Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Workload management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

679 records · Page 38

Electronic Out-fall Inspection Application - 12007

In early 2009 an exciting opportunity was presented to the Geographic Information Systems (GIS) team at the Savannah River Site (SRS). The SRS maintenance group was directed to maintain all Out-falls on Site, increasing their workload from 75 to 183 out-falls with no additional resources. The existing out-fall inspection system consisted of inspections performed manually and documented via paper trail. The inspections were closed out upon completion of activities and placed in file cabinets with no central location for tracking/trending maintenance activities. A platform for meeting new improvements required for documentation by the Department of Health and Environmental Control (DHEC) out-fall permits was needed to replace this current system that had been in place since the 1980's. This was accomplished by building a geographically aware electronic application that improved reliability of site out-fall maintenance and ensured consistent standards were maintained for environmental excellence and worker efficiency. Inspections are now performed via tablet and uploaded to a central point. Work orders are completed and closed either in the field using tablets (mobile application) or in their offices (via web portal) using PCs. And finally completed work orders are now stored in a central database allowing trending of maintenance activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Controller Inhibition of Automated Conflict Resolutions in a Maximum NextGen Condition

With the continued projection of increases in air traffic density, operations in the National Airspace System are expected to exceed human capabilities in the near future. In order to address the bottleneck of human workload capacity, highly automated safety-critical systems are under development to support air traffic controllers. A human-in-the-loop experiment examined controllers transition through four NextGen automation stages: Current-Day, Minimum, Moderate, and Maximum. Maximum NextGen simulated a fully automated environment where the automation was responsible for detecting and resolving conflicts within simulation parameters in high-density airspace. By allocating these tasks to the automation, the controllers task changed. The human moved to primarily a supervisory position- typically only regaining control over separation assurance tasks during conflict situations deferred by the automation. While tasks were allocated a-priori between the controller and automated agent, controllers maintained authority to inhibit the automation from interacting with particular aircraft. Preliminary work is complete, where significant differences were found in inhibition frequency between simulation participants. However, the contexts in which the controllers inhibited the automation, and their reasons for doing so, remain unclear. This analysis attempts to identity factors contributing to human controllers inhibition of the automation in the Maximum NextGen condition.

adaptable automation↗

A survey and taxonomy on energy efficient resource allocation techniques for cloud computing systems

In a cloud computing paradigm, energy efficient allocation of different virtualized ICT resources (servers, storage disks, and networks, and the like) is a complex problem due to the presence of heterogeneous application (e.g., content delivery networks, MapReduce, web applications, and the like) workloads having contentious allocation requirements in terms of ICT resource capacities (e.g., network bandwidth, processing speed, response time, etc.). Several recent papers have tried to address the issue of improving energy efficiency in allocating cloud resources to applications with varying degree of success. However, to the best of our knowledge there is no published literature on this subject that clearly articulates the research problem and provides research taxonomy for succinct classification of existing techniques. Hence, the main aim of this paper is to identify open challenges associated with energy efficient resource allocation. In this regard, the study, first, outlines the problem and existing hardware and software-based techniques available for this purpose. Furthermore, available techniques already presented in the literature are summarized based on the energy-efficient research dimension taxonomy. The advantages and disadvantages of the existing techniques are comprehensively analyzed against the proposed research dimension taxonomy namely: resource adaption policy, objective function, allocation method, allocation operation, and interoperability.

Cloud computing↗

Effects of adaptive task allocation on monitoring of automated systems

The effects of adaptive task allocation on monitoring for automation failure during multitask flight simulation were examined. Participants monitored an automated engine status task while simultaneously performing tracking and fuel management tasks over three 30-min sessions. Two methods of adaptive task allocation, both involving temporary return of the automated engine status task to the human operator ("human control"), were examined as a possible countermeasure to monitoring inefficiency. For the model-based adaptive group, the engine status task was allocated to all participants in the middle of the second session for 10 min, following which it was again returned to automation control. The same occurred for the performance-based adaptive group, but only if an individual participant's monitoring performance up to that point did not meet a specified criterion. For the nonadaptive control groups, the engine status task remained automated throughout the experiment. All groups had low probabilities of detection of automation failures for the first 40 min spent with automation. However, following the 10-min intervening period of human control, both adaptive groups detected significantly more automation failures during the subsequent blocks under automation control. The results show that adaptive task allocation can enhance monitoring of automated systems. Both model-based and performance-based allocation improved monitoring of automation. Implications for the design of automated systems are discussed.

