Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Stakeholder”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

3D Modeling of Safety-Related Upgrade Pilot Project

Constellation Energy and the United States Department of Energy (DOE) have established a public/private partnership to implement a pilot digital upgrade to replace legacy analog, safety-related reactor protection and emergency safety feature actuation systems (RPS/ESFAS) with modern digital systems. This effort is occurring at Constellation’s Limerick Generating Station. This project is being performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process, NISP-EN-04, Standard Digital Engineering Process and Electric Power Research Institute Report 3002011816, Digital Engineering Guide. The Light Water Reactor Sustainability (LWRS) Program at the Idaho National Laboratory (INL) has been supporting this effort. Latest INL HFE efforts in support of this project have focused on definition and implementation of the Human Factors Engineering (HFE) Program in support of Constellation design and related licensing efforts. This paper will present the development of the HFE 3D modeling execution of the Main Control Room safety upgrades. New equipment and modifications are planned for upgrading the new safety systems. 3D modeling allows for visualization of the new equipment and modifications to be shared with engineering and design teams for evaluation and review. Anthropometric considerations such as sight lines and functional reach can be evaluated directly using the 3D model. This effort has helped to provide visualizations for additional review with operations personnel and project stakeholders.

3D Modeling↗

Spatial Access Priority Mapping (SAPM) with Fishers: A Quantitative GIS Method for Participatory Planning

Spatial management tools, such as marine spatial planning and marine protected areas, are playing an increasingly important role in attempts to improve marine management and accommodate conflicting needs. Robust data are needed to inform decisions among different planning options, and early inclusion of stakeholder involvement is widely regarded as vital for success. One of the biggest stakeholder groups, and the most likely to be adversely impacted by spatial restrictions is the fishing community. In order to take their priorities into account, planners need to understand spatial variation in their perceived value of the sea. Here, a readily accessible, novel method for quantitatively mapping fishers’ spatial access priorities is presented. Spatial access priority mapping, or SAPM, uses only basic functions of standard spreadsheet and GIS software. Unlike the use of remote-sensing data, SAPM actively engages fishers in participatory mapping, documenting rather than inferring their priorities. By so doing, SAPM also facilitates the gathering of other useful data, such as local ecological knowledge. The method was tested and validated in Northern Ireland, where over 100 fishers participated in a semi-structured questionnaire and mapping exercise. The response rate was excellent, 97%, demonstrating fishers’ willingness to be involved. The resultant maps are easily accessible and instantly informative, providing a very clear visual indication of which areas are most important for the fishers. The maps also provide quantitative data, which can be used to analyse the relative impact of different management options on the fishing industry and can be incorporated into planning software, such as MARXAN, to ensure that conservation goals can be met at minimum negative impact to the industry. This research shows how spatial access priority mapping can facilitate the early engagement of fishers and the ready incorporation of their priorities into the decision-making process in a transparent, quantitative way.

54 ENVIRONMENTAL SCIENCES↗

Integrative assessment of climate change for fast-growing urban areas: Measurement and recommendations for future research

Over the 20th century, urbanization has substantially shaped the surface of Earth. With population rapidly shifting from rural locations towards the cities, urban areas have dramatically expanded on a global scale and represent crystallization points of social, cultural and economic assets and activities. This trend is estimated to persist for the next decades, and particularly the developing countries are expected to face rapid urban growth. The management of this growth will require good governance strategies and planning. By threatening the livelihoods, assets and health as foundations of human activities, another major global change contributor, climate change, became an equally important concern of stakeholders. Based on the climate trends observed over the 20th century, and a spatially explicit model of urbanization, this paper investigates the impacts of climate change in relation to different stages of development of urban areas, thus evolving a more integrated perspective on both processes. As a result, an integrative measure of climate change trends and impacts is proposed and estimated for urban areas worldwide. We show that those areas facing major urban growth are to a large extent also hotspots of climate change. Since most of these hotspots are located in the Global South, we emphasize the need for stakeholders to co-manage both drivers of global change. The presented integrative perspective is seen as a starting point to foster such co-management, and furthermore as a means to facilitate communication and knowledge exchange on climate change impacts.

