Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

Crustal dynamics project observations: 1982 results and plans for 1983

The 1982 Crustal Dynamics Project observations by fixed and mobile SLR and VLBI systems are reviewed. Plate motion measurements between North America and Europe were conducted by both techniques and SLR measurements were also made between North America, the Pacific, Australia and South American plates. Regional deformation measurements by VLBI and SLR systems were restricted to the western United States in 1982, including a number of important intercomparison baseline measured by both techniques. In 1983 the observing program grows significantly, with new SLR systems in Mexico, Easter Island, the Pacific and Italy. New VLBI systems will include a dedicated VLBI site at Weltzell, in Germany. Two highly mobile SLR and two highly mobile VLBI systems will greatly increase the regional deformation measurements in California and through the Basin and Range, where more than 25 sites will be occupied in 1983.

Frey, H.↗

The Project Manager Who Saved His Country

George Meade defeated Robert E. Lee, one of the greatest military leaders of all time. How did he do it? By using the skills he had learned as a project manager and outperforming Lee in all aspects of project management. Most project managers are familiar with the Project Management Institute's "Guide to the Project Management Body of Knowledge" (PMBOK), which identifies the skills and knowledge crucial to successful project management. Project managers need to make sure that all the elements of a project work together. They must develop and execute plans and coordinate changes to those plans. A project manager must define the scope of the work, break it into manageable pieces, verify and control what work is being done, and make sure that the work being done is essential to the project. Every project manager knows the challenges of schedule and the value of schedule slack. Project managers must get the resources they need and use them effectively. Project managers get the people they need and use their talents to achieve mission success. Projects generate huge amounts of information. A key to project success is getting sufficient and accurate information to the people who need it when they need it. Project managers must identify and quantify the risks that jeopardize project success and make plans for dealing with them. Studying Meade and Lee's performances at Gettysburg can help modern project managers appreciate, develop, and use the skills they need to be good project managers. The circumstances may be different, but the basic principles are the same. This dramatic event in American history shows how the skills of project management can be used in almost any situation. Former project manager George Meade used those skills to change the tide of the Civil War.

Baniszewski, John↗

Risk Analysis Application to Project Management

Oak Ridge National Laboratory staff are performing risk assessments for the Department of Energy Office of Nuclear Materials Integration for use in project management. The goal was to provide tools to help manage Department of Energy projects that require cross-functional teams to implement a project with a variety of drivers or constraints. The methodology is flexible and can be adapted for the level of rigor needed for the project. This paper focuses on risk assessments and risk mitigation planning for projects in their early stage of development when only preliminary project information is likely to be available. The methodology has been successfully used during the planning phases of projects to guide selection of tasks to be performed to reduce risk, lower costs, and improve chances of success.

Robinson, Sharon↗

Implementation of Lessons Learned - 17406

Following a negative occurrence or event, putting corrective actions into place to address an organisation's systemic and administrative weaknesses is paramount to that organisation's future success. At Los Alamos National Laboratory (LANL, or the Laboratory), recent experiences emphasize this critical point. On February 14, 2014, transuranic (TRU) waste management at DOE facilities changed significantly when a drum of mixed hazardous and TRU (MTRU) waste from LANL breached after its disposal at the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico. Shortly following the LANL-WIPP event, several internal and external investigations and analyses were conducted by LANL, the U.S. Department of Energy (DOE) and others, including the DOE Inspector General and an Office of Environmental Management Accident Investigation Board (AIB), to determine the cause of the LANL drum breach at WIPP. Internal investigations led LANL to self-disclose non-compliancies including treatment without a permit and improper waste characterization to the New Mexico Environment Department (NMED), leading to a Settlement Agreement in January 2016. The Settlement Agreement, together with the other investigations, led LANL to identify and implement many corrective actions related to its waste management practices. The Laboratory recognized the need to revisit implementation of some fundamental concepts, and noted the following 'Lessons Learned': - Communicating requirements more clearly, - Using technical expertise more effectively, and - Improving implementation of policies and procedures. This paper presents the actions LANL has taken to prevent recurrence and demonstrate the Laboratory's commitment to compliant waste management requirements. They have focused on promoting a better understanding of the regulatory requirements in order to address the key root causes and the resulting Lessons Learned, as follows: - Ensure that all levels of a Project Team understand the regulatory requirements related to performing the work;- Engage RCRA subject matter experts in planning (for both initial project plans and subsequent modifications to plans); - Validate that Project Teams' plans and procedures will be effective in meeting regulatory requirements; and - Verify implementation. We believe the corrective actions taken since the drum event at WIPP will fundamentally improve our way of doing business throughout the Laboratory. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of Facilities Master Plan and Laboratory Renovation Project

