Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “dams”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

HEAD INJURY ASSESSMENT IN JUVENILE CHINOOK USING THE ALPHA II-SPECTRIN BIOMARKER: EFFECTS OF PRESSURE CHANGES AND PASSAGE THROUGH A REMOVABLE SPILLWAY WEIR

The cytoskeletal protein alpha II-spectrin has specifi c neurodegenerative mechanisms that allow the necrotic (injury-induced) and apoptotic (non-injury-induced) pathways of proteolysis to be differentiated in an immunoblot. Consequently, αII-spectrin breakdown products (SBDPs) are potential biomarkers for diagnosing traumatic brain injury (TBI). The purpose of the following investigation, consisting of two studies, was to evaluate the utility of the spectrin biomarker in diagnosing TBI in fi sh that travel through hydroelectric dams in the Columbia and Snake Rivers. The fi rst study used hyperbaric pressure chambers to simulate the pressure changes that affect fi sh during passage through a Federal Columbia River Power System (FCRPS) Kaplan turbine. The second study tested the effect of a removable spillway weir (RSW) on the passage of juvenile chinook (Oncorhynchus tshawytscha). This study was conducted in tandem with a balloon-tag study by the U.S. Army Corps of Engineers. Brain samples from fi sh were collected and analyzed using an immunoblot for SBDPs, and imaging software was used to quantify the protein band density and determine the ratio of cleaved protein to total protein. The biomarker analyses found higher SBDP expression levels in fi sh that were exposed to lower pressure nadirs and fi sh that passed through the RSW at a deep orientation. In general, the incidence of injuries observed after treatment positively correlated with expression levels, suggesting that the biomarker method of analysis is comparable to traditional methods of injury assessment. It was also found that, for some treatments, the 110 kDa spectrin fragment (SBDP 110) correlated more strongly with necrotic head injury incidence and mortality rates than did the total cleaved protein or the 120 kDa fragment. These studies will be informative in future decisions regarding the design of turbines and fi sh passage structures in hydroelectric dams and will hopefully contribute to the development of faster and more accurate techniques for diagnosing TBI in fi sh.

Jonason, C↗

Climate Change Impacts to Hydropower Generation in Pacific Northwest River Basins (Final Report)

This is the final technical report describing the research findings for the project, “Climate change impacts to hydropower generation in Pacific Northwest river basins”. The overall objective of the research was to develop a new approach to assess which types of climate changes would adversely affect hydropower production. This research had three major components. First, we conducted a geospatial analysis of the region to identify potential focus basins. We compiled geospatial data on hydropower dam locations, contributing areas to hydropower dams, and climate characteristics in contributing areas. For the potential focus basins identified, we classified these basins by hydrologic regime as snow-dominated, rain-dominated, or mixed. Rain-dominated basins were primarily found in Oregon, with some in western Washington. Most of the basins draining west out of the Cascades in Washington were mixed, whereas most of the potential focus basins in Idaho were snowmelt-dominated. Next, we developed a stochastic conceptual modeling approach in which we stochastically generate a wide range of climate scenarios and use these scenarios to generate time series of reservoir inflows. We developed and applied this modeling approach to the North Fork of the Clearwater River in Idaho. Results showed that increases in temperature in the basin led to decreases in streamflow, even in cases where precipitation increased. Finally, we used the reservoir inflow scenarios from the stochastic conceptual model to force a reservoir operations model for Dworshak reservoir. The wide range of climate scenarios generated by the hydrologic model allowed us to test the sensitivity of reservoir operations objectives to shifts in both temperature and precipitation. Results showed that scenarios with lower inflow had less hydropower generation, but changes in hydropower generation were not always proportional to changes in inflow. Current reservoir operations were better suited to maximize hydropower generation under climate change scenarios with no shift in inflow timing but did not optimize power generation under warming scenarios with earlier snowmelt runoff.

