USI Process - LANL Steps to 420.2D Implementation
Explore the source record for details and available documents.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
A cooler device includes a cold plate and a manifold with fluid wicking structure. The cold plate includes an array of bonding posts and an array of fluid channels. Each bonding post of the array of bonding posts has a first height and is in contact with the manifold with fluid wicking structure. Each fluid channel of the array of fluid channels has a second height that is less than the first height. The array of fluid channels include a MIO secondary wick structure. The array of bonding posts is orthogonal to the array of fluid channels. The manifold with fluid wicking structure includes a plurality of spacer elements and a plurality of mesh layers. Each one of the plurality of spacer elements alternate with each one of the plurality of mesh layers in a stacked arrangement.
On June 25, 2019, the first grapple of waste and debris was lifted from Silo 130, one of the most challenging legacy waste storage silos at La Hague. This was the achievement of more than ten years of studies and efforts focused on solving some very unique technical and safety challenges, and on designing an innovative, efficient solution. The waste is from de-cladding materials from past Gas-Cooled Reactor fuel reprocessing operations. It is an unsorted mixture of magnesium cladding pieces, graphite debris, and various other metallic waste types. These materials can be chemically reactive and therefore need specific dispositions for handling and storing. The building is more than 40 years old and does not meet modern standards. French safety authorities have required the silo to be emptied. After about three years of operation, the bulk of this waste will be removed and placed in safe storage, pending the selection of a final conditioning solution. Removal of bottom debris will then be possible. When finished, this operation will bring a conclusion to a significant legacy-related hazard on the site. The silo will then be available for final cleaning and de-activation. This paper will describe the technical, safety, and economical challenges, and the various decisions and optimizations that led to the definition of the process and technology to be implemented. Several innovative features were developed and implemented, in all sections of the project: project organization, progressive approach for the waste disposition strategy, light building design, customized and robust retrieval technology, processing technologies involving the most modern robotic and sorting techniques, storage method... Several of these first-of-a-kind innovative features have been developed and qualified specifically for this application, using the detailed qualification procedure specified for all La Hague projects. The facility was built in less than five years, overcoming various difficulties along the line. Commissioning is now finished with the combined efforts of the project, engineering, start-up, and operating teams assisted by dedicated suppliers. The facility is now ramping-up. The paper will also report on the commissioning and start-up of the facility and describe the first operational results. (authors)
Barely 9% of the 353 million metric tons of plastic waste produced worldwide over the last two decades has been recycled, with the majority of it being either landfilled or incinerated. Recycling and upcycling plastic waste is thus essential in mitigating environmental pollution. Gasification is the thermochemical conversion of solid carbon feedstock at high temperatures using a gasifying agent to produce hydrogen-rich syngas. Existing gasification technologies are energy-intensive and require high operating temperatures (>1000 °C), leaving them uncommercial. Microwave heating has sparked attention in a variety of chemical processes due to its specific advantages over traditional heating technologies, such as rapid and selective heating to improve process efficiency. NETL’s research team recently investigated the synergistic advantages of corn stover and mixed plastics in producing hydrogen-rich syngas via microwave heating. As a continuation of the research, this study provides an outlook over the non-catalytic versus catalytic effects of plastic-corn stover gasification via process electrification to enhance H2 production, minimize undesired tar, and improve process efficiency. Our aim is to provide complete electrification of the existing gasification process by using waste plastics as a starting block to produce valuable fuel and support the nation’s net zero goals.
Explore the source record for details and available documents.
The Solar Automated Permit Processing Plus (SolarAPP+) software is an online platform that provides plan review and instantly issues permits for code-compliant residential photovoltaic (PV) systems. Here's how your jurisdiction can get started.
Hybrid modelling, a combination of mechanistic and data-driven modelling, is a promis¬ing approach to advance current mathematical models towards improved deci¬sion support tools for today's water-related challenges. Researchers have been develop¬ing guidelines or references for good modelling practices in the water field for mecha¬nistic (Rieger et al., 2012) and data-driven (Zhu et al., 2023) modelling, respectively. However, good modelling practices for hybrid modelling are currently missing (Schneider et al., 2022). Therefore, the International Water Association’s (IWA) hybrid modelling working group initiated the first competition on a data science competition platform (i.e. Kaggle) for water resource recovery modelling at the Watermatex con¬ference in September 2023 in Quebec. The main objective of this competition was to gain insights and experience to create good modelling practices. Further goals were to motivate students, researchers, and practitioners model, foster a vibrant and engaged community, and evaluate the efficacy of com¬petitions in solving modelling challenges within the water domain. Our next goal is that facilities will measure and gather relevant data for future competitions to solve their challenges from a modeller’s perspective.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
5G Open RAN security talk given to the IEEE Open RAN Security Working Group.