Task Performance and Analysis↗

Lunar Terrain Vehicle (LTV) Remote Teleoperation Studies Under Four Lunar Communication Latencies

Remotely operating a lunar rover from Earth while subject to an Earth-Moon time delay of multiple seconds could result in a dangerous state where the roving vehicle is either damaged or lost, thereby potentially compromising an entire mission or series of missions. Providing the right capabilities to the remote operator to manage inherent communication latencies will be important for remote driving to be successful. The National Aeronautics and Space Administration (NASA) conducted two studies to investigate the average speed and number of kilometers per day that an operator on Earth could teleoperate a notional Artemis unpressurized rover with minimal remote operator capabilities under 0- and 4-second communication delays (April 2023 study) and 6- and 8-second delays (August 2023 study). A primary goal of these studies was to understand if an Artemis Lunar Terrain Vehicle (LTV) could cover 6 kilometers (km) in 24 hours when operated remotely. During the April 2023 evaluation, eight test operators used an in-house simulation of the lunar surface South Pole to teleoperate a NASA government reference LTV. Each operator received approximately 30 minutes of remote driving familiarization/training prior to their test run. Operators viewed the surrounding terrain via a single, rover mast-mounted, high-resolution camera with pan/tilt/zoom capabilities; continuous communication was provided throughout all testing. In the August 2023 evaluation, remote operators received approximately 3 hours of familiarization training in each latency, and the simulation environment provided remote operators with an operator-selected rate limiter to enable finer sensitivity in the hand controller and a predictive circle function to better assist operators with predicting the path the vehicle could take. All test operators were able to successfully navigate and drive through six different types of terrain and five planned traverse scenarios using natural lighting under all communication delays. Results for average speeds for each communication delay, computed by averaging the data from all test conditions for that latency and all operators, are shown in the table below. The average speed data was then used to derive the total time needed to cover 6 km, 8 km, and 20 km. Remote operators drove slower and used the brake more frequently when subject to a communication latency as opposed to no communication latency. Subjective workload assessments revealed that while operating in a latency the overall workload significantly increased when compared to a 0-s delay with mental demand, frustration, and performance being the primary contributing factors. Driving strategies in the 0-s delay did not vary significantly among subjects; however, in the 4-s delay condition, three different driving strategies were identified. In the 6-s and 8-s latency conditions the operator’s use of the cruise control to maintain speed was more apparent. Additionally, over the course of the August study, the operator took advantage of the predictive circle indicator on the navigation display and over 95% of the operator’s navigation used the mast camera 180-degree panning function for ground truthing in terms of boulders and craters. Operators started to define more specific parameters in driving strategies for general operations. This consisted of setting the vehicle into a low-speed cruise mode of approximately 1–1.5 kph and noticing driving performance of the vehicle seemed to be much harder at slower speeds 0.4–0.8 kph; however, the vehicle was more responsive at speeds of 2.9–3.6 kph. Regardless of communication delay, operators used both the horizontal translation rails and the vehicle fenders as guides to predict a path for the vehicle through heavily concentrated terrain features. Test operators acknowledged that the teleoperations training for this study was substantially less than what an actual LTV remote operator will ultimately receive. They estimated a minimum of 20 to 100 hours spread across multiple days and weeks (e.g., strategies included immersion training over a 3-day period, to a short 8-week starter program) would be needed to get an operator ~ 60% proficient (i.e., able to complete a subset of remote driving tasks), to a yearlong program for full proficiency in remote driving tasks under all terrain types and natural lighting conditions. Remotely operating a vehicle on another planetary body while subject to communication latency is a complex task. Speed, distance covered, time spent driving, time spent navigating, brake usage and rock contacts are all affected by operator workload, driving strategies, workstation ergonomics and training. These studies provided a “firstlook” answer to a potential system requirement (namely if a remote operator could cover a given distance in a given amount of time); however, considerable general knowledge was gained to begin to understand what it will take to make a successful lunar rover teleoperator.

