Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Unit Testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

Spatially correlated incommensurate lattice modulations in an atomically thin high-temperature Bi 2.1 Sr 1.9 CaCu 2.0 O 8+y superconductor

Strong variations in superconducting critical temperatures in different families of the cuprate perovskites, even with similar hole doping in their copper-oxygen planes, suggest the importance of lattice modulation effects. The one-dimensional incommensurate lattice modulation (ILM) of Bi 2 Sr 2 CaCu 2 O 8+y , with the average atomic positions perturbed beyond the unit cell6, offer s an ideal test ground for studying the interplay between superconductivity and the long-range incommensurate lattice fluctuations. Here we report Scanning nano X-ray Diffraction (SnXRD) imaging of incommensurate lattice modulations in Bi 2 Sr 2 CaCu 2 O 8+y Van der Waals heterostructures of thicknesses down to two-unit cells. Using SnXRD, we probe that the long-range and short-range incommensurate lattice modulations in bulk sample surface with spatial resolution below 100 nm. We find that puddle-like domains of ILM of size uniformly evolving with dimensionality. In the 2-unit cell thin sample, it is observed that the wavevectors of the long- and short-range orders become anticorrelated with emerging spatial patterns having a directional gradient. The emerging patterns, originated by tiny tuning of lattice strain, induce static mesoscopic charge density waves. Finally, our findings thus demonstrate that the strain can be used to tune and control the electromagnetic properties of two-dimensional high-temperature superconductors.

36 MATERIALS SCIENCE↗

Application of FARM to an IES scenario within the FORCE ecosystem

The FARM (Feasible Actuator Range Modifier) software module is a component of the RAVEN-based FORCE framework for analysis of Integrated Energy Systems (IES). FARM supports the HERON software module in the evaluation of the optimal dispatch by evaluating feasible set-points for the different IES unit components. Set-points are required to satisfy limits on both production variables (i.e., the variables to be optimized such as the electrical power, the hydrogen production rate, etc.) and process variables tied to the service life of equipment (e.g., steam flowrate, vessel pressure, turbine firing temperature, etc.). This problem is addressed by adopting a two-stage approach. First, the HERON power dispatcher determines set-points that meet the constraints on the former variables (e.g., power levels and power ramp rate limits). These constraints are called explicit constraints. Then, FARM adjusts these set-points to ensure the respect of the limits on the latter variables given the knowledge of the system physics acquired through machine learning algorithms. These constraints are called implicit constraints. From this standpoint, FARM constitutes a bridge between the HERON power dispatcher that adopts a simplified description of the IES unit (low-resolution physics) and the HYBRID high-fidelity models (high-resolution physics). The original version of the FARM software module (FARM-Alpha) was released by Argonne National Laboratory in January 2021. In the latest version of the code released in July 2022 (FARM-Delta), the Reference Governor (RG) algorithm was upgraded to a Multi-Input Multi-Output version from its original Single-Input Single-Output form. The RG algorithm acts to enforce constraints. With this improvement an IES unit is now treated as a single dynamic system from the standpoint of control. The crosstalk among components in an IES unit is now fully considered thereby ensuring a true optimization is obtained for those units that have multiple set-points. In this report, the capabilities of FARM-Delta operating within the FORCE ecosystem are demonstrated for an IES test case. The specific configuration of IES unit for this case was selected by the IES team with consultation from the Advanced Reactor IES Expert Group. A full TEA analysis that invoked HERON, HYBRID, FARM, and RAVEN was performed and serves to demonstrate how the latest modification to FARM algorithms (i.e., state variable selection, state-space matrices derivation, set-point verification) can shape setpoints that might otherwise compromise the health of equipment through accelerated wear and tear. In this specific test case, it was demonstrated that these algorithms ensure a more efficient utilization of steam resources to be shared by two different subsystems, namely Balance of Plant (BOP) and High-Temperature Steam Electrolysis (HTSE). Finally, some code improvements that can further enhance the user-friendliness are suggested.

