Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “POLICY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

Biomass to bio-energy supply chain: Economic viability, case studies, challenges and policy implications in India

Biomass supply chain (BSC) management is an integral part of renewable energy projects, which include biomass-harvesting, collection, storage, processing and transportation to the bio-energy plants. The sustainability concept identifies economy, environment, and society as the three principal pillars of bioenergy. With an effective BSC implemented, all three dimensions of sustainability can be attained. Although, there’s been extensive research on the environmental sustainability of BSC, the economic aspects are under-represented in existing literature. So, an elaborate analysis on the economic viability of BSCs developed worldwide and those in India is critical, and needs to be studied. This review conducts a detailed accounting of the economic aspects of a BSC which includes the existing challenges in designing an environmental-cum-economically efficient BSC and strategies to address the issues. The Indian context has been studied on the BSC models, highlighting their shortcomings, while encapsulating the essential insights from global BSC models for a cost-effective BSC-to-bioenergy in India. Here, this review also emphasizes the policies supporting the BSC in India and forecasts the future biomass demand and supply. This review will provide stakeholders with critical insights on BSC and related challenges and assist them to investigate and devise strategies for successful implementation of BSCs in India.

Biomass↗

US cities can manage national hydrology and biodiversity using local infrastructure policy

Significance We introduce a unique and detailed data-driven approach that links cities’ hard infrastructures to their distal ecological impacts on streams. Although US cities concentrate most of the nation’s population, wealth, and consumption in roughly 5% of the land area, we find that city infrastructures influence habitats for over 60% of North America’s fish, mussel, and crayfish species and have contributed to local and complete extinctions in 260 species. We also demonstrate that city impacts are not proportionate to city size but reflect infrastructure decisions; thus, as US urbanization trends continue, local government and utility companies have opportunities to improve regional aquatic ecosystem conditions outside city boundaries through their hard infrastructure policies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

On-policy learning-based deep reinforcement learning assessment for building control efficiency and stability

Artificial intelligence technologies have emerged as a game changer not only in specific applications such as image recognition and machine translation but also in many scientific domains. In particular, as deep reinforcement learning (DRL) has shown great success in complex control problems, DRL-based control has been considered as a potential solution to efficiently control and manage building systems. However, broad assessment of DRL-based building control is still required to characterize their pros and cons in comparison with conventional building control methods (e.g., rule-based feedback controls). In this paper, we assessed DRL-based controls with on-policy learning-based algorithms and continuous control actions for cooling control of large office buildings in the summer season to minimize whole-building energy use and occupant discomfort. We compared DRL-based control methods with two baseline control methods: (1) a pre-determined schedule with supply temperature and static pressure setpoints, and (2) advanced reset method that adjusts setpoints based on heuristic rules, i.e., ASHRAE Guideline 36. We also tested the DRL algorithms to evaluate their performances in multiple climate locations. We found that DRL-based control methods outperformed the baseline control methods in terms of energy savings while maintaining a thermal comfort. DRL reduced energy use between ~4%–22% on average compared to the baseline methods, depending on climate location. We also evaluated DRL-based control in terms of control stability and showed that DRL-based methods should address the span of hardware lifetimes in practical operations.

control stability↗

Uncertainty-Proof Hosting Capacity with Surrogate Affine Policy

Physical constraints must be enforced when dis-tributed energy resources, such as PV, are integrated into distribution network. Hosting capacity (HC) is thus introduced to define the maximum renewable that distribution system can accommodate. When the grid is further pushed towards low-carbon, many research efforts are devoted to increasing HC. Security and cost-efficiency become even more important in determining HC. This work proposes an uncertainty-proof HC with surrogate affine policy. Flexible resources are leveraged to increase HC. We propose a novel hybrid two-stage AC model with variable uncertainty set. An iterative algorithm is designed to solve the problem. The proposed model and solution approach are validated in modified 141-node feeders, and HC performance is also analyzed.

hosting capacity↗

Water Use in Enhanced Geothermal Systems (EGS): Geology of U.S. Stimulation Projects, Water Costs, and Alternative Water Use Policies

According to the Energy Information Administration (EIA) of the U.S. Department of Energy (DOE), geothermal energy generation in the United States is projected to more than triple by 2040 (EIA 2013). This addition, which translates to more than 5 GW of generation capacity, is anticipated because of technological advances and an increase in available sources through the continued development of enhanced geothermal systems (EGSs) and low-temperature resources (EIA 2013). Studies have shown that air emissions, water consumption, and land use for geothermal electricity generation have less of an impact than traditional fossil fuel?based electricity generation; however, the long-term sustainability of geothermal power plants can be affected by insufficient replacement of aboveground or belowground operational fluid losses resulting from normal operations (Schroeder et al. 2014). Thus, access to water is therefore critical for increased deployment of EGS technologies and, therefore, growth of the geothermal sector. This paper examines water issues relating to EGS development from a variety of perspectives. It starts by exploring the relationship between EGS site geology, stimulation protocols, and below ground water loss, which is one of the largest drivers of water consumption for EGS projects. It then examines the relative costs of different potential traditional and alternative water sources for EGS. Finally it summarizes specific state policies relevant to the use of alternative water sources for EGS, and finally explores the relationship between EGS site geology, stimulation protocols, and below ground water loss, which is one of the largest drivers of water consumption for EGS projects.

