Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “STATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

Polk Power Station NGCC Carbon Capture FEED Study

Final Technical Report for Tampa Electric Company's Front-End Engineering Design Study for the implementation of an amine-based Carbon Capture System by ION Clean Energy at the Polk Power Station, Unit 2.

20 FOSSIL-FUELED POWER PLANTS↗

Wyoming CarbonSAFE Phase III: Site Characterization and Permitting Commercial-Scale Carbon Storage Complex Feasibility Study at Dry Fork Station, Wyoming

This report presents the findings of the technical and non-technical site characterization and permitting activities (“Phase III”) conducted under the Wyoming CarbonSAFE: Accelerating CCUS Commercialization and Deployment at Dry Fork Power Station (DFS) and the Wyoming Integrated Test Center project (“Wyoming CarbonSAFE”). Wyoming CarbonSAFE is part of the U.S. Department of Energy’s (DOE) National Energy Technology Laboratory (NETL) Carbon Storage Assurance Facility Enterprise (“CarbonSAFE”) Initiative. The results of Phase III demonstrate that the Wyoming CarbonSAFE project - referred to as the Northern Powder River Basin Carbon Sequestration Hub (NPRB-CSH) - meets the technical, regulatory, and commercial feasibility requirements necessary to advance toward commercial development and construction. The activities completed under this project Phase make the NPRB-CSH one of the region’s most commercially ready carbon storage sites. Completion of this Phase included the finalization of all site surface and subsurface characterization activities, completion and testing of two Class VI standard wells, 10 draft Class VI permits-to construct to address the future needs of a storage complex, finalized NEPA assessments, transportation and capture FEED studies, and a full commercialization strategy with economic modeling, operation and site closure strategies. The NPRB-CSH meets all requirements to progress to a CarbonSAFE Phase IV program or advance to full commercial operations under the development of a business partner.

01 COAL, LIGNITE, AND PEAT↗

Autonomous Hydrogen Fueling Station

This project “Autonomous Hydrogen Fueling Station” covered the autonomous refueling with both gaseous hydrogen and liquid hydrogen. The part on gaseous hydrogen focused on the development of an autonomous robotic fueling arm that would couple to a fuel cell engine for hydrogen refueling without guidance from the forklift operator and budget period. Research was also covered for the robotic fueling with a commercial vehicle. The second phase of the project created the baseline for an autonomous liquid hydrogen transfer system that would minimize boil off losses by operating at thermodynamically efficient state points. For the development of the robotic fueling arm, testing was conducted to establish a baseline measurement of the accuracy and repeatability of a human operator positioning a lift truck in front of a dispenser. The goal was to establish the range of motion required for an autonomous fueling mechanism to mate a hydrogen nozzle with a receptacle on a fuel cell system installed in a forklift. The final design comprised a selective compliance articulated robot arm (SCARA)-type mechanism with two arms for horizontal motion and a ball screw for vertical movement and color and LIDAR cameras were used for marker identification and proximity awareness to guide the robotic arm to its target receptacle. Initial tests resulted in 199 out of 200 successful attempts at autonomous coupling of the dispensing coupler and a fuel cell engine, without hydrogen. The dispenser prototype was modified to include tubing for both hydrogen fuel and air purge lines, but subsequent tests were confounded by the shoulder motor over current errors which limited the robot from getting to the fully inserted position to achieve a positive latch. Robotic hydrogen refueling was successfully demonstrated over 1.5 hours of testing, Plug completed 29 successful latches with an average number of 4 sequential latches before failure. However, a robot capable of placing the nozzle with more force is required for higher reliability. For budget period two, a small scale (10 kg / transfer) automated control system was designed that would operate valves to control pressure and flow of liquid nitrogen between a source and receiving tank with an aim to minimize boil off losses by operating at the most thermodynamically efficient state points. Control system logic flow and a P&ID were developed prior to system safety characterization via HAZOP. A control narrative and system state points were defined. Delays in approval for a change of project objective and procurement issues precluded the construction and test of the final prototype system.