LTV↗

Lunar Terrain Vehicle (LTV) Remote Teleoperation Studies Under Four Lunar Communication Latencies

Remotely operating a lunar rover from Earth while subject to an Earth-Moon time delay of multiple seconds could result in a dangerous state where the roving vehicle is either damaged or lost, thereby potentially compromising an entire mission or series of missions. Providing the right capabilities to the remote operator to manage inherent communication latencies will be important for remote driving to be successful. NASA conducted two studies to investigate the average speed and number of kilometers per day that an operator on Earth could teleoperate a notional Artemis unpressurized rover with minimal remote operator capabilities under 0- and 4-second communication delays (April 2023 study) and 6- and 8-second delays (August 2023 study). A primary goal of these studies was to understand if an Artemis Lunar Terrain Vehicle (LTV) could cover 6 kilometers (km) in 24 hours when operated remotely. During the April 2023 evaluation, eight test operators used an in-house simulation of the lunar surface South Pole to teleoperate a NASA government reference LTV. Each operator received approximately 30 minutes of remote driving familiarization/training prior to their test run. Operators viewed the surrounding terrain via a single, rover mast-mounted, high-resolution camera with pan/tilt/zoom capabilities; continuous communication was provided throughout all testing. In the August 2023 evaluation, remote operators received approximately 3 hours of familiarization training in each latency, and the simulation environment provided remote operators with an operator-selected rate limiter to enable finer sensitivity in the hand controller and a predictive circle function to better assist operators with predicting the path the vehicle could take. All test operators were able to successfully navigate and drive through six different types of terrain and five planned traverse scenarios using natural lighting under all communication delays. Results for average speeds for each communication delay, computed by averaging the data from all test conditions for that latency and all operators, are shown in the table below. The average speed data was then used to derive the total time needed to cover 6 km, 8 km, and 20 km (distances relevant to LTV-SYS071 and -029 requirements). Remote operators drove slower and used the brake more frequently when subject to a communication latency as opposed to no communication latency. Subjective workload assessments revealed that while operating in a latency the overall workload significantly increased when compared to a 0-s delay with mental demand, frustration, and performance being the primary contributing factors. Driving strategies in the 0-s delay did not vary significantly among subjects; however, in the 4-s delay condition, three different driving strategies were identified. In the 6-s and 8-s latency conditions the operator’s use of the cruise control to maintain speed was more apparent. Additionally, over the course of the August study, the operator took advantage of the predictive circle indicator on the navigation display and over 95% of the operator’s navigation used the mast camera 180-degree panning function for ground truthing in terms of boulders and craters. Operators started to define more specific parameters in driving strategies for general operations. This consisted of setting the vehicle into a low-speed cruise mode of approximately 11.5 kph and noticing driving performance of the vehicle seemed to be much harder at slower speeds 0.4–0.8 kph; however, the vehicle was more responsive at speeds of 2.9–3.6 kph. Regardless of communication delay, operators used both the horizontal translation rails and the vehicle fenders as guides to predict a path for the vehicle through heavily concentrated terrain features. Test operators acknowledged that the teleoperations training for this study was substantially less than what an actual LTV remote operator will ultimately receive. They estimated a minimum of 20 to 100 hours spread across multiple days and weeks (e.g., strategies included immersion training over a 3-day period, to a short 8-week starter program) would be needed to get an operator ~ 60% proficient (i.e., able to complete a subset of remote driving tasks), to a yearlong program for full proficiency in remote driving tasks under all terrain types and natural lighting conditions. Remotely operating a vehicle on another planetary body while subject to communication latency is a complex task. Speed, distance covered, time spent driving, time spent navigating, brake usage and rock contacts are all affected by operator workload, driving strategies, workstation ergonomics and training. These studies provided a “first-look” answer to a potential system requirement (namely if a remote operator could cover a given distance in a given amount of time); however, considerable general knowledge was gained to begin to understand what it will take to make a successful lunar rover teleoperator.