15 GEOTHERMAL ENERGY↗

Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan

China's 11th Five-Year Plan (FYP) sets an ambitious target to reduce the energy intensity per unit of gross domestic product (GDP) by 20% from 2005 to 2010 (NDRC, 2006). In the building sector, the primary energy-saving target allocated during the 11 FYP period is 100 Mtce. Savings are expected to be achieved through the strengthening of enforcement of building energy efficiency codes, existing building retrofits and heat supply system reform, followed by energy management of government office buildings and large scale public buildings, adoption of renewable energy sources. To date, China has reported that it achieved the half of the 20% intensity reduction target by the end of 2008, however, little has been made clear on the status and the impact of the building programs. There has also been lack of description on methodology for calculating the savings and baseline definition, and no total savings that have been officially reported to date. This paper intends to provide both quantitative and qualitative assessment of the key policies and programs in building sector that China has instituted in its quest to fulfill the national goal. Overall, this paper concludes that the largest improvement for building energy efficiency were achieved in new buildings; the program to improve the energy management in government and large scale public buildings are in line with the target; however the progress in the area of existing building retrofits, particularly heating supply system reform lags behind the stated goal by a large amount.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Evaluation of Groundwater Impacts to Support the National Environmental Policy Act Environmental Assessment for the INL Remote-Handled Low-Level Waste Disposal Project

Groundwater impacts have been analyzed for the proposed remote-handled low-level waste disposal facility. The analysis was prepared to support the National Environmental Policy Act environmental assessment for the top two ranked sites for the proposed disposal facility. A four-phase screening and analysis approach was documented and applied. Phase I screening was site independent and applied a radionuclide half-life cut-off of 1 year. Phase II screening applied the National Council on Radiation Protection analysis approach and was site independent. Phase III screening used a simplified transport model and site-specific geologic and hydrologic parameters. Phase III neglected the infiltration-reducing engineered cover, the sorption influence of the vault system, dispersion in the vadose zone, vertical dispersion in the aquifer, and the release of radionuclides from specific waste forms. These conservatisms were relaxed in the Phase IV analysis which used a different model with more realistic parameters and assumptions. Phase I screening eliminated 143 of the 246 radionuclides in the inventory from further consideration because each had a half-life less than 1 year. An additional 13 were removed because there was no ingestion dose coefficient available. Of the 90 radionuclides carried forward from Phase I, 57 radionuclides had simulated Phase II screening doses exceeding 0.4 mrem/year. Phase III and IV screening compared the maximum predicted radionuclide concentration in the aquifer to maximum contaminant levels. Of the 57 radionuclides carried forward from Phase II, six radionuclides were identified in Phase III as having simulated future aquifer concentrations exceeding maximum contaminant limits. An additional seven radionuclides had simulated Phase III groundwater concentrations exceeding 1/100th of their respective maximum contaminant levels and were also retained for Phase IV analysis. The Phase IV analysis predicted that none of the thirteen remaining radionuclides would exceed the maximum contaminant levels for either site location. The predicted cumulative effective dose equivalent from all 13 radionuclides also was less than the dose criteria set forth in Department of Energy Order 435.1 for each site location. An evaluation of composite impacts showed one site is preferable over the other based on the potential for commingling of groundwater contamination with other facilities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The National Energy Policy Institute (NEPI) at The University of Tulsa (F INAL REPORT)

NEPI, a non-profit organization located at The University of Tulsa (TU), was established to develop and disseminate national energy policy recommendations. Research under this grant covered a wide variety of projects, including research into the future of nuclear power, oil market pricing, and the feasibility of biofuels.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Deconstructing Solar Photovoltaic Pricing: The Role of Market Structure, Technology, and Policy

Solar photovoltaic (PV) system prices in the United States display considerable heterogeneity both across geographic locations and within a given location. Such heterogeneity may arise due to state and federal policies, differences in market structure, and other factors that influence demand and costs. This paper examines the relative importance of such factors on equilibrium solar PV system prices in the United States using a detailed dataset of roughly 100,000 recent residential and small commercial installations. As expected, we find that PV system prices differ based on characteristics of the systems. More interestingly, we find evidence suggesting that search costs and imperfect competition affect solar PV pricing. Installer density substantially lowers prices, while regions with relatively generous financial incentives for solar PV are associated with higher prices.

