Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Federal Programs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

Biennial Report to Congress on the Progress of the Federal Government in Meeting the Renewable Energy Goals of the Energy Policy Act of 2005

As a whole the Federal government met its statutory goal to consume renewable electricity to meet not less than 3 percent of total facility electricity use. However, overall Federal renewable electricity use declined 32% from 2007 to 2008, dropping from 2.8 terawatthours (TWh) (4.9%) to 1.9 TWh (3.4%). Of the 22 agencies reporting, 13 increased renewable energy use, but 7 agencies reported significant declines that more than offset the increases, while deployment was stagnant in 2 others. Higher prices for renewable energy certificates (RECs) and reduced incentives to purchase renewable energy because of the phase out of old rules that allowed counting renewable energy purchases towards energy efficiency goals were major reasons cited for the decline. In addition, there was a steep reduction of 73% in self-generated or on-site renewable energy. Although self-generated renewable energy declined, some facilities demonstrated a new approach to developing projects by selling high-value RECs to help finance projects, and then used some of the savings to purchase lower-cost replacement RECs. This approach, exemplified by the National Renewable Energy Laboratory’s (NREL) Mesa Top PV project, reduces the cost of meeting the goal, and allows the project to count as on-site energy production. EPAct 2005 only allows agencies, including the Department of Defense (DoD), to count renewable energy the agency consumes toward the EPAct goal and it only allows agencies to count electricity from renewable resources, not thermal energy. Under EPAct, ground-source heat pumps which provide thermal energy are not allowed. DoD has a separate statutory goal that counts production and consumption of both electricity and thermal energy from renewable sources, but DOD is also required to meet EPAct 2005 goals. The reduction in self-generated or on-site renewable energy is of particular concern. Given this trend, meeting the goal in 2009 may be difficult; increasing renewable energy use to 5 percent of facility electricity use in 2010 will be unlikely without a much greater effort. Agencies urgently need to increase attention to the renewable energy goal and take action to meet the goal. Removing barriers to these projects is also critically important.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Wildland Fire Management Plan

The Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) is written to comply with Department of Energy (DOE) Integrated Safety Management Policy; Federal Wildland Fire Management Policy and Program Review; and Wildland and Prescribed Fire Management Policy and Implementation Procedures Reference Guide. This current plan incorporates changes resulting from new policies on the national level as well as significant changes to available resources and other emerging issues, and replaces BNL's Wildland FMP dated 2014.

54 ENVIRONMENTAL SCIENCES↗

Energy Recovery Hydropower: Prospects for Off-Setting Electricity Costs for Agricultural, Municipal, and Industrial Water Providers and Users; July 2017 - September 2017

Energy recovery hydropower is one of the most cost-effective types of new hydropower development because it is constructed utilizing existing infrastructure, and it is typically able to complete Federal Energy Regulatory Commission (FERC) review in 60 days. Recent changes in federal and state policy have supported energy recovery hydropower. In addition, some states have developed programs and policies to support energy recovery hydropower, including resource assessments, regulatory streamlining initiatives, and grant and loan programs to reduce project development costs. This report examines current federal and state policy drivers for energy recovery hydropower, reviews market trends, and looks ahead at future federal resource assessments and hydropower reform legislation.

13 HYDRO ENERGY↗

Highlights and Lessons Learned from Army Re-tuning™ Pilot Demonstrations

The Army has aggressively pursued policy and energy efficiency projects and programs in recent years to meet Federal mandates and reduction goals organizationally (EISA 2007, AR 420-1, 42 U.S.C. § 8253), resulting in a 9.6% reduction in energy use intensity (EUI) from FY2015 to FY2017. Despite these successes, the Army remains the largest consumer of electricity in the Federal government and spent approximately $1.1 billion in energy-related costs in FY2017. Many of the low-cost/no-cost conservation measures have been deployed, so finding additional savings and projects that either (a) are cost effective or (b) can be bundled with more costly capital improvement projects to improve life cycle cost effectiveness, is imperative for the Army. Leveraging building control systems (BCS) and optimizing building performance through re-tuning represents a great opportunity for the Army. In 2016, the Pacific Northwest National Laboratory (PNNL), in support of the Assistant Secretary of the Army (Installations, Energy and Environment), i.e. ASA (IEE), was tasked in 2016 with a multi-year study and pilot demonstration to develop a business case for the potential energy and cost reduction benefits from re-tuning efforts for the Army.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Federal Best Practices: Core Principles of Sustainable Fleet Management