54 ENVIRONMENTAL SCIENCES↗

Using mixed methods to construct and analyze a participatory agent-based model of a complex Zimbabwean agro-pastoral system

Complex social-ecological systems can be difficult to study and manage. Simulation models can facilitate exploration of system behavior under novel conditions, and participatory modeling can involve stakeholders in developing appropriate management processes. Participatory modeling already typically involves qualitative structural validation of models with stakeholders, but with increased data and more sophisticated models, quantitative behavioral validation may be possible as well. In this study, we created a novel agent-basedmodel applied to a specific context: Zimbabwean non-governmental organization the Muonde Trust has been collecting data on their agro-pastoral system for the last 35 years and had concerns about land-use planning and the effectiveness of management interventions in the face of climate change. We collaboratively created an agent-based model of their system using their data archive, qualitatively calibrating it to the observed behavior of the real system without tuning any parameters to match specific quantitative outputs. We then behaviorally validated the model using quantitative community-based data and conducted a sensitivity analysis to determine the relative impact of underlying parameter assumptions, Indigenous management interventions, and different rainfall variation scenarios. We found that our process resulted in a model which was successfully structurally validated and sufficiently realistic to be useful for Muonde researchers as a discussion tool. The model was inconsistently behaviorally validated, however, with some model variables matching field data better than others. We observed increased model system instability due to increasing variability in underlying drivers (rainfall), and also due to management interventions that broke feedbacks between the components of the system. Interventions that smoothed year-to-year variation rather than exaggerating it tended to improve sustainability. The Muonde trust has used the model to successfully advocate to local leaders for changes in land-use planning policy that will increase the sustainability of their system.

54 ENVIRONMENTAL SCIENCES↗

Energy-Community-Geo-Database

Fundamental to understanding evolving infrastructure and technology is understanding the drivers for energy communities that affect where and how infrastructure is placed and used. An Energy Community Geo Database aligned to carbon storage systems will aid stakeholders in decision making around key future infrastructure (e.g., CCS injection locations) placement while helping contextualize these analyses against past and present-day social and environmental attributes. Much of the data required to support analyses are available from authoritative, largely governmental sources, but at present are disparate and require time-consuming acquisition, integration, and upkeep for currency. The CCS-EC-GB v2.0 integrates datasets from various federal agencies and authoritative sources to aid stakeholders and decision makers of the social and environmental factors that might impact the viability of CCS and energy related project implementation. There are 5 categories in the CCS-EC-GB v2 database. Most of the layers within each category have been updated in this version. As compared to the old database, there is 1 new category in the CCS-EC-GB v2 database: infrastructure. This is an evolving project and application will be updated periodically with new datasets and information. Notes for consideration: This database/web map will be updated with additional as new data and information becomes available and has been processed, reviewed, and approved for release. Additional state and federal entity data are planned to be integrated and included in future revisions. Summary layers provided in this application are derived from proprietary layers and do not always contain key features (age, status, or TVD) and therefore might not be shown when data are queried for those features.

CCS,Carbon capture and storage,Carbon storage,U.S.↗

Factors Influencing Building Demand Flexibility

The U.S. Department of Energy’s National Roadmap for Grid-interactive Efficient Buildings (GEB) acknowledged that building demand flexibility (DF) is both an important strategy to decarbonizing the buildings sector and an important resource for meeting the changing needs of the electrical grid such as improving grid reliability. However, understanding the complexity and uncertainties in real building field performance of DF strategies is a large gap hindering stakeholders on both grid and buildings side to make investments on deploying such strategies. The research work in this report intended to advance understanding of the variability and influential factors in building demand flexibility. Adding such knowledge based on lab testing results and measured performance data from real buildings is an important contribution. The report uses standardized metrics and methods to quantify DF performance from field-measured DF datasets of two significant building groups of big-box retail and medium office buildings to present the challenge of building DF variability in multiple dimensions. The report presents findings related to how several key factors influence building demand flexibility from implementing a common, cost-effective DF control strategy (i.e., adjusting zone temperatures). The findings are supported by full-scale lab testing, field data analysis and simulation research. The authors also provided application-oriented recommendations to stakeholders such as building aggregators, utility program design professionals, sophisticated building portfolio owners, and more.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Understanding the Costs and Barriers of Residential Electrical Panel and Service Upgrades