97 MATHEMATICS AND COMPUTING↗

Findings on Subtask 3.1 - Bakken Rich Gas Enhanced Oil Recovery Project

Total in-place oil for the Bakken petroleum system (BPS) (which includes the Bakken and Three Forks Formations) has been estimated to be 600 billion barrels (bbl). However, BPS wells have decline rates as high as 85% over the first 3 years of their lives, and primary recovery factors typically range from 3% to 10% of original oil in place. Given the low initial recovery rates, even small incremental productivity improvements could dramatically increase technically recoverable oil in the BPS. One potential solution is enhanced oil recovery (EOR) using gas injection, such as carbon dioxide (CO2) or hydrocarbon (HC) gases. While commonly used in conventional reservoirs, CO2 EOR in unconventional tight oil reservoirs has been limited to pilot tests. EOR using rich gas (mixture of methane, ethane, and propane) has also been employed in numerous pilots in several unconventional plays and has recently been successfully applied in the Eagle Ford play. If successful, large-scale gas-based EOR in the BPS could dramatically increase oil productivity and recovery factors and extend the life of the play for decades. While CO2 may be a technically suitable working fluid for EOR in the BPS, supplies are limited and costs for using CO2 in EOR pilots are prohibitively high. Meanwhile, produced gas flaring has presented challenges for BPS operators in North Dakota. Analysis conducted by the North Dakota Pipeline Authority indicates that the current gas-gathering infrastructure in North Dakota is insufficient to accommodate all of the associated gas that is produced from the BPS. The geographically isolated location of North Dakota relative to large natural gas markets, combined with suppressed natural gas prices, has made it economically challenging for industry to invest capital in expanding gas-gathering infrastructure in the state. These circumstances led to a research program conducted by the Energy & Environmental Research Center (EERC) in partnership with Liberty Resources Management Company LLC (LR) to examine the potential to use rich gas injection for EOR and mitigate flaring. A rich gas EOR pilot test was designed and executed by LR at its Stomping Horse development area in Williams County, North Dakota. From July 2018 through May 2019, a total of 160 million standard cubic feet (MMscf) of rich produced gas was injected into the BPS using five different wells in a sequential injection strategy. LR’s Leon–Gohrick drill spacing unit (DSU) was used as the test site. Regulatory oversight was provided by the North Dakota Industrial Commission (NDIC). Technical support was provided by the EERC through a series of laboratory, modeling, and field-based activities, and additional post-pilot research activities incorporated learnings from the test, developed new laboratory data, improved fracture modeling methods, and developed machine learning and big data analytics. The results from the Stomping Horse rich gas EOR pilot activities indicate that developing an effective, economical EOR approach for the BPS will require more field tests. Another key lesson learned from the Stomping Horse tests is that detailed pre- and posttest data on reservoir conditions and fluids production are essential. Robust reservoir characterization provides information that is crucial to creating realistic geomodels and conducting valid dynamic simulations of potential EOR scenarios. A detailed understanding of the completions and production history of offset wells is also necessary for valid test result interpretations. This knowledge is essential to designing the operational parameters of injectivity tests and interpreting the results. A conformance control strategy is also essential to success. Laboratory-based examinations of rich gas interactions with reservoir fluids and rocks were conducted, with an emphasis on determining the ability to mobilize oil in the tight reservoir rocks and shales of the BPS. Injection fluid composition was shown to have a positive impact on reducing reservoir oil minimum miscibility pressure (MMP), reducing interfacial tension (IFT), and altering wettability. IFT and contact angle measurements demonstrated that wettability can be altered in the presence of rich gas, suggesting the potential to improve oil recovery. Iterative modeling of surface infrastructure and reservoir performance using data generated by the various project activities was conducted. A geologic model of the Stomping Horse area was built; history-matched oil, gas, and water production was used in simulations of various EOR scenarios. Early programmatic modeling results were used to support LR’s design and operation of the EOR pilot and to provide insight regarding optimization of future commercial-scale BPS EOR design and operations. Post-pilot modeling focused on alternative methods of understanding complex fracture networks and accelerating simulation time. These led to improved simulation run times and provide excellent history-matching results. Several of these iterative models were used as the bases for developing algorithms into machine learning and big data analytics. History matching in reservoir simulation is time-consuming and computer processing-intensive. Machine learning algorithms were created, and an automated history-matching tool was developed. A large set of synthetic reservoir simulations were created to generate well responses (oil, gas, and water production, well bottomhole pressure [BHP], and tracer or propane breakthrough) for a set of EOR operating parameters that included offset well status (open or closed), injectate (rich gas or propane), injection rate, and injection well BHP. A user interface was developed to provide real-time visualization. Machine learning-based models were developed to provide rapid forecasting of well performance given a set of user-defined EOR operating parameters. These predictive models allow the user to modify the offset well status, injection rate, and injection well BHP and rapidly forecast future production performance. The combination of real-time visualization tools with real-time forecasting tools provides a framework for real-time control—operational changes that the EOR site operator can enact (e.g., changing gas injection rates) to affect the observed performance and potentially improve the EOR outcome. There is great reason to be optimistic about the future of EOR in the Bakken. The results of the laboratory studies suggest significant potential for high rates of oil mobilization using produced field gas injection under the right conditions. The results of the lab studies, combined with rigorous statistical analysis of well production data and associated modeling efforts, confirm the notion that fluid mobility within the reservoir is controlled by fractures. As more knowledge is gained about the nature and distribution of fracture networks in the Bakken, the industry will be in a better position to predict and, ultimately, influence fluid mobility. New field tests are necessary to develop a more complete understanding of those conditions. Thoughtful and creatively engineered field tests within a well-characterized geologic setting will yield the fundamental knowledge needed to take Bakken oil production to the next level. This subtask was cofunded through the EERC–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by the North Dakota Industrial Commission’s Oil and Gas Research Program and Computer Modelling Group.