13 HYDRO ENERGY↗

DETERMINATION OF THE DISTRIBUTION AND INVENTORY OF RADIONUCLIDES WITHIN A SAVANNAH RIVER SITE WATERWAY

An investigation was conducted to evaluate the radionuclide inventory within the Lower Three Runs (LTR) Integrator Operable Unit (IOU) at the U.S. Department of Energy’s (DOE’s) Savannah River Site (SRS). The scope of this effort included the analysis of previously existing sampling and analysis data as well as additional streambed and floodplain sampling and analysis data acquired to delineate horizontal and vertical distributions of the radionuclide as part of the ongoing SRS environmental restoration program, and specifically for the LTR IOU program. While cesium-137 (Cs-137) is the most significant and abundant radionuclide associated with the LTR IOU it is not the only radionuclide, hence the scope included evaluating all radionuclides present and includes an evaluation of inventory uncertainty for use in sensitivity and uncertainty analyses. The scope involved evaluation of the radionuclide inventory in the P-Reactor and RReactor cooling water effluent canal systems, PAR Pond (including Pond C) and the floodplain and stream sediment sections of LTR between the PAR Pond Dam and the Savannah River. The approach taken was to examine all of the available Sediment and Sediment/Soil analysis data available along the P- and R-Reactor cooling water re-circulation canal system, the ponds situated along those canal reaches and along the length of LTR below Par Pond dam. By breaking the IOU into a series of sub-components and sub-sections, the mass of contaminated material was estimated and a representative central concentration of each radionuclide was computed for each compartment. The radionuclide inventory associated with each sub-compartment was then aggregated to determine the total radionuclide inventory that represented the full LTR IOU. Of special interest was the inventory of Cs-137 due to its role in contributing to the potential dose to an offsite member of the public. The overall LTR IOU inventory of Cs-137 was determined to be 75.5 Ci, which is similar to two earlier estimates. This investigation provides an independent, ground-up estimate of Cs-137 inventory in LTR IOU utilizing the most recent field data.

54 ENVIRONMENTAL SCIENCES↗

LCOE Uncertainty Analysis for Hydropower using Monte Carlo Simulations

Levelized Cost of Energy (LCOE) is an important metric to evaluate the cost and performance of electricity production generation alternatives, and combined with other measures, can be used to assess the economics of future hydropower development. Multiple assumptions on input parameters are required to calculate the LCOE, which each contain some level of uncertainty, in turn affecting the accuracy of LCOE results. This paper explores these uncertainties, their sources, and ultimately the level of variability they introduce at the screening level of project evaluation for non-powered dams (NPDs) across the U.S.Owing to site-specific differences in site design, the LCOE for hydropower varies significantly from project to project unlike technologies with more standardized configurations such as wind and gas. Therefore, to assess the impact of LCOE input uncertainty on the economics of U.S. hydropower resources, these uncertainties must be modeled across the population of potential opportunities. To demonstrate the impact of uncertainty, resource data from a recent nationwide non-powered dam (NPD) resource assessment (Hadjerioua et al., 2012) and screening-level predictive cost equations (O’Connor et al., 2015) are used to quantify and evaluate uncertainties in project capital and operations & maintenance costs, and generation potential at broad scale. LCOE dependence on financial assumptions is also evaluated on a sensitivity basis to explore ownership/investment implications on project economics for the U.S. hydropower fleet.The results indicate that the LCOE for U.S. NPDs varies substantially. The LCOE estimates for the potential NPD projects of capacity greater than 1 MW range from 40 to 182 $/MWh, with average of 106 $/MWh. 4,000 MW could be developed through projects with individual LCOE values below 100 $/MWh. The results also indicate that typically 90 % of LCOE uncertainty can be attributed to uncertainties in capital costs and energy production; however, for small projects (below 10 MW) O&M uncertainty plays an important role. The potential NPDs have costs with uncertainty bands extending well above 100 $/MWh in some cases. A truly representative evaluation should complement LCOE with an assessment of potential revenues from the provision of ancillary services. Moreover, hydroelectric production is often part of multipurpose water resource projects where other purposes (e.g., irrigation, flood control, navigation, recreation, etc.) also provide value. Neither of these considerations are accounted for LCOE.