Upgrading electrical panels and services in U.S. homes represents a significant barrier to building modernization, imposing considerable costs, delays, and procedural uncertainties on homeowners, contractors, utilities, and building departments. Although cost databases document individual infrastructure activities, they rarely capture the integrated, whole-project perspective required to understand how electrical upgrades are planned, executed, and regulated. Existing research is often geographically constrained, narrowly scoped, or derived from limited samples, leaving significant knowledge gaps unaddressed. This study examines the timelines and costs associated with residential electrical panel and service upgrades using data from a national cross- sectional survey conducted in summer 2025. The survey captured responses from 140 stakeholders across 34 states, including building industry professionals, utility staff, and building department staff. Findings indicate that project duration and cost increase substantially with building size though patterns vary by infrastructure type. Most single-family and small multifamily projects were completed within 30 days, whereas medium and large multifamily buildings show longer and less predictable timelines. Service rating increases modestly extend project duration, but building type and size were the primary determinants of delays. Cost patterns were similar: customer-side equipment and panel replacements scale predictably with building size, while utility-side costs are highly variable, often triggered by threshold-driven infrastructure upgrades such as transformer replacements. Permit fees vary considerably between jurisdictions but generally represent a minor proportion of total project costs. These findings identify electrical upgrades as a significant barrier to residential building costs and highlight the need for improved stakeholder coordination, streamlined permitting, and strategies that reduce upgrade requirements while maintaining safety and code compliance.

Casquero-Modrego, Nuria↗

Business Models for Scaling Demand Flexibility Volume II – Customer relationship management strategies, challenges, and lessons learned from U.S. programs

Load growth at the grid edge is driving increased attention to the distribution system and its ability to enable customer technology adoption in an affordable and timely manner. Key industry stakeholders, including electric utilities and regulators, can benefit from strategies to manage and balance customer needs with infrastructure investments, such as demand flexibility. This report focuses on demand flexibility—the ability to reduce, shift, shed, generate, or modulate loads in response to building and grid needs—to reduce the need for costly grid upgrades by deferring investment needs and increase system reliability by shifting electricity usage during periods of high risk. Specifically, we focus on the emerging characteristics of business models for demand flexibility as a framework to understand how demand flexibility programs generate value. In this report, we focus on demand flexibility program customer relationship management strategies, which provide information on value creation and focus on ensuring customers can navigate programs smoothly. This report discusses the role of customer relationship management strategies in demand flexibility programs, characterizes customer relationship management strategies that can be considered during program design and implementation, identifies existing challenges to customer relationship management strategies, and describes lessons learned. This report is part of a series that includes reports on value propositions, stakeholder ecosystem management, and program life cycle.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Packages of Distributed Energy Technologies Demonstrating Demand Flexibility at Community Scale