04 OIL SHALES AND TAR SANDS↗

High Solids Performance Testing in a Scaled TSCR System

The Tank Side Cesium Removal (TSCR) project is a technology demonstration that will pretreat Hanford tank waste supernatant in support of the Direct Feed Low-Activity Waste (DFLAW) mission. The TSCR system employs two key separation technologies: dead-end filtration (DEF) and ion exchange (IX) using crystalline silicotitanate (CST) media. DEF will be used to remove undissolved solids from tank waste to protect the functionality of the IX columns and the IX system will remove Cs-137 from tank waste. The separation technologies (DEF and IX) used in TSCR are technically mature and have also been successfully deployed at the Savannah River site in a similar facility known as the Tank Closure Cesium Removal (TCCR) system. While testing with simulants and real waste has been successfully performed under conditions expected during the initial operation of TSCR, test data is absent for assessing off normal high solids loading that may be in the TSCR waste feed. Normal TSCR treatment operations are expected to handle wastes with solids content on the order of 200 ppm, and off normal solids loading could be much larger than the nominal level. The testing program described in this report was conducted to understand the consequence of operating the TSCR system at elevated solids loadings up to the high-solids limit of 15,000 ppm [i.e., 1.5-wt%] identified in the TSCR design basis. Although the system is not required to make throughput above the nominal solids loading, the testing was intended to provide important information related to potential off normal operations. At off normal levels near the high-solids limit, there are potential implications for TSCR performance in the areas of throughput, DEF pressure drop, filter backflush frequency, and IX column pressure drop. In addition, intrusion of solids into the IX column was postulated to impact the Cs-137 loading behavior by promoting channeling or flow maldistribution in the column; since the magnitude of the postulated effect was unknown, assessing it was also of interest. The testing was performed using representative waste simulants and a prototypic, integrated TSCR system designed and assembled specifically to conduct the high solids performance assessment. Overall, the scaled TSCR testing demonstrated that full-scale unit operations can succeed in fulfilling their processing objectives in the presence of solids up to 3,000 ppm, but there are potential performance challenges to filtration operations at solids loadings as low as ~500 ppm. The severity of the challenge is likely to be dependent on the type and size distribution of solids, of which the current testing only examined a single type and size distribution. To provide some flexibility for future full-scale operations, the results of the testing suggest two possible risk reduction strategies that can be implemented without any changes in TSCR design or configuration. One option would be to enact an administrative limit on the solids loading to protect TSCR from feeds that are likely to require a high DEF swap frequency. Another option is to permit operation of the DEFs at differential pressures greater than 2 psid before swapping filters. The selection of a higher differential pressure target is not anticipated to adversely impact DEF backflushing efficacy and would reduce both swap frequency and the amount of waste sent to AP-108.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Operation Plumbbob