08 HYDROGEN↗

Multimodal Instrument Concepts for Chemical Sciences at Second Target Station

The development of advanced chemical and energy systems is inherently complex, relying heavily on their unique pathways. Because no two catalysts or batteries follow exactly the same kinetic trajectories, conventional sequential measurements often obscure crucial relationships between structure and dynamics through statistical averaging. This report introduces two neutron scattering instrument concepts for the Second Target Station (STS) specifically designed to overcome this barrier: the Extended Q-range Diffractometer (EQD) and the Multimodal Chemical Spectrometer (MCS).

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Neutronics Evaluation of the Preliminary Design of the Service Cell Door for the Second Target Station

The service cell door needs to provide sufficient shielding to achieve 0.25 mrem/h dose rates in the adjacent room while remote handling operations of waste materials are going on within the service cell for the Second Target Station (STS). This analysis provides a neutronics evaluation of the preliminary design of the service cell door to evaluate the required thickness and the effect of streaming gaps around the door. As radiation source, we use the decay gamma source of the moderator reflector assembly (MRA) of the STS with a decay time of either two days or six months. As the MRA contains a significant amount of beryllium, photonuclear reactions induce a neutron source, which dictates the required door thickness in certain situations. Four scenarios with different MRA positions and decay times have been analyzed. The required thickness differs drastically depending on the chosen scenario and on the material of the door. The streaming through the gaps around the door is relatively small with high dose rates limited to small sections of the geometry.

43 PARTICLE ACCELERATORS↗

Moderator Optimization for the Second Target Station Final Design

This report details the results from the optimization simulations performed for the final design of the Second Target Station (STS). This is a continuation of the analysis performed in 2022 for the preliminary design. To evaluate the impact of the design changes since 2022, the analysis was repeated with updated target and moderator models. Additionally, more degrees of freedom have been considered in the premoderator dimensions which provide a refinement compared to the previous optimization analysis.

43 PARTICLE ACCELERATORS↗

Yield Estimates of three Historical Atmospheric Nuclear Explosions at Lop Nor, from Reduced Order Models of Regionally Recorded Rayleigh Waveforms and One Seismic Station: A Brief Communication

We use a reduced order model (ROM) for Rayleigh waveforms sourced by large atmospheric explosions along with data collected from a single seismic station (TLG) to estimate the yields of three atmospheric nuclear tests with order-megaton (MT) yields. These historical tests were conducted by China between 1973 and 1980 (CHIC 15, CHIC 16, and CHIC 26). We use our ROM to estimate yields of 2.34 MT (CHIC 15), 0.51 MT (CHIC 16), and 1.15 (CHIC 26) in the 20.5 s period band that are consistent with publicly accepted values of 3 MT (CHIC 15), 0.50 MT (CHIC 16), and 0.730 MT (CHIC 26).

58 GEOSCIENCES↗

Design and Prototyping of the 162.5 MHz PIP-II RF Reference-Line Station

The Proton Improvement Plan II (PIP-II) Reference Line distributes phase-stable radio-frequency signals so accelerating cavities transfer energy to the proton beam at the correct point in each RF cycle. The full system contains 162.5, 325, and 650 MHz sections; this project focuses on the 162.5 MHz station. Commercial filters, amplifiers, splitters, mixers, and hardware were assembled into a compact, serviceable heat-plate layout and tested to verify performance metrics at 162.5 MHz.

Subedi, Harsheet [Unlisted, US]↗

Field Testing of Activated Carbon Injection Options for Mercury Control at TXU's Big Brown Station

