Study and investigation of optical system, phase II Final report
Optical design for infrared spectrophotometer and telescope for Mars flyby spacecraft
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Optical design for infrared spectrophotometer and telescope for Mars flyby spacecraft
Unmanned Jupiter space flights, discussing requirements for flyby, Orbiter and low thrust missions
Communication parameters associated with Martian flyby probes and with lander and manned vehicles
Data return advantages of earth-Mars-earth flyby trajectories over more conventional Mars trajectories
Low thrust Jupiter flyby mission analysis for interplanetary vehicles with solar electric propulsion
In the Saturnian system, the control of the node crossing point is important to avoid debris in Saturn's ring plane and to target flybys of moons other than Titan. This paper describes how to use Titan gravity assists to control the spacecraft's node crossing point.
The Cassini spacecraft will arrive at Saturn in 2004 carrying the Huygens probe which will descend into the atmosphere of Saturn's moon Titan. An extra 32-day orbit has been inserted at the beginning of the tour, and the orbiter altitude has been increased during the probe delivery flyby. This paper will detail the changes to the tour.
This paper computes the probabilities that the near-Sun flyby mission, Fire, might be bombarded by high energy protons from solar-activity related proton acceleration lying beneath Fire's perihelion altitude of three solar radii.
The only physical observations which predate the identifications of 253 Mathilde as a potential flyby target of NEAR were measurements of its absolute magnitude in reflected light and thermal radiometry by IRAS. Mathilde has been revealed to be an unusual object, of a class not previously visited by a spacecraft.
The use of an electromechanical device for optically positioning a mirror system during the pre-project phase of the Pluto Fast Flyby mission was evaluated at JPL. The device under consideration was a piezoelectric driven linear motor functionally dependent upon a time varying electric field which induces displacements ranging from submicrons to millimeters with positioning accuracy within nanometers.
This paper presents the results of a survey of LF plasma waves detected during the Ulysses Jupiter flyby.
The original Cassini mission concept for intensive Saturn exploration included dual atmospheric probes - to Titan and Saturn. The Saturn probe was lost in Cassini Project cost reduction, but the Saturn atmospheric goals are still important to the planetary science community - especially it measurements can be acquired during synoptic coverage by the Cassini Orbiter. New advanced technology and design heritage from the Pluto Fast Flyby mission permit a low cost mission concept for launch early in the first decade of the 21st century, in time to take advantage of the Cassini spacecraft being in orbit around Saturn. This paper will describe such a concept. The mini-probe carrier can be a relatively simple design, depending on a solar array/battery power system design instead of Radioactive Thermoelectric Generators (RTGs) with their attendant programmatic complexities, costs, and constraints. The Atlas IIAS/Star 48B, Proton, and STS with upper stage are launch vehicle options which permit modest payload deliveries to Saturn with relatively short flight times (3 to 4 years) such that the mini-probes arrive in the time period when the Cassini Orbiter is operating at Saturn. The Cassini time-line with a compatible SMP mission sequence is described. An example mission concept includes a carrier spacecraft with three 10 to 20 kg mini-probes, launched in the late summer of 2001 by an Atlas IIAS/Star 48B on a 3.8 year trip to Saturn. Preliminary evaluation of the Cassini time-line suggests compatibility of the probe entries with collecting the data for Earth-return.
As the time of the Ida encounter by Galileo approached, some unfortunate circumstances occurred, causing a very worrisome but exciting encounter, especially with regards to navigation. This paper reports on Galileo's orbit determination stratagy during the period after the last Earth encounter through the Ida flyby. Details in the modeling of Galileo's orbit, and in the use of various navigation tools, will be explained and the results of several key orbit solutions will be given.
The Cassin/Huygens Project is a joint undertaking between NASA, the European Space Agency, and the Italian Space Agency to conduct an in-depth exploration of the Saturnian system. The spacecraft consists of an orbiter vehicle and an atmospheric probe which has completed its mission in the atmosphere and on the surface of Titan, the largest moon of Saturn. The spacecraft was launched on October 15, 1997, has completed its nearly seven years of interplanetary flight, and by the time of the 56th IAC, it will have completed 17 of its planned 75 orbits during its four-year prime orbital mission. This paper gives an overview of the mission, and describes in detail the accomplishments and events over the past year, including the spectacularly successful descent of the .European Space Agency's Huygens probe to the surface of Titan. Initial scientific results from both the Huygens mission as well as from the first one-and-a-quarter years of orbiting Saturn are summarized. The plans for the remainder of the orbiter's tour of the Saturn system and the many flybys of Titan and the smaller icy satellites are described.