On June 24, 1957, a thirty-seven kiloton nuclear device, codenamed Priscilla, exploded 700 feet over the Nevada Test Site’s Frenchman dry lake. Below, on the lakebed, was a bank vault designed by the Mosler Safe Company for one of several Federal Civil Defense Administration experiments. The vault was constructed “to evaluate the effectiveness of a reinforced-concrete vault and steel vault door in providing protection against the effects of a nuclear detonation.” Blast damage to the exterior was largely confined to the side walls, whose concrete was stripped off; its steel reinforcing rods bent and twisted. The vault door was essentially undamaged and was opened with minimal difficulty. The vault contents - sandbags, movie camera, and thermometers - were only slightly disturbed. The camera operated as planned, running 40 ft of film. The film, however, was completely fogged. Two clinical type thermometers registered 88°F, and a 24-hr stylus American temperature recorder registered a constant 88°F. Priscilla was the fifth of twenty-nine tests conducted in 1957 as part of Operation Plumbbob, whose stated purpose was to conduct tests “aimed to attain new knowledge important to the defense of the United States and the Free World.” Individual events included “proof tests of air defense and antisubmarine warheads to be stockpiled, development tests of bomb components and mockups, and design tests of smaller and lighter warheads.” One test, John, was that of an air-to-air missile detonated 18,500 feet over the test site.

99 GENERAL AND MISCELLANEOUS↗

Magnetically Recoverable and Reusable Antimicrobial Nanocomposite Based on Activated Carbon, Magnetite Nanoparticles, and Silver Nanoparticles for Water Disinfection

Recent advancements in nanotechnology have led to the development of innovative, low-cost and highly efficient water disinfection technologies that may replace or enhance the conventional methods. In this study, we introduce a novel procedure for preparing a bifunctional activated carbon nanocomposite in which nanoscale-sized magnetic magnetite and antimicrobial silver nanoparticles are incorporated (MACAg). The antimicrobial efficacy of the nanocomposite was tested against Escherichia coli (E. coli). MACAg (0.5 g, 0.04% Ag) was found to remove and kill 10 6 –10 7 CFU (colony-forming units) in 30 min via a shaking test and the removing and killing rate of the nanocomposites increased with increasing silver content and decreased with increasing CFU. The inhibition zone tests revealed, among the relevant components, only Ag nanoparticles and Ag + ions showed antimicrobial activities. The MACAg was easily recoverable from treated water due to its magnetic properties and was able to remove and kill 10 6 CFU after multiple-repeated use. The MACAg nanocomposite also demonstrated its feasibility and applicability for treating a surface water containing 10 5 CFU. Combining low cost due to easy synthesis, recoverability, and reusability with high antimicrobial efficiency, MACAg may provide a promising water disinfection technology that will find wide applications.

