Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “development timelines”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

Ion Propulsion for Solar System Exploration

NASA's Evolutionary Xenon Thruster (NEXT) is ready for transition-to-flight. The thruster has completed all qualification-level environmental testing, and has demonstrated a xenon propellant throughput, total impulse, and total operating hours greatly in excess of anticipated planetary science mission requirements, and exceeding that achieved by any other thruster technology in the history of electric propulsion. NEXT is the next generation system, a natural progression in technology from that implemented successfully on the Deep-Space one and Dawn missions, developed at NASA's Glenn Research Center in Cleveland, Ohio. The first implementation of NEXT will be on NASA 's Double Asteroid Redirection Test (DART). DART will be the first demonstration of the kinetic impact technique to change the motion of an asteroid in space. The DART mission is in Phase C, led by Johns Hopkins University Applied Physics Laboratory. The DART spacecraft will utilize the NASA Evolutionary Xenon Thruster solar electric propulsion system as its primary in-space propulsion system. By utilizing NEXT, DART is able to gain significant flexibility to the mission timeline and launch window, as well as decrease in launch vehicle cost. This presentation will review NASA's investment strategy in electric propulsion _ in particular gridded ion thruster technology _ as it applies to solar system exploration. Results obtained from implementing this technology on Deep-Space one and Dawn will be reviewed. Mission studies which highlight the impacts of the NEXT technology will be discussed, and near-term proposed and scheduled missions including DART and CAESAR (Comet Astrobiology Exploration Sample Return) will be reviewed.

Electric Propulsion↗

Metrics for Flight Operations: Application to Europa Clipper Tour Selection

Objective measures are ubiquitous in the formulation, design and implementation of deep space missions. Tour durations, flyby altitudes, propellant budgets, power consumption, and other metrics are essential to developing and managing NASA missions. But beyond the simple metrics of cost and workforce, it has been difficult to identify objective, quantitative measures that assist in evaluating choices made during formulation or implementation phases in terms of their impact on flight operations. As part of the development of the Europa Clipper Mission system, a set of operations metrics have been defined along with the necessary design information and software tooling to calculate them. We have applied these methods and metrics to help assess the impact to the flight team on the six options for the Clipper Tour that are currently being vetted for selection in the fall of 2021. To generate these metrics, the Clipper MOS team first designed the set of essential processes by which flight operations will be conducted, using a standard approach and template to identify (among other aspects) timelines for each process, along with their time constraints (e.g., uplinks for sequence execution). Each of the resulting 50 processes is documented in a common format and concurred by stakeholders. Process timelines were converted into generic schedules and workforce-loaded using COTS scheduling software, based on the inputs of the process authors and domain experts. Custom code was generated to create an operations schedule for a specific portion of Clipper's prime mission, with instances of a given process scheduled based on specific timing rules (e.g., process X starts once per week on Thursdays) or relative to mission events (e.g., sequence generation process begins on a Monday, at least three weeks before each Europa closest approach). Over a 5-month period, and for each of six Clipper candidate tours, the result was a 20,000+ line, workforce-loaded schedule that documents all of the process-driven work effort at the level of individual roles, along with a significant portion of the level-of-effort work. Post-processing code calculated the absolute and relative number of work hours during a nominal 5 day / 40 hour work week, the work effort during 2nd and 3rd shift, as well as 1st shift on weekends. The resultant schedules and shift tables were used to generate objective measures that can be related to both human factors and to operational risk and showed that Clipper tours which utilize 6:1 resonant (21.25 day) orbits instead of 4:1 resonant (14.17 day) orbits during the first dozen or so Europa flybys are advantageous to flight operations. A similar approach can be extended to assist missions in more objective assessments of a number of mission issues and trades, including tour selection and spacecraft design for operability.