Explore the source record for details and available documents.
The substantial technical differences of liquid-salt fueled nuclear power plants from previously licensed reactors results in significant divergence in the evidence necessary to demonstrate adequate protection of the health and safety of the public and the environment. The US Government is supporting a diverse set of activities to improve the efficiency and effectiveness of molten salt reactor safety adequacy evaluation. Key current projects include developing a fuel salt thermophysical and thermochemical properties database and performing integral and separate effects experiments to validate accident progression models.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
With the conclusion of the Laboratory Directed Research and Development (LDRD) project on Provable Security and Resilience (PSaR) in Critical Infrastructure, we present forward-looking technical concepts and strategies that build on the project’s outcomes and INL’s long-standing expertise in infrastructure protection. The challenge is to protect critical infrastructure and functions much more efficiently at scale than capable adversaries can attack at scale. After summarizing progress and ongoing work we’ll discuss what are the challenges that remain and what are new/emerging technologies, strategies, and processes to meet those challenges. Finally, we’ll layout concepts that integrate with other protection work in the coming year and beyond. For example, building secure function-specific platforms based on the seL4 microkernel, and considering the successes of Cyber-Informed Engineering as a model for engage, collaboration, and adoption. We look forward to your feedback and collaboration as we refine and expand this vision.
The Full-scale Emplacement (FE) heater experiment at the Mont Terri Underground Rock Laboratory (URL) was designed and conducted by Nagra to replicate an emplacement tunnel of Nagra’s reference repository design at 1:1 scale. Alongside testing the technical feasibility of constructing disposal tunnels, emplacing waste containers in the tunnels and then backfilling them, the main goals of the FE experiment are (1) to obtain a better understanding of the coupled effects of induced thermo-hydro-mechanical (THM) processes that may occur and (2) to validate existing coupled THM models (Müller et al., 2017). A key aspect of ensuring safety for repositories located in low-permeability rock involves minimizing any damage to the rock itself, thereby preserving its integrity and promoting a stable environment Amongst a number of processes that could damage the rock is the increase in pore pressure due to thermal loading caused by heat emitted from the waste. To reduce the potential damage of the rock, it is important to analyse the evolution of heat over time due to the heat load of the containers and assess possible consequences by coupled THM models. The aim of Task C of DECOVALEX-2023 was to build 3D numerical models of the FE experiment, focussing in particular on the heating induced pore pressure change in the Opalinus Clay. Data from a large number of sensors were available from the FE experiment for model comparison. These sensors measured temperature and relative humidity in the bentonite around the heaters, and temperature, pressure and displacement/strain in the surrounding Opalinus clay. Data were available from the start of excavation (April 2012) up to August 2020 for most sensors (more than 5 years from the start of heating in December 2014). To fulfil the overall aim of the task, the work was broken down into a number of steps, starting with simpler models to build confidence in each team’s approach and then moving to more complex models that better represent the FE experiment. Step 0 consisted of 2D benchmark models, gradually increasing the number of processes that are represented from thermal (T) only models in Step 0a, to coupled thermal hydraulic (TH) models in Step 0b with a representation of changing porosity, to coupled thermo-hydro-mechanical (THM) models in Step 0c, where porosity changes are calculated by the mechanical model. A detailed specification of processes, parameters, initial and boundary conditions was provided for this step, with the ambition that all teams would work towards close agreement in their model results, thus building confidence in the model implementations. vi It was not straightforward to achieve agreement between the teams, so additional steps (Step 0b2, 0b3, 0c2, 0c3) were added along with derivation of some analytical solutions against which the models could be compared. The reasons for the differences between teams were investigated and found to be caused primarily by different conceptual model assumptions (including temperature dependence of the thermal expansion of water), different model formulations (including porosity evolution) and differences in modelled domain sizes, boundary conditions and grid discretisation. This demonstrates that comparisons between multiple modelling teams and/or comparison with analytical results and experimental data are highly beneficial in providing an indication of uncertainty in model predictions. At the conclusion of Step 0, almost all teams had achieved a close agreement in model results and those that had not achieved an agreement knew the reason for this. Step 1 moved from 2D models to 3D models of the FE experiment without adding technical features like shotcrete or EDZ, and only considering the heating phase. Initially the 3D model was tightly specified to continue to build confidence in the model implementations (Step 1a). The results