Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “design loads”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

Fundamentals of Solar PV Bolted Joint Loosening and Prevention

The photovoltaic (PV) industry has long reported anecdotal accounts of systems exhibiting intermittent or chronic fastener loosening, including joints that fail to maintain preload despite multiple re-tightening attempts. These occurrences are frequently, and often incorrectly, attributed to installer errors, vibration, or loading beyond design expectations (e.g., extreme weather events). Loose fasteners have serious implications and can significantly impact solar PV systems’ performance, reliability, and safety. However, effective bolted joint design and proper assembly practices can mitigate or eliminate loosening. Until the US Department of Energy’s Solar Energy Technologies Office (SETO) funded research on fasteners and solar PV structures, there was a notable gap in understanding the causes of loosening in solar PV systems.

14 SOLAR ENERGY↗

Cybersecurity Workforce Training for SMR Integration into Distribution Grids: A Competency Framework and Containerized Hands-On Lab for the SMR/DER/Microgrid Boundary

Small modular reactors (SMRs) and microreactors are entering the U.S. distribution grid as synchronous generation on feeders designed for loads and inverter-based distributed energy resources (DERs). No existing cybersecurity training program addresses this intersection of nuclear operations, DER management, and operational technology security. As subcontractor to Iowa State University on the CyDERMS Center, Argonne analyzed the relevant standards and training landscape, translated the resulting gaps into a twelve-objective competency framework across distribution-operator and graduate-analyst role tracks, and built a containerized training lab using a ∼400-bus composite grid model behind a realistically simulated Modbus TCP SCADA stack. The analysis isolates the balance-of-plant / energy-management-system (BOP/EMS) boundary as the critical jurisdictional seam where, as of March 2026, neither NRC nor NERC CIP cleanly claims cybersecurity responsibility for distribution-connected SMRs. The framework maps each objective across NIST CSF 2.0, ISA/IEC 62443, NIST NICE Task–Knowledge–Skill statements, and NRC RG 5.71 awareness-and-training controls. The training lab implements operator-recognition assessment scenarios spanning grid-side disturbances and telemetry-layer anomalies.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Development of a CW Superconducting RF Booster Cryomodule for Future Light Sources

Future light sources based on seeded free electron lasers (FEL) have the potential to increase the soft xray flux by several orders of magnitude with short bunch lengths to probe electron structure and dynamics. A low emittance, high rep-rate radio frequency (RF) photocathode electron gun will generate the electron beam that will require very stringent beam control and manipulation through the superconducting linear accelerator to maintain the high brightness required for an x-ray FEL. The initial or booster cavities of the superconducting radio frequency (SRF) linear accelerator will require stringent control of transverse kicks and higher order modes (HOM) during the beam manipulation and conditioning that is needed for emittance exchange and bunch compression. This SBIR proposal will develop, fabricate and test a continuous-wave SRF booster cryomodule specifically for this application. Phase I demonstrated the technical feasibility of the project by completing the preliminary SRF cavity and cryomodule design and its integration into an R&D test stand for beam studies at Lawrence Berkeley National Laboratory (LBNL). The five-cell bulk niobium cavities operate at 750 MHz, and generate 10 MV each with strong HOM damping and special care to eliminate transverse kicks due to couplers. Due to continuous-wave operation at fairly modest beam currents and accelerating gradients the complexity of the two cavity cryomodule is greatly reduced compared to an ILC type system. Phase II will finalize the design, and fabricate and test the booster cryomodule. The cryomodule consists of two five-cell cavities that will accelerate megahertz bunch trains with nano-coulomb charge. The accelerating gradient is a very modest 10 MV/m with peak surface fields of 20 MV/m and 42.6 mT. The cryogenic system operates at 2 K with a design dynamic load of 20 W and total required cryogenic capacity of 45 W. The average beam current of up to 1 mA corresponds to a beam power of 10 kW per 5- cell cavity and will require 20 kW of RF power for transmission, control and regulation. The RF power will be supplied by a commercial tetrode. Cryogenic tests will be carried out at LBNL to make use of their test facilities, cryogenics and laser systems, and for future use with beam. Demonstration of this new type of booster cryomodule will open many new applications of SRF linear accelerators.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Design and construction of coke battery 1A at Radlin coke plant, Poland

In the design and construction of coke battery 1A at Radlin coke plant (Poland), coking of rammed coke with a stationary system was employed for the first time. The coke batteries are grouped in blocks. Safety railings are provided on the coke and machine sides of the maintenance areas.

