Study of Reactor BN-350 Wastewater Impact on the Environment
The fast neutron reactor BN-350 had a dual purpose: steam production and plutonium accumulation. The steam produced in the reactor was used to generate electricity (up to 150 MW) and desalination of seawater (up to 120,000 tons/day). The BN-350 reactor became operational in July 1973; its design operation lifetime was 20 years. After expiration of the reactor design lifetime in July 1993, its subsequent operation was continued according to the annual decisions on extension of the reactor operation, by one year. The reactor has been idle since December 1998. On April 22, 1999 Resolution No. 456 'About decommissioning of the BN-350 reactor in Aktau, Mangistau region' was adopted by the RK Government. Thus, the total operation period of the reactor was more than 25 years. One of the important issues related to the long-term operation of a radiation-hazardous facility, such as the BN-350 reactor, is to assess its impact on the environment. The necessity and urgency of detailed studies of the radiation situation is explained by the location of the Caspian Sea and Aktau city in the area of the BN-350 reactor's potential impact. This paper describes the preliminary results of the evaluation of the BN-350 reactor's effect on the level of radionuclide contamination of surface water, including the Caspian Sea via the mechanism of radionuclide discharge in wastewater. (authors)