The combination of increased electric load growth across all sectors, deferred electrical infrastructure investment, and other factors resulting in variable electric power supply, has created technical challenges to maintaining a resilient and reliable grid. Many federal, regional, and local efforts are in play to modernize the electric grid, including advancing building technologies and distributed energy resources (DERs) that are utilizing smarter controls to become responsive to both occupant and grid needs. This report reviews ten pilot projects demonstrating how groups of buildings combined with behind-the-meter (BTM) DERs such as electric vehicle (EV) charging, battery storage, flexible HVAC and domestic hot water systems, and photovoltaic systems can reliably and cost effectively provide grid services. Each of the ten pilot projects aim to deliver both energy efficiency and demand flexibility (DF) while supporting load growth. The ten demonstration teams are piloting flexible DER packages across diverse communities of residential and commercial buildings to address a variety of regional grid needs. The outcomes of these pilot projects will be used to inform future scaling through utility program development. This paper characterizes the ten teams, showcasing the decision-making process used by each group to develop their packages (Section 2), the grid services they plan to deliver (Section 3), the types of DER packages selected for deployment within building sectors (Section 4) and trends between building sector, DER types, and grid services In order to achieve community scale benefits, the pilot projects must utilize aggregated control mechanisms for coordinating buildings and DERs together. Several types of coordinated control architectures have evolved amongst the teams, influenced by use type, existing market conditions, and integration type. Three coordinated controls architectures have been characterized, highlighting their use cases, benefits, challenges, and tradeoffs in their design. These insights can aid utilities, control vendors, and developers in scaling community-level energy systems (Paul, 2024). Ultimately, the technology packages selected by the ten teams will be coordinated to provide power system services, also known as grid services. Insights from these demonstrations will be useful for grid operators, regulators, aggregators and other stakeholders as they look to deploy demand flexible resources as grid services in the future. The grid services that each team is targeting for demonstration are described in Section 3 and Section 4. Methods for evaluating the grid services have been described in the paper Metrics for Evaluating Grid Service Provision from Communities of Grid-interactive and Efficient Buildings and other DER (MacDonald, 2023). To identify technology packages for demonstration, Section 2 shows that project teams used a range of analysis approaches, including building energy modeling, AMI data analysis, cost-benefit frameworks, and utility pilot data. Some teams emphasized technical modeling to quantify grid impacts and demand reduction potential, while others prioritized economic evaluations, stakeholder input, or exploratory pilots to inform deployment decisions. This diversity reflects the need to tailor selection methods to project goals, available data, and organizational context. Section 5 discusses trends between the DER technologies deployed and the grid service provisions from each team. Residential buildings (multifamily and single family) lean towards technologies that enhance energy efficiency (e.g. weatherization upgrades, smart thermostats) and onsite power generation integration (e.g. solar PV). Commercial building demonstrations prioritize technologies that ensure operational reliability (e.g. battery storage) and centralized energy management systems and optimization solutions. Teams that are deploying controllable storage-based technologies are more likely to provide grid services that require a near real-time response. Teams incorporating load shifting technologies like smart thermostats with HEMs are likely to include energy markets participation and customer bill management offerings. Campus demonstrations are adopting diverse sets of DERs to emphasize renewable generation, paired with centralized control. This section also describes technologies that were considered during project planning but ultimately excluded from final deployment. These demonstrations reveal that effective DER package design should be tailored to building type, customer segment, and construction vintage. Multifamily buildings benefit from centralized HVAC upgrades and supervisory controls, while single-family homes are well-suited for individualized technologies like solar, storage, and smart home energy monitors. Commercial and campus settings prioritize EMIS integration and load optimization. New construction enables cost-effective integration of DER-ready infrastructure, whereas retrofits require deployments aligned with owner and tenant value streams. For utility program planners, early coordination with developers and building owners, paired with segmented and modular program offerings, can improve adoption, scalability, and grid impact.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Business Models for Scaling Demand Flexibility Volume IV – Program life cycle challenges and lessons learned from U.S. programs

Load growth at the grid edge is driving increased attention to the distribution system and its ability to enable customer technology adoption in an affordable and timely manner. Key industry stakeholders, including electric utilities and regulators, can benefit from strategies to manage and balance customer needs with infrastructure investments, such as demand flexibility. This report focuses on demand flexibility—the ability to reduce, shift, shed, generate, or modulate loads in response to building and grid needs—to reduce the need for costly grid upgrades by deferring investment needs and increase system reliability by shifting electricity usage during periods of high risk. Specifically, we focus on the emerging characteristics of business models for demand flexibility as a framework to understand how demand flexibility programs generate value. In this report, we focus on the life cycle of demand flexibility programs, which provides information on value creation and describes the various deployment phases program implementers navigate from initial program conceptualization through to program expansion and replication to new customer segments and regions. This report characterizes the key phases of the demand flexibility program life cycle, identifies existing challenges across the program deployment phases, and describes lessons learned. This report is part of a series that includes reports on customer relationship management strategies, stakeholder ecosystem management, and program life cycle.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Developing a Prototype Methodology to Rank CO2-EOR Wells and Assess Their Reuse Potential for Geologic Carbon Storage

