases, shoulder season and cooling season performance will also be determined and reported.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Prototyping the BOPTEST Framework for Simulation-Based Testing of Advanced Control Strategies in Buildings

Advanced control strategies are becoming increasingly necessary in buildings in order to meet and balance requirements for energy efficiency, demand flexibility, and occupant comfort. Additional development and widespread adoption of emerging control strategies, however, ultimately require low implementation costs to reduce payback period and verified performance to gain control vendor, building owner, and operator trust. This is difficult in an already first-cost driven and risk-averse industry. Recent innovations in building simulation can significantly aid in meeting these requirements and spurring innovation at early stages of development by evaluating performance, comparing state-of-the-art to new strategies, providing installation experience, and testing controller implementations. This paper presents the development of a simulation framework consisting of test cases and software platform for the testing of advanced control strategies (BOPTEST - Building Optimization Performance Test). The objectives and requirements of the framework, components of a test case, and proposed software platform architecture are described, and the framework is demonstrated with a prototype implementation and example test case.

Blum, David↗

Test bench to commission a third ion source beam line and a newly designed extraction system

The HIT (Heidelberg Ion Beam Therapy Center) is the first hospital-based treatment facility in Europe where patients can be irradiated with protons and carbon ions. Since the commissioning starting in 2006 two 14.5 GHz electron cyclotron resonance ion sources are routinely used to produce a variety of ion beams from protons up to oxygen. In the future a helium beam for regular patient treatment is requested, therefore a third ion source (Supernanogan source from PANTECHNIK S.A.) will be integrated. This third ECR source with a newly designed extraction system and a spectrometer line is installed at a test bench at HIT to commission and validate this section. Measurements with different extraction system setups will be presented to show the improvement of beam quality for helium, proton, and carbon beams. An outlook to the possible integration scheme of the new ion source into the production facility will be discussed.

43 PARTICLE ACCELERATORS↗

Local Neutral Density and Plasma Parameter Measurements in a Hollow Cathode Plume

In order to understand the cathode and keeper wear observed during the Extended Life Test (ELT) of the DS1 flight spare NSTAR thruster and provide benchmarking data for a 2D cathode/cathode-plume model, a basic understanding of the plasma and neutral gas parameters in the cathode orifice and keeper region of the cathode plume must be obtained. The JPL cathode facility is instrumented with an array of Langmuir probe diagnostics along with an optical diagnostic to measure line intensity of xenon neutrals. In order to make direct comparisons with the present model, a flat plate anode arrangement was installed for these tests. Neutral density is deduced from the scanning probe data of the plasma parameters and the measured xenon line intensity in the optical regime. The Langmuir probes are scanned both axially, out to 7.0 cm downstream of the keeper, and radially to obtain 2D profile of the plasma parameters. The optical fiber is housed in a collimating stainless steel tube, and is scanned to view across the cathode plume along cuts in front of the keeper with a resolution of 1.5 mm. The radial intensities are unfolded using the Abel inversion technique that produces radial profiles of local neutral density. In this paper, detailed measurements of the plasma parameters and the local neutral densities will be presented in the cathode/keeper plume region for a 1.5 cm diameter NEXIS cathode at 25A of discharge current at several different strengths of applied magnetic field.

Plasma density↗

Remediation of the FGMSP at Sellafield: The First Transfer of Bulk Sludge - 17133

The very first bulk transfers of radioactive sludge have commenced from one of the most hazardous nuclear plants in Europe, using equipment and systems researched, designed, installed and commissioned by Jacobs as part of the ACKtiv alliance. Sellafield is a nuclear fuel reprocessing and decommissioning site, close to the village of Seascale on the coast of the Irish Sea in Cumbria, England. Sellafield incorporates the original nuclear reactor site at Windscale, which is currently undergoing decommissioning, and dismantling, and Calder Hall, the world's first nuclear power generating reactor. The first nuclear facilities were built in the 1940's.The First Generation Magnox Storage Pond (FGMSP) dates back to the 1950's as part of the UK's expanding nuclear programme and was constructed to store, cool and prepare used Magnox nuclear fuel for recycling into new fuel. It urgently needs to be emptied of 1500 cubic metres of radioactive sludge. In this paper we describe the work undertaken by Jacobs to deliver a very challenging programme of work to provide the capability to remove sludge from the pond. The FGMSP Retrievals Project was awarded in March 2007 to supply equipment and services for the removal of sludge and miscellaneous waste from the First Generation Magnox Storage Pond at Sellafield. The Project is being executed by ACKtiv Nuclear (Jacobs, Carillion and Atkins) of which Jacobs is a 40% stakeholder. ACKtiv Nuclear is a mature Joint Venture and has been operating continuously and successfully since 2002, the oldest JV still in operation on Sellafield Site. The roots of the JV can be traced back to the 1980's. The Project covers all project phases from front-end engineering through detailed design, procurement, installation and commissioning support. The Project places huge emphasis on off-Site testing and has several facilities for both installation and integrated testing. This proves equipment prior to installation in a radioactive environment. The Project has achieved success and recognition including winning the 2014 and 2015 Sellafield Business Excellence awards, as well as numerous internal Jacobs awards. The Project achieved a major decommissioning milestone in March 2016. Since the installation of a 31 m pipe-bridge in 2012, using a 1200 te mobile crane surrounded by several other facilities with nuclear inventory, the Project has successfully installed the sludge retrieval and effluent system into the FGMSP. This 4 year programme of work included 2 booster pump platforms, sludge recovery tooling, hoses, umbilicals and a deluge skip wash box which were all trialled and proven off-Site prior to installation in the pond. This milestone to commence transfer of sludge to modern stainless steel containment is a major step forward in the hazard reduction of the facility.The presentation will cover the installation of the pond de-sludging equipment, the innovations deployed that ensured that the milestone was achieved under budget and ahead of schedule, as well the benefits to the facility, the Site and the nuclear industry. It will also examine the challenges that needed to be overcome such as high dose, contamination, limited working times and space constraints. The presentation will describe why the work is of national Importance and conclude with the achievement of commencement of bulk sludge transfer to a modern facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