Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Generation scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

Intermediate Fidelity Solid State Recorder Modeling for NISAR

At 26Tb/day return average, NISAR (National Aero- nautics and Space Administration (NASA) and the In- dian Space Research Organization (ISRO) Synthetic Aperture Radar) will stress ground station facilities with a variable cadence of data generation observing nearly all of earth's land and ice to produce global time- series maps of cryospheric, solid-Earth and ecosystem phenomena. Between the instrument data generation source and downlink sink lies the primary science data bu er, the SSR (Solid State Recorder). The SSR has deferred, discrete le deletion events that occur only after a le is played back to all required ground segments (sometimes both NASA and ISRO). A forward dispatch, advancing frontier repropagation playback scheduler is proposed as a model of the SSR's greedy playback scheduling behavior. Schedules based on the existing low delity model and new intermediate delity model are compared to assess the impact of deferred, discrete deletion on planning. The low delity model is found to produce unfeasible schedules that exceed SSR capacity, causing 3.87% of all observations in a 12 day simulation to be removed by repair actions.

Doubleday, Joshua R.↗

Asset - An application in mission automation for science planning

Recent advances in computer technology were used to great advantage in planning science observation sequences for the Voyager 2 encounter with Uranus in 1986. Despite a loss of experienced personnel, a challenging schedule, workforce limitations, and the complex nature of the Uranus encounter itself, the resultant science observation timelines were the most highly optimized of the five Voyager encounters with the outer planets. In part, this was due to the development of a microcomputer-based system, called ASSET (Automated Science Sequence Encounter Timelines generator), which was used to design those science observation timelines. This paper details the development of that system. ASSET demonstrates several features essential to the design of the first expert systems for science planning which will be applied for future missions.

Finnerty, D. F.↗

Ares I-X Flight Test--The Future Begins Here

In less than one year, the National Aeronautics and Space Administration (NASA) will launch the Ares I-X mission. This will be the first flight of the Ares I crew launch vehicle, which, together with the Ares V cargo launch vehicle, will send humans to the Moon and beyond. Personnel from the Ares I-X Mission Management Office (MMO) are finalizing designs and fabricating vehicle hardware for a 2009 launch. Ares I-X will be a suborbital development flight test that will gather critical data about the flight dynamics of the integrated launch vehicle stack; understand how to control its roll during flight; better characterize the severe stage separation environments that the upper stage engine will experience during future flights; and demonstrate the first stage recovery system. NASA also will modify the launch infrastructure and ground and mission operations. The Ares I-X Flight Test Vehicle (FTV) will incorporate flight and mockup hardware similar in mass and weight to the operational vehicle. It will be powered by a four-segment Solid Rocket Booster (SRB), which is currently in Shuttle inventory, and will include a fifth spacer segment and new forward structures to make the booster approximately the same size and weight as the five-segment SRB. The Ares I-X flight profile will closely approximate the flight conditions that the Ares I will experience through Mach 4.5, up to approximately 130,000 feet (39,600 meters (m)) and through maximum dynamic pressure ('Max Q') of approximately 800 pounds per square foot (38.3 kilopascals (kPa)). Data from the Ares I-X flight will support the Ares I Critical Design Review (CDR), scheduled for 2010. Work continues on Ares I-X design and hardware fabrication. All of the individual elements are undergoing CDRs, followed by a two-part integrated vehicle CDR in March and July 2008. The various hardware elements are on schedule to begin deliveries to Kennedy Space Center (KSC) in early September 2008. Ares I-X is the first step in the long journey to the Moon and farther destinations. This suborbital test will be NASA's first flight of a new human-rated launch vehicle in more than a generation. This promises to be an exciting time for NASA and the nation, as we reach for new goals in space exploration. A visual presentation is included.

Davis, Stephan R.↗

Applications of Payload Directed Flight

Next generation aviation flight control concepts require autonomous and intelligent control system architectures that close control loops directly around payload sensors in manner more integrated and cohesive that in traditional autopilot designs. Research into payload directed flight control at NASA Ames Research Center is investigating new and novel architectures that can satisfy the requirements for next generation control and automation concepts for aviation. Tighter integration between sensor and machine requires definition of specific sensor-directed control modes to tie the sensor data directly into a vehicle control structures throughout the entire control architecture, from low-level stability- and control loops, to higher level mission planning and scheduling reasoning systems. Payload directed flight systems can thus provide guidance, navigation, and control for vehicle platforms hosting a suite of onboard payload sensors. This paper outlines related research into the field of payload directed flight; and outlines requirements and operating concepts for payload directed flight systems based on identified needs from the scientific literature.'