Funding from this grant has allowed Morehouse School of Medicine to complete its first professionally developed, comprehensive campus master plan that is in alignment with the recently completed strategic plan. In addition to master planning activities, funds were used for programming and designing research renovations, and also to supplement other research facility upgrades by providing lighting and equipment. The activities funded by this grant will provide the catalyst for substantial improvement in the School's overall facilities for biomedical education and research, and will also provide much of the information needed to conduct a successful campaign to raise funds for proposed buildings and renovations.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Overview of the PLEXIL Plan Execution Technology and its Applications in Autonomous Piloting Projects at NASA

Automated planning is a key Artificial Intelligence technology enabling Unmanned Aerial Systems (UAS) and the eminent reality of Urban Air Mobility (UAM). It produces plans, which formalize procedures often performed by humans. Plans differ from other kinds of computer programs in their ability to react and interact with a dynamically changing environment. Aviation plans must encode the procedural knowledge, reasoning capability, and capacity for multi-tasking held by competent human pilots. Correct execution of these plans (performed by software called an executive) in the dynamic airspace environment is vital to the success of each automated flight, and the safety of the vehicle and all things in its path. In the early 2000s NASA developed a plan representation language and executive called PLEXIL (Plan Execution Interchange Language) that has successfully been applied in several NASA aviation and UAS projects. Autonomy Operating System (AOS), Cockpit Hierarchical Automated Planning and Execution (CHAP-E), and ICAROUS are all projects that have used PLEXIL to help encode and automatically execute flight procedures, some normally performed by human pilots. AOS also automates a subset of pilot/Air Traffic Control communication towards enabling UAS entry into the National Airspace. PLEXIL has been open-source software since 2008 and has seen usage in a wide range of prototypical autonomy applications in academia, government, and industry. In this presentation, we describe PLEXIL and highlight its significant accomplishments in the aviation domain.

Dalal, Michael↗

Pliocene Model Intercomparison Project Phase 3 (PlioMIP3) – Science Plan and Experimental Design

The Pliocene Model Intercomparison Project (PlioMIP) was initiated in 2008. Over two phases PlioMIP has helped co-ordinate the experimental design and publication strategy of the community, which has included an increasing number of climate models and modelling groups from around the world. It has engaged with palaeoenvironmental scientists to foster new data synthesis supporting the construction of new model boundary conditions, as well as to facilitate new data-model comparisons. The work has advanced our understanding of Pliocene climates and environments, enhanced our knowledge regarding the ability of complex climate and Earth System models to accurately simulate climate change, and helped to refine our estimates of how sensitive the climate system is to forcing conditions. In this community protocol paper, we outline the scientific plan for PlioMIP Phase 3 (PlioMIP3). This plan provides the required guidance to participating modelling groups from around the world to successfully set up and perform PlioMIP3 climate model experiments. The project is open to new participants from the scientific community (both from the climate modelling and geosciences communities). In PlioMIP3, we retain the PlioMIP2 Core experiments (Eoi 400 , E 280 ) and extend the Core requirements to include either an experiment focussed on the Early Pliocene or an alternative Late Pliocene simulation (or both). These additions (a) allow a comparison of Early and Late Pliocene warm intervals and help build research connections and synergy with the MioMIP (Miocene Model Intercomparison Project - also known as DeepMIP-Miocene) and PlioMioVAR projects (Pliocene-Miocene Variability Working Group), and (b) create an alternative time slice simulation for 3.205 Ma (MIS KM5c) through removal of some of the largest palaeogeographic differences introduced between PlioMIP1 and 2 resulting in minimal land-sea mask variations from the modern. In addition, we present ten optional experiments designed to enhance our assessment of climate sensitivity and to explore the uncertainty in greenhouse gas-related forcing. For the first time, we introduce orbital sensitivity experiments into the science plan, as well as simulations incorporating dynamic vegetation-climate feedbacks and an experiment designed to examine the potential significance of East Antarctic Ice Sheet boundary condition uncertainty. These changes enhance palaeo-to-future scientific connections and enable an exploration of the significance of palaeogeographic uncertainties on climate simulations.