01 COAL, LIGNITE, AND PEAT↗

Progress report on the NASA V-G/VGH general aviation program

An analysis is presented of 79 000 hours of data obtained from NASA V -G and VGH flight recorders installed on 134 general aviation aircraft engaged in eight types of operations. Information is presented on typical mission characteristics, on airspeed practices, on gust accelerations and derived gust velocities encountered, on maneuver -acceleration experience, and on the initial positive landing-impact accelerations. Comparisons are also made of the actual gust and maneuver loads experienced with the design gust and maneuver loads.

Joseph W. Jewel, Jr.↗

A fuselage/tank structure study for actively cooled hypersonic cruise vehicles: Active cooling system analysis

The effects of fuselage cross section and structural arrangement on the performance of actively cooled hypersonic cruise vehicles are investigated. An active cooling system which maintains the aircraft's entire surface area at temperatures below 394 K at Mach 6 is developed along with a hydrogen fuel tankage thermal protection system. Thermodynamic characteristics of the actively cooled thermal protection systems established are summarized. Design heat loads and coolant flowrate requirements are defined for each major structural section and for the total system. Cooling system weights are summarized at the major component level. Conclusions and recommendations are included.

Stone, J. E.↗

Fatigue crack propagation behavior of the Ni-Ni3Cb eutectic composite

The experimental procedures used in the investigation are considered, taking into account solidification and heat treatment, fatigue testing, questions of test specimen and loading fixture design verification, metallographic techniques, and electron microscopy techniques. Attention is given to the characteristics of the microstructure, aspects of fatigue crack propagation (FCP) in the Ni-Ni3Nb composite, the effect of test variables on FCP, the effect of metallurgical variables on FCP, and fatigue fracture mechanisms. Fractographic and metallographic observations are discussed.

Mills, W. J.↗

Exploratory study of transient upstart phenomena in a three-dimensional fixed-geometry scramjet engine

The structural and thermal design of a hydrogen fueled regeneratively cooled three dimensional fixed geometry scramjet was examined. An exploratory study was conducted at Mach 5.3 in the 7-inch Mach 7 pilot tunnel to investigate the unstart phenomena and to provide the experimental data base required to predict the design pressure loads. The test results indicate that the peak pressures occurred during the transient unstart and not during steady state started or unstarted flow conditions. The local peak pressures can be conservatively predicted by normal shock wave theory as the peak approaches the pressure that would exist behind a stationary normal shock with an upstream Mach number equal to the area weighted local Mach number for the normal started condition.

Wieting, A. R.↗

Subsonic and supersonic longitudinal stability and control characteristics of an aft-tail fighter configuration with cambered and uncambered wings and cambered fuselage

The longitudinal aerodynamic characteristics of a fighter airplane concept has been determined through an investigation over a Mach number range from 0.50 to 2.16. The configuration incorporates a cambered fuselage with a single external compression horizontal ramp inlet, a clipped arrow wing, twin horizontal tails, and a single vertical tail. The wing camber surface was optimized in drag due to lift and was designed to be self trimming at Mach 1.40 and at a lift coefficient of 0.20. The fuselage was cambered to preserve the design wing loadings on the part of the theoretical wing enclosed by the fuselage. An uncambered of flat wing of the same planform and thickness ratio distribution was also tested.

