Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Task scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

The Soil Moisture Active Passive (SMAP) Applications Activity

The Soil Moisture Active Passive (SMAP) mission is one of the first-tier satellite missions recommended by the U.S. National Research Council Committee on Earth Science and Applications from Space. The SMAP mission 1 is under development by NASA and is scheduled for launch late in 2014. The SMAP measurements will allow global and high-resolution mapping of soil moisture and its freeze/thaw state at resolutions from 3-40 km. These measurements will have high value for a wide range of environmental applications that underpin many weather-related decisions including drought and flood guidance, agricultural productivity estimation, weather forecasting, climate predictions, and human health risk. In 2007, NASA was tasked by The National Academies to ensure that emerging scientific knowledge is actively applied to obtain societal benefits by broadening community participation and improving means for use of information. SMAP is one of the first missions to come out of this new charge, and its Applications Plan forms the basis for ensuring its commitment to its users. The purpose of this paper is to outline the methods and approaches of the SMAP applications activity, which is designed to increase and sustain the interaction between users and scientists involved in mission development.

Brown, Molly E.↗

NASA's Gravitational - Wave Mission Concept Study

With the conclusion of the NASA/ESA partnership on the Laser Interferometer Space Antenna (LISA) Project, NASA initiated a study to explore mission concepts that will accomplish some or all of the LISA science objectives at lower cost. The Gravitational-Wave Mission Concept Study consisted of a public Request for Information (RFI), a Core Team of NASA engineers and scientists, a Community Science Team, a Science Task Force, and an open workshop. The RFI yielded were 12 mission concepts, 3 instrument concepts and 2 technologies. The responses ranged from concepts that eliminated the drag-free test mass of LISA to concepts that replace the test mass with an atom interferometer. The Core Team reviewed the noise budgets and sensitivity curves, the payload and spacecraft designs and requirements, orbits and trajectories and technical readiness and risk. The Science Task Force assessed the science performance by calculating the horizons. the detection rates and the accuracy of astrophysical parameter estimation for massive black hole mergers, stellar-mass compact objects inspiraling into central engines. and close compact binary systems. Three mission concepts have been studied by Team-X, JPL's concurrent design facility. to define a conceptual design evaluate kt,y performance parameters. assess risk and estimate cost and schedule. The Study results are summarized.

Stebbins, Robin↗

The 40 KW of Solar Cell Modules for the Large Scale Production Task a Low Cost Silicon Solar Array Project

Forty kilowatts of solar cell modules was produced in this program. This is equivalent to 4123 modules. The average power output per module was 9.7 watts at 16.5 volts, 60 C and 100 mW/sq cm. The peak production rate was 200 modules per week which is equal to 1.9 kW per week. This rate was sustained for over four and one-half months and is equivalent to 100 kW per year. This final report covers the solar cell module design, electrical and power performance, module preproduction environmental test results, production and shipping schedule, program summary, and delivery. A cost analysis section is written. Particular emphasis on the percentage of labor and material utilized in constructing a solar cell module is presented. Also included are cost reduction recommendations.

Jones, G. T.↗

Voyager flight engineering - Preparing for Uranus

Two Voyager spacecraft are currently engaged in exploration of the outer solar system with Voyager 2 scheduled to conduct the first close-up investigation of the planet Uranus during the period November 4, 1985 through March 3, 1986. Flight engineering for the Voyager project has the objectives of delivering a functioning spacecraft containing observing sequences to the right places at the right times. Due to the changing environment as the mission has progressed outward from Jupiter to Saturn to Uranus (and on to Neptune), this engineering task has included the development of significant new capabilities. The paper utilizes the case-study method to examine some new spacecraft capabilities in three subsystems: data, attitude and articulation control, and power. The implementation of a new navigational data-type, delta DOR, is also reviewed. An overview is given of the Voyager sequencing process for the cruise and encounter phases with a case study focusing on late updating of part of the near encounter sequence. The prospective mission to Neptune is previewed.

Mclaughlin, W. I.↗

Collaboration technology and space science

A summary of available collaboration technologies and their applications to space science is presented as well as investigations into remote coaching paradigms and the role of a specific collaboration tool for distributed task coordination in supporting such teleoperations. The applicability and effectiveness of different communication media and tools in supporting remote coaching are investigated. One investigation concerns a distributed check-list, a computer-based tool that allows a group of people, e.g., onboard crew, ground based investigator, and mission control, to synchronize their actions while providing full flexibility for the flight crew to set the pace and remain on their operational schedule. This autonomy is shown to contribute to morale and productivity.