LTV↗

High Performance Computing Facility Operational Assessment 2015: Oak Ridge Leadership Computing Facility

Oak Ridge National Laboratory’s (ORNL’s) Leadership Computing Facility (OLCF) continues to surpass its operational target goals: supporting users; delivering fast, reliable systems; creating innovative solutions for high-performance computing (HPC) needs; and managing risks, safety, and security aspects associated with operating one of the most powerful computers in the world. The results can be seen in the cutting-edge science delivered by users and the praise from the research community. Calendar year (CY) 2015 was filled with outstanding operational results and accomplishments: a very high rating from users on overall satisfaction that ties the highest-ever mark set in CY 2014; the greatest number of core-hours delivered to research projects; the largest percentage of capability usage since the OLCF began tracking the metric in 2009; and success in delivering on the allocation of 60, 30, and 10% of core hours offered for the INCITE (Innovative and Novel Computational Impact on Theory and Experiment), ALCC (Advanced Scientific Computing Research Leadership Computing Challenge), and Director’s Discretionary programs, respectively. These accomplishments, coupled with the extremely high utilization rate, represent the fulfillment of the promise of Titan: maximum use by maximum-size simulations. The impact of all of these successes and more is reflected in the accomplishments of OLCF users, with publications this year in notable journals Nature, Nature Materials, Nature Chemistry, Nature Physics, Nature Climate Change, ACS Nano, Journal of the American Chemical Society, and Physical Review Letters, as well as many others. The achievements included in the 2015 OLCF Operational Assessment Report reflect first-ever or largest simulations in their communities; for example Titan enabled engineers in Los Angeles and the surrounding region to design and begin building improved critical infrastructure by enabling the highest-resolution Cybershake map for Southern California to date. The Titan system provides the largest extant heterogeneous architecture for computing and computational science. Usage is high, delivering on the promise of a system well-suited for capability simulations for science. This success is due in part to innovations in tracking and reporting the activity on the compute nodes, and using this information to further enable and optimize applications, extending and balancing workload across the entire node. The OLCF continues to invest in innovative processes, tools, and resources necessary to meet continuing user demand. The facility’s leadership in data analysis and workflows was featured at the Department of Energy (DOE) booth at SC15, for the second year in a row, highlighting work with researchers from the National Library of Medicine coupled with unique computational and data resources serving experimental and observational data across facilities. Effective operations of the OLCF play a key role in the scientific missions and accomplishments of its users. Building on the exemplary year of 2014, as shown by the 2014 Operational Assessment Report (OAR) review committee response in Appendix A, this OAR delineates the policies, procedures, and innovations implemented by the OLCF to continue delivering a multi-petaflop resource for cutting-edge research. This report covers CY 2015, which, unless otherwise specified, denotes January 1, 2015, through December 31, 2015.

97 MATHEMATICS AND COMPUTING↗

Modeling Framework for Data Center

This chapter highlights the critical need for advanced modeling of data centers due to their rapidly increasing energy consumption and impact on grid reliability. Driven by the demand for AI applications, data centers are projected to consume a significant portion of US energy by 2028, putting stress on an already challenged power grid. The chapter emphasizes the importance of "fast" time-scale models to understand the dynamic interactions between data centers and the grid, especially given the rapid power fluctuations of AI workloads. It outlines a modeling framework that includes both offline and real-time EMT domain simulations, detailing the necessary representations for various components like utility interfaces, transformers, IT loads, UPS, cooling loads, Battery Energy Storage Systems (BESS), generators, protection systems, and higher-level control systems. While standard simulation tools like PSCAD offer basic models, custom development is often required to accurately capture the unique and fast-changing behaviors of modern data centers. The chapter also discusses key metrics and test cases for validating these models, focusing on transient load responses, protection relay coordination, and demand flexibility. Finally, it addresses the challenges of modeling large-scale data centers, such as computational complexity and the trade-off between model fidelity and practicality, suggesting hybrid modeling approaches as a solution. The overarching goal is to create a robust framework that helps assess data center impacts on grid stability, identify vulnerabilities, and inform the development of standards for reliable integration of these large loads into the bulk power system.