Ippolito, Corey↗

MUSTANG Applications

Reducing nonrecurring cost and shortening the build schedule for space qualified avionics has been a recurring theme in Space Industry. The NASA Goddard Space Flight Center has leverage its heritage flight qualified design and developed a portfolio of modular avionics comprised of 22 different board designs in a form factor named MUSTANG (Modular Unified Space Technology Avionics for Next Generation) that can be utilized in a variety flight applications. Since the design has no backplane, the modules can be mixed and match to meet the needed requirements. The MUSTANG form factor is sized to fill the void between 3U and 6U form factor and with flexibility to adapting the design without relaying out the boards.

Space↗

Pathfinder Technology Demonstrator (PTD) Status

This paper will provide the status of the NASA Small Spacecraft Technology (SST) program’s Pathfinder Technology Demonstrator (PTD) series. Details on the development, launch, and operations of the recently completed PTD-1, as well as the planned operations of the upcoming PTD-3 and PTD-4 flights will be presented. Significant advances in the capabilities of nano-spacecraft over the past 15 years, coupled with improved access to space for CubeSats, have created new opportunities for scientific exploration using these high-value platforms. Continued development and demonstration of key technologies are improving the performance of the 1-unit (U) and 3U class CubeSats while expanding the reach of nano-spacecraft technologies into larger platforms, such as the 12-kilogram class “6U” buses. NASA’s PTD series is demonstrating a variety of new technologies on-orbit, providing proof of the maturity of these significant new technologies, and enhancing the performance of future CubeSats. Each of the four PTD flights consists of one 6U CubeSat weighing approximately 12 kilograms and measuring approximately 36 centimeters x 25 centimeters x 10 centimeters. Each flight is planned to characterize its payload within 90 days of insertion into low-Earth orbit. The PTD flights will demonstrate key technologies such as novel nano-spacecraft compatible propulsion systems, which enable deep space and maneuverable CubeSat flights; optical communications systems to facilitate high data rate collection and communications; and highly integrated systems that combine power and communication system elements to enable high power generation and novel integrated communication systems. The first PTD spacecraft, PTD-1, was placed in orbit by a SpaceX Falcon 9 launch in January of 2021 and demonstrated the functionality of the HYDROS propulsion system, developed by Tethers Unlimited of Bothell, Washington, over a period of six months. The PTD-3 flight, scheduled for launch in summer 2022, will demonstrate the TeraByte InfraRed Delivery, or TBIRD, optical communications payload developed by Massachusetts Institute of Technology Lincoln Laboratory in Lexington. The PTD-4 flight will demonstrate the Lightweight Integrated Solar Array and anTenna, or LISA-T, a payload that consists of an integrated solar array and transceiver developed by NASA’s Marshall Spaceflight Center in Huntsville, Alabama. The PTD spacecraft bus, integration and test, and flight operations services are provided by Tyvak Nano-Satellite Systems, Inc. (“Tyvak”) of Irvine, California. NASA’s SST program within the agency’s Space Technology Mission Directorate funds the PTD demonstration flights. The SST program rapidly develops and demonstrates capabilities for small spacecraft applicable to exploration, science, and the commercial sector. The program is based at NASA’s Ames Research Center.

Small Spacecraft↗

International Conference on Advances in Communication and Control Systems, 1st, Washington, DC, June 18-20, 1987, Proceedings

Theoretical models of communication and control systems are discussed in reviews and reports. Topics addressed include smoothing and identification for random fields, the information and coding capacities of mismatched Gaussian channels, recursive least-squares estimation and Kalman filtering by systolic arrays, Kemp echo digital filters, a periodic test-scheduling scheme for communication and queuing processes, and receivers for direct-sequence systems. Consideration is given to a distributed-parameter model for detecting cracks in rotors, active control of aeroelastic systems governed by functional differential equations, robust multivariable control of large space structures, finite-rank relatively bounded perturbations of semigroup generators, and sensitivity analysis of convex optimal-control problems.