of Step 1a were compared to the data from the FE-experiment without the teams seeing the data. The teams were then provided with a sub-set of the data from the FE-experiment and invited to consider how best to use the large dataset for model comparison (Step 1b). Teams were then asked to use the data provided to calibrate their models, only changing material property values rather than adding features or processes to their models (Step 1c). In Step 1, teams were asked to only model the heating phase of the experiment, so pressure in the Opalinus Clay was reported as change in pressure since the initial conditions were specified rather than modelled. The change from 2D to 3D models was accompanied by an increase in the dispersion of results between the teams. Some of this was resolved during the task, but some remained and is potentially due to model discretisation. Calibration of parameters was useful in improving the fit of the models to the data but the remaining differences indicated that the models were missing features or processes. In Step 2, the teams were asked to update their models with additional features and processes as well as calibrating parameters to try and improve the fit of the models to the data. Teams were encouraged to represent ventilation of the open FE tunnel prior to backfilling with heaters and bentonite and in Step 2, the absolute pressure in the Opalinus Clay was compared between the teams. Teams took different approaches, but there was consideration of adding shotcrete and an EDZ into the model, representing stress change during excavation and different approaches to modelling ventilation of the FE tunnel. Overall, the documented results showed a very good agreement for temperature. The results for porewater pressure evolution showed a significant improvement for most teams compared to Step 1c with a good agreement to the measurements for several teams whereas some teams overpredicted the pressure increase and others overpredicted the drainage effect especially for the sensors close to the heater. Step 3 was an opportunity for teams to use the models developed in Step 1 and Step 2 to make predictions about the temperature and pressure changes that will be expected at the FE experiment over the next few years in light of the planned changes in thermal output of the heaters.
Abstract To avoid the use of a computationally intensive full unsteady simulation while providing an accurate solution, a quasi-steady simulation has been performed to study glaze and mixed ice accretion in the supercooled large droplet (SLD) regime in turbulent flow of atmospheric air. We have attempted to find the minimum time-step necessary to adequately simulate the icing process on an airfoil surface. Based on node displacement, a mesh morphing scheme has been adopted in the computations to account for the moving boundaries that are caused by the continuous ice buildup. We have modeled ice accretion on an airfoil surface for a time period of 232 s using several time steps. At each time-step we solved the steady-state conservation equations for the air and droplet phases and then used the results as initial conditions for the next time position. The magnitude of the time-step ranged from a least accurate two-shot simulation (where the time-step is 116 s) to a most accurate 2320-shot simulation (where the time-step is 0.1 s). In-between these two extreme time steps, we have performed a three-shot simulation (where the time-step is 77.33 s), a four-shot simulation (where the time-step is 58 s), a six-shot simulation (where the time-step is 38.67 s), a 46-shot simulation (where the time-step is 5 s), and a 232-shot simulation (where the time-step is 1 s). We have done so to find out the degree of accuracy (or inaccuracy) of the multishot simulation approach and to find out the appropriate time-step needed for a successful and valid quasi-steady simulation. A valid quasi-steady simulation needs to use a time-step that is small enough to reproduce the full time-dependent solution within a very small error band. We have found that both the 1 s and the 0.1 s time steps produce virtually identical results. This is the primary litmus test that proves the validity of the quasi-steady-state assumption. The results adopted in this paper are thus all based on the more conservative 0.1 s time-step. In the process of performing the simulations, remeshing was required in order to maintain the grid density in zones of high curvature to be able to capture the full physics in those zones. After successfully modeling glaze ice accretion over the airfoil surface using the 0.1 s quasi-steady simulation approach, the effects of supercooled large droplets (SLDs) impacting the surface have been examined and presented in terms of the variation of the local collection efficiency, the water film thickness, and the heat transfer rate. Examination of the variation of the angle that the ice horn makes with the airfoil chord line demonstrated a 20% improvement in angle prediction when the time-step is reduced from 116 s to 0.1 s. The analysis also reveals a 12% or 8.5% increase in the maximum collection efficiency, βmax, depending on whether the value of the liquid water content (LWC) has been doubled from 0.5 g/m3 to 1 g/m3, or the value of the freestream velocity has been doubled from 75 m/s to 150 m/s, respectively. Because of the need to monitor the local collection efficiency and convective heat fluxes at each shot (regardless of the number of shots employed), the approach adopted here was found to be effective in successively and successfully reproducing the curvature of the glaze ice horn.