Leiner, Barry M.↗

Towards a Decision Support System for Space Flight Operations

The Mission Operations Directorate (MOD) at the Johnson Space Center (JSC) has put in place a Model Based Systems Engineering (MBSE) technological framework for the development and execution of the Flight Production Process (FPP). This framework has provided much added value and return on investment to date. This paper describes a vision for a model based Decision Support System (DSS) for the development and execution of the FPP and its design and development process. The envisioned system extends the existing MBSE methodology and technological framework which is currently in use. The MBSE technological framework currently in place enables the systematic collection and integration of data required for building an FPP model for a diverse set of missions. This framework includes the technology, people and processes required for rapid development of architectural artifacts. It is used to build a feasible FPP model for the first flight of spacecraft and for recurrent flights throughout the life of the program. This model greatly enhances our ability to effectively engage with a new customer. It provides a preliminary work breakdown structure, data flow information and a master schedule based on its existing knowledge base. These artifacts are then refined and iterated upon with the customer for the development of a robust end-to-end, high-level integrated master schedule and its associated dependencies. The vision is to enhance this framework to enable its application for uncertainty management, decision support and optimization of the design and execution of the FPP by the program. Furthermore, this enhanced framework will enable the agile response and redesign of the FPP based on observed system behavior. The discrepancy of the anticipated system behavior and the observed behavior may be due to the processing of tasks internally, or due to external factors such as changes in program requirements or conditions associated with other organizations that are outside of MOD. The paper provides a roadmap for the three increments of this vision. These increments include (1) hardware and software system components and interfaces with the NASA ground system, (2) uncertainty management and (3) re-planning and automated execution. Each of these increments provide value independently; but some may also enable building of a subsequent increment.

Meshkat, Leila↗

Advanced EVA Suit Camera System Development Project

The National Aeronautics and Space Administration (NASA) at the Johnson Space Center (JSC) is developing a new extra-vehicular activity (EVA) suit known as the Advanced EVA Z2 Suit. All of the improvements to the EVA Suit provide the opportunity to update the technology of the video imagery. My summer internship project involved improving the video streaming capabilities of the cameras that will be used on the Z2 Suit for data acquisition. To accomplish this, I familiarized myself with the architecture of the camera that is currently being tested to be able to make improvements on the design. Because there is a lot of benefit to saving space, power, and weight on the EVA suit, my job was to use Altium Design to start designing a much smaller and simplified interface board for the camera's microprocessor and external components. This involved checking datasheets of various components and checking signal connections to ensure that this architecture could be used for both the Z2 suit and potentially other future projects. The Orion spacecraft is a specific project that may benefit from this condensed camera interface design. The camera's physical placement on the suit also needed to be determined and tested so that image resolution can be maximized. Many of the options of the camera placement may be tested along with other future suit testing. There are multiple teams that work on different parts of the suit, so the camera's placement could directly affect their research or design. For this reason, a big part of my project was initiating contact with other branches and setting up multiple meetings to learn more about the pros and cons of the potential camera placements we are analyzing. Collaboration with the multiple teams working on the Advanced EVA Z2 Suit is absolutely necessary and these comparisons will be used as further progress is made for the overall suit design. This prototype will not be finished in time for the scheduled Z2 Suit testing, so my time was also spent creating a case for the original interface board that is already being used. This design is being done by use of Creo 2. Due to time constraints, I may not be able to complete the 3-D printing portion of this design, but I was able to use my knowledge of the interface board and Altium Design to help in the task. As a side project, I assisted another intern in selecting and programming a microprocessor to control linear actuators. These linear actuators will be used to move various increments of polyethylene for controlled radiation testing. For this, we began the software portion of the project using the Arduino's coding environment to control an Arduino Due and H-Bridge components. Along with the obvious learning of computer programs such as Altium Design and Creo 2, I also acquired more skills with networking and collaborating with others, being able to multi-task because of responsibilities to work on various projects, and how to set realistic goals in the work place. Like many internship projects, this project will be continued and improved, so I also had the chance to improve my organization and communication skills as I documented all of my meetings and research. As a result of my internship at JSC, I desire to continue a career with NASA, whether that be through another internship or possibly a co-op. I am excited to return to my university and continue my education in electrical engineering because of all of my experiences at JSC.