This paper presents a prototype methodology to assess the possible transition of Class II carbon dioxide-enhanced oil recovery (CO2-EOR) wells to Class VI wells. The focus is on wellbore construction materials—casing, cement, tubing, and the packer—and includes comprehensive workflows to evaluate these materials, with primary emphasis on compliance with Environmental Protection Agency (EPA) Class VI well construction and conversion guidelines. These workflows systematically assess material properties and performance criteria to ensure regulatory compliance and optimize long-term wellbore integrity and functionality. Utilizing Python scripts and JavaScript Object Notation (JSON) representations, the study automates checks on digitized Texas Railroad Commission (TRRC) data to rank wells based on workflow criteria. By emphasizing critical factors such as casing integrity, cementing techniques, tubing compatibility, and packer selection, the methodology helps well owners and operators prioritize wells for potential reuse as CO2 injection wells. Given limitations in digitized data, manual user verification is required in some sections. Future improvements include integrating non-digitized data through web scraping and machine learning techniques. This research serves as a practical guide for stakeholders, supporting environmental compliance and sustainable well operations.

geologic carbon sequestration↗

Basin-Scale Opportunity Assessment Initiative Background Literature Review

As called for in the March 24, 2010, Memorandum of Understanding (MOU) for Hydropower, the U.S. Department of Energy (DOE), the U.S. Department of the Interior (DOI), the U.S. Army Corps of Engineers (USACE), environmental stakeholders, and the hydropower industry are collaborating to identify opportunities to simultaneously increase electricity generation and improve environmental services in river basins of the United States. New analytical tools provide an improved ability to understand, model, and visualize environmental and hydropower systems. Efficiencies and opportunities that might not be apparent in site-by-site analyses can be revealed through assessments at the river-basin scale. Information from basin-scale assessments could lead to better coordination of existing hydropower projects, or to inform siting decisions (e.g., balancing the removal of some dams with the construction of others), in order to meet renewable energy production and environmental goals. Basin-scale opportunity assessments would inform energy and environmental planning and address the cumulative effects of hydropower development and operations on river basin environmental quality in a way that quantifies energy-environment tradeoffs. Opportunity assessments would create information products, develop scenarios, and identify specific actions that agencies, developers, and stakeholders can take to locate new sustainable hydropower projects, increase the efficiency and environmental performance of existing projects, and restore and protect environmental quality in our nation's river basins. Government agencies and non-governmental organizations (NGO) have done significant work to understand and assess opportunities for both hydropower and environmental protection at the basin scale. Some initiatives have been successful, others less so, and there is a need to better understand the legacy of work on which this current project can build. This background literature review is intended to promote that understanding. The literature review begins with a discussion in Section 2.0 of the Federal regulatory processes and mission areas pertaining to hydropower siting and licensing at the basin scale. This discussion of regulatory processes and mission areas sets the context for the next topic in Section 3.0, past and ongoing basin-scale hydropower planning and assessment activities. The final sections of the literature review provide some conclusions about past and ongoing basin-scale activities and their relevance to the current basin-scale opportunity assessment (Section 4.0), and a bibliography of existing planning and assessment documents (Section 5.0).

13 HYDRO ENERGY↗

Program Management at the National Nuclear Security Administration Office of Defense Nuclear Security: A Review of Program Management Documents and Underlying Processes

The scope of this paper is to review the National Nuclear Security Administration Office of Defense Nuclear Security (DNS) program management documents and to examine the underlying processes. The purpose is to identify recommendations for improvement and to influence the rewrite of the DNS Program Management Plan (PMP) and the documentation supporting it. As a part of this process, over 40 documents required by DNS or its stakeholders were reviewed. In addition, approximately 12 other documents produced outside of DNS and its stakeholders were reviewed in an effort to identify best practices. The complete list of documents reviewed is provided as an attachment to this paper.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

U.S. Department of Energy clean cities five-year strategic plan.

