Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “LAUNCHING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

Advanced Launch Development Program status

The Advanced Launch System is a joint NASA - Air Force program originally directed to define the concept for a modular family of launch vehicles, to continue development programs and preliminary design activities focused primarily on low cost to orbit, and to offer maturing technologies to existing systems. The program was restructed in the spring of 1990 as a result of funding reductions and renamed the Advanced Launch Development Program. This paper addresses the program's status following that restructuring and as NASA and the Air Force commence a period of deliberation over future space launch needs and the budgetary resources available to meet those needs. The program is currently poised to protect a full-scale development decision in the mid-1990's through the appropriate application of program resources. These resources are concentrated upon maintaining the phase II system contractor teams, continuing the Space Transportation Engine development activity, and refocusing the Advanced Development Program demonstrated activities.

Colgrove, Roger↗

The Personnel Launch System

NASA has begun to study candidate vehicles for manned access to space in support of the Space Station or other future missions requiring on-demand transportation of people to and from earth orbit. One such system, which would be used to complement the present Shuttle or an upgraded version, is the Personnel Launch System (PLS), which is envisioned as a reusable priority vehicle to place people and small payloads into orbit using an experimental launch vehicle. The design of the PLS is based on a Space Station crew changeout requirement whereby eight passengers and two crew members are flown to the station and a like number are returned within a 72 hour mission duration. Experimental and computational aerothermodynamic heating studies have been conducted using a new two-color thermographic technique that involved coating the model with a phosphor that radiates at varying color intensities as a function of temperature when illuminated with UV light. A full-scale model, the HL-20, has been produced and will be used for man-machine research. Three launch vehicle concepts are being considered, a Titan IV, the Advanced Launch System, and a Shuttle equipped with liquid rocket boosters.

Piland, William M.↗

The cost of unreliability in the avionics suite of a launch vehicle

The main objective of the Advanced Launch System (ALS) program is to realize a substantial reduction in recurring launch costs over present launch systems. A methodology is presented for assessing the impact of the reliability of the avionics suite on the recurring launch cost of the ALS. The methodology is illustrated by focusing on two architectures. The first is a distillation of a typical architecture for this type of application. The second is a simplified implementation of the Advanced Information Processing System (AIPS) technology developed at the Charles Stark Draper Laboratory, Inc. Both architectures utilize redundancy of hardware to tolerate faults. the key contributors to the cost of unreliability are identified and modeled utilizing Markov modeling techniques for each of the two architectures. The results are presented along with the more traditional costs for these avionics suites.

Rosch, Gene↗

An Outlook for the Twenty First Century as to Launch Operations, Facilities, and Systems

A discussion of launch systems for the 21st century is presented. The following launch systems are mentioned: the European Ariane family; the Japanese H-1 and H-2; the U.S.'s Titan, Delta, Atlas, and Space Shuttle; the Chinese Long March 4; and the USSR's Mir, Proton, and Zenit. Systems currently under investigation, including the Assured Crew Return Vehicle, Personnel Launch Systems, and Single Stage to Orbit (SSTO), are discussed. Automated operations, low Earth orbit, and reliability are addressed. Standards that were acceptable for ballistic missiles will not be acceptable for future launch vehicles. The achievement of significantly higher levels of reliability is seen as the challenge.

Loftus, Joseph P., Jr.↗

COLD-SAT orbital experiment configured for Altas launch

A study was done of the feasibility of conducting liquid hydrogen orbital storage, acquisition, and transfer experiments aboard a spacecraft launched by a commercial Atlas launch vehicle. Three hydrogen tanks are mated to a spacecraft bus that is similar to that used for three-axis-controlled satellites. The bus provides power, communications, and attitude control along with acceleration levels ranging from 10 exp -6 to 10 exp -4 g. At launch, all the liquid hydrogen is contained in the largest tank, which has an insulation system designed for both space operation and the short-term launch pad and ascent environment. This tank is much lighter and lower in cost than a vacuum-jacketed design, and is made possible by the experiment tanking options available due to the hydrogen-fueled Centaur upper stage of the Atlas I.