14 SOLAR ENERGY↗

Market and Policy Barriers for Demand Response Providing Ancillary Services in U.S. Markets

In this study, we attempt to provide a comprehensive examination of various market and policy barriers to demand response providing ancillary services in both ISO/RTO and non-ISO/RTO regions, especially at the program provider level. It is useful to classify barriers in order to create a holistic understanding and identify parties that could be responsible for their removal. This study develops a typology of barriers focusing on smaller customers that must rely on a program provider (i.e., electric investor owned utility or IOU, ARC) to create an aggregated DR resource in order to bring ancillary services to the balancing authority.ii The barriers were identified through examinations of regulatory structures, market environments, and product offerings; and discussions with industry stakeholders and regulators. In order to help illustrate the differences in barriers among various wholesale market designs and their constituent retail environments, four regions were chosen to use as case studies: Colorado, Texas, Wisconsin, and New Jersey. We highlight the experience in each area as it relates to the identified barriers.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Appendix F: DOE/EERE Conflict-of-Interest Policy and Form

Conflict of interest policy and agreement recognize that 1) expert reviewers of in-progress programs do not make funding decisions, and 2) programs must often balanced perceived conflict of interest & need expert advice from small community of experts.

99 GENERAL AND MISCELLANEOUS↗

Market and Policy Barriers for Demand Response Providing Ancillary Services in U.S. Markets

This study provides an examination of various market and policy barriers to demand response providing ancillary services in both ISO/RTO and non-ISO/RTO regions, especially at the program provider level. It is useful to classify barriers in order to create a holistic understanding and identify parties that could be responsible for their removal. This study develops a typology of barriers focusing on smaller customers that must rely on a program provider (i.e., electric investor owned utility or IOU, ARC) to create an aggregated DR resource in order to bring ancillary services to the balancing authority. The barriers were identified through examinations of regulatory structures, market environments, and product offerings; and discussions with industry stakeholders and regulators. In order to help illustrate the differences in barriers among various wholesale market designs and their constituent retail environments, four regions were chosen to use as case studies: Colorado, Texas, Wisconsin, and New Jersey.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Energy Policy Case Study - Texas: Wind, Markets, and Grid Modernization

This document presents a case study of energy policies in Texas related to power system transformation, renewable energy and distributed energy resources (DERs). Texas has experienced a dramatic increase in installed wind capacity, from 116 MW in 2000 to over 15,000 MW in 2015. This achievement was enabled by the designation of Competitive Renewable Energy Zones (CREZs) and new transmission lines that transmit wind to load centers. This report highlights nascent efforts to include DERs in the ERCOT market. As costs decline and adoption rates increase, ERCOT expects distributed generation to have an increasing effect on grid operations, while bringing potentially valuable new resources to the wholesale markets.

17 WIND ENERGY↗

Expanding Energy Performance Contracting in china: policy solutions and market mechanisms

Energy performance contracting is an important market mechanism that uses energy savings to pay over time for the upfront costs of energy efficiency retrofits in buildings, industries, and other types of facilities. Through energy performance contracts (EPCs), Energy Service Companies (ESCOs) play an important role in implementing energy efficiency retrofits. Both China and the United States have large markets for EPCs and significant opportunities for growth. The Chinese government has made great efforts in promoting the country’s ESCO business and expanding its EPC markets. This paper makes a series of recommendations for China to adopt more ambitious policy measures to encourage deep energy savings projects via EPCs. These recommendations are built on initial insights from a white paper developed by researchers at the Pacific Northwest National Laboratory and the Lawrence Berkeley National Laboratory with the assistance from the ESCO Committee of China’s Energy Conservation Association (EMCA). Key recommendations are listed below.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