Declaris, Nicholas↗

Recursive heuristic classification

The author will describe a new problem-solving approach called recursive heuristic classification, whereby a subproblem of heuristic classification is itself formulated and solved by heuristic classification. This allows the construction of more knowledge-intensive classification programs in a way that yields a clean organization. Further, standard knowledge acquisition and learning techniques for heuristic classification can be used to create, refine, and maintain the knowledge base associated with the recursively called classification expert system. The method of recursive heuristic classification was used in the Minerva blackboard shell for heuristic classification. Minerva recursively calls itself every problem-solving cycle to solve the important blackboard scheduler task, which involves assigning a desirability rating to alternative problem-solving actions. Knowing these ratings is critical to the use of an expert system as a component of a critiquing or apprenticeship tutoring system. One innovation of this research is a method called dynamic heuristic classification, which allows selection among dynamically generated classification categories instead of requiring them to be prenumerated.

Wilkins, David C.↗

Runway Operations Planning: A Two-Stage Solution Methodology

The airport runway is a scarce resource that must be shared by different runway operations (arrivals, departures and runway crossings). Given the possible sequences of runway events, careful Runway Operations Planning (ROP) is required if runway utilization is to be maximized. Thus, Runway Operations Planning (ROP) is a critical component of airport operations planning in general and surface operations planning in particular. From the perspective of departures, ROP solutions are aircraft departure schedules developed by optimally allocating runway time for departures given the time required for arrivals and crossings. In addition to the obvious objective of maximizing throughput, other objectives, such as guaranteeing fairness and minimizing environmental impact, may be incorporated into the ROP solution subject to constraints introduced by Air Traffic Control (ATC) procedures. Generating optimal runway operations plans was approached in with a 'one-stage' optimization routine that considered all the desired objectives and constraints, and the characteristics of each aircraft (weight class, destination, Air Traffic Control (ATC) constraints) at the same time. Since, however, at any given point in time, there is less uncertainty in the predicted demand for departure resources in terms of weight class than in terms of specific aircraft, the ROP problem can be parsed into two stages. In the context of the Departure Planner (OP) research project, this paper introduces Runway Operations Planning (ROP) as part of the wider Surface Operations Optimization (SOO) and describes a proposed 'two stage' heuristic algorithm for solving the Runway Operations Planning (ROP) problem. Focus is specifically given on including runway crossings in the planning process of runway operations. In the first stage, sequences of departure class slots and runwy crossings slots are generated and ranked based on departure runway throughput under stochastic conditions. In the second stage, the departure class slots are populated with specific flights from the pool of available aircraft, by solving an integer program. Preliminary results from the algorithm implementation on real-world traffic data are included.

Anagnostakis, Ioannis↗

IpexT: Integrated Planning and Execution for Military Satellite Tele-Communications

The next generation of military communications satellites may be designed as a fast packet-switched constellation of spacecraft able to withstand substantial bandwidth capacity fluctuation in the face of dynamic resource utilization and rapid environmental changes including jamming of communication frequencies and unstable weather phenomena. We are in the process of designing an integrated scheduling and execution tool which will aid in the analysis of the design parameters needed for building such a distributed system for nominal and battlefield communications. This paper discusses the design of such a system based on a temporal constraint posting planner/scheduler and a smart executive which can cope with a dynamic environment to make a more optimal utilization of bandwidth than the current circuit switched based approach.

Plaunt, Christian↗

Multi-Robot Assembly Scheduling for the Lunar Crater Radio Telescope on the Far-Side of the Moon

The Lunar Crater Radio Telescope (LCRT) is a pro- posed ultra-long-wavelength radio telescope to be constructed on the far side of the moon. The proposed telescope will be constructed by deploying a 1km wire mesh in a 3-5km crater using a team of wall-climbing DuAxel robots. In this work, we consider the problem of generating minimum-time assembly sequences for LCRT, using realistic models of travel speed and lighting. Specifically, we pose the assembly sequencing problem as a mixed-integer linear program (MILP), which we solve to global optimality using commercial solvers. We present methods for modeling time-varying travel and assembly times, based on variable lighting conditions (including crater shadowing), and show how such time-varying parameters can be incorporated into the MILP. Finally, we present numerical studies of our method, showing how makespan varies with the number of assembly robots.