Ongoing studies, performed at NASA/JPL over the past two years in support of NASA's SSE Roadmap activities, proved the feasibility of a NF class Saturn probe mission. I. This proposed mission could also provide a good opportunity for international collaboration with the proposed Cosmic Vision KRONOS mission: a) With ESA contributed probes (descent modules) on a NASA lead mission; b) Early 2017 launch could be a good programmatic option for ESA-CV/NASA-NF. II. A number of mission architectures could be suitable for this mission: a) Probe Relay based architecture with short flight time (approx. 6.3-7 years); b) DTE probe telecom based architecture with long flight time (-11 years), and low probe data rate, but with the probes decoupled from the carrier, allowing for polar trajectories I orbiter. This option may need technology development for telecom; c) Orbiter would likely impact mission cost over flyby, but would provide significantly higher science return. The Saturn probes mission is expected to be identified in NASA's New Frontiers AO. Thus, further studies are recommended to refine the most suitable architecture. International collaboration is started through the KRONOS proposal work; further collaborated studies will follow once KRONOS is selected in October under ESA's Cosmic Vision Program.
The Nuclear Thermal Rocket (NTR) represents the next evolutionary step in cryogenic liquid rocket engines. Deriving its energy from fission of uranium-235 atoms contained within fuel elements that comprise the engine's reactor core, the NTR can generate high thrust at a specific impulse of approx. 900 seconds or more - twice that of today's best chemical rockets. In FY'11, as part of the AISP project, NASA proposed a Nuclear Thermal Propulsion (NTP) effort that envisioned two key activities - "Foundational Technology Development" followed by system-level "Technology Demonstrations". Five near-term NTP activities identified for Foundational Technology Development became the basis for the NCPS project started in FY'12 and funded by NASA's AES program. During Phase 1 (FY'12-14), the NCPS project was focused on (1) Recapturing fuel processing techniques and fabricating partial length "heritage" fuel elements for the two candidate fuel forms identified by NASA and the DOE - NERVA graphite "composite" and the uranium dioxide (UO2) in tungsten "cermet". The Phase 1 effort also included: (2) Engine Conceptual Design; (3) Mission Analysis and Requirements Definition; (4) Identification of Affordable Options for Ground Testing; and (5) Formulation of an Affordable and Sustainable NTP Development Strategy. During FY'14, a preliminary plan for DDT&E was outlined by GRC, the DOE and industry for NASA HQ that involved significant system-level demonstration projects that included GTD tests at the NNSS, followed by a FTD mission. To reduce development costs, the GTD and FTD tests use a small, low thrust (approx. 7.5 or 16.5 klbf) engine. Both engines use graphite composite fuel and a "common" fuel element design that is scalable to higher thrust (approx. 25 klbf) engines by increasing the number of elements in a larger diameter core that can produce greater thermal power output. To keep the FTD mission cost down, a simple "1-burn" lunar flyby mission was considered along with maximizing the use of existing and flight proven liquid rocket and stage hardware (e.g., from the RL10-B2 engine and Delta Cryogenic Second Stage) to further ensure affordability. This paper provides a preliminary NASA, DOE and industry assessment of what is required - the key DDT&E activities, development options, and the associated schedule - to affordably build, ground test and fly a small NTR engine and stage within a 10-year timeframe.
The Nuclear Thermal Rocket (NTR) derives its energy from fission of uranium-235 atoms contained within fuel elements that comprise the engine's reactor core. It generates high thrust and has a specific impulse potential of approximately 900 seconds - a 100% increase over today's best chemical rockets. The Nuclear Thermal Propulsion (NTP) project, funded by NASA's AES program, includes five key task activities: (1) Recapture, demonstration, and validation of heritage graphite composite (GC) fuel (selected as the "Lead Fuel" option); (2) Engine Conceptual Design; (3) Operating Requirements Definition; (4) Identification of Affordable Options for Ground Testing; and (5) Formulation of an Affordable Development Strategy. During FY'14, a preliminary DDT&E plan and schedule for NTP development was outlined by GRC, DOE and industry that involved significant system-level demonstration projects that included GTD tests at the NNSS, followed by a FTD mission. To reduce cost for the GTD tests and FTD mission, small NTR engines, in either the 7.5 or 16.5 klbf thrust class, were considered. Both engine options used GC fuel and a "common" fuel element (FE) design. The small approximately 7.5 klbf "criticality-limited" engine produces approximately 157 megawatts of thermal power (MWt) and its core is configured with parallel rows of hexagonal-shaped FEs and tie tubes (TTs) with a FE to TT ratio of approximately 1:1. The larger approximately 16.5 klbf Small Nuclear Rocket Engine (SNRE), developed by LANL at the end of the Rover program, produces approximately 367 MWt and has a FE to TT ratio of approximately 2:1. Although both engines use a common 35 inch (approximately 89 cm) long FE, the SNRE's larger diameter core contains approximately 300 more FEs needed to produce an additional 210 MWt of power. To reduce the cost of the FTD mission, a simple "1-burn" lunar flyby mission was considered to reduce the LH2 propellant loading, the stage size and complexity. Use of existing and flight proven liquid rocket and stage hardware (e.g., from the RL10B-2 engine and Delta Cryogenic Second Stage) was also maximized to further aid affordability. This paper examines the pros and cons of using these two small engine options, including their potential to support future human exploration missions to the Moon, near Earth asteroids, and Mars, and recommends a preferred size. It also provides a preliminary assessment of the key activities, development options, and schedule required to affordably build, ground test and fly a small NTR engine and stage within a 10-year timeframe.