Sarrel, Marc↗

Operational experience with the new CMS DAQ-Expert

The data acquisition (DAQ) system of the Compact Muon Solenoid (CMS) at CERN reads out the detector at the level-1 trigger accept rate of 100 kHz, assembles events with a bandwidth of 200 GB/s, provides these events to the high level-trigger running on a farm of about 30k cores and records the accepted events. Comprising custom-built and cutting edge commercial hardware and several 1000 instances of software applications, the DAQ system is complex in itself and failures cannot be completely excluded. Moreover, problems in the readout of the detectors,in the first level trigger system or in the high level trigger may provoke anomalous behaviour of the DAQ systemwhich sometimes cannot easily be differentiated from a problem in the DAQ system itself. In order to achieve high data taking efficiency with operators from the entire collaboration and without relying too heavily on the on-call experts, an expert system, the DAQ-Expert, has been developed that can pinpoint the source of most failures and give advice to the shift crew on how to recover in the quickest way. The DAQ-Expert constantly analyzes monitoring data from the DAQ system and the high level trigger by making use of logic modules written in Java that encapsulate the expert knowledge about potential operational problems. The results of the reasoning are presented to the operator in a web-based dashboard, may trigger sound alerts in the control room and are archived for post-mortem analysis - presented in a web-based timeline browser. We present the design of the DAQ-Expert and report on the operational experience since 2017, when it was first put into production.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Innovation in Radiological Security, Part 1 of 2 – Using a Cloud Solution to Compress the Timely Detection Model

The design and implementation of new security technologies must account for numerous and complex operational challenges. For example, traditionally isolated systems must now survive amid the proliferation of network connectivity and endure the dynamic environments created by organizations tolerating bring-your-own-device policies. When evaluating the cyber, physical, or cyber-physical security of an asset, a common practice in the security industry is to apply the Timely Detection Model (TDM)—a versatile concept that relates the security functions of detection, delay, and response to the progression of an oppositional force’s attack timeline. If implemented correctly, security enhancements can compress the TDM to offer efficiencies to the stakeholders responsible for adjudicating threat scenarios. The efficiencies gained by the response force allow for more effective protection strategies to be realized. One such enhancement, deployed within the radiological security domain—the Sentry-Remote Monitoring System (Sentry-RMS)—is a stand-alone security system that detects, assesses, and communicates priority alarms as a means of thwarting internal and external threats. The SEntry-RMS CommUnications and REsponse (Sentry-SECURE) platform—an optional feature of the Sentry-RMS—is being developed to facilitate more efficient alarm adjudication by site stakeholders and, if necessary, a faster response by law enforcement. This Cloud-hosted platform receives protected information from deployed Sentry-RMS units and relays it to stakeholders that have vested interests in maintaining an elevated level of situational awareness. Operationally, this enables real-time delivery of high-priority alarm and video imagery directly to an identified response stakeholder, such as local law enforcement or site management, via natively developed mobile applications or full platform integration. The Sentry-SECURE platform, as implemented by the U.S. Department of Energy’s Office of Radiological Security, is an example of an innovative security technology that compresses the TDM by (1) enabling a more efficient time to target and (2) better informing a response force’s predetermined tactics, techniques, and procedures. This paper explores the platform’s operational roles, highlights its principal functions, and presents a use case that demonstrates how the platform provides enhanced situational awareness when adjudicating priority alarms.

Sentry-RMS, Timely Detection Model, Sentry-SECURE↗

Physical Security Timeline Analysis in Support of Advanced Reactor Demonstration and Deployment

This report presents the regulatory requirements and directions on the physical security of advanced nuclear reactors in USA. Presently, a rule is being proposed that allows for a performance-based analysis. In determining the physical security requirements for an advanced reactor, new tools may be desired to conduct a performance-based analysis. These tools should incorporate dynamic analysis methods to provide as much realism as possible. In comparison, the security requirements for existing light water reactors (LWRs) are much more prescriptive and the analysis conducted to establish the required physical security strategies were more easily performed with static analysis. In order to achieve the cost goals that advanced reactors require for adoption; the nuclear security force required should not be excessive. Dynamic physical security analysis methods and tools have been developed by the US Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) program. This report details how the dynamic risk analysis tools developed in the LWRS program using the dynamic risk modelling tool, EMRALD, may be adapted for use in analyzing the physical security designs for advanced reactors accounting for variable performance-based requirements. This report provides an example analysis of a hypothetical SFR using publicly available information and generic assumptions to demonstrate the methods and potential presentation and analysis of the results. No actual plant information is used in this example analysis. Future work in this area will create additional models that can be adapted for any advanced reactor concept and use various security features to create a physical security system that provides adequate protection from radiological theft and sabotage.