Schwager, Mac↗

Investigation of automated task learning, decomposition and scheduling

The details and results of research conducted in the application of neural networks to task planning and decomposition are presented. Task planning and decomposition are operations that humans perform in a reasonably efficient manner. Without the use of good heuristics and usually much human interaction, automatic planners and decomposers generally do not perform well due to the intractable nature of the problems under consideration. The human-like performance of neural networks has shown promise for generating acceptable solutions to intractable problems such as planning and decomposition. This was the primary reasoning behind attempting the study. The basis for the work is the use of state machines to model tasks. State machine models provide a useful means for examining the structure of tasks since many formal techniques have been developed for their analysis and synthesis. It is the approach to integrate the strong algebraic foundations of state machines with the heretofore trial-and-error approach to neural network synthesis.

Livingston, David L.↗

Future Applications of Remote Sensing to Archeological Research

Archeology was one of the first disciplines to use aerial photography in its investigations at the turn of the 20th century. However, the low resolution of satellite technology that became available in the 1970 s limited their application to regional studies. That has recently changed. The arrival of the high resolution, multi-spectral capabilities of the IKONOS and QUICKBIRD satellites and the scheduled launch of new satellites in the next few years provides an unlimited horizon for future archeological research. In addition, affordable aerial and ground-based remote sensing instrumentation are providing archeologists with information that is not available through traditional methodologies. Although many archeologists are not yet comfortable with remote sensing technology a new generation has embraced it and is accumulating a wealth of new evidence. They have discovered that through the use of remote sensing it is possible to gather information without disturbing the site and that those cultural resources can be monitored and protected for the future.

Sever, Thomas L.↗

Intelligent rover decision-making in response to exogenous events

This paper presents an introduction to the CLEAR system which performs rover command generation and re-planning, the challenges faced maintaining domain specific information in an uncertain environment, and the successes demonstrated with several methods of system testing.

planning and scheduling↗

Propelling Exploration to the Moon and Beyond

As the Constellation Program enters its fourth year, the Ares Projects have made substantial progress toward sending human explorers beyond Earth orbit. The Ares I crew launch vehicle, which will take six astronauts or cargo to the International Space Station or four astronauts to rendezvous with Ares V for missions to the Moon, is the first human-rated vehicle NASA has developed in over 30 years. Since the Exploration Systems Architecture Study in 2005, the Ares Projects have completed a successful system requirements review, system definition review, and preliminary design review for the Ares I crew launch vehicle. The Ares I elements are well into development, beginning with the Shuttle-derived, five-segment solid rocket motor that will provide first-stage propulsion. The first stage team has poured its first production simulation article motor and will be pouring and firing the first five-segment development motor in 2009. Large-scale tooling has been installed and tested to produce propellant tanks for the liquid-fuel upper stage at Marshall Space Flight Center (MSFC) in Alabama. The initial upper stage units and main propulsion test article will be manufactured and tested at MSFC before transferring to Michoud Assembly Facility in Louisiana. The upper stage engine team has completed powerpack testing using Apollo J-2 heritage hardware and begun construction of a new altitude test stand at Stennis Space Center in Mississippi. The flight and integrated testing group has designed and built hardware for the Ares I-X test flight scheduled for 2009, as well as begun refurbishing existing infrastructure to support ground testing. Additionally, a base configuration has been selected for the Ares V cargo launch vehicle, which will send the Altair lunar lander and Orion to the Moon. Today, the Ares Projects are well on the way to building America s next generation of exploration-capable launch vehicles.

