Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Outpost”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

The Miniaturized Electron Proton Telescope, MERiT onboard Lunar Gateway

The Lunar Gateway or the Gateway, part of NASA’s Artemis program, is a space station orbiting around the moon The cis-lunar Gateway platform provides the opportunity for Heliophysics investigations to advance our knowledge of the coupled Sun-Earth system and the opportunity better understand the radiation environment in order to support and improve crew safety and operations at the Moon and beyond. The Heliophysics Environmental and Radiation Measurement Experiment Suite (HERMES) is a suite of instruments place on the outside of the Habitation and Logistics Outpost ( HALO) monitor the Sun’s radiation environment and space weather. HERMES, led byNASA’s Goddard Space Flight Center, will monitor lower energy solar particles critical to scientific investigations of the Sun including the solar winds. Additional suite of instruments provided by ESA, the European Radiation Sensors Array (ERSA) will complement space weather studies. We report here on the energetic particle instrument, the Minaturized Electron Proton Telescope (MERiT) on board HERMES designed to measure electrons and protons in the energy range ~0.3-9. MeV and ~1-190 MeV in 11 and 20 differential energy channels respectively. MERiT is a solid state detector telescope with the two sensor heads:one looking sunward and the other anti-sunward. MERiT will help advance our understanding of solar energetic particles, low energy cosmic rays and energetic electrons in the magnetospheric tail. We will describe the instrument in details and the science topics it is expected to address. Lunar Gateway is currently expected to launch in 2024

Shri Kanekal↗

Solar Array System Combined Environmental Effects Tests: Gateway Power and Propulsion Element

The NASA Lunar Orbital Platform-Gateway (LOP-G), a vital component of NASA’s Artemis program, will serve as a multi-purpose outpost orbiting the Moon. A foundational component of LOP-G is the Power and Propulsion Element (PPE). The PPE is a high-power, +60-kilowatt solar electric propulsion spacecraft that will provide power, high-rate communications, attitude control, and orbital transfer capabilities for the Gateway. The solar array system will utilize 4-junction photovoltaic cell technology on a flexible substrate (roll-out solar array or ROSA) in combination with multiple diode assemblies to combine the power of the solar array strings. NASA’s Marshall Space Flight Center, together with the PPE developer, Maxar, are in the midst of completing a rigorous combined environments test campaign of 3 solar array coupons and 1 array blocking diode board coupon. The campaign includes Ultra-Violet Radiation, Charged Particle Radiation, Ion Erosion, Thermal Cycles, and Electrostatic Discharge tests. The environments are applied in 3 separate incremental stages reflecting the various mission phases: 460 days of Earth-to-Lunar Transit, with much of that time through the Van Allen Belts, 5-years in Lunar Near-Rectilinear Halo Orbit (NRHO) at the Moon, and finally 15-years in Lunar NRHO, which represents the end of the design life. This paper will report on the state of the testing for each coupon, and brief look at the array performance, including some unexpected sensitivities of array blocking diodes.

Gateway↗

Optimizing Consumable Gas Tank Usage while Maintaining Emergency Reserves Between Two Pressure Control Systems on Gateway

Two of NASA’s Lunar Space Station (Gateway) modules, the Habitation and Logistics Outpost (HALO) and International Habitat (IHAB) contain a pressure control system (PCS) that is used to supply Nitrogen (N2) and Oxygen (O2) to maintain a habitable environment within Gateway, with only one of the PCS active at any given time. To protect the crew during a contingency that is affecting pressure control and therefore gas consumables, Gateway is required to have sufficient amount of reserve consumable gas across the entire habitable Gateway stack of modules until the gas can be replenished by crew changing out a gas tank. This will occur in a non-contingency setting either on the current mission or on the next mission. To access the stack reserve Gateway features a Nitrogen Oxygen Transfer System (NOTS) between HALO and IHAB that allows each module’s PCS to access the gas tanks in the other module. The PCS designs are different between the two modules and lack interchangeable tanks so which module has active PCS must be accounted for in logistics planning. This paper describes the logistics resupply planning analysis used to determine the most efficient use of the tanks within each PCS, and a method for switching which module is active for PCS while maintaining the stack reserve that preserves enough gas to cover contingency cases.