Mock, Kyla↗

Towards a decision support system for space flight operations

The Mission Operations Directorate (MOD) at the Johnson Space Center (JSC) has put in place a Model Based Systems Engineering (MBSE) technological framework for the development and execution of the Flight Production Process (FPP). This framework has provided much added value and return on investment to date. This paper describes a vision for a model based Decision Support System (DSS) for the development and execution of the FPP and its design and development process. The envisioned system extends the existing MBSE methodology and technological framework which is currently in use. The MBSE technological framework currently in place enables the systematic collection and integration of data required for building an FPP model for a diverse set of missions. This framework includes the technology, people and processes required for rapid development of architectural artifacts. It is used to build a feasible FPP model for the first flight of spacecraft and for recurrent flights throughout the life of the program. This model greatly enhances our ability to effectively engage with a new customer. It provides a preliminary work breakdown structure, data flow information and a master schedule based on its existing knowledge base. These artifacts are then refined and iterated upon with the customer for the development of a robust end-to-end, high-level integrated master schedule and its associated dependencies. The vision is to enhance this framework to enable its application for uncertainty management, decision support and optimization of the design and execution of the FPP by the program. Furthermore, this enhanced framework will enable the agile response and redesign of the FPP based on observed system behavior. The differences between the anticipated system behavior and the observed behavior may be due to the processing of tasks internally, or due to external factors such as changes in program requirements or conditions associated with other organizations that are outside of MOD. The paper provides a roadmap for the four increments of this vision. These increments include (1) the existing capabilities (2) hardware and software system components and interfaces with the NASA ground system, (3) uncertainty management and (4) re-planning and automated execution. Each of these increments provides value independently; but some may also enable building of a subsequent increment.

Ruszkowski, James↗

Designing Autonomy into Interfaces for Long-Duration Missions

As NASA develops technologies for long-duration crewed missions, we must understand how communication between ground control teams and astronauts differs from the current dynamic to adapt new concepts for long-duration mission operations. Today, ground control teams support astronauts with immediate availability to answer questions, resolve issues, and manage activities. In the near future, however, extended communication delays during long-duration missions will require astronauts to become more autonomous. As many of the responsibilities shift from the ground control teams to the astronauts on-board, the concept of operations must also change from how it functions today. With increased astronaut autonomy, software tools must be developed that enable efficient completion of mission tasks without increased mental workload. Designing software tools to facilitate crew autonomy requires development teams to know which data will enhance quick decision making while providing necessary context for situational awareness of systems being managed on-board. NASA's Autonomous Systems and Operations (ASO) team is presently developing a software interface tool, EXPRESS (EXpedite the PRocessing of Experiments for Space Station) 2.5 to enable a long-duration crew to schedule activities for and operate autonomous systems. This paper describes details of the integrated human factors approach that drove the design of the elements of the software tool, including self-managed scheduling, constraint-driven planning, autonomous system fault recovery, and recommended troubleshooting actions. Additionally, this paper will chronicle ASO modifications of the user interface after the team's first flight demonstration, how it was based on lessons learned during software development, as well as from crew feedback in order to develop the current version which will be demonstrated on ISS in 2021. In the upcoming ISS demonstration, the astronaut crew will be given scenarios for scheduling and operating autonomous system activities, including off-nominal scenarios and autonomous system recoveries. The demonstration of the EXPRESS 2.5 tool is a step towards improved levels of autonomy as our new journeys take us farther into space.

autonomy↗

Laser geodynamic satellite/thermal/optical vibrational analyses and testing. Volume 2: Technical report, book 3

The overall plan for accomplishing the various tests required to achieve the program objectives and tasks of the LAGEOS thermal/optical/vibration analysis and test program is described. The requirements for each test are identified for the purpose of program review for the design and fabrication of the required test article and test fixtures, for the allocation of test facilities, equipment and expendables, and for the generation of the detail test procedures by which the specified data will be obtained at specified test conditions. The current internal test program schedules, by which the various individual preparatory subtasks are to be accomplished to ensure that the individual test will be conducted within the time period required to meet program objectives are included.