25 ENERGY STORAGE↗

Evaluation of Multiple Flow Constrained Area Capacity Setting Methods for Collaborative Trajectory Options Program

The purpose of this study was to compare flow constrained area (FCA) capacity setting methods for Collaborative Trajectory Options Program (CTOP) as they pertain to the Integrated Demand Management (IDM) concept. IDM uses flow balancing to manage air traffic across multiple FCAs with a common downstream constraint, as well as constraints at the respective FCA locations. FCA capacity rates can be set manually, but generating capacities for multiple, interdependent FCAs could potentially over-burden a user. A new enhancement to CTOP called the FCA Balance Algorithm (FBA) was developed at NASA Ames Research Center to improve the process of allocating capacity across multiple flow constrained segments in the airspace. The FBA evaluates the predicted demand and capacity across multiple FCAs and dynamically generates capacity settings for the FCAs that best meet capacity limits for all identified constraints. In a human-in-the-loop simulation study, both manual and automated capacity setting methods were evaluated in terms of their overall feasibility using measures of system performance, human performance, and qualitative feedback. Subject matter experts were asked to use three different methods to allocate capacity to three FCAs, either (1) by manually setting capacity for every 60-minute time window, (2) by manually setting capacity for every 15-minute time window, or (3) by using the FBA capability to automatically generate capacity settings. Results showed no significant differences in terms of overall system performance, indicated by similar ground delay and airport throughput numbers between methods. However, differences in individual strategies afforded by the manual methods allowed some participants to achieve system-wide delay that was much lower than the average. The FBA was the fastest method of capacity setting, and it received the lowest subjective rating scores on physical task load, mental task load, task difficulty and task complexity out of the three methods. Finally, participants explained through qualitative feedback that there were many benefits to using the FBA, such as ease of use, accuracy, and low risk of human input error. Participants did not experience the same limitations with the FBA that they did with the manual methods, such as reduced accuracy in the 60-minute manual condition, or high complexity in the 15-minute/manual condition. These results suggest that the FBA automation enhancement to CTOP maintains system performance while improving human performance. Therefore, the FBA could be introduced as a way to mitigate operator workload while planning a CTOP.

NextGen↗

Evaluation of Multiple Flow Constrained Area Capacity Setting Methods for Collaborative Trajectory Options Program

The purpose of this study was to compare flow constrained area (FCA) capacity setting methods for Collaborative Trajectory Options Program (CTOP) as they pertain to the Integrated Demand Management (IDM) concept. IDM uses flow balancing to manage air traffic across multiple FCAs with a common downstream constraint, as well as constraints at the respective FCA locations. FCA capacity rates can be set manually, but generating capacities for multiple, interdependent FCAs could potentially over-burden a user. A new enhancement to CTOP called the FCA Balance Algorithm (FBA) was developed at NASA Ames Research Center to improve the process of allocating capacity across multiple flow constrained segments in the airspace. The FBA evaluates the predicted demand and capacity across multiple FCAs and dynamically generates capacity settings for the FCAs that best meet capacity limits for all identified constraints. In a human-in-the-loop simulation study, both manual and automated capacity setting methods were evaluated in terms of their overall feasibility using measures of system performance, human performance, and qualitative feedback. Subject matter experts were asked to use three different methods to allocate capacity to three FCAs, either (1) by manually setting capacity for every 60-minute time window, (2) by manually setting capacity for every 15-minute time window, or (3) by using the FBA capability to automatically generate capacity settings. Results showed no significant differences in terms of overall system performance, indicated by similar ground delay and airport throughput numbers between methods. However, differences in individual strategies afforded by the manual methods allowed some participants to achieve system-wide delay that was much lower than the average. The FBA was the fastest method of capacity setting, and it received the lowest subjective rating scores on physical task load, mental task load, task difficulty and task complexity out of the three methods. Finally, participants explained through qualitative feedback that there were many benefits to using the FBA, such as ease of use, accuracy, and low risk of human input error. Participants did not experience the same limitations with the FBA that they did with the manual methods, such as reduced accuracy in the 60-minute manual condition, or high complexity in the 15-minute/manual condition. These results suggest that the FBA automation enhancement to CTOP maintains system performance while improving human performance. Therefore, the FBA could be introduced as a way to mitigate operator workload while planning a CTOP.