36 MATERIALS SCIENCE↗

Accelerated Fuel Qualification of Fast Modular Reactor Fuel in a Thermal Reactor: Modeling and Simulation Paired with Irradiation Testing

The accelerated fuel qualification (AFQ) methodology is applied by simulating accelerated fuel tests of the General Atomics Electromagnetic Systems’ fuel system for its 44-MW(electric) gas-cooled, fast-spectrum fast modular reactor (FMR). This fuel is comprised of UO 2 pellets in SiGA® cladding, a silicon carbide ceramic matrix composite. Fast reactors, like the FMR, offer many benefits, including high fuel utilization and flexibility, but may require a lengthy material design process if tests are performed using fast neutron irradiation alone. A thermal neutron irradiation can instead be used to rapidly test how well key components of the current material models extend to high burnup. Thermal neutrons produce a different radial power distribution within the pin than fast neutrons. However, the temperature and burnup values for the two neutron types are comparable, and the differences between the simulated fuel responses are relatively small, demonstrating the weak sensitivity of the physics-based fuel model calculations on the neutron type and the irradiation rate. Furthermore, the deformation of the SiGA cladding saturates after about 1 displacement per atom for both neutron spectra. In an accelerated fuel test, the irradiation time required to reach the target fuel burnup can be reduced by a factor of 3 by using a small rodlet with a 45% smaller pellet diameter while maintaining the same linear power. Therefore, the time for data collection up to high burnup can be significantly reduced while maintaining the same temperature profile, which largely determines the material response. Tests of fuel rodlets of standard and compact size will be carried out in the Idaho National Laboratory’s Advanced Test Reactor (ATR), including full size and compact rodlets with varying gap sizes. By applying physics-based mechanistic modeling and simulation in accordance with the AFQ methodology, this type of compact rodlet testing in a thermal test reactor captures the necessary phenomena to test fuel material models up to high burnup and to simulate the expected impact of fast neutron radiation on the fuel in FMR operations. Finally, this approach to testing fast reactor fuels in existing thermal test reactors, paired with advanced physics-based mechanistic modeling and simulation, is expected to be applicable to a range of advanced fuels and will decrease the overall fuel qualification timeframe from decades to years.

Advanced test reactor (ATR)↗

New Whole-House Solutions Case Study: Hydronic Heating Coil Versus Propane Furnace, Rehoboth Beach, Delaware

In this project involving two homes, the IBACOS team evaluated the performance of the two space conditioning systems and the modeled efficiency of the two tankless domestic hot water systems relative to actual occupant use. Each house was built by Insight Homes and is 1,715-ft2 with a single story, three bedrooms, two bathrooms, and the heating, ventilation, and air conditioning systems and ductwork located in conditioned crawlspaces. The standard house, which the builder offers as its standard production house, uses an air source heat pump (ASHP) with supplemental propane furnace heating. The Building America test house uses the same ASHP unit with supplemental heat provided by the DHW heater (a combined DHW and hydronic heating system, where the hydronic heating element is in the air handler).

air source heat pump↗

Southeast Carbon Sequestration Partnership (SECARB) Phase III Anthropogenic Test at Citronelle Field, Mobile Co., AL: Project Assessment Report