This report helps agency fleet managers understand and implement optimal petroleum reduction strategies for fleet locations by evaluating the most appropriate combination of the four core principles of sustainable fleet management: right-sizing the fleet to agency mission by implementing a vehicle allocation methodology study; minimizing vehicle miles traveled; increasing fleet fuel efficiency by replacing inefficient vehicles with more fuel-efficient vehicles, maintaining vehicles, driving more efficiently, and avoiding excessive idling; and optimizing cost-effective alternative fuel use, including maximizing utilization of existing alternative fuel infrastructure, installing alternative fuel infrastructure where practical (including electric vehicle charging stations), and aligning deployment of alternative fuel vehicles with fueling infrastructure.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Federal Fleet Resilience Planning

Federal fleet operations span the diverse geography of the country as the vehicles provide services in support of equally diverse agency missions. Fleets face the potential for disruption of services from natural disasters, infrastructure failures, and human threats. This report reviews some of the hazards, threats, and disruptions that fleets may face, describes an approach to fleet management that incorporates resilience, and provides an overview of fleet resilience considerations. While this report is not comprehensive, it describes considerations for integrating resilience into fleet management organizational priorities.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Energy Management Information Systems Technical Resources Report

This report illustrates how energy management information systems (EMIS) can enable federal agencies to improve energy performance, reduce costs, and meet energy goals. The guide discusses how to identify and implement needed EMIS functions and capabilities, covering the entire EMIS life cycle including system design, procurement, implementation, and ongoing maintenance.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Demonstration and Evaluation of Lightweight High Performance Secondary Windows

Eight secondary windows (single-pane and double-pane) were installed at Building 53 of the Denver Federal Center in Colorado as part of a demonstration project to assess their thermal performance, life cycle costs, and deployment potential for use in conjunction with existing, older single-pane windows. The U.S. Department of Energy's National Renewable Energy Laboratory performed several different evaluations to assess the viability of the secondary windows for GSA applications. Some assessments were performed with models, while others required onsite evaluations including time series measurements.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Customizable Technical Specifications for Lithium-Ion Battery Storage Projects

Learn how to navigate the FEMP Lithium-ion Battery Storage Technical Specifications, a key resource for federal agencies developing onsite energy storage projects. This webinar, led by technical experts, will provide a step-by-step walkthrough of the specifications, supplemented with a real-world case study. Gain practical insights to support successful battery storage project development and implementation.

25 ENERGY STORAGE↗

Evaluating Air-Source Heat Pumps with Distributed Energy Resources in REopt

This training introduces attendees to NREL's REopt(R) web tool and its capabilities in evaluating air-source heat pumps (ASHP) alongside distributed energy resources (DERs). Designed for energy managers, facility operators, and sustainability managers, this session will explore how REopt provides techno-economic analysis to assess the financial viability of ASHP while identifying synergies with solar PV and battery storage. Participants will gain practical insights into using REopt to optimize energy strategies, reduce costs, and improve site resilience.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Federal Water Management Planning Manual

FEMP developed this Federal Water Management Planning Manual to provide a resource for designing a comprehensive water management program. The manual describes strategies to optimize water use at federal facilities, use water balance analysis methods, identify design elements and procurement best practices, and expand use of alternative water.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Audit Report on "Work for Others Performed by the Department of Energy for the Department of Defense"