Rachel Anne Sturtz↗

Gateway Integrated Environmental Control and Life Support System (ECLSS) Overview and Status

The Gateway comprised of modules provided by commercial and international partners will be a lunar orbiting platform that is a critical element in the Moon to Mars architecture. Of the 4 modules that comprise the Gateway, the core Environmental Control and Life Support System (ECLSS) is provided by the Habitation and Logistics Outpost (HALO) module provided by NASA, and the International Habitat (I-Hab) provided by the European Space Agency (ESA) with the ECLSS provided by the Japanese Space Agency (JAXA). These modules work together to provide pressure control, air revitalization, and air conditioning capabilities for the Gateway integrated habitable volumes and attached visiting vehicles during open hatch crewed operations. Individually, they maintain the internal atmosphere during the long periods of dormancy between crewed operations to support payload operations and ensure a safe environment when the crew returns. Additionally, NASA bolsters crew survivability by providing government furnished equipment (GFE) to support crew survival in the face of catastrophic hazards (such as fire or a cabin air leak) until the Gateway stack reaches a point in the orbit where crew can safely abort on Orion. This paper explains the key driving requirements, architecture, and development status of the Gateway ECLSS.

Gateway↗

Functionality of the Python Packages for the HERMES Mission

The Heliophysics Environmental and Radiation Measurement Experiment Suite (HERMES) is a set of four instruments that will fly on the Lunar Gateway, an orbital outpost which will support Artemis lunar operations. HERMES will focus on understanding the causes of space-weather variability as driven by the Sun and modulated by the magnetosphere. In this talk, we will discuss the open source approach of the HERMES Science Operation Center (SOC) team being implemented in a number of Python packages which all work together. We will describe the core package which contains Python interfaces for the loading, calibrating, plotting, validating, and saving of measurement data through Common Data Format (CDF) files making use of pycdf provided by spacepy. Each instrument also has a Python package developed using a package template and will provide specific calibration and processing functionality to each instrument. The packages make extensive use of the scientific Python ecosystem and maintain compatibility with PyHC standards. The abstraction of intricate, high heritage data formats, such as CDF files, in Python enables easier analysis and opens doors for greater participation in heliophysics science.

hermes↗

Overview of the Lunar Transit Trajectory Performed by the Power and Propulsion Element of NASA’s Gateway

NASA has committed to returning to the moon, landing the first woman and the next man on its surface. To support a sustained lunar presence, NASA is designing an orbital platform to be assembled in an orbit near the moon called the Near Rectilinear Halo Orbit (NRHO). This platform is known as the Gateway and its purpose it to support missions primarily to the lunar south pole. As NASA continues to study ways to reduce the cost of lunar exploration, a simplification implemented in 2020combinedthe first two elements of the Gateway, the Power and Propulsion Element (PPE) and NASA’s Habitation and Logistics Outpost (HALO), onto a single commercial launch vehicle (CLV). When launched together, the PPE and HALO make up the first two elements of NASA’s Gateway and exceed the performance capacity of commercially available launch vehicles to deliver directly to the moon. The delivery of the Gateway is enabled by and takes advantage of the high efficiency of the PPEs high-power Solar Electric Propulsion (SEP) system to transfer a significant starting mass from an initial Earth orbit to final insertion into the NRHO. The PPE is a 50-kW class high power solar electric propulsion stage comprised of two different types of electric thruster strings. The SEP system is operated in two different modes, a high thrust and high Isp (specific impulse), to both maximize the final delivered mass and attempt to minimize the time spent in the Van Allen Belts early in the transit trajectory. Additionally, this SEP system brings the capability to the assembled Gateway for transfer between orbits in cislunar space. This paper captures the preliminary low thrust lunar transfer reference trajectory to be flown by the PPE it delivers itself and HALO via a spiral trajectory from launch vehicle insertion to insertion into the NRHO as well as a preliminary reference round trip transfer of the Gateway from the NRHO to a Distant Retrograde Orbit (DRO) using the PPE. Once in its final NRHO, the Gateway is being designed to enable long duration human and robotic exploration of the lunar south pole as a precursor to Mars. The Gateway’s low thrust lunar transit trajectory is envisioned to prove out the application of and flight of a high-power SEP system as a demonstration of technologies applicable to the enabling of future human space exploration.

