Probabilistic Asteroid Impact Risk Assessment 2023 PDC Hypothetical Impact Exercise Scenario Epoch 1: Initial Discovery
Explore the source record for details and available documents.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
General slides on INL risk analysis capabilities for SMRs.
No abstract available
No abstract prepared.
No abstract prepared.
When new technology, such as artificial intelligence (AI), is introduced into an existing workflow it may impact risk by mitigating some vulnerabilities and threats in the workflow while introducing others. We present a versatile methodology for assessing the vulnerabilities and threats that impact overall risk in a workflow to inform technology integration. Our method involves both qualitative and quantitative assessment of risk and includes a formula for generating a risk score to guide technology integration. We describe our methodology and demonstrate its application to a specific workflow (the Derivative Classification review process). This work was funded by the Department of Energy (DOE) Automated Classification Tools for the Identification of Classified Information (ACTICI) program.
Multi-hazard approach represents a convenient way to address structural reliability of a critical infrastructure. Objective of the present paper is to present a multi-hazard methodology for evaluation of the risk associated with the limit state of collapse for a reinforced concrete (RC) structure subject to both seismic and blast threats. Blast fragility can be defined as the probability of progressive collapse given a blast event has taken place and its evaluation is here suggested via a Monte Carlo procedure, generating different possible blast configurations. For each blast scenario, the consequent damages occurring to the investigated structure are identified and an updating of the structure is then performed. The structural stability under gravity loading is then verified by employing a kinematic plastic limit analysis. The conditional probability of collapse or the blast fragility is then calculated as the mean value of the collapse indicator variable over the number of cases generated by the simulation procedure. Therefore, the seismic fragility is also determined via classical methods described elsewhere and the total risk of collapse is evaluated as the sum of blast and seismic contributions.
This report describes the sampling locations, identifies samples collected, and describes any modifications and additions made to the DOE/RL-2005-42.
No abstract prepared.
Los Alamos National Laboratory (LANL) and surrounding areas have been exposed to at least four significant wildfires since 1977 and there have been numerous others within 50 miles of LANL. Based on this history, wildfires are considered a risk to LANL facilities and their contents. While many LANL facilities are at risk to wildfire to some degree, they are found in a wide variety of conditions, thus they have varying sensitivities to wildfires. Additionally, LANL facilities have various functions and different assets, so they have a wide range of values or consequences if compromised. Therefore, determining the risks and precautions that are warranted to mitigate these risks must be done on a case-by-case basis. In an effort to assess possible wildfire risks to sensitive materials stored in a Perma-Con ® in dome TA-54-0375, a conventional fire risk analysis was performed. This conventional risk analysis is documented in Engineering Evaluation Form AP-FIRE-001-FM1, which is dated 9/28/2015 and was titled ‘Wildland Fire Exposure Evaluation for Building TA-54-0375’ (Hall 2015). This analysis acknowledged that there was significant chance of wildfire in the vicinity of TA-54-0375, but the amount of combustible material surrounding the building was deemed low. The wildland fuels that were closest to the building were largely fine fuels and were not expected to have significant duration of heat release. The prevailing winds at this location are from the south and southwest and the nearest significant upwind fuels (tree crowns or unmown grasses) are at least 300 feet away. Based on these factors the conventional wildland fire risk to TA-54-0375 was deemed minimal, “Acceptable As Is, No Action Required.” This risk evaluation was based on a combined assessment of low probability of wildfires arriving at the site from other directions (where higher fuel loadings might be present) as well as the effective setback of fuels in the direction that fire is expected to arrive from.
Numerous operational paradigms, technologies, and missions are emerging as newcomers to the National Airspace System (NAS) develop small Unmanned Aircraft Systems (sUAS), personal air vehicles and other Urban Air Mobility (UAM) concepts. As the list of applications expands, maintaining the safety of the current airspace system remains one of the core concerns preventing widespread commercial implementation of these concepts. Further, the risks associated with unmanned aircraft operations themselves have to be recognized and mitigated in a timely manner. Safety-critical risks include, but are not limited to, flight outside of approved airspace, unsafe proximity to people or property, critical system failures, loss-of control, and cyber-security related risks. Instead of reacting to accidents, a set of predictive and data-driven risk monitoring, assessment, and mitigation capabilities are envisioned to help capture and eliminate hazards as these systems become operational. NASA’s System-wide Safety project is performing R&D on such a safety assurance concept. As part of this concept, this paper describes an architecture that continuously monitors a diverse set of onboard and ground-based sources to estimate and predict non-participant casualty risk during flight. Timely identification of the changing nature of this risk can inform decision making processes to mitigate current and impending situations.
This study examines the mechanisms governing sustained tin plasma formation in vacuum. The authors have experimentally demonstrated that sustained tin plasmas can form in vacuum at dc power supply voltages as low as 4 V, and present a qualitative model for the observed voltage and current signatures associated with tin plasma formation. Engineering estimates were developed to help quantify tin whisker risk as a function of power supply voltage. Implications for space applications are also discussed.
United States critical infrastructure entities are increasingly targeted by motivated and capable threat actors and must be prepared to assess and treat a diverse range of cyber risks. Consequently, this necessitates some form of analytical process to evaluate risks and inform cyber security investment decisions. A potential solution for structuring cyber risk evaluation exists within the field of sovereign credit ratings – where agencies employ mature approaches that integrate quantitative and qualitative data to produce a singular value of assessment. Adapting such approaches, we present a novel criterion and methodology for measuring and communicating the likelihood element of cyber risk. The methodology is composed of three sequential phases: a quantitative baseline organized by distinct capability frames, a bounded qualitative adjustment per frame, and a greater-bounded qualitative adjustment spanning the entire process. The process culminates in publication of a cyber capability rating that communicates a critical infrastructure entity’s ability and willingness to mitigate discontinuous function due to cyberattack.