Source record↗

A two-level structure for advanced space power system automation

The tasks to be carried out during the three-year project period are: (1) performing extensive simulation using existing mathematical models to build a specific knowledge base of the operating characteristics of space power systems; (2) carrying out the necessary basic research on hierarchical control structures, real-time quantitative algorithms, and decision-theoretic procedures; (3) developing a two-level automation scheme for fault detection and diagnosis, maintenance and restoration scheduling, and load management; and (4) testing and demonstration. The outlines of the proposed system structure that served as a master plan for this project, work accomplished, concluding remarks, and ideas for future work are also addressed.

Loparo, Kenneth A.↗

Ring Buffered Network Bus

This report describes the research effort to demonstrate the integration of a data sharing technology, Ring Buffered Network Bus, in development by Dryden Flight Research Center, with an engine simulation application, the Java Gas Turbine Simulator, in development at the University of Toledo under a grant from the Glenn Research Center. The objective of this task was to examine the application of the RBNB technologies as a key component in the data sharing, health monitoring and system wide modeling elements of the NASA Aviation Safety Program (AVSP) [Golding, 1997]. System-wide monitoring and modeling of aircraft and air safety systems will require access to all data sources which are relative factors when monitoring or modeling the national airspace such as radar, weather, aircraft performance, engine performance, schedule and planning, airport configuration, flight operations, etc. The data sharing portion of the overall AVSP program is responsible for providing the hardware and software architecture to access and distribute data, including real-time flight operations data, among all of the AVSP elements. The integration of an engine code capable of numerically "flying" through recorded flight paths and weather data using a software tool that allows for distributed access of data to this engine code demonstrates initial steps toward building a system capable of monitoring and modeling the National Airspace.

Source record↗

The Training Process of the Organization Development and Training Office

The Organization Development and Training Office provides training and development opportunities to employees at NASA Glenn Research Center, as a division of the Office of Human Resources and Workforce Planning. Center-wide required trainings, new employee trainings, workshops and career development programs are organized by the OD&TO staff. They also arrange all academic, non-academic, headquarters, fellowship and learning center sponsored courses. They also service organizations wishing to work more effectively by facilitating teambuilding exercises. Equal Opportunity programs and upward mobility programs such as the STEP and GO programs for administrative staff. In working with my mentor I am very involved with Cuyahoga Community College classes, mandatory supervisory training and administrative staff workshops. My largest tasks are in the secretarial training category. The Supporting Organizations And Relationships workshop for administrative personnel, commonly known as SOAR, began last year and continued this summer with follow-up workshops. Months before a workshop or class is brought to Glenn, a need has to be realized. In this case, administrative staff did not feel they had an opportunity to receive relevant training and develop skills through teambuilding, networking and communication. A Statement of work is then created as several companies are contacted about providing the training. After the company best suited to meet the target group s needs is selected, the course is announced with an outline of all pertinent information. A reservation for a facility is made and applications or nominations, depending on the announcement s guidelines, are received from interested employees. Confirmations are sent to participants and final preparations are made but there are still several concluding steps. A training office staff member also assists the facilitator with setting up the facility and introducing the class. After the class, participants evaluations are read and summarized to determine the effectiveness of the class and instructor. In addition to the SOAR workshops, I have several projects and daily tasks to complete. Coding training applications, which require me to be familiar with Glenn s budgetary allocations and policies on training, is an ongoing process. It also requires verifying information reported by an employee via her C-478 form, more commonly known as the training application. I am also the point of contact for the Cuyahoga Community College Advising Sessions held here at NASA Glenn which involves coordinating counselors visits with employees schedules. Two databases had to be created. The first database holds information on administrative staff, and the other tracks supervisors training histories. Through these assignments I gained experience in Microsoft Access 2002 and spreadsheet creation, communicating with co-workers, and successfully facilitating a training to serve specific purposes. With trainings and evaluations to assessment them, the Organization Development and Training Office can assure a quality product and continued customer satisfaction.