human exploration↗

Space Transformation -- Localizing the Remote and Connecting the Isolated

In motivating the Space Transformation theme for this year’s 4S symposium, the organizers provided the following context, “Transformation of economies are driven by a change in values and accelerated by new technologies.” These words rang particularly true when I read them at the beginning of the holiday season. Like so many others, I was in the early phases of my Christmas shopping procrastination campaign, and I’d just been reflecting on how Amazon Prime was the transformational tool I’d been waiting for. Basic limiting principles of time and space, supply and demand, were all but erased by the Amazon Prime phenomenon. Coupled with emerging 3D printing and other adaptive manufacturing technologies, a transformation from deliberate planning to “think it … have it” had occurred, empowering me to procrastinate longer than I’d ever dreamed possible. The organizers went on to ponder, “Will space transformation also affect society?”, just as our team at the Air Force Research Lab’s (AFRL) Center for Rapid Innovation (CRI) were working alongside partners within our larger Integrated Capabilities Directorate, NASA’s Flight Opportunities and Small Spacecraft Technology programs, and DARPA’s Luna-10 program to develop technologies and execute demonstration missions that leverage the space domain to genuinely connect even the most remote and austere domains on the timeline of need. Picking apart the miracle that is Amazon prime, where does the model fail, and why? More relevantly to the theme of this year’s symposium, how can the space domain be used to overcome its limitations and minimize its weaknesses? Perhaps it is best assessed in the context of Use Cases. What are the Amazon delivery cost, schedule, and cargo limiters to the Amundsen-Scott South Pole Research Station, or the Lunar South Pole Research Station? This paper will explore enabling infrastructure that allows Amazon prime to thrive and assess the transformational enabling technologies that would be necessary to extend that miracle to the truly remote or the truly austere. Localizing the Remote • First, it will evaluate the ability of the on-going AFRL Rocket Cargo and Space Initiatives Ringside Seats systems, coupled with Astrobotic’s Xodiak and Xogdor capabilities, developed to support the NASA Flight Opportunities Program (FOP), to supply orbital/suborbital delivery to both improved and austere sites on the Earth and Moon. • Then, it will add the surface terminal distribution leg, with an examination of Lunar Outpost’s Mobile Autonomous Prospecting Platform (MAPP), equipped with Mobile Autonomous Robotic Swarm (MARS) software, and Intuitive Machine’s Hopper, developed with support of AFRL and NASA’s Commercial Lunar Payload Services (CLPS) program. Connecting the Isolated From there, it will focus on the destination, asking what implied destination services are required to support highly assured autonomous delivery. • Specifically, it will highlight Astrobotic’s Skymage mesh-networked publish and subscribe communication and navigation service, as well as AFRL’s on-going developments of radioisotope and reactor nuclear-sourced thermoelectric power generation and distribution systems under development under the Joint Emergent Technology Supplying On-orbit Nuclear Power (JETSON) program by Lockheed Martin, Westinghouse, Intuitive Machines, and Zeno Power, to provide the power service to locations well off the grid. • Finally, the paper will connect to the “human machine”. What connects the remote or in-situ human consumer to the remote domain? What connects the diverse international government and commercial services to each other? The former will focus on AFRL’s OraCloud feeding their Space Defense Control and Characterization System (SDCCS) and Lunar Station’s MoonHacker systems, while the latter will focus on the BlueHalo/Tensor LunX Technology Platform for the Cislunar Commodity Marketplace. In 1984, Krafft Ehricke famously remarked that, “If God wanted man to become a spacefaring species, He would have given man a Moon.” This paper is not about the Moon, but is about humans as a spacefaring species, shedding the pesky land/air limitations of the Amazon Prime model … so that we can all live a procrastinator’s “think it … have it” existence.