Schuster, J. R.↗

National Launch System comparative economic analysis

Results are presented from an analysis of economic benefits (or losses), in the form of the life cycle cost savings, resulting from the development of the National Launch System (NLS) family of launch vehicles. The analysis was carried out by comparing various NLS-based architectures with the current Shuttle/Titan IV fleet. The basic methodology behind this NLS analysis was to develop a set of annual payload requirements for the Space Station Freedom and LEO, to design launch vehicle architectures around these requirements, and to perform life-cycle cost analyses on all of the architectures. A SEI requirement was included. Launch failure costs were estimated and combined with the relative reliability assumptions to measure the effects of losses. Based on the analysis, a Shuttle/NLS architecture evolving into a pressurized-logistics-carrier/NLS architecture appears to offer the best long-term cost benefit.

Prince, A.↗

Propulsion requirements for the HL-20 personnel launch system

A lifting-body approach to the design of an HL-20 personnel launch system spacecraft for SSF crew rotation missions is presented. The high hypersonic lift-to-drag ratio of the HL-20 provides significant advantages in reduced g-loads during entry, high crossrange capability, ability to fly to landing sites over an extensive part of the earth, and multiple landing opportunities per day at specific landing sites. The HL-20 is capable of performing a return-to-launch-site runaway landing anytime during the first minute of launch following activation of an enhanced launch escape system.

Talay, Theodore A.↗

Reusable Reentry Satellite (RRS): Launch tradeoff study

A goal of the Phase B study is to define the launch system interfaces for the reusable reentry satellite (RRS) program. The focus of the launch tradeoff study, documented in this report, is to determine which expendable launch vehicles (ELV's) are best suited for the RRS application by understanding the impact of all viable launch systems on RRS design and operation.

Source record↗

Electromagnetic launch of lunar material

Lunar soil can become a source of relatively inexpensive oxygen propellant for vehicles going from low Earth orbit (LEO) to geosynchronous Earth orbit (GEO) and beyond. This lunar oxygen could replace the oxygen propellant that, in current plans for these missions, is launched from the Earth's surface and amounts to approximately 75 percent of the total mass. The reason for considering the use of oxygen produced on the Moon is that the cost for the energy needed to transport things from the lunar surface to LEO is approximately 5 percent the cost from the surface of the Earth to LEO. Electromagnetic launchers, in particular the superconducting quenchgun, provide a method of getting this lunar oxygen off the lunar surface at minimal cost. This cost savings comes from the fact that the superconducting quenchgun gets its launch energy from locally supplied, solar- or nuclear-generated electrical power. We present a preliminary design to show the main features and components of a lunar-based superconducting quenchgun for use in launching 1-ton containers of liquid oxygen, one every 2 hours. At this rate, nearly 4400 tons of liquid oxygen would be launched into low lunar orbit in a year.

Snow, William R.↗

Advanced Manned Launch System

Several alternatives exist for the development of the next manned launch system. The Advanced Manned Launch System (AMLS), which represents a clean-sheet replacement for the Space Shuttle, faces competition from concepts such as (1) the Personnel Launch System, which would serve as a personnel transport to complement the Space Shuttle, and (2) an advanced version of the existing Space Shuttle. An AMLS system could begin operations sometime between 2005 and 2020, depending upon the level of national interest and support. It would probably demonstrate a payload capacity less than that of the Space Shuttle, although performance specifications are far from certain. Even the form of the AMLS is still under discussion. Design studies have considered a wide variety of options including all levels of hardware reusability; single-, dual- and multiple-staging; and airbreathing vs. rocket propulsion. An evaluation of the relative cost-effectiveness of these options is impossible without guidance regarding basic mission requirements such as total number of launches over the system's life cycle and the date required. The availability of more advanced technologies will enable single-stage-to-orbit (SSTO) designs that are in general not feasible using current technology.

Talay, Theodore A.↗

Ten-year space launch technology plan

This document is the response to the National Space Policy Directive-4 (NSPD-4), signed by the President on 10 Jul. 1991. Directive NSPD-4 calls upon the Department of Defense (DoD), the Department of Energy (DOE), and the National Aeronautics and Space Administration (NASA) to coordinate national space launch technology efforts and to jointly prepare a 10-year space launch technology plan. The nation's future in space rests on the strength of its national launch technology program. This plan documents our current launch technology efforts, plans for future initiatives in this arena, and the overarching philosophy that links these activities into an integrated national technology program.