NextGen↗

Human Thermal Assessment of Traverse and Geology Task Iterations During Simulated Lunar Extravehicular Activity

Spacewalks or extravehicular activities (EVA) in microgravity are mentally and physically demanding. Current microgravity EVAs are predominantly focused on upper body tasks on engineered surfaces; however, the introduction of gravity means that crew members during future lunar EVAs will be required to perform tasks that generate full body workloads such as navigating natural lunar terrain while conducting geological sampling. To date, only 12 people have walked on the surface of the Moon resulting in limited knowledge of suited thermal regulation under lunar-relevant physical workloads. To address this gap, a study is underway to focus on spacesuit operations with simulated lunar EVA workloads. This study presents methodology for collecting standard thermal measures during suit testing. In this pilot study, two suited subjects underwent simulated lunar EVAs using the NASA Active Response Gravity Offload System (ARGOS) to simulate the effects of partial gravity. Each lunar EVA, lasting three to five hours, included various metabolically demanding EVA tasks. Subjects donned the NASA Mark III (MK III) space suit and were offloaded to 1/6th G (lunar gravity). A subset task circuit from one of these simulations replicated an EVA traverse to a lunar crater, taking a geological sample, and returning to base. The suited subject walked one 1500 m (0% grade) and three 500 m traverses at three different grades (10, 20, 30%). Between each traverse, subjects performed geology sampling tasks (0 and 10% grade). Thermal measurements included core and skin temperature, liquid cooling garment (LCG) inlet and outlet temperature, and spacesuit gas inlet and outlet temperature and humidity. Compared to baseline core temperature (S1 = 37.07±0.32 °C, S2 = 37.27±0.01 °C) and mean skin temperature (S1 = 32.38±0.34 °C, S2 = 33.62±0.03 °C), after a 1500 m traverse, each suited subject showed an increased core temperature (S1 = 37.23±0.12 °C, S2 = 37.41±0.11°C) and decreased mean skin temperature (S1 = 32.16±0.17 °C, S2 = 31.53±1.15 °C) at a delta LCG temperature (S1 = 1.86±0.24 °C, S2 = 2.20±0.76 °C) and delta suit humidity (S1 = 9.66±1.49 %, S2 = 11.50±1.58 %). Core temperature continued to increase from compounding traverse and geology tasks (S1 = 38.04±0.03 °C, S2 = 38.1±0.02 °C) accompanied by an increase in delta LCG temperature (S1 = 2.24±0.13 °C, S2 = 2.67±0.12 °C) and delta suit humidity (S1 = 28±2.42 %, S2 = 31±2.13 %). Conversely, as the circuit progressed, mean skin temperature continued to decrease due to sustained LCG heat rejection (S1 = 30.08±0.15 °C, S2 = 30.28±0.07 °C). During the simulated EVA circuit core temperature increased to elevated values and remained elevated as heat was retained while mean skin temperature decreased due to peripheral heat offloaded to the LCG. The thermal measures collected during this study provided critical heat loading dynamics during lunar EVA tasks. Including core and skin temperatures along with suited thermal measures provides a standard data collection scheme for human thermal metrics during EVA task management. Data collected in this configuration can be used to build future lunar EVA task circuits and human thermal predictions.