Clean Cities is a government-industry partnership sponsored by the U.S. Department of Energy's (DOE) Vehicle Technologies Program, which is part of the Office of Energy Efficiency and Renewable Energy. Working with its network of about 100 local coalitions and more than 6,500 stakeholders across the country, Clean Cities delivers on its mission to reduce petroleum consumption in on-road transportation. In its work to reduce petroleum use, Clean Cities focuses on a portfolio of technologies that includes electric drive, propane, natural gas, renewable natural gas/biomethane, ethanol/E85, biodiesel/B20 and higher-level blends, fuel economy, and idle reduction. Over the past 17 years, Clean Cities coalitions have displaced more than 2.4 billion gallons of petroleum; they are on track to displace 2.5 billion gallons of gasoline per year by 2020. This Clean Cities Strategic Plan lays out an aggressive five-year agenda to help DOE Clean Cities and its network of coalitions and stakeholders accelerate the deployment of alternative fuel and advanced technology vehicles, while also expanding the supporting infrastructure to reduce petroleum use. Today, Clean Cities has a far larger opportunity to make an impact than at any time in its history because of its unprecedented $300 million allocation for community-based deployment projects from the American Recovery and Reinvestment Act (ARRA) (see box below). Moreover, the Clean Cities annual budget has risen to $25 million for FY2010 and $35 million has been requested for FY2011. Designed as a living document, this strategic plan is grounded in the understanding that priorities will change annually as evolving technical, political, economic, business, and social considerations are woven into project decisions and funding allocations. The plan does not intend to lock Clean Cities into pathways that cannot change. Instead, with technology deployment at its core, the plan serves as a guide for decision-making at both the national and local levels of Clean Cities over the next five years. The plan recognizes the need for flexibility and sets out a strategic direction that will build on the progress of current technologies and new opportunities presented in emerging fuels and technologies, such as hydrogen and fuel cells, as well as new niche markets such as off-road applications that build additional throughput at existing alternative fuel stations.

02 PETROLEUM↗

Framework for Identifying Key Environmental Concerns in Marine Renewable Energy Projects- Appendices

Marine wave and tidal energy technology could interact with marine resources in ways that are not well understood. As wave and tidal energy conversion projects are planned, tested, and deployed, a wide range of stakeholders will be engaged; these include developers, state and federal regulatory agencies, environmental groups, tribal governments, recreational and commercial fishermen, and local communities. Identifying stakeholders’ environmental concerns in the early stages of the industry’s development will help developers address and minimize potential environmental effects. Identifying important concerns will also assist with streamlining siting and associated permitting processes, which are considered key hurdles by the industry in the U.S. today. In September 2008, RE Vision consulting, LLC was selected by the Department of Energy (DoE) to conduct a scenario-based evaluation of emerging hydrokinetic technologies. The purpose of this evaluation is to identify and characterize environmental impacts that are likely to occur, demonstrate a process for analyzing these impacts, identify the “key” environmental concerns for each scenario, identify areas of uncertainty, and describe studies that could address that uncertainty. This process is intended to provide an objective and transparent tool to assist in decision-making for siting and selection of technology for wave and tidal energy development. RE Vision worked with H. T. Harvey & Associates, to develop a framework for identifying key environmental concerns with marine renewable technology. This report describes the results of this study. This framework was applied to varying wave and tidal power conversion technologies, scales, and locations. The following wave and tidal energy scenarios were considered: 4 wave energy generation technologies 3 tidal energy generation technologies 3 sites: Humboldt coast, California (wave); Makapu’u Point, Oahu, Hawaii (wave); and the Tacoma Narrows, Washington (tidal) 3 project sizes: pilot, small commercial, and large commercial The possible combinations total 24 wave technology scenarios and 9 tidal technology scenarios. We evaluated 3 of the 33 scenarios in detail: 1. A small commercial OPT Power Buoy project off the Humboldt County, California coast 2. A small commercial Pelamis Wave Power P-2 project off Makapu’u Point, Oahu, Hawaii 3. A pilot MCT SeaGen tidal project, sited in the Tacoma Narrows, Washington. This framework document used information available from permitting documents that were written to support actual wave or tidal energy projects, but the results obtained here should not be confused with those of the permitting documents1. The main difference between this framework document and permitting documents of currently proposed pilot projects is that this framework identifies key environmental concerns and describes the next steps in addressing those concerns; permitting documents must identify effects, find or declare thresholds of significance, evaluate the effects against the thresholds, and find mitigation measures that will minimize or avoid the effects so they can be considered less-than-significant. Two methodologies, 1) an environmental effects analysis and 2) Raptools, were developed and tested to identify potential environmental effects associated with wave or tidal energy conversion projects. For the environmental effects analysis, we developed a framework based on standard risk assessment techniques. The framework was applied to the three scenarios listed above. The environmental effects analysis addressed questions such as: What is the temporal and spatial exposure of a species at a site? What are the specific potential project effects on that species? What measures could minimize, mitigate, or eliminate negative effects? Are there potential effects of the project, or species’ response to the effect, that are highly uncertain and warrant additional study? The second methodology, Raptools, is a collaborative approach useful for evaluating multiple characteristics of numerous siting or technology alternatives, and it allows us to graphically compare alternatives. We used Raptools to answer these questions: How do the scenarios compare, in terms of exposure, risks, and effects to the ecological and human environments? Are there sites that seem to present the fewest effects regardless of technology and scale? Which attributes account for many or much of the effects associated with wave or tidal energy development?