Dollyhigh, S. M.↗

Prop-fan data support study

Updated parametric prop-fan data packages are presented and the rationale used in developing the new prop-fan data is detailed. These data represent Hamilton Standard's projections of prop-fan characteristics for aircraft that are expected to be in-service in the 1985 to 1990 time frame. The basic prop-fan configuration was designed for efficient cruise operation at 0.8 Mach number and 10,668M altitude. The design blade tip speed is 244 mps and the design power loading is 301 KW/M squared.

Baum, J. A.↗

Definition of mutually optimum NDI and proof test criteria for 2219 aluminum pressure vessels. Volume 1: Methods

The requirements for proof testing and nondestructive inspection of aluminum pressure vessels were discussed. The following conclusions are (1) lack-of-fusion weld defects are sufficiently tight in the as-welded condition to be considered undetectable; (2) proof-level loads are required to fully open lack-of-fusion weld defects; (3) significant crack opening occurs at subproof levels so that an inspection enhancement loading treatment designed to avoid catastrophic failure is feasible; (4) currently used proof levels for 2219 pressure vessels are adequate for postproof inspection; (5) quantification of defect size and location using collimated ultrasonic pitch-catch techniques appears sufficiently feasible for tankage to warrant developmental work; (6) for short-time single-cycle pressure-vessel applications, postproof inspection is desirable; and (7) for long-term multiple-cycle pressure-vessel applications, postproof inspection is essential for life assurance.

Schwartzberg, F. R.↗

Feasibility study of aileron and spoiler control systems for large horizontal axis wind turbines

The feasibility of using aileron or spoiler controls as alternates to pitch control for large horizontal axis wind turbines was studied. The NASA Mod-0 100 kw machine was used as the basis for the study. Specific performance studies were conducted for 20% chord ailerons over the outboard 30% span, and for 10% chord spoilers over the same portion of the span. Both control systems utilized control deflections up to 60 deg. Results of the study show that either ailerons or spoilers can provide the control necessary to limit turbine power in high wind conditions. The aileron system, as designed, provides overspeed protection at hurricane wind speeds, low wind speed starting torque of 778 N-m (574 ft. lb) at 3.6 m/sec, and a 1.3 to 1.5% increase in annual energy compared to a fixed pitch rotor. The aileron control system preliminary design study includes aileron loads analysis and the design of a failsafe flyweight actuator for overspeed protection in the event of a hydraulic system failure.

Wentz, W. H., Jr.↗

Mated vertical ground vibration test

The Mated Vertical Ground Vibration Test (MVGVT) was considered to provide an experimental base in the form of structural dynamic characteristics for the shuttle vehicle. This data base was used in developing high confidence analytical models for the prediction and design of loads, pogo controls, and flutter criteria under various payloads and operational missions. The MVGVT boost and launch program evolution, test configurations, and their suspensions are described. Test results are compared with predicted analytical results.

Ivey, E. W.↗

Space Fabrication Demonstration System

The completion of assembly of the beam builder and its first automatic production of truss is discussed. A four bay, hand assembled, roll formed members truss was built and tested to ultimate load. Detail design of the fabrication facility (beam builder) was completed and designs for subsystem debugging are discussed. Many one bay truss specimens were produced to demonstrate subsystem operation and to detect problem areas.

Source record↗

Advanced manufacturing development of a composite empennage component for L-1011 aircraft

Work on process verification and tooling development continued. The cover process development was completed with the decision to proceed with low resin content prepreg material (34 + or - 3% by weight) in the fabrication of production readiness verification test (PRVT) specimens and the full-scale covers. The structural integrity of the cover/joint design was verified with the successful test of the cover attachment to fuselage ancillary test specimen (H25). Failure occurred, as predicted, in the skin panel away from the fuselage joint at 141 percent of the design ultimate load. With the successful completion of the H25 test, the PRVT cover specimens, which are identical to the H25 ancillary test specimen, were cleared for production. Eight of the twenty cover specimens were fabricated and are in preparation for test. All twenty of the PRVT spar specimens were fabricated and also were prepared for test. The environmental chambers used in the durability test of ten cover and ten spar PRVT specimens were completed and installed in the load reaction frames.

Source record↗