The Southeast Carbon Sequestration Partnership Phase III Anthropogenic Test at Citronelle Field is the United States’ largest CO 2 capture and transportation, injection, storage and monitoring project using CO 2 derived from a coal-fired power station. The project represents a U.S. Department of Energy research and development initiative designed to demonstrate deep underground injection and containment of 100,000 tonnes or more of anthropogenic-source CO 2 . This report provides an assessment of the CO 2 injection at the Citronelle Anthropogenic Test site for the period August 23, 2012 to August 31, 2013. The purpose of the project assessment is to re-evaluate the AoR for the injection well. The AoR is defined as the region surrounding the geological sequestration project that may be impacted by the injection activity. The AoR is further defined as the farthest reach of the tangible CO 2 plume and/or the region of ‘significant’ reservoir pressure increase. An updated geologic model of the injection zones and storage reservoir sandstones incorporates geologic data obtained from the injection well and characterization wells drilled at the Phase III Anthropogenic Test site. The numerical modeling of the injection was conducted using the updated geologic model, plus the monitoring results obtained to August 31, 2013. The simulation demonstrates effective containment of CO 2 by the reservoir architecture of the upper Paluxy Formation, consisting of multiple, stacked, highly porous and permeable sandstones, separated by low permeability flow barriers. The CO 2 containment demonstrated in this report requires an AoR with a radius of 440 ft from the injection well. This revision reduces the radius of the AoR from the preinjection determination of 1,700 ft. With the revised AoR, the only well within the AoR is the injection well itself, the D 9-7 #2. The nearest well to the injector is the D 9-8 #2. The surface location is 870 ft away from the D 9-7 #2, placing the D 9-8 #2 outside the revised AoR.

01 COAL, LIGNITE, AND PEAT↗

Power System Resilience Enhancement in Typhoons Using a Three-Stage Day-Ahead Unit Commitment

In this work, we propose a three-stage resilient unit commitment model which considers uncertain typhoon paths and line outages to improve the power system resilience against typhoon events. The proposed solution coordinates resources in response to the worst-case scenario for each possible typhoon path. The optimal decision is based on the characterization of the power system schedule into three stages of preventive control, emergency control, and restoration. Preventive control is performed before the typhoon occurs by quickly adjusting the three-stage resilient unit commitment schedule; emergency control is conducted during the typhoon by shedding local loads to meet the power balance, while other control strategies are assumed to be unavailable due to possible interruptions in the communication system; restoration is realized after the typhoon, when resources are optimally dispatched to repair the outages of critical devices and recover the normal operation state of the power system quickly. Considering the typhoon path uncertainty, we have introduced a stochastic model for possible typhoon paths where all possible affected lines along each typhoon path are assumed to be on outage during the typhoon. Accordingly, we explore the strategy for co-optimizing the three stages in unit commitment. The proposed model is tested on the IEEE 118-bus system and the real-world provincial system to verify its effectiveness.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Experimental evaluation of thermal-fluids performance of Helium-Cooled Flat Plate (HCFP) divertor

Various helium (He)-cooled solid-tungsten (W) divertor concepts have been proposed for long-pulse magnetic fusion energy reactors. Among these concepts, the He-cooled flat plate divertor (HCFP) modules have the largest plasma-facing surface area of ~0.2 m 2 . Simulations have shown that the most recent version of the design can withstand heat fluxes as great as 8 MW/m 2 . Earlier experimental studies of a single shortened HCFP cooling unit with a slot length of 7.6 cm used air at ambient temperature and pressures below 0.6 MPa. Here, we present initial experimental studies of a copper alloy and steel test section modeling a shortened HCFP cooling unit using He at prototypical pressure of 10 MPa, inlet temperatures T i ≤ 200 °C and steady-state incident heat fluxes q" ≤ 1.2 MW/m 2 . Results for Nusselt number Nu as a function of Reynolds number Re were obtained for Re = 1.2×10 4 –3.4×10 4 , and used to develop a Nu(Re) correlation and validate numerical models of the test section using commercial computational fluid dynamics (CFD) software. Simulations with this model are performed to evaluate the effect of the shortened slot. Furthermore, these analyses are used to estimate the thermal-fluids performance of the HCFP under prototypical conditions.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Recovery Act: Advanced Load Identification and Management for Buildings