Energy↗

PACE and the Federal Housing Finance Agency (FHFA)

The FHFA regulates Fannie Mae, Freddie Mac, and the 12 Federal Home Loan Banks (the government-sponsored enterprises - GSEs). On June 18, 2009, James B. Lockhart III, then Director of FHFA, released a letter expressing concern about the negative impact of energy loan tax assessment programs (ELTAPs) - also known as Property Assessed Clean Energy (PACE) programs - on both the housing finance system and homeowner program participants. Subsequently, a number of PACE proponents responded to the concerns laid out in the FHFA letter. In early Fall 2009, word circulated that FHFA was planning to follow its June letter with guidance to other agencies, possibly including Fannie Mae and Freddie Mac, discouraging them from buying loans on properties subject to PACE-type assessment liens. This triggered a second round of stakeholder letters, several of which were addressed to President Obama. On October 18, 2009, the White House, in what some believe was an attempt to obviate the need for FHFA guidance, released a Policy Framework for PACE Financing Programs that outlined best practices guidance for homeowner and lender protection. As of February 2010, FHFA and the GSEs have agreed to monitor PACE programs and work with stakeholders and the Administration to consider additional guidance beyond the Policy Framework and to collect more information on PACE program efficacy and risks. A summary of the communications timeline and highlights of the communications are provided.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Southwest Region Experiment Station - Final Technical Report

Southwest Technology Development Institute (SWTDI), an independent, university-based research institute, has been the operator of the Southwest Region Photovoltaic Experiment Station (SWRES) for almost 30 years. The overarching mission of SWTDI is to position PV systems and solar technologies to become cost-effective, major sources of energy for the United States. Embedded in SWTDI's general mission has been the more-focused mission of the SWRES: to provide value added technical support to the DOE Solar Energy Technologies Program (SETP) to effectively and efficiently meet the R&D needs and targets specified in the SETP Multi-Year Technical Plan. : The DOE/SETP goals of growing U.S. PV manufacturing into giga-watt capacities and seeing tera-watt-hours of solar energy production in the U.S. require an infrastructure that is under development. The staff of the SWRES has supported DOE/SETP through a coherent, integrated program to address infrastructural needs inhibiting wide-scale PV deployment in three major technical categories: specialized engineering services, workforce development, and deployment facilitation. The SWRES contract underwent three major revisions during its five year period-of- performance, but all tasks and deliverables fell within the following task areas: Task 1: PV Systems Assistance Center 1. Develop a Comprehensive multi-year plan 2. Provide technical workforce development materials and workshops for PV stakeholder groups including university, professional installers, inspectors, state energy offices, Federal agencies 3. Serve on the NABCEP exam committee 4. Provide on-demand technical PV system design reviews for U.S. PV stakeholders 5. Provide PV system field testing and instrumentation, technical outreach (including extensive support for the DOE Market Transformation program) Task 2: Design-for-Manufacture PV Systems 1. Develop and install 18 kW parking carport (cost share) and PV-thermal carport (Albuquerque) deriving and publishing lessons learned Task 3: PV Codes and Standards 1. Serve as the national lead for development and preparation of all proposals (related to PV) to the National Electrical Code 2. Participate in the Standards Technical Panels for modules (UL1703) and inverters (UL1741) Task 4: Assess Inverter Long Term Reliability 1. Install and monitor identical inverters at SWRES and SERES 2. Operate and monitor all inverters for 5 years, characterizing all failures and performance trends Task 5: Test and Evaluation Support for Solar America Initiative 1. Provide test and evaluation services to the National Laboratories for stage gate and progress measurements of SAI TPP winners