From Policy to Compliance: Federal Energy Efficient Product Procurement

Federal buyers are required to purchase energy-efficient products in an effort to minimize energy use in the federal sector, save the federal government money, and spur market development of efficient products. The Federal Energy Management Program (FEMP)’s Energy Efficient Product Procurement (EEPP) Program helps federal agencies comply with the requirement to purchase energy-efficient products by providing technical assistance and guidance and setting efficiency requirements for certain product categories. Past studies have estimated the savings potential of purchasing energy-efficient products at over $500 million per year in energy costs across federal agencies.1 Despite the strong policy support for EEPP and resources available, energy-efficient product purchasing operates within complex decision-making processes and operational structures; implementation challenges exist that may hinder agencies’ ability to comply with purchasing requirements. The shift to purchasing green products, including energy-efficient products, relies on “buy in” from a variety of potential actors throughout different purchasing pathways. Challenges may be especially high for EEPP relative to other sustainable acquisition programs given that efficient products frequently have a higher first cost than non-efficient ones, which may be perceived as a conflict with fiscal responsibility, or more simply problematic for agency personnel trying to stretch limited budgets. Federal buyers may also face challenges in determining whether a given product is subject to EEPP requirements. Previous analysis on agency compliance with EEPP, conducted by the Alliance to Save Energy (ASE), shows that federal agencies are getting better at purchasing energy-efficient products. ASE conducted two reviews of relevant solicitations for product and service contracts listed on Federal Business Opportunities (FBO), the centralized website where federal agencies are required to post procurements greater than $25,000. In 2010, ASE estimated a compliance rate of 46% in 2010, up from an estimate of 12% in 2008. Our work updates and expands on ASE’s 2010 analysis to gauge agency compliance with EEPP requirements.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Solar Photovoltaic (PV) Manufacturing Expansions in the United States, 2017-2019: Motives, Challenges, Opportunities, and Policy Context

This report analyzes U.S. PV manufacturing announcements from 2017 through July-2019 and explores the potential impact of tariffs on the competitiveness of U.S. PV module manufacturing. First, the fraction of announcements that resulted in established facilities in the time frame specified is analyzed, as well as firm nationality and the existence of any other U.S. facilities for the firm. The prevalence of different PV product types among the announcements was also analyzed, as well as the type of facilities selected for development (greenfield, existing PV factories, or repurposed buildings). The cost to build these facilities was also analyzed in the context of their capacity, the value of incentives received by state and local governments, and the number of jobs created. Case studies of Auxin Solar, First Solar, Hanwha Q Cells, JinkoSolar, LG, Silfab, Solaria, and SunPower were conducted and highlight five factors influencing firms’ decisions to expand their U.S. PV production capacity. These included: 1) proximity to demand, including supply contracts and demand for domestic content 2) tariffs and other incentives. The Section 201 tariffs on PV module imports were often described helpful but tariffs on cell imports (Section 201) or materials (Section 301, Section 232) were often described as counterproductive since U.S. supply chains do not exist for many necessary goods. The corporate tax decrease and local incentives were often mentioned as helpful. 3) the ability to move quickly in order to maximize the benefit of the Section 201 tariffs. This affected decisions to select localities with faster permitting or moving into existing buildings. 4) competition with scale, where competing with Asian PV imports or avoiding imports of material from China was challenging due to the larger scale of Asian manufacturers. Additionally, smaller firms expressed concerns that larger firms may not need their U.S. facilities to profitable. 5) access to capital, which was a particular challenge for smaller firms. Several U.S. tariffs affect the economics of PV cells, modules, and balance-of-module (BOM) materials, some of which are applicable to a long list of countries and others applicable only to China or Taiwan. We analyze how the tariffs interact to affect the prices of c-Si modules sourced under various assumptions about domestic and imported components and assembly. We estimate module prices under a range of baseline scenarios featuring U.S.-assembled modules with Southeast Asian cells (not from China or Taiwan). When all BOM components are sourced from the United States, baseline module prices are $0.37/W (below the 2.5-GW Section 201 cell cap) to $0.42/W (above the 2.5-GW cell cap). If all BOM components are sourced from China, the module price in this baseline U.S.-assembly scenario can reach up to $0.60/W. Imported module prices are lower than or within the range of the U.S.-assembled baseline prices under some conditions. Importing bifacial modules from Southeast Asia is the lowest-priced alternative, at $0.35/W, because bifacial modules are excluded from the Section 201 tariffs. Importing Southeast Asia modules that contain U.S. cells results in a price of $0.38/W, also owing to a Section 201 exclusion. Importing Southeast Asian modules that have Southeast Asian cells yields a price of $0.44/W, and importing Chinese modules that have U.S. cells yields a price of $0.58/W. These results suggest that U.S. tariff policy in 2019 may encourage U.S. assembly of mono-facial c-Si modules if the 2.5-GW cell import cap is not reached and Chinese BOM imports are negligible. However, some imported module options may offer the lowest prices if the 2.5-GW cell import cap is reached and/or U.S. module manufacturers must rely on significant Chinese BOM content. The analysis shows the 2.5-GW cell cap may be exceeded in 2019 and following years. It is also likely that U.S. module manufacturers will need to use at least some Chinese BOM content, since U.S. module manufacturers have stated that U.S. supply chains do not exist (or do not exist at a sufficient scale) for most BOM components, which makes them at least partially reliant on Chinese BOM and thus subject to Section 301 tariffs.

14 SOLAR ENERGY↗