Chalise, Dol Raj↗

DEVELOPMENT OF THE PRIEST RAPIDS TURBINE UPGRADE PROJECT

The Priest Rapids Dam is located on the Columbia River and is operated by Public Utility District No. 2 of Grant County, WA (GCPUD). In operation since 1959, GCPUD decided that a major upgrade was necessary. As with other hydroelectric facilities on the Columbia River, improving fish passage at Priest Rapids Dam is of great importance for salmon and steelhead populations in the Pacific Northwest. Consequently, GCPUD established the Priest Rapids Turbine Upgrade Project to extend the life of the units, increase efficiency and power production, and improve fish-passage. The Priest Rapids powerhouse is equipped with 10 vertical Kaplan turbines with runner diameters of 7.21 m operating under net heads varying from 18 m to 27 m. The scope of the project included a design competition involving three turbine manufacturers providing up to two designs for evaluation. Selection of the replacement design was determined by the lowest evaluated price based on model test results conducted at an independent laboratory (Ecole Polytechnique Federale de Lausanne in Lausanne Switzerland) and a biological performance score determined by a newly developed Biological Performance Assessment (BioPA) performed by Pacific Northwest National Laboratory in Richland, WA. In the paper, the hydraulic design challenges are reviewed, in addition to comparisons of designs evaluated during the competitive model test program and biological assessment. The paper also provides a description of the process followed by GCPUD, and how the evaluation criteria influenced the development and the finally selected solution.

CFD↗

Anthropogenic Obstructions to Paddlefish Movement and Migration

Paddlefish Polyodon spathula are behaviorally, morphologically, and physiologically adapted for prolonged free-swimming at moderately high speeds but not for maneuverability which makes them prone to impacts from submerged structures. These structures include low-head dams, weirs, dikes, levees, high-head dams, dredges, diversions, intakes, and vessels. Impacts include blocked migrations, reduced access and quality of habitat, entrainment, impingement, trauma, and stranding. Effects of these impacts on individuals are displacement, injuries, and death; effects on populations are fragmentation, lower gene flow, lower reproductive success, and elevated rate of mortality. Despite this, the status of the Paddlefish in most parts of its historic range is secure. Management techniques, like stocking and habitat restoration, are typically implemented at the local level but appear effective at conserving the species range wide. Refinement of management techniques, however, is still possible by modifying operations of structures and by rescuing stranded Paddlefish.

Hoover, Jan Jeffrey↗

Evaluating Future US Hydropower Opportunities

Uncertainties, and a lack of confidence regarding issues, such as water availability/storage capacities and operational constraints, can be major obstacles in assessing the range of future opportunities for existing dams, which are certainly substantial. The authors discuss specific challenges facing current infrastructure and water resource data analysis that can inhibit large-scale evaluation of potential hydro development at existing dams. Recent advances in data and tools that may address these challenges are introduced.

13 HYDRO ENERGY↗

Hydropower Role in a Power Grid with a High Proportion of Variable Renewables

The importance of hydropower increases as the power grid evolves with the higher variable renewable contribution. As conventional thermal power plants are retired, the importance of hydropower contribution increases to balance the variability of solar and wind generation. However, reservoir water resources are constrained by multiple constraints, and variability of water inflow to the reservoirs creates limitations to dam water releases for power grid needs. Coordination of multiple tools, including water resources modeling, ecological modeling, and technical and economic power grid modeling, informs dam water releases. Better representation of ecological constraints and other water use details in the suit of power grid models are required to identify the hydropower flexibility to provide multiple power grid services. Impacts of water planning and hydropower operation changes to a power grid are better understood by production cost model simulations with technical and economic data, including unserved energy, reserve failures, transmission congestion to serve load, and local marginal price increases. Similarly, PCM simulation of current and future projected power grid information, including LMP, and carbon emission rates, informs short-term water release plans and long-term investments for power plant upgrades for technical and ecological needs. Hydropower operations of several case studies are simulated to understand operation patterns, revenue, water release decisions in multiple time scales (month, day, minutes), hydropower contracts scheduling, and water variability impacts.

environmental↗

Hydropower Resilience Database for Assessing Microgrid Formation Capability and Enhancing Power Grid Resilience