97 MATHEMATICS AND COMPUTING↗

The Antarctic Search for Meteorites: A Model for Deep Space Exploration

In an era of shrinking buying power and reduced flight opportunities, NASA must extract the greatest possible value from all sources of insight into the future of human space exploration. Antarctica is one such source. The history of Antarctic exploration has many political and technical parallels with the development of space, and Antarctica's remoteness and harsh climate make it an excellent proxy for space (e.g., [1,2]). Links between exploration of space and of the Antarctic date back to the International Geophysical Year of 1957-1958, which saw both the launch of Sputnik 1 and the establishment of a station at the South Pole. The Antarctic Search for Meteorites (ANSMET) is an annual expedition to the south polar plateau to collect meteorites. Although its intent is not to simulate a space mission, the handful of astronauts who have participated in ANSMET agree that it is very similar to a long-duration space flight. Independently, NASA and other space agencies have simulated deep space exploration missions in "analog" activities at remote field sites on Earth (e.g., [3]). These include NASA Extreme Environment Mission Operations (NEEMO) [4,5], Desert Research And Technology Studies (Desert RATS) [6,7], and the Pavilion Lake Research Project (PLRP or simply Pavilion Lake) [8]. This report focuses on NEEMO, Desert RATS, and PLRP because of the author's firsthand experience with them. Other noteworthy analogs, such as the arctic Haughton Mars Project and the European Space Agency's underground Cooperative Adventure for Valuing and Exercising human behavior and performance Skills (CAVES), are not treated here. NASA analogs often include fully staffed control centers, astronauts serving as crew, and realistic mission timelines lasting one to two weeks. Analogs have provided key insights into system architectures and operational concepts for the future human exploration of deep space. They have pioneered techniques for human communication with significant speed-of-light delays, for conducting spacewalks on natural objects with negligible surface gravity, and for empowering exploration crews to work with reduced dependence on a ground control center. They have field-tested dozens of emerging technologies including spacewalking tools and full-scale prototype vehicles and habitats. They have provided valuable experience for astronauts preparing for their first space flight, and for flown crewmembers who will take command roles on later flights. Some analogs, especially PLRP, have connected observers in the field with science teams in remotely located control centers to produce high-quality, publishable scientific results. The analogs have accomplished all of this at a tiny fraction of the cost of an actual space flight. This report treats ANSMET as space flight analog. The chapter following this introduction describes ANSMET in depth. The report then presents data on logistics and crew considerations that may be useful for developers of future human space exploration missions. It offers detailed comparisons between ANSMET and past, present, and future space flights on the Space Shuttle, the International Space Station (ISS), and a proposed Mars mission. Those comparisons are intended to complement the work of Eppler [2], who compares ANSMET to the Apollo moon flights. This report also compares ANSMET with the Desert RATS, NEEMO, and PLRP analogs. It then presents observations and makes recommendations related to ANSMET's value as a simulated space mission. The report ends with a short conclusion. The remainder of this introductory chapter provides background material to help readers interpret the rest of the report. It gives brief overviews of Space Shuttle and ISS missions along with information on a notional future human flight to Mars. It also presents the general features of three of NASA's space flight "analog" projects. With those points of reference in place, the chapter concludes with an overview of ANSMET.

Love, Stanley G.↗

Stainless Steel Coating Test Report

A process was developed to coat 316L stainless steel pieces having very low levels of fixed contamination on their surface (~100 dpm/100 cm²). The coating process served to significantly decrease the likelihood of any fixed contamination becoming loose contamination due to physical shocks. Prior to coating, the stainless steel was etched with a commercial methane sulfonic acid (MSA) solution in a heated ultrasonic bath, rinsed with deionized water, cleaned with a basic detergent solution, and then rinsed with deionized water. The MSA etched the surface of the stainless-steel pieces, creating a more favorable surface on which the coating could adhere. Due to the short timeline of the project, only commercially available clear coating products were considered. The clear coating had to be wear-resistant, shock resistant, radiation resistant, and have high adhesion to the surface of the stainless steel. Adhesion of coatings to stainless steel is notoriously difficult. A commercial, high molecular weight polymer coating was found that met these requirements. The adhesion properties of this coating to stainless steel are very good, and are significantly improved by the etching process. The etching process results in a higher surface area that is free of debris and other residues, making the surface much more wetable, and at the same time creating a favorable surface topography for adhesion. The polymer in its uncured form is a low viscosity liquid. It can be applied by brush or pipette, and it cures in air alone, but heat is required to speed up curing and attain the highest performance of the cured polymer. As the project progressed, the project team became interested in the composition of the selected commercial polymer coating, and in ways that this polymer coating could be made more wear resistant and potentially more radiation resistant. Nano-particle addition was chosen as the preferred way to achieve higher performance. Therefore, a series of tests were planned and performed. This report summarizes these tests, and presents the results.