Source record↗

Autonomous rendezvous targeting techniques for national launch system application

The rendezvous targeting techniques that can be utilized to achieve autonomous guidance for delivering a cargo to Space Station Freedom (SSF) using the National Launch System's (NLS) Heavy Lift Launch Vehicle (HLLV) and the on-orbit Cargo Transfer Vehicle (CTV) are described. This capability is made possible by advancements in autonomous navigation (Global Positioning System - GPS) on-board the CTV and SSF as well as the new generation flight computers. How the HLLV launch window can be decoupled from the CTV phasing window is described. The performance trades that have to be made to determine the length of the launch window and the phasing window between the CTV and SSF are identified and recommendations made that affect mission timelines.

Lomas, James J.↗

The importance of short-term forecasting of thunderstorms to launch operations at Cape Canaveral

The local meteorological events leading up to the launch of the space shuttle Atlantis on 2 August 1991 were captured in full-resolution GOES visible data being archived for the Convection and Precipitation/Electrification Experiment. The postponement of the launch on 1 August, and the successful lift-off on the following day provide a good example of the important role played by nowcasting and short-term forecasting at Cape Canaveral. In this brief article, we discuss the local weather conditions prior to, during, and after the launch and demonstrate the importance of short-term forecasting capabilities around the cape during launch operations.

Cooper, Harry J.↗

High-altitude balloon-launched aircraft - A piloted simulation study

A real-time piloted simulation at the NASA Dryden Flight Research Facility was used to study the feasibility of launching a research aircraft from a high-altitude balloon. In the study, the simulated aircraft was launched in a nosedown attitude at zero airspeed from 110,000 ft. After launch, the pilot flew the aircraft through a near-maximum-lift pullout and then through a zoom climb to a trimmed, l-g flight condition at the test altitude. The study included parametric variations to measure the effects of launch altitude, gross weight, Mach number limit, and parachute size on the test altitude attained. The aerodynamic model of the simulated aircraft was based on flight test results, low Reynolds number windtunnel tests, and computational models; the model included significant Mach number and Reynolds number effects at high altitude. A small parachute was included in the simulation to limit Mach number during the pullout to avoid adverse transonic effects and their resultant energy losses. A small rocket motor was included in the simulation and was investigated for boosting the aircraft to a higher test altitude. In the study, a test altitude of approximately 95,000 ft was attained without rocket boost, and a test altitude in excess of 100,000 ft was attained using small rocket boost.

Murray, James E.↗

Trajectory optimization for a National Launch System vehicle

A trajectory design process is presented for a proposed National Launch System (NLS) vehicle configuration. A software trajectory planner was developed to generate near optimal pitch plane trajectories for variable mission plans, variable launch site selections, and last minute wind conditions at the time of launch. In addition, the trajectory planner performs in-flight near optimal trajectory redesign in the event of an engine-out or unexpected wind dispersions. The trajectory planner iteratively simulates trial trajectories defined by variables corresponding to a parameterized trajectory shape. The trajectory planner optimizes these trajectory parameters according to the fuel used to realize the trajectories. For prelaunch scenarios, the trajectory planner generated near optimal trajectories of consistent fuel performance irrespective of the winds encountered at the launch site. In-flight trajectory redesigns were also shown to be effective in fulfilling the mission plan and preserving the structural integrity of the vehicle. The in-flight redesign results indicate that closed-loop guidance in the early stages of ascent is highly effective in accommodating engine failures or wind dispersions. All trajectory designs were verified using a 6DOF simulation with flight controllers.

