Model-Based Integrated High Penetration Renewables Planning and Control Analysis
Increasing adoption of Solar Photovoltaic (PV) generation at the distribution level poses several changes for the reliable operation of electrical power distribution systems. The addition of a significant amount of PV to a distribution network can introduce a variety of operational problems, including steady-state overvoltages, reverse flows, voltage flicker and excessive controller movement among others. These adverse impacts can be mitigated through a variety of equipment upgrades which represent a cost to either the electric utility or the owner of the PV site. The study performed here aims to quantify the levels of PV generation which present operational problems on a distribution circuit and how those problems might be alleviated. The study performed here included 20 distribution feeders selected from Pepco Holdings, Inc. (PHI) service territory. These feeders are located in the states of Delaware, Maryland and New Jersey. A hosting capacity study was performed on each feeder to determine how much additional PV it could support in its current configuration. Several improvements were then performed on these circuits including phase balancing, capacitor redesign, reducing the voltage regulator set points, fixed power factor operation on the PV inverters and the installation of battery storage. After each of these improvements the hosting capacity of the circuit was reevaluated in order to determine how that particular improvement impacted the amount of PV that could be hosted by the circuit. Each of these improvements represents a real cost in terms of labor and equipment in order to be implemented. They are expected to provide a benefit in terms of the amount of additional PV generation which can be safely interconnected to the distribution feeder. A cost benefit analysis was performed in order to evaluate the expected costs of each feeder improvement and how each one was able to increase the PV hosting capacity of each feeder. It is hoped that these results can be utilized by other distribution utilities in order to understand how they can improve the hosting capacity of their feeders and facilitate the deployment of more PV generation at the distribution level. Admittedly other utility companies will most likely have different feeder architectures and differing labor and equipment costs so the realized cost benefit numbers may be significantly different.