36 MATERIALS SCIENCE↗

Development of Logistics for Building Radiation Storm Shelters and Their Operational Evaluation

Over the past three years NASA has been studying the operational effectiveness and astronaut protection efficacy of numerous radiation protection shelters for use in space exploration activities outside of earth's magnetosphere. The work presented was part of NASA's Advanced Exploration Systems (AES) RadWorks Storm Shelter project. This paper is a summary of the concept development activities of this third year. Fabricated items were integrated into mock up deep space habitat vehicle sections for operational evaluations. Two full scale human-in-loop simulations were designed, fabricated, and implemented through an Institutional Review Board approved solicited participant assessment process. Fabricated items are described, along with usage scenarios of two protection approaches. Existing ISS type logistics along with proposed variations of those logistics were used. Preliminary Discrete Event Simulation (DES) work is noted to be useful in quantifying and documenting operational performance measures for the two primary shelter methods, including some characterization of radiation dose accumulation over a mission timeline. The project also performed correlation analyses between effective radiation dose and the Risk of Exposure Induced Death (REID) to show that concept level work may be able to include such a performance metric in early stages of mission scenario habitat design trade space investigation.

Cerro, Jeffrey A.↗

Sub-sized specimen testing and its relationship with Gen IV Materials Qualification

Renewed interest in advanced reactor technologies which can produce inherently safe, reliable, low carbon, low cost energy requires the development of new materials which can operate in the extreme environments proposed by Gen IV reactor designs. The primary focus of the Nuclear Materials Discovery and Qualification Initiative (NMDQi) is to accelerate the process by which new materials can make their way into commercial use, enabling new technologies and innovations within the nuclear sector. Due to limitations in the production of neutron irradiated material for testing and qualification, the use of specimens far smaller than those traditionally called for in regulatory codes becomes a necessity. While the use of these sub-sized specimens is necessary to achieve materials qualification on a realistic timeline and budget, literature showing the efficacy of these samples as an appropriate surrogate for ASME/ASTM defined samples is limited. This poster will detail historical efforts to compare the mechanical behavior of small geometry samples with bulk material behavior and the potential of sub-sized specimen testing at INL for future materials qualification efforts.

36 MATERIALS SCIENCE↗

A Systems Engineering Approach to Accident Response Planning

This paper explores the Systems Engineering structure, strategies and tools for real world scenarios involving work with accident response groups. A systems engineering approach must be taken by the technical teams to prepare for a successful response and design the technical systems in support of the operations. The scope of this project is focused on laying out the foundation of the systems engineering approach taken to help the teams develop an accident response strategy and identify new engineering designs in support of these operations for the black box systems. This Master’s project involves several interdisciplinary teams & stakeholders across different areas. Identifying the proper tools to use is key to addressing the big picture needs of the multiple stakeholders. This project explores some of the key tools used by the integrated team. The integrated project work will primarily take place over the course of 8 weeks via integrated team meetings. Other work in support of this project will take place off-line as needed by the project lead. Details on the prospective timeline, milestones, key dates and work scope can be referenced in other sections of this paper. Key systems engineering methodologies and tools used thus far in support of this project includes: 1) Market Surveys and Interviews, 2) Project Charter, 3) Feasibility Study, 4) Swim Lane Diagram, and 5) Knowledge Management Plan.