Climate modelling↗

Airborne Projection of Burning Embers – Planning and Controls for Los Alamos National Laboratory Facilities

As a result of the Las Conchas Fire, the Department of Energy in correspondence SO:32CK 372899 (DOE 2011) requested that LANS take the following action: Evaluate the Las Conchas fire experience and other data on airborne projection of burning embers and the appropriate planning and controls for Los Alamos National Laboratory (LANL) facilities, including nuclear and high hazard facilities. This paper addresses the DOE action by evaluating 1) the meteorology at the time of the accident and implications for new wild land fires; 2) the ability of LANL facilities to withstand fires as a result of burning embers, and 3) LANL programs in place to mitigate the effects of wild land fires. The spread of fire as a result of burning embers is a known and important mechanism. Both empirical and computational studies have been performed, and it is recognized that these studies should continue (Kim 2009, Koo 2010, Sardoy 2007). Due to the locale and environs of LANL, burning brands or embers from forest fires are a credible risk at LANL. With the exception of the Area G TRU Waste Facility, LANL nuclear facilities have fire resistant exteriors with UL Class A roofs. Waste at Area G is stored in fire resistant containers. The laboratory has comprehensive Emergency Operations and Fire Protection Programs, which includes assessing wildland fire risk and mitigating the spread of fires, for example, by maintaining fire breaks and additional defensible buffer areas free of combustibles around LANL facilities and limits on combustible loading. Vegetation is cut-back to at least national consensus standards on a regular basis around nuclear facilities. Fire Department services are provided by Los Alamos County through an agreement with the Department of Energy. The interface between the Fire Department and LANL during emergencies is the Emergency Operations Division. The ability of LANL facilities to withstand a wildland fire was tested by both the Cerro Grande fire in 2000 as well as the Las Conchas fire. No nuclear or high-hazard facilities were damaged even though the Cerro Grande fire burned around a number of the facilities. Since then, the laboratory has strengthened programs to protect against wildland fires.

99 GENERAL AND MISCELLANEOUS↗

Design of 650 MHz Tuner for PIP-II Project

The Proton Improvement Plan (PIP) II project at Fermilab is a proton driver linac which will use of five different cavity geometries including a 650 MHz 5-cell elliptical cavities that will operate in RF-pulse mode. Detuning of these cavities by Lorentz Forces will be large and strongly depend of the stiffness of the cavity's tuner. First prototype tuner built and tested warm [1,2]. Measured stiffness of the prototype tuner was below 30kN/mm instead of expected from simulation 70kN/mm [2]. Significant effort has been invested into understanding discrepancy between simulation and experimental data that led to newest tuner design. Updated 'dressed cavity-helium vessel-tuner' model provided consistent results between ANSYS simulations and experiment results. Modified tuner design and analysis in limitations for overall 'cavity/tuner system' stiffness will be presented.