Not Available
Future human space missions target far destinations such as Near Earth Objects (NEO) or Mars that require extended stay in hostile radiation environments in deep space. The continuous assessment of exploration vehicles is needed to iteratively optimize the designs for shielding protection and calculating the risks associated with such long missions. We use a predictive software capability that calculates the risks to humans inside a spacecraft. The software uses the CAD software Pro/Engineer and Fishbowl tool kit to quantify the radiation shielding properties of the spacecraft geometry by calculating the areal density seen at a certain point, dose point, inside the spacecraft. The shielding results are used by NASA-developed software, BRYNTRN, to quantify the organ doses received in a human body located in the vehicle in a possible solar particle events (SPE) during such prolonged space missions. The organ doses are used to quantify the risks posed on the astronauts' health and life using NASA Space Cancer Model software. An illustration of the shielding optimization and risk calculation on an exploration vehicle design suitable for a NEO mission is provided in this study. The vehicle capsule is made of aluminum shell, airlock with hydrogen-rich carbon composite material end caps. The capsule contains sets of racks that surround a working and living area. A water shelter is provided in the middle of the vehicle to enhance the shielding in case of SPE. The mass distribution is optimized to minimize radiation hotspots and an assessment of the risks associated with a NEO mission is calculated.
Advanced small modular reactors (aSMRs) can complement the current fleet of large light-water reactors in the USA for baseload and peak demand power production and process heat applications (e.g., water desalination, shale oil extraction, hydrogen production). The day-to-day costs of aSMRs are expected to be dominated by operations and maintenance (O&M); however, the effect of diverse operating missions and unit modularity on O&M is not fully understood. These costs could potentially be reduced by optimized scheduling, with risk-informed scheduling of maintenance, repair, and replacement of equipment. Currently, most nuclear power plants have a “living” probabilistic risk assessment (PRA), which reflects the as-operated, as-modified plant and combine event probabilities with population-based probability of failure (POF) for key components. “Risk monitors” extend the PRA by incorporating the actual and dynamic plant configuration (equipment availability, operating regime, environmental conditions, etc.) into risk assessment. In fact, PRAs are more integrated into plant management in today’s nuclear power plants than at any other time in the history of nuclear power. However, population-based POF curves are still used to populate fault trees; this approach neglects the time-varying condition of equipment that is relied on during standard and non-standard configurations. Equipment condition monitoring techniques can be used to estimate the component POF. Incorporating this unit-specific estimate of POF in the risk monitor can provide a more accurate estimate of risk in different operating and maintenance configurations. This enhanced risk assessment will be especially important for aSMRs that have advanced component designs, which don’t have an available operating history to draw from, and often use passive design features, which present challenges to PRA. This paper presents the requirements and technical gaps for developing a framework to integrate unit-specific estimates of POF into risk monitors, resulting in enhanced risk monitors that support optimized operation and maintenance of aSMRs.
In order to quantify the probable risk associated with a safety system, nuclear safety risk evaluation process is applied which is generally performed in three steps. The first step is to calculate the damage frequency of a critical system. This step is followed by the radioactive source term estimation due to the potential system damage. The final step is the assessment of off-site consequences. The safety risk formula is shown by Eq. (1). P{sub F} is the probability of safety system failure (the probability used describes a random, independent event), and C is the consequence value. R{sub SAF} = P{sub F} * C (1) The security risk associated with an attack on critical infrastructure and/or special nuclear materials theft is usually evaluated using three- term risk equation (probability of attack, probability of adversary success, and consequence). A security threat and the related initiating events are not considered in a pure safety risk analysis. The vulnerability of the physical protection system is performed independently even though the consequence resulting from a security initiating event can be similar to a safety related initiating event and thus gets double counted. The security risk can be calculated using Eq. (2) R{sub SEC} = P{sub A} * P{sub S} * C (2) PA is the probability of attack, P{sub S} is the probability of adversary success (P{sub S} = 1 - P{sub I} P{sub N}). P{sub I} being the probability of interruption which accounts for the probabilities of detection of all timely detection elements along an adversary path. PN being the probability of neutralization: the result of engagement of the response force with the adversaries after the interruption has occurred. C is the consequence magnitude from a successful attack. The two security probabilities do not describe random, independent events. As a result, because of the differences in the randomness and independence of the respective safety and security probabilities, the safety and the security risks are currently calculated separately. The consequence term in nuclear safety and security risk evaluation have the same definition. An effort is made here to study the effect on the overall risk by considering security initiating events along with the subsequent failure of the intermediate safety element. The target selected is a spent fuel storage pool for analyzing the public risk arising from the interplay between nuclear security and safety initiating events. EASI (Estimate of Adversary Sequence Interruption) model is used to calculate the probability of interruption related to a security system that leads to the calculation of the security initiating event frequency. Further progression of this initiating security event to a top event is analyzed using a Probabilistic Safety Assessment (PSA) tool, SAPHIRE (version 8) to obtain a joint pool damage frequency. For the progression of events leading to a top event, the failure of the intermediate safety elements is assumed to be external random events such as heavy load drop and fire events. The objectives of this study is to (1) determine the double accounting of frequency of failure, risk and allocated resources in the scenario of a non-random security initiating event leading to a safety random event chain (2) compare the damage frequency from pure security with the frequency of combined security-safety failure event and pure safety failure events. (authors)