Task D of DECOVALEX-2023 is focused on the simulation of the coupled thermal hydraulic-mechanical (THM) behaviour in the full-scale engineered barrier system (EBS). The Horonobe EBS experiment is the demonstration of the full-scale EBS in the underground research laboratory (URL) (performed by JAEA in the Horonobe URL in Japan). Task D consisted of the three steps, a preliminary step (Step 0), simulation of the laboratory tests (Step 1) and simulation of the in-situ full-scale EBS experiment (Step 2). Since the Horonobe EBS experiment demonstrates the vertical emplacement option of the EBS, the experiment gallery is also backfilled with the backfill material. Therefore, interaction between the EBS and the backfill material can also be demonstrated, such as deformation (change of density) of the buffer material. The underground water in the Horonobe URL is saline. This fact adds chemical processes to THM behaviour. For example, mechanical properties (such as swelling pressure of the buffer material and backfill material) and hydraulic properties (such as permeability of the buffer material and backfill material) change depending on the water chemistry. Task D was therefore a challenging Task focused on not only the relatively simple THM behaviour but also complex THM behaviour including chemical processes. Six research teams (BGR, CAS, JAEA, KAERI, SNL and Taipower) participated the Task D. BGR, CAS, JAEA, KAERI and Taipower research teams selected a THM approach, while the SNL research team selected a TH approach. Step 1 involved the simulation of laboratory test results and was important to check the numerical codes developed by the research teams. Step 1 was divided into four sub steps. The simulation results through the Step 1 identified the parameters for simulation of the Step 2. Basic parameters of the materials (buffer material, backfill material, rock mass, concrete, sand) were provided by JAEA. Special parameters which research team needed were identified by back analysis of Step 1. Most notably the mechanical behaviour of swelling and displacement depended on the applied model (elastic model or elastoplastic model). Parameters such as Young’s modulus were found to need smaller values than characterised in the fundamental laboratory test results (Step 1-1, 1-2) for the elastic model. Although laboratory experiments are usually simple, test results contained some error. For example, if the saturation level is 100 % or higher, it should be considered an error. This situation was presented in the Step 1-3. A possible reason is that the buffer material is a mixture of bentonite and silica sand. When a specimen is cut to measure volume or weight, sand grains will affect the measurement data. In Step 2, boundary conditions such as temperature on the surface of the simulated overpack, heater power of the electrical heaters installed in the simulated overpack, injection pressure and inflow rate of the test water, were applied. The outer boundary conditions can be selected using measured data (injection pressure and inflow rate of the test water that is controlled by the injection systems installed in the sand layer around the buffer material and in the boundary between backfill material and concrete support). Since such measured data has some noise, research teams developed their own simplified boundary conditions. Inner boundary conditions can be selected using measured data as heater power and temperature on the surface of the simulated overpack. These data also contain some noise, so research teams developed their own simplified developed boundary conditions. Task D validated various approaches thorough the simulation of the in-situ full scale EBS system including backfill of the gallery: variations in the coupling processes (THM or THC), analysis codes, and boundary conditions. Temperature distribution in the buffer material was simulated well by all research teams. This means thermal behaviour is not sensitive to the simulation approaches. Although the water content distribution on the outside of the buffer material was well simulated by all research teams, the simulation results differ from the measured values inside the buffer material (at the centre and inside, near the simulated overpack). The buffer material is made from tap water, but in the in-situ experiment, saline groundwater infiltrates the buffer material. Therefore, the selection of the hydraulic parameters of the buffer material greatly affects the simulation results of the re saturation behaviour of the buffer material. In the Horonobe EBS experiment, measured values suitable for validating the simulation results were not obtained near the simulated overpack. When simulating the pressure and deformation of the buffer material, the measurement data is easily affected by the installation conditions of the measurement sensors, so verifying the measurement data itself remains an issue. Mechanical simulation results differ depending on whether they are considered as elastic or elastoplastic phenomena. The accuracy of measured in-situ data can be assessed by detailed analysis comparing sampling specimen analysis and measured data. The Horonobe EBS experiment is scheduled to be dismantled in the future (FY2026 and 2027). This detailed dismantling investigation will finally confirm the measured data.