Johnson, Melissa S.↗

Lunar Overview

This slide presentation reviews the programs and missions that are being planned to enhance our knowledge of the moon. (1) Lunar Precursor Robotics Program (LPRP): the goal of which is to undertake robotic lunar exploration missions that will return data to advance our knowledge of the lunar environment and allow United States (US) exploration architecture objectives to be accomplished earlier and with less cost through application of robotic systems. LPRP will also reduce risk to crew and maximize crew efficiency by accomplishing tasks through precursor robotic missions, and by providing assistance to human explorers on the Moon. The missions under this program ae: the Lunar Reconnaissance Orbiter (LRO), Lunar Crater Observation and Sensing Satellite (LCROSS), Lunar Mapping Project. (2) The Altair Project, the goal of which is to land a crew of 4 to and from the surface of the moon. The vehicle, the 3 design reference missions (DRMs) and a Draft Lunar Landing schedule are briefly reviewed. (3) Lunar Science Program (LSP) which describes two different lunar missions: (1) Lunar Atmosphere & Dust Environment Explorer (LADEE), and (2) International Lunar Network (ILN).

Clinton, Raymond G., Jr.↗

Using Grid Benchmarks for Dynamic Scheduling of Grid Applications

Navigation or dynamic scheduling of applications on computational grids can be improved through the use of an application-specific characterization of grid resources. Current grid information systems provide a description of the resources, but do not contain any application-specific information. We define a GridScape as dynamic state of the grid resources. We measure the dynamic performance of these resources using the grid benchmarks. Then we use the GridScape for automatic assignment of the tasks of a grid application to grid resources. The scalability of the system is achieved by limiting the navigation overhead to a few percent of the application resource requirements. Our task submission and assignment protocol guarantees that the navigation system does not cause grid congestion. On a synthetic data mining application we demonstrate that Gridscape-based task assignment reduces the application tunaround time.

Frumkin, Michael↗

Evaluation of Classifier Complexity for Delay Tolerant Network Routing

The growing popularity of small cost effective satellites (SmallSats, CubeSats, etc.) creates the potential for a variety of new science applications involving multiple nodes functioning together or independently to achieve a task, such as swarms and constellations. As this technology develops and is deployed for missions in Low Earth Orbit and beyond, the use of delay tolerant networking (DTN) techniques may improve communication capabilities within the network. In this paper, a network hierarchy is developed from heterogeneous networks of SmallSats, surface vehicles, relay satellites and ground stations which form an integrated network. There is a tradeoff between complexity, flexibility, and scalability of user defined schedules versus autonomous routing as the number of nodes in the network increases. To address these issues, this work proposes a machine learning classifier based on DTN routing metrics. A framework is developed which will allow for the use of several categories of machine learning algorithms (decision tree, random forest and deep learning) to be applied to a dataset of historical network statistics, which allows for the evaluation of algorithm complexity versus performance to be explored. We develop the emulation of a hierarchical network, consisting of tens of nodes which form a cognitive network architecture. CORE (Common Open Research Emulator) is used to emulate the network using bundle protocol and DTN IP neighbor discovery.

Dudukovich, Rachel↗

En route position and time control of aircraft using Kalman filtering of radio aid data

Fixed-time-of-arrival (FTA) guidance and navigation is investigated as a possible technique capable of operation within much more stringent en route separation standards and offering significant advantages in safety, higher traffic densities, and improved scheduling reliability, both en route and in the terminal areas. This study investigated the application of FTA guidance previously used in spacecraft guidance. These FTA guidance techniques have been modified and are employed to compute the velocity corrections necessary to return an aircraft to a specified great-circle reference path in order to exercise en route time and position control throughout the entire flight. The necessary position and velocity estimates to accomplish this task are provided by Kalman filtering of data from Loran-C, VORTAC/TACAN, Doppler radar, radio or barometric altitude,and altitude rate. The guidance and navigation system was evaluated using a digital simulation of the cruise phase of supersonic and subsonic flights between San Francisco and New York City, and between New York City and London.

Mcgee, L. A.↗

Earth orbital operations supporting manned interplanetary missions

The orbital operations required to accumulate, assemble, test, verify, maintain, and launch complex manned space systems on interplanetary missions from earth orbit are as vital as the flight hardware itself. Vast numbers of orbital crew are neither necessary nor desirable for accomplishing the required tasks. A suite of robotic techniques under human supervisory control, relying on sensors, software and manipulators either currently emergent or already applied in terrestrial settings, can make the job tractable. The mission vehicle becomes largely self-assembling, using its own rigid aerobrake as a work platform. The Space Station, having been used as a laboratory testbed and to house an assembly crew of four, is not dominated by the process. A feasible development schedule, if begun soon, could emplace orbital support technologies for exploration missions in time for a 2004 first interplanetary launch.

Sherwood, Brent↗