In the face of increasing frequency of extreme events, enhancing resilience and reliability of energy infrastructure demands innovative solutions. Hydropower, with its inherent generation flexibility and grid-forming capability, offers significant potential for enhancing power grid resilience through the establishment of microgrids. To enable informed decision-making and strategic planning, we present the Hydropower Resilience Database (HRD) that integrates data from various sources such as Oakridge National Laboratory (ORNL) HydroSource, National Inventory of Dams, and US Western Grid database. By integrating relevant information on hydropower plant characteristics, including dams, reservoirs, and connected electrical grid, this resource enables hydropower plant owners, utilities, and community stakeholders to identify and evaluate the feasibility of using hydropower resources in microgrids to support nearby communities and critical infrastructure in various challenging scenarios. Using HRD, a set of metrics are evaluated to quantify the capability of hydropower plants to support essential microgrid functions. An interactive tool is developed using ArcGIS, enabling the visualization and analysis using HRD. Our research contributes to strategic planning efforts for fortifying energy infrastructure, ensuring reliable power supply during disruptions, and advancing the development of robust and resilient energy systems in regions susceptible to grid vulnerabilities.

13 HYDRO ENERGY↗

Hydropower Resilience Database for Assessing Microgrid Formation Capability and Enhancing Power Grid Resilience

In the face of increasing frequency of extreme events, enhancing resilience and reliability of energy infrastructure demands innovative solutions. Hydropower, with its inherent generation flexibility and grid-forming capability, offers significant potential for enhancing power grid resilience through the establishment of microgrids. To enable informed decision-making and strategic planning, we present the Hydropower Resilience Database (HRD) that integrates data from various sources such as Oakridge National Laboratory (ORNL) HydroSource, National Inventory of Dams, and US Western Grid database. By integrating relevant information on hydropower plant characteristics, including dams, reservoirs, and connected electrical grid, this resource enables hydropower plant owners, utilities, and community stakeholders to identify and evaluate the feasibility of using hydropower resources in microgrids to support nearby communities and critical infrastructure in various challenging scenarios. Using HRD, a set of metrics are evaluated to quantify the capability of hydropower plants to support essential microgrid functions. An interactive tool is developed using ArcGIS, enabling the visualization and analysis using HRD. Our research contributes to strategic planning efforts for fortifying energy infrastructure, ensuring reliable power supply during disruptions, and advancing the development of robust and resilient energy systems in regions susceptible to grid vulnerabilities.

13 HYDRO ENERGY↗

Risk-Based Remediation Approach for Cs-137 Contaminated Sediment/Soils at the Savannah River Site (SRS) Lower Three Runs Tail (U) - 13348 - SRNS-RP-2012-00546