43 PARTICLE ACCELERATORS↗

Grimsel Test Site - A Successful International Underground Research Laboratory for Many Decades - 20429

For more than 35 years, Nagra and its partners from around the world have been conducting underground research projects at the Grimsel Test Site (GTS, www.grimsel.com) to contribute to the development and confirmation of safe geological disposal concepts and for the characterization of suitable host rock formations. Over the years, the results of this internationally recognized research program have been, and continue to be, incorporated directly into exploration programs, modelling, safety, and engineering feasibility studies on options for deep geological repositories. Each project of the GTS program involves field-testing, laboratory studies, design and modelling tasks, and integrates all scientific and technical aspects. Each project phase is planned with a duration of three to five years to facilitate practical and administrative aspects and allow flexibility for updating the overall project plans with the latest findings. Scientific and engineering interaction among the different projects is ensured via an international steering committee meeting. Hosting an IAEA level C radiation- controlled zone, which allows use of radionuclides, including actinides such as thorium, uranium, neptunium, plutonium and americium, in in-situ experiments is one of the reasons why GTS also developed as a center of excellence for work with radioactive tracers under realistic in-situ boundary conditions. Last year, a new five-year program (2019 to 2023) started which includes projects with a planning horizon of decades. The new five-year program includes a new phase of in-situ experiments using radionuclides such as migration experiments in the Colloid Formation and Migration project (CFM), the Long-Term Diffusion experiment (LTD) and the newly established C-14 and I-129 Migration in cement project (CIM). The 'High Temperature effects on Bentonite' (HotBENT) project is starting in the current phase and is studying the effects of elevated temperatures (>175 deg. C) on bentonite materials. As a generic underground research laboratory (URL) it is expected that the GTS will provide in the coming years a platform for international collaboration, knowledge development and knowledge transfer for the next generation of scientists and engineers in the area of radioactive waste disposal and geosciences. A key role regarding knowledge transfer and training is provided by the well-established Grimsel Training Center (GTC), which (beside many URL related issues) also covers many general aspects of radioactive waste management. In this paper we provide an overview of the current program at the GTS, focusing on the experiments that study the migration of radionuclides through engineered barrier materials and the geosphere. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PROTOPLASMA - Proton-driven plasma-wakefield experiment at Fermilab: Stages and approach

Generation of TeV-scale electron beams using conventional RF technology appears expensive for building the next generation of colliders. Proton-driven plasma-wakefield acceleration of electrons promises an alternative route to generate TeV-scale electron beams using existing proton machines. PROTOPLASMA is the proposed R and D project at Fermilab that plans to use a proton beam driven plasma-wakefield to accelerate electrons. The project is planned in stages with the project's path guided by simulations. First, a 60-120 GeV proton beam will be injected into 1-2 meters of plasma to observe selfmodulation instability in the proton beam. Next, an injected 5 MeV electron beam will be accelerated by the plasma. In this paper, we report on the basic project plan and outline our staged approach. We report on first simulation results that show self-modulation of a proton bunch and discuss beam optics requirements and other limits.

43 PARTICLE ACCELERATORS↗

Apollo Soyuz Test Project photographic processing control plan

The laboratory controls to be used within the photographic technology division (PTD) for processing original space flight films exposed on the Apollo Soyuz Test Project mission are specified. The sensitometric exposures to be used by PTD for certifying processes, for exposing Houston Controls, and for preflight and postflight exposures on original films as well as procedures for film certification are described. Processing conditions used to achieve each control and processing machine operating parameters are included.