Charles Finley↗

An Integrated Architecture Study for Autonomous Lunar Construction

Lunar construction is an expanding field within NASA’s Moon to Mars objectives that presents many challenges and requires innovative and reliable forms of autonomous operations on the surface of the Moon to further the technologies needed for human space exploration. Marshal Space Flight Center’s (MSFC) Advanced Concepts Office (ACO) addressed Lunar Infrastructure Objective LI-4 l by developing a Pre-Phase A, integrated architecture to inform a demonstration for lunar construction operations. The ACO study traded three architectures that would survey and prepare a construction area to build a landing pad out of lunar regolith using MMPACT (Moon-to-Mars Planetary Autonomous Construction Technology) platforms, rovers, and navigation outposts. The main trades examined navigation for the system/architecture, options for rover navigation, battery vs continuous tether power for the MMPACT robotic arm, and assigning site prep functionality to the rovers vs the platforms. Results of the study determined that the best options for the scenario provided would be local navigation (more accurate and continuous), a combination of Light Detection and Ranging (LiDAR) for initial site mapping with subsequent Smart Video Guidance Sensors (SVGS) to save power for construction, and using tethered power to decrease mission duration. The team also concluded that assigning site prep functionality to either the rovers or the platforms has benefits and challenges; future studies could explore having that functionality on both the rovers and platforms. Lastly, the team provided a Concept of Operations (ConOps) timeline that can be used in real-time ground demonstrations to explore the mission timeline, construction processes, autonomous operations, and communication systems that can be tested using MSFC’s lunar regolith field and Lunar Utilization Control Area (LUCA).

Sarah Triana↗

Enhancing Future Commercial Space Stations: Applying ISS Insights to Environmental Control and Life Support Systems (ECLSS) Development

The expansion of space exploration to commercial space stations represents a shift from government-led endeavors to a new competitive era driven by private companies and innovative forces. The journey to actualize these celestial outposts is fraught with difficulties, including the intricate establishment of Environmental Control and Life Support systems (ECLSS) within these commercial space stations. By applying the insights gleaned from the ISS, particularly during the initial conceptual design phase of the commercial developments, there is an opportunity to circumvent some of the teething issues and optimize the development process. Furthermore, applying insights from the ISS ECLSS design, development, test, and maintenance phases has the potential to enhance system compatibility and mitigate the challenges associated with upgrading a fixed design. This approach can lead to lower costs due to fewer iterations and streamlined processes. This paper will conduct an in-depth evaluation of the ECLS system from both system and operational perspectives with the aim to provide a knowledge capture for early-stage design considerations to bolster the development of sustainable, efficient, and habitable commercial space stations.

ISS↗

Development Testing and Analysis of the Integrated Gateway-ESPRIT Bipropellant Refuelling System

The Gateway will be humanity’s first space station orbiting the Moon completed by NASA in partnership with ESA and other US and international partners. The Gateway will provide critical support to sustainable human exploration on the moon through the Artemis program. To enable the Lunar Gateway to complete its mission, on orbit refuelling is essential. The ESPRIT Refuelling Module (ERM) will provide the capability to transfer propellants, MMH and MON-3, through the Habitation and Logistics Outpost (HALO) to the Power and Propulsion Element (PPE). The transfer of these propellants carries known risks and hazards. These hazards include overpressure of the propellant lines during priming sequences between modules and during refuelling pause operations. To support the early system development and to mitigate these risks, a collaborative test program between NASA, ESA and Thales Alenia Space was completed at the Thales Alenia Space test facility in Harwell, UK. This test program integrated fluidic breadboards of the ERM, HALO and PPE modules. The objectives of the test program were to demonstrate and characterise critical performance and transient operations, inform refuelling concept of operations and to calibrate and validate numerical models of the refuelling subsystem in EcosimPro. To support the completion of this final objective a detailed model of the integrated breadboard was developed in EcosimPro and key steady-state and transient test cases were simulated. As an industry first, a National Institute of Standards and Technology (NIST) database correlation for Hydrofluoroether (HFE-7000) was used as a mixed oxides of nitrogen (MON-3) simulant with EcosimPro and European Space Propulsion System Simulation (ESPSS) libraries to result in a more accurate analysis for transient phenomenon such as priming. The test and simulation data showed good agreement validating the model for further system analysis as the ERM design progresses.