42 ENGINEERING↗

Use of Operating Agreements and Energy Storage to Reduce Photovoltaic Interconnection Costs: Technical and Economic Analysis

This report presents an analytical methodology to identify alternative options to manage interconnection costs and streamline interconnection timelines for distribution system-connected photovoltaic (PV) systems not co-located with load. Specifically, the report details the methodology and results of an analysis that: 1. Identifies potential grid violations that would be induced by a PV system requesting interconnection to a distribution circuit; 2. Identifies multiple technically viable options for mitigating the potential violations, including infrastructure upgrades, downsizing the PV system size, curtailment of PV, and addition of battery energy storage; 3. Defines the required technical operating parameters of the system in order to mitigate all potential violations (the "Operating Envelope"); 4. Compares the economics of each option, from the PV developer's perspective. The analysis supports the ongoing evolution of interconnection standards for combined PV and energy storage systems by providing a methodology to define allowable maximum export limits during each hour. The methodology presented could be used by utilities as part of the interconnection study process, to inform negotiations with DER developers and the drafting of mutually acceptable interconnection agreements. The resulting technical operating parameters could be included as part of the interconnection service agreement (ISA) between the system owner and the utility company. The companion report to this analysis, Gill et al. (2022), details the envisioned framework for the implementation of the technical operating parameters.

14 SOLAR ENERGY↗

Semantic Interoperability to Enable Smart, Grid-Interactive Efficient Buildings

Achieving a widespread transition to grid-interactive, efficient buildings (GEBs) depends critically on there being sufficient interoperability among connected building systems. While many critical elements already exist at the technical interoperability level (TCP/IP, BACnet, etc.), a lack of interoperability in the semantic level hinders streamlined integration of interdependent applications. Semantics refers to expressing information about “things” in a way that can be consistently understood by applications. Key components of formalized semantics include identifying what a “thing” is (its “type”), defining general information about that “thing” (its characteristics or properties), and defining the appropriate relationships of that “thing” to other “things” (its function or role in a larger system). Although this might seem initially trivial, the success of smart building applications is highly dependent on maintaining consistent self-descriptive notions of the “things”. Without semantic interoperability, it is technically difficult, labor-intensive, and cost-prohibitive to enable three key objectives of GEBs: optimizing performance, automatically identifying and diagnosing faults, and delivering grid services. Industry, academia, and standards bodies have invested effort in developing information models to facilitate semantic interoperability, however, they have not been widely adopted across the U.S. commercial building portfolio. This paper will present a pathway to drive semantic interoperability through a three-pronged approach to be led by the DOE Building Technologies Office in partnership with NIST and multiple national laboratories comprising: 1) industry engagement and coordination across existing efforts; 2) a semantic interoperability standard that empowers building owners to identify and require interoperable attributes when procuring equipment and applications; 3) tools to assist in implementation and a test framework to verify compliance of products with semantic interoperability specifications. This approach is designed to accelerate the timeline for adoption of semantic interoperability specifications. The intent is to reduce soft costs associated with implementing advanced controls, fault detection and diagnostics, and other smart building technologies and use cases as a necessary step in achieving an energy efficient smart grid future.

Bergmann, Harry↗

Semantic Interoperability to Enable Smart, Grid-Interactive Efficient Buildings

Achieving a widespread transition to grid-interactive, efficient buildings (GEBs) depends critically on there being sufficient interoperability among connected building systems. While many critical elements already exist at the technical interoperability level (TCP/IP, BACnet, etc.), a lack of interoperability in the semantic level hinders streamlined integration of interdependent applications. Semantics refers to expressing information about “things” in a way that can be consistently understood by applications. Key components of formalized semantics include identifying what a “thing” is (its “type”), defining general information about that “thing” (its characteristics or properties), and defining the appropriate relationships of that “thing” to other “things” (its function or role in a larger system). Although this might seem initially trivial, the success of smart building applications is highly dependent on maintaining consistent self-descriptive notions of the “things”. Without semantic interoperability, it is technically difficult, labor-intensive, and cost-prohibitive to enable three key objectives of GEBs: optimizing performance, automatically identifying and diagnosing faults, and delivering grid services. Industry, academia, and standards bodies have invested effort in developing information models to facilitate semantic interoperability, however, they have not been widely adopted across the U.S. commercial building portfolio. This paper will present a pathway to drive semantic interoperability through a three-pronged approach to be led by the DOE Building Technologies Office in partnership with NIST and multiple national laboratories comprising: 1) industry engagement and coordination across existing efforts; 2) a semantic interoperability standard that empowers building owners to identify and require interoperable attributes when procuring equipment and applications; 3) tools to assist in implementation and a test framework to verify compliance of products with semantic interoperability specifications. This approach is designed to accelerate the timeline for adoption of semantic interoperability specifications. The intent is to reduce soft costs associated with implementing advanced controls, fault detection and diagnostics, and other smart building technologies and use cases as a necessary step in achieving an energy efficient smart grid future.