In response to the U.S. Department of Energy (DoE)’s goal of achieving market ready, net-zero energy residential and commercial buildings by 2020 and 2025, Eaton partnered with the Department of Energy’s National Renewable Energy Laboratory (NREL) and Georgia Institute of Technology to develop an intelligent load identification and management technology enabled by a novel “smart power strip” to provide critical intelligence and information to improve the capability and functionality of building load analysis and building power management systems. Buildings account for 41% of the energy consumption in the United States, significantly more than either transportation or industrial. Within the building sector, plug loads account for a significant portion of energy consumption. Plug load consumes 15-20% of building energy on average. As building managers implement aggressive energy conservation measures, the proportion of plug load energy can increase to as much as 50% of building energy leaving plug loads as the largest remaining single source of energy consumption. This project focused on addressing plug-in load control and management to further improve building energy efficiency accomplished through effective load identification. The execution of the project falls into the following three major aspects; An intelligent load modeling, identification and prediction technology was developed to automatically determine the type, energy consumption, power quality, operation status and performance status of plug-in loads, using electric waveforms at a power outlet level. This project demonstrated the effectiveness of the developed technology through a large set of plug-in loads measurements and testing; A novel “Smart Power Strip (SPS) / Receptacle” prototype was developed to act as a vehicle to demonstrate the feasibility of load identification technology as a low-cost, embedded solution; and Market environment for plug-in load control and management solutions, in particular, advanced power strips (APSs) was studied. The project evaluated the market potential for Smart Power Strips (SPSs) with load identification and the likely impact of a load identification feature on APS adoption and effectiveness. The project also identified other success factors required for widespread APS adoption and market acceptance. Even though the developed technology is applicable for both residential and commercial buildings, this project is focused on effective plug-in load control and management for commercial buildings, accomplished through effective load identification. The project has completed Smart Receptacle (SR) prototype development with integration of Load ID, Control/Management, WiFi communication, and Web Service. Twenty SR units were built, tested, and demonstrated in the Eaton lab; eight SR units were tested in the National Renewable Energy Lab (NREL) for one-month of field testing. Load ID algorithm testing for extended load sets was conducted within the Eaton facility and at local university campuses. This report is to summarize the major achievements, activities, and outcomes under the execution of the project.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Battery Test Manual For Electric Vehicles, Revision 3

This battery test procedure manual was prepared for the United States Department of Energy (DOE), Office of Energy Efficiency and Renewable Energy (EERE), Vehicle Technologies Office. It is based on technical targets for commercial viability established for energy storage development projects aimed at meeting system level DOE goals for Electric Vehicles (EV). The specific procedures defined in this manual support the performance and life characterization of advanced battery devices under development for EVs. However, it does share some methods described in the previously published battery test manual for plug-in hybrid electric vehicles. Due to the complexity of some of the procedures and supporting analysis, future revisions including some modifications and clarifications of these procedures are expected. As in previous battery and capacitor test manuals, this version of the manual defines testing methods for full-size battery systems, along with provisions for scaling these tests for modules, cells or other subscale level devices. The DOE-United States Advanced Battery Consortium (USABC), Technical Advisory Committee (TAC) supported the development of the manual. Technical Team points of contact responsible for its development and revision are Chul Bae of Ford Motor Company and Jon P. Christophersen of the Idaho National Laboratory. The development of this manual was funded by the Unites States Department of Energy, Office of Energy Efficiency and Renewable Energy, Vehicle Technologies Office. Technical direction from DOE was provided by David Howell, Energy Storage R&D Manager and Hybrid Electric Systems Team Leader. Comments and questions regarding the manual should be directed to Jon P. Christophersen at the Idaho National Laboratory (jon.christophersen@inl.gov).

25 ENERGY STORAGE↗

Existing Whole-House Solutions Case Study: Community-Scale Energy Modeling - Southeastern United States

Community-scale energy modeling and testing are useful for determining energy conservation measures that will effectively reduce energy use. To that end, IBACOS analyzed pre-retrofit daily utility data to sort homes by energy consumption, allowing for better targeting of homes for physical audits. Following ASHRAE Guideline 14 normalization procedures, electricity consumption of 1,166 all-electric, production-built homes was modeled. The homes were in two communities: one built in the 1970s and the other in the mid-2000s.

ASHRAE GUIDELINE 14↗