Chen, Eugene S.↗

GRYPHON: Air launched space booster

The project chosen for the winter semester Aero 483 class was the design of a next generation Air Launched Space Booster. Based on Orbital Sciences Corporation's Pegasus concept, the goal of Aero 483 was to design a 500,000 pound air launched space booster capable of delivering 17,000 pounds of payload to Low Earth Orbit and 8,000 pounds of payload to Geosynchronous Earth Orbit. The resulting launch vehicle was named the Gryphon. The class of forty senior aerospace engineering students was broken down into eight interdependent groups. Each group was assigned a subsystem or responsibility which then became their field of specialization. Spacecraft Integration was responsible for ensuring compatibility between subsystems. This group kept up to date on subsystem redesigns and informed those parties affected by the changes, monitored the vehicle's overall weight and dimensions, and calculated the mass properties of the booster. This group also performed the cost/profitability analysis of the Gryphon and obtained cost data for competing launch systems. The Mission Analysis Group was assigned the task of determining proper orbits, calculating the vehicle's flight trajectory for those orbits, and determining the aerodynamic characteristics of the vehicle. The Propulsion Group chose the engines that were best suited to the mission. This group also set the staging configurations for those engines and designed the tanks and fuel feed system. The commercial satellite market, dimensions and weights of typical satellites, and method of deploying satellites was determined by the Payloads Group. In addition, Payloads identified possible resupply packages for Space Station Freedom and identified those packages that were compatible with the Gryphon. The guidance, navigation, and control subsystems were designed by the Mission Control Group. This group identified required tracking hardware, communications hardware telemetry systems, and ground sites for the location of the Gryphon's mission control center. The Structures group was responsible for ensuring the structural integrity of the vehicle. Their designs included the payload shroud, payload support structure, exterior hull and engine support struts. The Gryphon's power requirements were determined by the Power/Thermal/Attitude Control Group. This group then selected suitable batteries and other components to meet these requirements. The group also designed heat shielding and cooling systems to ensure subsystem performance. In addition to these responsibilities this group designed the attitude control methods and RCS components for the vehicle. The Aircraft Integration Group was responsible for all aspects of the booster aircraft connection. This included the design of the connection structure and the drop mechanism. This group also designed the vehicle assembly facility and identified possible ground bases for the plane.

Source record↗

Minuteman 2 launched small satellite

The goal of LEOSat Industries' Spring 1994 project was to design a small satellite that has a strong technology demonstration or scientific justification and incorporates a high level of student involvement. The satellite is to be launched into low earth orbit by the converted Minuteman 2 satellite launcher designed by Minotaur Designs, Inc. in 1993. The launch vehicle shroud was modified to a height of 90 inches, a diameter of 48 inches at the bottom and 35 inches at the top for a total volume of 85 cubic feet. The maximum allowable mass of the payload is about 1100 lb., depending on the launch site, orbit altitude, and inclination. The satellite designed by LEOSat Industries is TerraSat, a remote-sensing satellite that will provide information for use in space-based earth studies. It will consist of infrared and ultraviolet/visible sensors similar to the SDI-developed sensors being tested on Clementine. The sensors will be mounted on the Defense Systems, Inc. Standard Satellite-1 spacecraft bus. LEOSat has planned for two satellites orbiting the Earth with trajectories similar to that of LANDSAT 5. The semi-major axis is 7080 kilometers, the eccentricity is 0, and the inclination is 98.2 degrees. The estimated mass of TerraSat is 145 kilograms and the estimated volume is 1.8 cubic meters. The estimated cost of TerraSat is $13.7 million. The projected length of time from assembly of the sensors to launch of the spacecraft is 13 months.

Chan, Sunny↗

Launch vehicle flight control augmentation using smart materials and advanced composites (CDDF Project 93-05)

The Marshall Space Flight Center has a rich heritage of launch vehicles that have used aerodynamic surfaces for flight stability such as the Saturn vehicles and flight control such as on the Redstone. Recently, due to aft center-of-gravity locations on launch vehicles currently being studied, the need has arisen for the vehicle control augmentation that is provided by these flight controls. Aerodynamic flight control can also reduce engine gimbaling requirements, provide actuator failure protection, enhance crew safety, and increase vehicle reliability, and payload capability. In the Saturn era, NASA went to the Moon with 300 sq ft of aerodynamic surfaces on the Saturn V. Since those days, the wealth of smart materials and advanced composites that have been developed allow for the design of very lightweight, strong, and innovative launch vehicle flight control surfaces. This paper presents an overview of the advanced composites and smart materials that are directly applicable to launch vehicle control surfaces.

Barret, C.↗