Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “INTERCONNECTION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

Initial Studies on Actionable Control for Improving Small Signal Stability in Interconnected Power Systems

Power consumption and demand continues to grow around the world. As the electric power grid continues to be put under more stress, the conditions of instability are more likely to occur. One cause of such instabilities is intearea oscillations, such as the oscillation that resulted in the August 10, 1996 blackout of the WECC. This paper explores different potential operations of different devices on the power system to improve the damping of these interarea oscillations using two different simulation models

24 POWER TRANSMISSION AND DISTRIBUTION↗

Energy Management System Lowers U.S. Navy Energy Costs Through PV System Interconnection (Fact Sheet)

To meet the U.S. Navy's energy goals, the National Renewable Energy Laboratory (NREL) and the Naval Facilities Engineering Command (NAVFAC) spent two years collaborating on demonstrations that tested market-ready energy efficiency measures, renewable energy generation, and energy systems integration. One such technology - an energy management system - was identified as a promising method for reducing energy use and costs, and can contribute to increasing energy security.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Security Enhancements for Distributed Energy Resource Systems Interconnected with Distribution Networks: Final Technical Report

The revised IEEE 1547 Standard defines new complex communication-adjustable voltage and frequency regulation and ride-through characteristics, while maintaining the general antiislanding requirement for unintentional islanding situations. Unintentional islanding is prohibited while intentional islanding is specifically allowed, thus effectively enabling microgrid operation mode. Further, IEEE 1547-2018 Standard introduces new requirements in terms of interoperability so that the DER plant/circuit segments may be seamlessly integrated with the utility networks but at the same time become vulnerable to a cyber-attack. Traditional cybersecurity measures including encryption, authentication and role-based access control may not be fully implementable to all communication protocols specified in the IEEE 1547 Standard. Therefore, in this project we have identified, researched, implemented and tested several cyberphysical approaches that rely mostly on the behavior of the DER circuit and may help with validating the incoming command and control action potentially coming through an insecure communications channel. Additionally, we have built semantic models and communications profiles for DER facilities and have implemented lightweight IEC 61850 based publisher-subscriber GOOSE messaging mechanism, with security extensions in terms of authentication and encryption. The project proposed information models for integration into UCA OpenFMB 2.0 profiles focusing on grid code compliance.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Residential and Small Commercial Solar Photovoltaic and Storage Permitting, Inspection, and Interconnection Timelines: A Retrospective Review (2017-2023)

This report is part of the ongoing Solar Time-Based Residential Analytics and Cycle Time Estimator (SolarTRACE) project, led by the National Renewable Energy Laboratory (NREL). The SolarTRACE project utilizes time-stamped project-level data provided by installer-partners to assess nationwide and AHJ- and utility-level PI&I and other solar PV adoption timelines since 2017. Our dataset now covers 22% of residential solar and 33% of residential storage installs in the U.S. since 2017. This report provides an update to our previous 2022 report (Cruce et al., 2022b) and includes: updated 2017 2023 project timelines for residential rooftop solar PV up to 20kW; updated tracking of permitting process changes at nearly 4,000 AHJs nationwide; and first-ever reporting of timelines for residential PV+storage projects up to 20kW.

14 SOLAR ENERGY↗

NASA EEE Parts and Advanced Interconnect Program (AIP)

none given From Program Objectives: I. Accelerate the readiness of new technologies through development of validation, assessment and test method/tools II. Provide NASA Projects infusion paths for emerging technologies III. Provide NASA Projects technology selection, application and validation guidelines for harware and processes IV. Disseminate quality assurance, reliability, validation, tools and availability information to the NASA community.

NASA EEE Parts Program Advanced Interconnect Progr↗