Refuelling↗

Application of Solar Electric Propulsion to the Low Thrust Lunar Transit of the Gateway Power and Propulsion Element

NASA has committed to returning to the moon, landing the first woman and the next man on its surface. To support a sustained lunar presence, NASA will assemble an orbital platform in a quasi-stable orbit near the moon known as a Near Rectilinear Halo Orbit (NRHO). This platform, known as Gateway, will support long duration exploration missions targeting the lunar south pole. An architecture simplification implemented in 2020 combined the first two elements of the Gateway together onto a single commercial launch vehicle (CLV). When launched, the Power and Propulsion Element (PPE) and the Habitation and Logistics Outpost (HALO) will form the initial capability of NASA’s Gateway. The PPE, with its high-power Solar Electric Propulsion (SEP) system, will propel the combined vehicle from an elliptical Earth parking orbit to the target NRHO. A transit of such a large mass, delivered to the moon from a single launch vehicle, is only made possible using the highly efficient SEP system. Delivering the same mass via more traditional chemical propulsion systems would require major modifications to the mission architecture, significantly more propellant mass, and could necessitate the use of a more powerful launch vehicle. This paper describes the design of the nominal low-thrust transit by which Gateway will be delivered to the NRHO utilizing the PPE SEP system. Additionally, this paper captures how the unique capabilities of the PPE electric propulsion system have guided the design of the trajectory and how mission requirements have, in turn, impacted the maturation of the SEP system.

electric propulsion↗

Application of Solar Electric Propulsion to the Low Thrust Lunar Transit of the Gateway Power and Propulsion Element

NASA has committed to returning to the moon, landing the first woman and the next man on its surface. To support a sustained lunar presence, NASA is designing an orbital platform to be assembled in a semi-stable orbit near the moon called the Near Rectilinear Halo Orbit (NRHO). This platform is known as the Gateway and its purpose it to support missions primarily to the lunar south pole. As NASA continues to study ways to reduce the cost of lunar exploration, a simplification implemented in 2020 was combining the first two elements of the Gateway together onto a single commercial launch vehicle (CLV). When launched together, the Power and Propulsion Element (PPE) and NASA’s Habitation and Logistics Outpost (HALO) make up the Co-Manifested Vehicle (CMV). The PPE, a high-power Solar Electric Propulsion (SEP) Stage, will propel the combined stack from a low elliptical orbit to a semi stable orbit near the moon known as a Near Rectilinear Halo Orbit (NRHO). A transit of such a large mass, delivered to the moon from a single launch vehicle is only made possible by the use of the highly efficient SEP low thrust propulsion system. Delivering the same mass via more traditional chemical propulsion systems would require multiple launches and significantly more propellant. This paper captures an overview of the PPE’s SEP system, the lunar transit it will perform to deliver these first two elements of NASA’s Gateway to the NRHO with a comparison of a chemical system performing the same lunar transit to illustrate how SEP enables NASA’s Gateway.

electric propulsion↗

Lunar Rescue Workshop Intenational Space University SSP24

Presentation package for a workshop to consider strategic planning perspectives to posture humanity to be able to support rescue scenarios on the lunar surface when there are multiple outpost presences established

Artemis↗

Enhancing Future Commercial Space Stations: Applying ISS Insights to Environmental Control and Life Support Systems (ECLSS) Development

The expansion of space exploration to commercial space stations represents a shift from government-led endeavors to a new competitive era driven by private companies and innovative forces. The journey to actualize these celestial outposts is fraught with difficulties, including the intricate establishment of Environmental Control and Life Support systems (ECLSS) within these commercial space stations. By applying the insights gleaned from the ISS, particularly during the initial conceptual design phase of the commercial developments, there is an opportunity to circumvent some of the teething issues and optimize the development process. Furthermore, applying insights from the ISS ECLSS design, development, test, and maintenance phases has the potential to enhance system compatibility and mitigate the challenges associated with upgrading a fixed design. This approach can lead to lower costs due to fewer iterations and streamlined processes. This paper will conduct an in-depth evaluation of the ECLS system from both system and operational perspectives with the aim to provide a knowledge capture for early-stage design considerations to bolster the development of sustainable, efficient, and habitable commercial space stations.

ISS↗

Assessment of Base Loads Generated by an Exercise Device in the HALO Module

The purpose of this document is to prescribe a uniform procedure that can be used to postprocess base loads generated by a crew member and an exercise device in the Gateway Habitation and Logistics Outpost (HALO) module. This memo has three primary sections. First, the exercise loads pass through a Vibration Isolation and Stabilization (VIS) system notionally depicted in Figure 1 for the purpose of preliminary analyses. This is described in Section 2. Next, these loads are processed in frequency domain as explained in Section 3. Finally, the resulting outputs are compared with a Gateway Program Loads and Dynamics (L&D) allocation given to the VIS system. This information is provided in Section 4.