The primary objective of the project was to evaluate the long-term feasibility of using activated carbon injection (ACI) options to effectively reduce mercury emissions from Texas electric generation plants in which a blend of lignite and subbituminous coal is fired. Field testing of ACI options was performed on one-quarter of Unit 2 at TXU's Big Brown Steam Electric Station. Unit 2 has a design output of 600 MW and burns a blend of 70% Texas Gulf Coast lignite and 30% subbituminous Powder River Basin coal. Big Brown employs a COHPAC configuration, i.e., high air-to-cloth baghouses following cold-side electrostatic precipitators (ESPs), for particulate control. When sorbent injection is added between the ESP and the baghouse, the combined technology is referred to as TOXECON{trademark} and is patented by the Electric Power Research Institute in the United States. Key benefits of the TOXECON configuration include better mass transfer characteristics of a fabric filter compared to an ESP for mercury capture and contamination of only a small percentage of the fly ash with AC. The field testing consisted of a baseline sampling period, a parametric screening of three sorbent injection options, and a month long test with a single mercury control technology. During the baseline sampling, native mercury removal was observed to be less than 10%. Parametric testing was conducted for three sorbent injection options: injection of standard AC alone; injection of an EERC sorbent enhancement additive, SEA4, with ACI; and injection of an EERC enhanced AC. Injection rates were determined for all of the options to achieve the minimum target of 55% mercury removal as well as for higher removals approaching 90%. Some of the higher injection rates were not sustainable because of increased differential pressure across the test baghouse module. After completion of the parametric testing, a month long test was conducted using the enhanced AC at a nominal rate of 1.5 lb/Macf. During the time that enhanced AC was injected, the average mercury removal for the month long test was approximately 74% across the test baghouse module. ACI was interrupted frequently during the month long test because the test baghouse module was bypassed frequently to relieve differential pressure. The high air-to-cloth ratio of operations at this unit results in significant differential pressure, and thus there was little operating margin before encountering differential pressure limits, especially at high loads. This limited the use of sorbent injection as the added material contributes to the overall differential pressure. This finding limits sustainable injection of AC without appropriate modifications to the plant or its operations. Handling and storage issues were observed for the TOXECON ash-AC mixture. Malfunctioning equipment led to baghouse dust hopper plugging, and storage of the stagnant material at flue gas temperatures resulted in self-heating and ignition of the AC in the ash. In the hoppers that worked properly, no such problems were reported. Economics of mercury control at Big Brown were estimated for as-tested scenarios and scenarios incorporating changes to allow sustainable operation. This project was funded under the U.S. Department of Energy National Energy Technology Laboratory project entitled 'Large-Scale Mercury Control Technology Field Testing Program--Phase II'.

01 COAL, LIGNITE, AND PEAT↗

INVESTIGATION OF PIPELINES INTEGRITY ASSOCIATED WITH PUMP MODULES VIBRATION FOR PUMPING STATION 9 OF ALYESKA PIPELINE SERVICE COMPANY

Since the operation of PS09 SR module in 2007, it has been observed that there is vibration in various parts of the structures, on various segments of piping, and on appurtenance items. At DOT Pipeline and Hazardous Materials Safety Administration (PHMSA) request, ORNL Subject Matter Experts support PHMSA in its review and analysis of the observed vibration phenomenon. The review and analysis consider possible effects of pipeline design features, vibration characteristics, machinery configuration, and operating practices on the structural capacity and leak tight integrity of the pipeline. Emphasis is placed on protection of welded joints and machinery against failure from cyclic loading. A series of vibration measurements were carried out by the author during the site visit to PS09, the power of the operating pump during the data collection is at about 2970KW, which is less than that of APSC's vibration data collected at 3900KW. Thus, a first order proportional factor of 4900/2970 was used to project the measured velocity data to that of APSC's measurement of the velocity data. It is also noted here that the average or the peak-hold value of the measured velocity data was used in the author's reported data, and only the maximum peak-hold data was used in APSC's reported data. Therefore, in some cases APSC's data is higher than the author's projective estimates that using the average data. In general the projected velocity data are consistent with APSC's measurements; the examples of comparison at various locations are illustrated in the Table 1. This exercise validates and confirms the report vibration data stated in APSC's summary report. After the reinforcement project for PS09 Station, a significant reduction of vibration intensity was observed for the associated pipelines at the SR Modules. EDI Co. provided a detailed vibration intensity investigation for the newly reinforced Pump Module structures and the associated pipelines. A follow-up review of EDI's report was carried out by the author. The comments and questions regarding the EDI report are categorized into four subjects, namely (1) piping vibration severity, (2) pulsation and its impact on the PS09 structure and piping, (3) strain-gage stress history profiles, and (4) the cavitation potential investigation, where the questions are stated at the end of the comments for further follow-on investigations.

02 PETROLEUM↗