14 SOLAR ENERGY↗

SciDAC's Earth System Grid Center for Enabling Technologies Semiannual Progress Report October 1, 2010 through March 31, 2011

This report summarizes work carried out by the Earth System Grid Center for Enabling Technologies (ESG-CET) from October 1, 2010 through March 31, 2011. It discusses ESG-CET highlights for the reporting period, overall progress, period goals, and collaborations, and lists papers and presentations. To learn more about our project and to find previous reports, please visit the ESG-CET Web sites: http://esg-pcmdi.llnl.gov/ and/or https://wiki.ucar.edu/display/esgcet/Home. This report will be forwarded to managers in the Department of Energy (DOE) Scientific Discovery through Advanced Computing (SciDAC) program and the Office of Biological and Environmental Research (OBER), as well as national and international collaborators and stakeholders (e.g., those involved in the Coupled Model Intercomparison Project, phase 5 (CMIP5) for the Intergovernmental Panel on Climate Change (IPCC) 5th Assessment Report (AR5); the Community Earth System Model (CESM); the Climate Science Computational End Station (CCES); SciDAC II: A Scalable and Extensible Earth System Model for Climate Change Science; the North American Regional Climate Change Assessment Program (NARCCAP); the Atmospheric Radiation Measurement (ARM) program; the National Aeronautics and Space Administration (NASA), the National Oceanic and Atmospheric Administration (NOAA)), and also to researchers working on a variety of other climate model and observation evaluation activities. The ESG-CET executive committee consists of Dean N. Williams, Lawrence Livermore National Laboratory (LLNL); Ian Foster, Argonne National Laboratory (ANL); and Don Middleton, National Center for Atmospheric Research (NCAR). The ESG-CET team is a group of researchers and scientists with diverse domain knowledge, whose home institutions include eight laboratories and two universities: ANL, Los Alamos National Laboratory (LANL), Lawrence Berkeley National Laboratory (LBNL), LLNL, NASA/Jet Propulsion Laboratory (JPL), NCAR, Oak Ridge National Laboratory (ORNL), Pacific Marine Environmental Laboratory (PMEL)/NOAA, Rensselaer Polytechnic Institute (RPI), and University of Southern California, Information Sciences Institute (USC/ISI). All ESG-CET work is accomplished under DOE open-source guidelines and in close collaboration with the project's stakeholders, domain researchers, and scientists. Through the ESG project, the ESG-CET team has developed and delivered a production environment for climate data from multiple climate model sources (e.g., CMIP (IPCC), CESM, ocean model data (e.g., Parallel Ocean Program), observation data (e.g., Atmospheric Infrared Sounder, Microwave Limb Sounder), and analysis and visualization tools) that serves a worldwide climate research community. Data holdings are distributed across multiple sites including LANL, LBNL, LLNL, NCAR, and ORNL as well as unfunded partners sites such as the Australian National University (ANU) National Computational Infrastructure (NCI), the British Atmospheric Data Center (BADC), the Geophysical Fluid Dynamics Laboratory/NOAA, the Max Planck Institute for Meteorology (MPI-M), the German Climate Computing Centre (DKRZ), and NASA/JPL. As we transition from development activities to production and operations, the ESG-CET team is tasked with making data available to all users who want to understand it, process it, extract value from it, visualize it, and/or communicate it to others. This ongoing effort is extremely large and complex, but it will be incredibly valuable for building 'science gateways' to critical climate resources (such as CESM, CMIP5, ARM, NARCCAP, Atmospheric Infrared Sounder (AIRS), etc.) for processing the next IPCC assessment report. Continued ESG progress will result in a production-scale system that will empower scientists to attempt new and exciting data exchanges, which could ultimately lead to breakthrough climate science discoveries.

54 ENVIRONMENTAL SCIENCES↗