30 DIRECT ENERGY CONVERSION↗

Burning Plasma Science: Long Pulse-Materials and Fusion Nuclear Science (Final Project Report)

The series of International Conferences on Fusion Reactor Materials (ICFRM) has been established nearly forty years ago as the major international forum for exchanging and archiving a growing knowledge based on the development of materials for both near and long-term fusion energy systems. The critical role of materials science and engineering in overcoming the technological challenges to making fusion energy a practical reality has been an overarching theme of invited and contributed oral talks as well as the poster session presentations. ICFRM is the premier international forum connecting specialists in the area of development of materials for both near and longer-term fusion energy systems. A central theme is the sharing of new insights, cutting-edge research, and technology in materials science pertaining to the realization of fusion energy. The conference consists of daily overview plenary lectures, invited and contributed oral presentations, and a series of technical poster sessions. In addition to hosted satellite meetings, pre-conference technical tutorials, and stimulating discussions. The 19th International Conference on Fusion Reactor Materials (ICFRM-19) was held in La Jolla, California, U.S.A. during the period October 27 through November 1, 2019. We describe here the conference background, topics, structure, program, schedule and timeline, publications, venue, satellite meetings, short courses and seminars, and finally the budget and expenses.

36 MATERIALS SCIENCE↗

Automated Target Planning for FUSE Using the SOVA Algorithm

The SOVA algorithm was originally developed under the Resilient Systems and Operations Project of the Engineering for Complex Systems Program from NASA s Aerospace Technology Enterprise as a conceptual framework to support real-time autonomous system mission and contingency management. The algorithm and its software implementation were formulated for generic application to autonomous flight vehicle systems, and its efficacy was demonstrated by simulation within the problem domain of Unmanned Aerial Vehicle autonomous flight management. The approach itself is based upon the precept that autonomous decision making for a very complex system can be made tractable by distillation of the system state to a manageable set of strategic objectives (e.g. maintain power margin, maintain mission timeline, and et cetera), which if attended to, will result in a favorable outcome. From any given starting point, the attainability of the end-states resulting from a set of candidate decisions is assessed by propagating a system model forward in time while qualitatively mapping simulated states into margins on strategic objectives using fuzzy inference systems. The expected return value of each candidate decision is evaluated as the product of the assigned value of the end-state with the assessed attainability of the end-state. The candidate decision yielding the highest expected return value is selected for implementation; thus, the approach provides a software framework for intelligent autonomous risk management. The name adopted for the technique incorporates its essential elements: Strategic Objective Valuation and Attainability (SOVA). Maximum value of the approach is realized for systems where human intervention is unavailable in the timeframe within which critical control decisions must be made. The Far Ultraviolet Spectroscopic Explorer (FUSE) satellite, launched in 1999, has been collecting science data for eight years.[1] At its beginning of life, FUSE had six gyros in two IRUs and four reaction wheels. Over time through various failures, the satellite has been left with one reaction wheel on the vehicle skew axis and two gyros. To remain operational, a control scheme has been implemented using the magnetic torque rods and the remaining momentum wheel.[2] As a consequence, there are attitude regions where there is insufficient torque authority to overcome environmental disturbances (e.g. gravity gradient torques). The situation is further complicated by the fact that these attitude regions shift inertially with time as the spacecraft moves through earth s magnetic field during the course of its orbit. Under these conditions, the burden of planning targets and target-to-target slew maneuvers has increased significantly since the beginning of the mission.[3] Individual targets must be selected so that the magnetic field remains roughly aligned with the skew wheel axis to provide enough control authority to the other two orthogonal axes. If the field moves too far away from the skew axis, the lack of control authority allows environmental torques to pull the satellite away from the target and can potentially cause it to tumble. Slew maneuver planning must factor the stability of targets at the beginning and end, and the torque authority at all points along the slew. Due to the time varying magnetic field geometry relative to any two inertial targets, small modifications in slew maneuver timing can make large differences in the achievability of a maneuver.