Lockwood, H. E.↗

Storm Water Pollution Prevention Plan for the Facility LAMP Project

A site-specific Stormwater Pollution Prevention Plan (SWPPP) is needed for most construction activities/projects that disturb one (1) acre or more of land to meet the requirements of the National Pollutant Discharge Elimination System (NPDES) General Permit for Storm Water Discharges Associated With Construction and Land Disturbance Activities (General Permit) issued by the State Water Resources Control Board (State Board). This Order No. 2009-0009- DWQ was adopted by the State Board on September 2, 2009 and became effective July 1, 2010

54 ENVIRONMENTAL SCIENCES↗

The NASA/DOE/DOD nuclear rocket propulsion project - FY 1991 status

NASA has initiated planning and critical technology development for nuclear rocket propulsion systems for Space Exploration Initiative missions to the moon and to Mars. Interagency agreements are being negotiated between NASA, the Department of Energy, and the Department of Defense for joint technology development activities. This paper summarizes the activities of the NASA project planning team in FY 1990 that led to the draft Nuclear Propulsion Project Plan, outlines the FY 1991 Interagency activities, and describes the current status of the project plan.

Clark, John S.↗

Improving DOE Project Performance Using the DOD Integrated Master Plan - 12481

DOE O 413 measures a project's progress to plan by the consumption of funding, the passage of time, and the meeting of milestones. In March of 2003, then Under Secretary, Energy, Science, Card received a memo directing the implementation of Project Management and the Project Management Manual, including the Integrated Master Plan and Integrated Master Schedule. This directive states 'the integrated master plan and schedule tie together all project tasks by showing their logical relationships and any constraints controlling the start or finish of each task. This process results in a hierarchy of related functional and layered schedules derived from the Work Breakdown Structure that can be used for monitoring and controlling project progress'. This paper shows how restoring the IMP/IMS paradigm to DOE program management increases the probability of program success in ways not currently available using DOD O 413 processes alone. Using DOE O 413 series guidance, adding the Integrated Master Plan and Integrated Master Schedule paradigm would provide a hierarchical set of performance measures for each 'package of work,' that provides measurable visibility to the increasing maturity of the project. This measurable maturity provides the mechanism to forecast future performance of cost, schedule, and technical outcomes in ways not available using just the activities in DOE O 413. With this information project managers have another tool available to address the issues identified in GAO-07-336 and GAO-09-406. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Simulations of space charge in the Fermilab Main Injector

The Fermilab Project X plan for future high intensity operation relies on the Main Injector as the engine for delivering protons in the 60-120 GeV energy range. Project X plans call for increasing the number of protons per Main Injector bunch from the current value of 1.0 x 10{sup 11} to 3.0 x 10{sup 11}. Space charge effects at the injection energy of 8 GeV have the potential to seriously disrupt operations. We report on ongoing simulation efforts with Synergia, MARYLIE/Impact, and IMPACT, which provide comprehensive capabilities for parallel, multi-physics modeling of beam dynamics in the Main Injector including 3D space-charge effects.

43 PARTICLE ACCELERATORS↗

Test Plan Proposal for an International Joint Project for Transient Testing of Fast Reactor Fuels

EXECUTIVE SUMMARY An international joint project for transient testing of fast reactor fuels is proposed. Input from several countries is provided regarding their advanced/fast reactor programs, and the objectives and methods are given based on both historical projects and modern tools and methods. The full package would include irradiation testing using TREAT, use of existing facilities for non destructive exams/evaluations (NDE) and post irradiation exams (PIE), and integration of current state-of-the-art modeling and simulation (M&S) tools to aid in both experiment design, and prediction of experimental results.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Ute Mountain Ute Tribe Community-Scale Solar Project (Final Technical Report)

Deployment of Community-Scale solar power has been a goal of the Ute Mountain Ute Tribe (Tribe) for several years. The 1 MW AC photovoltaic power facility was built to power Tribal facilities in a manner that would allow the Tribe to credit residents’ electric bills and Tribal government electric bills with the dollar equivalent of the power generated. Other accomplished project objectives, in addition to learning the intricacies of such an endeavor, included strengthening the relationship with the local electric cooperative and their primary power provider, analysis of the generation and operations and maintenance during a one-year test phase, workforce development and training, and using the project to plan and drive future community scale solar projects. The Tribe’s vision of a net-zero electrical independence for its communities became a clearer reality with this project.

14 SOLAR ENERGY↗