Lower Three Runs is a large blackwater stream that runs through the eastern and southern portion of the Savannah River Site. The Lower Three Runs watershed includes two SRS facility areas: P Area (P Reactor) and R Area (R Reactor) that provided effluent discharges to Lower Three Runs. During reactor operations, effluent discharges were well above natural (pre-industrial) or present day stream discharges. The watershed contains a 2,500-acre mainstream impoundment (PAR Pond), several smaller pre-cooler ponds, and a canal system that connects the pre-cooler ponds and discharges surface water to PAR Pond. From the PAR Pond dam, Lower Three Runs flows approximately 36 kilometers braiding through bottom-land/flood-plain forests before it enters the Savannah River. About eight kilometers downstream from the PAR Pond dam, the SRS boundary narrows (termed the Lower Three Runs tail) providing a limited buffer of DOE property for the Lower Three Runs stream and associated flood-plain. Previous screening characterization efforts revealed Cs-137 contamination in the sediment/soils of the flood-plain. As a part of the American Recovery and Reinvestment Act stimulus package, a comprehensive characterization effort was executed on the sediment/soils of the Lower Three Runs tail flood-plain providing a comprehensive look at the contaminant signature of the area. As a follow-up to that characterization, a regulatory decision Core Team, comprised of members of the South Carolina Department of Health and Environmental Control, Environmental Protection Agency - Region IV, and DOE, conducted negotiations on a risk-based approach to address the level of contamination found in the tail flood-plain as an early action that provided a long-term solution to exposure scenarios. For evaluation purposes, the adolescent trespasser was selected as the most likely human receptor for the Lower Three Runs tail portion because of the natural attractiveness of the area for recreational activities (i.e., hunting, fishing, hiking etc.) and access from public property. Exposure of the adolescent trespasser to Cs-137 contaminated sediment/soil at concentrations greater than 23.7 pico curies per gram have been calculated to result in an unacceptable cancer risk (> 1 x 10{sup -4}). Comparing the characterization sampling results conducted in 2009 with the benchmark concentration of 23.7 pCi/g, identified elevated risk levels along three sampling areas in the Lower Three Runs tail portion. On January 5, 2012, it was agreed by the core team that a Removal Action in the Lower Three Runs tail was to be conducted for the identified soil/sediment locations in the three identified areas that exceed the 1 x 10{sup -4} risk (23.7 pCi/g) for the adolescent trespasser receptor. The addition of Land Use Controls following the Removal Action was appropriate to protect human health and the environment. A systematic screening matrix was initiated at the identified hot spots (i.e., sampling points with Cs-137 activities greater than 23.7 pCi/g) to identify the limits of the excavation area. Sediment/soil within the defined removal areas would be excavated to the depth necessary to achieve the cleanup goal and disposed of in a CERCLA Off-Site Rule approved disposal facility. It was agreed that this removal action would adequately reduce the volume of available Cs-137 in the Lower Three Runs tail and consequently residual activities of the Cs-137 would decay over time reducing the amount of Cs-137 available in the tail which would curtail risk. The Land Use Controls consist of installation of an additional seven miles of fencing at major road crossings, utility easements, and at areas that showed a higher probability of access. In addition, signs were placed along the entire SRS perimeter of the Lower Three Runs tail approximately every 200 feet. Sign posts included both a No Trespassing sign and a Contaminant Warning sign. The project initiated a subcontract for both the removal action and the installation of fencing and signs on May 1, 2012. All field activities were completed by July 26, 2012. The project excavated and disposed of over 2700 cubic yards of contaminated sediment/soil, erected approximately seven miles of fence and placed over 2,000 signs demonstrating DOE's commitment to protect human health and act as a good neighbor to residents in the area. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Topography-based Flood Planning and Optimization Capability Development Report

Globally, water-related disasters are among the most frequent and costly natural hazards. Flooding inflicts catastrophic damage on critical infrastructure and population, resulting in substantial economic and social costs. NISAC is developing LeveeSim, a suite of nonlinear and network optimization models, to predict optimal barrier placement to protect critical regions and infrastructure during flood events. LeveeSim currently includes a high-performance flood model to simulate overland flow, as well as a network optimization model to predict optimal barrier placement during a flood event. The LeveeSim suite models the effects of flooding in predefined regions. By manipulating a domain’s underlying topography, developers altered flood propagation to reduce detrimental effects in areas of interest. This numerical altering of a domain’s topography is analogous to building levees, placing sandbags, etc. To induce optimal changes in topography, NISAC used a novel application of an optimization algorithm to minimize flooding effects in regions of interest. To develop LeveeSim, NISAC constructed and coupled hydrodynamic and optimization algorithms. NISAC first implemented its existing flood modeling software to use massively parallel graphics processing units (GPUs), which allowed for the simulation of larger domains and longer timescales. NISAC then implemented a network optimization model to predict optimal barrier placement based on output from flood simulations. As proof of concept, NISAC developed five simple test scenarios, and optimized topographic solutions were compared with intuitive solutions. Finally, as an early validation example, barrier placement was optimized to protect an arbitrary region in a simulation of the historic Taum Sauk dam breach.