Heatwole, Scott↗

Semantic Interoperability to Enable Smart, Grid-Interactive Efficient Buildings

Achieving a widespread transition to grid-interactive, efficient buildings (GEBs) depends critically on there being sufficient interoperability among connected building systems. While many critical elements already exist at the technical interoperability level (TCP/IP, BACnet, etc.), a lack of interoperability in the semantic level hinders streamlined integration of interdependent applications. Semantics refers to expressing information about “things” in a way that can be consistently understood by applications. Key components of formalized semantics include identifying what a “thing” is (its “type”), defining general information about that “thing” (its characteristics or properties), and defining the appropriate relationships of that “thing” to other “things” (its function or role in a larger system). Although this might seem initially trivial, the success of smart building applications is highly dependent on maintaining consistent notions of the “things” being self-descriptive. Without semantic interoperability, it is technically difficult, labor-intensive, and cost-prohibitive to enable three key objectives of GEBs: optimizing performance, identifying faults, and delivering grid services. Industry, academia, and standards bodies have invested effort in developing information models to facilitate semantic interoperability, however, they have not been widely adopted across the U.S. commercial building portfolio. This paper will present a pathway to drive semantic interoperability through a three-pronged approach to be led by the DOE Building Technologies Office in partnership with NIST and multiple national laboratories comprising: 1) industry engagement and coordination across existing efforts; 2) a semantic interoperability standard that empowers building owners to identify and require interoperable attributes when procuring equipment and applications; 3) tools to assist in implementation and a test framework that can verify compliance of products with semantic interoperability specifications. This strategic approach is designed to accelerate the timeline for adoption of semantic interoperability standards. The intent is to reduce soft costs associated with implementing advanced controls, fault detection and diagnostics, and other smart building technologies as a necessary step in achieving an energy efficient smart grid future.

semantic interoperability, Semantic modeling, inte↗

Shuttle orbiter TPS flight repair kit development

The design and application of a TPS repair kit is presented. The repair kit is designed for on orbit use by a crew member working in the manned maneuvering unit (MMU). The kit includes the necessary equipment and materials to accomplish the repair tasks which include the following: HRSI emittance coating repair, damaged tile repair, missing tile repair, and multiple tile repair. Two types of repair materials required to do the small area repair and the large area repair are described. The materials area cure in place, silicone base ablator for small damaged areas and precured ablator tile for repair of larger damaged areas is examined. The cure in place ablator is also used as an adhesive to bond the precured tiles in place. An applicator for the cure in place ablator, designed to contain a two-part silicon compound, mix the two components at correct ratio, and dispense the materials at rates compatible with mission timelines established for the EVA is described.

Source record↗

Implementing Distributed Operations: A Comparison of Two Deep Space Missions

Two very different deep space exploration missions--Mars Exploration Rover and Cassini--have made use of distributed operations for their science teams. In the case of MER, the distributed operations capability was implemented only after the prime mission was completed, as the rovers continued to operate well in excess of their expected mission lifetimes; Cassini, designed for a mission of more than ten years, had planned for distributed operations from its inception. The rapid command turnaround timeline of MER, as well as many of the operations features implemented to support it, have proven to be conducive to distributed operations. These features include: a single science team leader during the tactical operations timeline, highly integrated science and engineering teams, processes and file structures designed to permit multiple team members to work in parallel to deliver sequencing products, web-based spacecraft status and planning reports for team-wide access, and near-elimination of paper products from the operations process. Additionally, MER has benefited from the initial co-location of its entire operations team, and from having a single Principal Investigator, while Cassini operations have had to reconcile multiple science teams distributed from before launch. Cassini has faced greater challenges in implementing effective distributed operations. Because extensive early planning is required to capture science opportunities on its tour and because sequence development takes significantly longer than sequence execution, multiple teams are contributing to multiple sequences concurrently. The complexity of integrating inputs from multiple teams is exacerbated by spacecraft operability issues and resource contention among the teams, each of which has their own Principal Investigator. Finally, much of the technology that MER has exploited to facilitate distributed operations was not available when the Cassini ground system was designed, although later adoption of web-based and telecommunication tools has been critical to the success of Cassini operations.

Cassini Mission↗