Pursuant to the Atomic Energy Act of 1954, as amended, and the Economy Act of 1932, the Department of Energy and its semi-autonomous National Nuclear Security Administration (NNSA) provide research and technical assistance to other Federal agencies on a reimbursable, full cost recovery basis through the Work for Others (WFO) program. For the vast majority of WFO technical projects, Department Federal officials furnish administrative project oversight while the actual detailed scientific or technical work is completed by the Department's 'management and operating' contractors. These contractors are awarded a special contract type specifically created under the Federal Acquisition Regulation to manage and operate Department sites and facilities, including sophisticated laboratories and technical centers, on a government-owned, contractor-operated basis. With annual expenditures exceeding $1 billion, the Department of Defense (DoD) is one of the Department's largest WFO customers. Work performed for DoD at the Department's national laboratories and other facilities includes highly technical research in areas such as nuclear weapons systems, counter-terrorism, and in-theater troop support. The National Defense Authorization Act for Fiscal Year (FY) 2009, required the Inspectors General of the DoD and the Department to review procurement methods to determine whether the Department complied with DoD procurement requirements and/or whether alternative procurement policies were in place. In response, we focused our review on projects performed by NNSA because it completes the vast majority (approximately $900 million in FY 2008) of the Department's work for DoD. As part of this effort, and, at the specific request of the DoD Office of Inspector General (DoD OIG), we identified the universe of WFO technical projects that received new funding in the fourth quarter of FY 2008 at NNSA sites. We independently reviewed a judgmental sample of 11 projects selected by the DoD OIG to meet the objectives of this audit. Our review revealed that NNSA managed DoD WFO technical projects in a manner consistent with requirements of the Atomic Energy Act of 1954, the Federal Acquisition Regulation, and the Department's implementing guidance, the Department of Energy Acquisition Regulation. Because of the very nature of the Department's management and operating contracting model, WFO projects may not be technically compliant with DoD procurement regulations in certain instances. We found that NNSA did not let new contracts or task orders for the DoD WFO technical projects we reviewed and instead managed them under its existing internal control process as part of its management and operating contract structure. In one instance, we noted that the Department had, at DoD's request, supplemented its control structure to incorporate specific DoD procurement requirements. Senior Department of Energy procurement officials acknowledged that neither the Department nor NNSA modified their existing prime contracts to incorporate specific defense procurement requirements because such modifications would be inappropriate, costly, and inefficient. In short, they informed us that the Department had developed and implemented a series of controls designed to monitor overall contractor performance, including WFO technical projects. Department and NNSA officials noted, however, that they were willing to incorporate DoD specific requirements into work orders should DoD request and fund such efforts. Additional details regarding management of WFO technical projects are discussed in the body of this report.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Wildland Fire Management Plan for Brookhaven National Laboratory

This Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) updates the 2003 plan incorporating changes necessary to comply with DOE Order 450.1 and DOE P 450.4, Federal Wildland Fire Management Policy and Program Review; Wildland and Prescribed Fire Management Policy and implementation Procedures Reference Guide. This current plan incorporates changes since the original draft of the FMP that result from new policies on the national level. This update also removes references and dependence on the U.S. Fish & Wildlife Service and Department of the Interior, fully transitioning Wildland Fire Management responsibilities to BNL. The Department of Energy policy for managing wildland fires requires that all areas, managed by the DOE and/or its various contractors, that can sustain fire must have a FMP that details fire management guidelines for operational procedures associated with wild fire, operational, and prescribed fires. Fire management plans provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled, 'prescribed' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered, threatened, and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL. This FMP will be reviewed periodically to ensure the fire program advances and evolves with the missions of the DOE and BNL. This Fire Management Plan is presented in a format that coverers all aspects specified by DOE guidance documents which are based on the national template for fire management plans adopted under the National Fire Plan. The DOE is one of the signatory agencies on the National Fire Plan. This FMP is to be used and implemented for the entire BNL site including the Upton Reserve and has been reviewed by, The Nature Conservancy, New York State Department of Environmental Conservation Forest Rangers, and DOE, as well as appropriate BNL emergency services personnel. The BNL Fire Department is the lead on wildfire suppression. However, the BNL Natural Resource Manager will be assigned to all wildland fires as technical resource advisor.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