Bradley Hoffmann↗

Steps Towards the Integration of Conflict Resolution with Metering and Scheduling

NASA Ames Research Center is developing decision support tool technology for air traffic controllers to improve the efficiency and capacity of National Airspace System. The goal is to provide technology, tools and procedures that result in the highest possible level of user preferred trajectories whenever possible with safe and efficient traffic management when necessary. The work is being conducted under the NASA Advanced Air Transportation Technology Program in cooperation with the FAA through the Inter-Agency Integrated Product Team. The objective is to develop technology and procedures that lead towards a seamless integration of conflict resolution with metering and scheduling for arrival aircraft and en route aircraft that are under metering restrictions. A requirement is that the integration incorporate user preferred trajectories. The ultimate goal is the implementation and validation of the Descent Advisor (DA) concept which provides clearance advisories to a sector controller that simultaneously meet metering constraints, are conflict free, incorporate a user preferred (e.g., minimum fuel) descent profile, and generally require no further corrective clearance as the aircraft transitions from en route cruise into the TRACON. The DA concept may also be applied to en route aircraft under metering constraints, e.g., miles-in-trail. To achieve the DA concept a stepwise development and field evaluation is anticipated. This paper addresses the initial steps towards implementation of the DA. The Traffic Management Advisor (TMA) computes arrival time sequence and required delay information for display to the sector controller during periods when arrivals must be metered due to landing rate restrictions at the airport. The Initial Conflict Probe (ICP) compares trajectory predictions for all aircraft and alerts the controller when any two aircraft are predicted to violate separation standards (5 mi. and 2000 ft. in en route airspace). ICP also includes a trial planning function allowing the controller to develop and check a separate "what if" trajectory for conflict resolution. TMA and ICP currently operate independent of one another and have separate controller displays. The TMA meter list is on the radar controller's plan view display. The ICP is still under development, but the current concept calls for a list of predicted conflicts at the data controller position. The research described herein address two steps towards the implementation of DA. The first is to develop a concept for integrated display of conflict and metering information on a controller's display. The objective is to provide the controller with situational awareness of one problem while he develops a solution to the other. The next step is to expand the concept for display of automated clearance advisories for one problem (e.g., metering) which take into account the other problems (e.g., conflicts). Information to be communicated between TMA and ICP to facilitate' manual or automated advisories is being identified as the concept matures. In order to study the ICP/TMA integration concept the CTAS conflict probe capability has been adapted to Ft. Worth Center. The system is being validated in the laboratory with all-track data and for non -interference with TMA, TMA is already running as a daily use prototype at Ft. Worth Center. A laboratory prototype system has been developed under the CTAS baseline which combines conflict and metering information on a common user interface. Elements of the user interface are shown in Figure 1. In this simple illustration the user sees the simultaneous effect of a trial plan on meter fix delay and conflict status. Delay information is shown in the aircraft flight data block, the meter list, and the TMA timeline. Experience during Descent Advisor development and observations at Ft. Worth Center high and low attitude arrival sectors during metering suggests that manual trial planning will be unworkable during rush periods due to high controller workload.

McNally, B. David↗

Vulcan Test Platform: Demonstrating the Data Center as a Flexible Grid Asset

Explosive data center demand is outpacing grid infrastructure development. AI workloads and hyperscale cloud growth are creating unprecedented power requirements, while traditional grid expansion faces multi-year development timelines, regulatory hurdles, and decarbonization challenges. Sidewalk Infrastructure Partners recognized this impending crisis years ago and founded Verrus to develop an innovative solution: data centers that function as grid assets rather than passive loads. The Verrus approach integrates proprietary grid-aware controls with battery energy storage systems (BESS) in a medium-voltage architecture that delivers three critical capabilities: Fast-responding demand flexibility that can service requests from the utility within 10 seconds, Uninterrupted transition to islanded operation during grid disturbances, Continuous uptime assurance while maintaining all customer service level commitments Through Verrus' strategic partnership with the National Renewable Energy Laboratory (NREL), we validated these capabilities on Vulcan, a 70 MW utility-scale test platform powered by NREL's ARIES Virtual Emulation Environment. This deployment-ready technology has successfully demonstrated that Verrus data centers can deliver meaningful grid services while maintaining mission-critical reliability. This technical report outlines the design, methodology, and results of this emulated deployment, demonstrating that data centers can play a pivotal role in enhancing grid flexibility and reliability, without sacrificing service level guarantees.

24 POWER TRANSMISSION AND DISTRIBUTION↗