Exercise↗

Thermal Analysis of Refueling Propellant Systems for PPE

To support the sustainability of Gateway, approach the challenge of sustainable presence beyond low earth orbit, and provide proving grounds for future missions beyond the surface of the moon, refueling capabilities must be incorporated into Gateway. The objective is to replenish propellants into the Power and Propulsion Element (PPE) from the European System Providing Refueling, Infrastructure and Telecommunications (ESPIRIT) through the Habitation and logistics outpost (HALO). PPE refueling will consist of a bipropellant transfer system, as well as a main propellant transfer system. Refueling the Power and Propulsion Element in near rectilinear halo orbit can present various issues, and to thermally maintain the refueling system during this event requires diligent planning and thermal design. Presently, a thermal model exists to analyze the components of the refueling system as the development of PPE continues. The analysis from the thermal model will verify the integrity of the all the components during a refueling event throughout the duration of the mission given various environmental differences. To confidently refuel PPE, thermal analysis, and various tests of the refueling components, must be completed to achieve the desired sustainability of Gateway.

Ethan Sparks↗

Framework for Seismic Vulnerability Assessment of Nonstructural Elements Inside an Inflatable Lunar Habitat

The pursuit of knowledge and curiosity are once again driving humanity to seek a human presence on extraterrestrial bodies. While numerous challenges must be overcome on the moon to achieve this goal, the moonquake hazard has often been overlooked. Using NASA’s Moon to Mars Architecture requirements for surface habitation and accounting for the midterm/long-term mission duration, a framework for vulnerability assessment is developed for essential nonstructural elements (NSEs) inside an inflatable habitat subjected to moonquakes. The aim of this study is to develop an approach to assess the vulnerability of typical NSEs that support essential equipment, such as the environmental control and life support system, under a paucity of information related to the seismic hazard. We also emphasize that the launch dynamic environment and lunar seismic environment exhibit notable differences in their characteristics, which can lead to higher lateral acceleration levels than initially expected. This acceleration may be linked to high-occurrence seismic events. However, due to the lack of information regarding the frequency of these events, the risk of NSEs being subjected to unforeseen loads increases. It is imperative to equip future lunar habitats with seismic mitigation measures until additional seismometers are deployed near upcoming surface human outposts.

Oscar D Forero↗

Mass Economy Evaluation for Integrated ECLSS and Propulsion Architecture

As missions in Low Earth Orbit (LEO) lengthen and extend to deep space, minimizing resupply needs becomes vital for sustaining crewed operations. Traditional life support systems depend on consumables resupplied from Earth, a method that is increasingly impractical for missions beyond LEO, such as lunar outposts or Mars transit. Long-duration missions require more efficient, autonomous systems that can recycle essential resources, particularly water and oxygen, to minimize the frequency and mass of resupply missions. The Environmental Control and Life Support System (ECLSS) is essential to such missions, with the International Space Station (ISS) serving as a testbed for advanced water recovery and partial oxygen recycling via physico-chemical methods. Yet, ECLSS and propulsion subsystems generally operate independently, despite overlapping requirements and potential areas for synergy. For instance, ECLSS byproducts, water, CO₂, and hydrogen, could be repurposed for propulsion, potentially reducing dedicated propellant mass and increasing overall system efficiency. One promising approach is to develop shared-resource architectures that integrate ECLSS with propulsion systems. This study examines the potential of such integration through the Sabatier CO₂ reduction process, focusing on water management as a key factor in system mass trade-offs. The Sabatier reaction produces water and methane from metabolic CO₂ and electrolytic hydrogen, partially closing the life support loop and providing methane, which could serve as a propellant. This integration could minimize waste, reduce resupply requirements, and enhance mission mass efficiency. A dynamic modeling framework will be used to simulate resource flows over long missions, capturing interactions between life support and propulsion. By comparing integrated versus separate system configurations, the study aims to quantify mass benefits and penalties, informing future habitat designs and trade studies for missions prioritizing autonomy and mass efficiency.

ECLSS↗