Cook, Stephen A.↗

First Results from NASA's Lunar Atmosphere and Dust Environment Explorer (LADEE)

As of early August, 2013, the Lunar Atmosphere and Dust Environment Explorer (LADEE) mission is scheduled for launch on a Minotaur V rocket from Wallops Flight Facility during a five-day launch period that opens on Sept. 6, 2013 (early Sept. 7 UTC). LADEE will address 40 year-old mysteries of the lunar atmosphere and the question of levitated lunar dust. It will also pioneer the next generation of optical space communications. LADEE will assess the composition of the lunar atmosphere and investigate the processes that control its distribution and variability, including sources, sinks, and surface interactions. LADEE will also determine whether dust is present in the lunar exosphere, and reveal its sources and variability. These investigations are relevant to our understanding of surface boundary exospheres and dust processes occurring at many objects throughout the solar system, address questions regarding the origin and evolution of lunar volatiles, and have potential implications for future exploration activities. Following a successful launch, LADEE will enter a series of phasing orbits, which allows the spacecraft to arrive at the Moon at the proper time and phase. This approach accommodates any dispersion in the Minotaur V launch injection. LADEE's arrival at the moon in early October. The spacecraft will approach the moon from its leading edge, travel behind the Moon out of sight of the Earth, and then re-emerge and execute a three-minute Lunar Orbit Insertion maneuver. This will place LADEE in an elliptical retrograde equatorial orbit with an orbital period of approximately 24 hours. A series of maneuvers is then performed to reduce the orbit to become nearly circular with a 156-mile (250- kilometer) altitude. Spacecraft checkout and science instrument commissioning will commence in early-October and will nominally span 30 days but can be extended for an additional 30 days in the event of contingencies. Following commissioning, the 100-day Science Phase is performed at an orbit with periapsis between 20-60 km. This orbit must be constantly managed due to the Moon's highly inhomogeneous gravity field. During the Science Phase, the moon will rotate more than three times underneath the LADEE orbit. LADEE employs a high heritage instrument payload: a Neutral Mass Spectrometer (NMS) from Goddard Space Flight Center, an Ultraviolet/Visible Spectrometer (UVS) from Ames Research Center, and a dust detection experiment (LDEX) from the University of Colorado/LASP. It will also carry the Lunar Laser Communications Demonstration (LLCD) as a technology demonstration. The LLCD is funded by the Human Exploration Operations Mission Directorate (HEOMD), managed by GSFC, and built by the MIT Lincoln Lab. Contingent upon LADEE's successful lunar orbit insertion and checkout, we will report the early results from the science investigations.

Moon↗

Best of Breed

No team of engineers, no matter how much time they took or how many bottles of cabernet they consumed, would dream up an antenna that looked like a deer antler on steroids. Yet that's what a group at NASA Ames Research Center came up with-thanks to a little help from Darwin. NASA's Space Technology 5 nanosatellites, which are scheduled to start measuring Earth's magnetosphere in late 2004, requires an antenna that can receive a wide range of frequencies regardless of the spacecraft's orientation. Rather than leave such exacting requirements in the hands of a human, the engineers decided to breed a design using genetic algorithms and 32 Linux PCs. The computers generated small antenna-constructing programs (the genotypes) and executed them to produce designs (the phenotypes). Then the designs were evaluated using an antenna simulator. The team settled on the form pictured here. You won't find this kind of antenna in any textbook, design guide, or research paper. But its innovative structure meets a challenging set of specifications. If successfully deployed, it will be the first evolved antenna to make it out of the lab and the first piece of evolved hardware ever to fly in space.

Lohn, Jason↗

The International Space Station: Operations and Assembly - Learning From Experiences - Past, Present, and Future

As the Space Shuttle continues flight, construction and assembly of the International Space Station (ISS) carries on as the United States and our International Partners resume the building, and continue to carry on the daily operations, of this impressive and historical Earth-orbiting research facility. In his January 14, 2004, speech announcing a new vision for America s space program, President Bush ratified the United States commitment to completing construction of the ISS by 2010. Since the launch and joining of the first two elements in 1998, the ISS and the partnership have experienced and overcome many challenges to assembly and operations, along with accomplishing many impressive achievements and historical firsts. These experiences and achievements over time have shaped our strategy, planning, and expectations. The continual operation and assembly of ISS leads to new knowledge about the design, development and operation of systems and hardware that will be utilized in the development of new deep-space vehicles needed to fulfill the Vision for Exploration and to generate the data and information that will enable our programs to return to the Moon and continue on to Mars. This paper will provide an overview of the complexity of the ISS Program, including a historical review of the major assembly events and operational milestones of the program, along with the upcoming assembly plans and scheduled missions of the space shuttle flights and ISS Assembly sequence.

Fuller, Sean↗