42 ENGINEERING↗

Toward a Resilient Cybersecure Hydropower Fleet: Cybersecurity Landscape and Roadmap 2021

With this roadmap, Pacific Northwest National Laboratory (PNNL) hopes to assist the U.S. Department of Energy’s (DOE’s) Water Power Technologies Office (WPTO) in improving the cybersecurity of hydropower plants across the nation. This effort draws upon collected data from the dams sector, from industrial control system cybersecurity threat reports, from similar work focused on neighboring sectors, and from frank discussions with owners, operators, and vendors. While remaining tightly focused on the needs of hydropower projects, during this landscape study and development of the resulting roadmap, the research team sought to remain informed by the larger energy sector’s vision and direction so that the topics and milestones may fit within a larger vision common to the whole.

13 HYDRO ENERGY↗

Environmental Issues Related to Conventional Hydropower

Hydropower is the largest renewable electrical energy source in the world and has a total global capacity of approximately 1,010 GW from 150 countries. Although hydropower has many environmental advantages, hydropower dams have potential adverse ecological impacts such as fish passage, water quality, and habitat alterations.

dams↗

Carbon dynamics of river corridors and the effects of human alterations

Research in stream metabolism, gas exchange, and sediment dynamics indicates that rivers are an active component of the global carbon cycle and that river form and process can influence partitioning of terrestrially derived carbon among the atmosphere, geosphere, and ocean. Here we develop a conceptual model of carbon dynamics (inputs, outputs, and storage of organic carbon) within a river corridor, which includes the active channel and the riparian zone. The exchange of carbon from the channel to the riparian zone represents potential for storage of transported carbon not included in the “active pipe” model of organic carbon (OC) dynamics in freshwater systems. The active pipe model recognizes that river processes influence carbon dynamics, but focuses on CO2 emissions from the channel and eventual delivery to the ocean. We also review how human activities directly and indirectly alter carbon dynamics within river corridors. We propose that dams create the most significant alteration of carbon dynamics within a channel, but that alteration of riparian zones, including the reduction of lateral connectivity between the channel and riparian zone, constitutes the most substantial change of carbon dynamics in river corridors. We argue that the morphology and processes of a river corridor regulate the ability to store, transform, and transport OC, and that people are pervasive modifiers of river morphology and processes. The net effect of most human activities, with the notable exception of reservoir construction, appears to be that of reducing the ability of river corridors to store OC within biota and sediment, which effectively converts river corridors to OC sources rather than OC sinks. We conclude by summarizing knowledge gaps in OC dynamics and the implications of our findings for managing OC dynamics within river corridors.

54 ENVIRONMENTAL SCIENCES↗

A Cloud-Based Decision Support System Framework for Hydropower Biological Evaluation

Hydropower has become one of the most important energy sources: it accounts for more than 80% of the world’s renewable energy and about 16% of all the energy in the world. Significantly more hydropower capacity is planned to be developed. However, hydro-structures, including powered dams, may have adverse biological effects on fishes, especially on migrating fish. For instance, fish can be injured or even killed when they pass through turbines. This is why biological evaluations on hydro-structures are greatly needed to estimate fish injury and mortality rates. The Hydropower Biological Evaluation Toolset (HBET) is an integrated suite of science-based desktop tools designed to evaluate whether the hydraulic conditions of hydropower structures are fish friendly by analyzing collected data and providing estimated injury and mortality rates. Sensor Fish, a small, autonomous sensor package, is used by HBET to record data describing the conditions that live fish passing through a hydropower structure will face. In this paper, we incorporated cloud computing into HBET, and migrated it into a cloud-based decision support system framework for hydropower biological evaluation. This will make the evaluation systems more scalable and flexible; however, this also introduces a significant challenge: how to maintain the security while retaining scalability and flexibility. We discuss the technical methodologies and algorithms implemented in the proposed framework, and analyze the countermeasures implemented therein.

Decision Support System, Hydropower, Dam, Fish Inj↗

Scientific aspects of hydraulic engineering in the Extreme North

Information relative to participation of the B. E. Vedeneev All-Russian Scientific-Research Institute of Hydraulic Engineering (VNIIG im. B. E. Vedeneeva) in the solution of problems of scientific verification of the design, construction, and operation of water-development works in regions of the Extreme North are presented. Basic characteristics of changes in the technical condition of high rock-and-earthfill dams, and the conditions under which their safety is ensured for long-term service in these regions are examined.

42 ENGINEERING↗