Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Federal Energy Management Program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

INL Environmental Monitoring Plan (DOE/ID-11088 Rev. 5)

This plan provides a high-level summary of environmental monitoring performed by various organizations within and around the Idaho National Laboratory (INL) Site as required by U.S. Department of Energy (DOE) Order 435.1, Radioactive Waste Management, and DOE Order 458.1, Radiation Protection of the Public and the Environment, Guide DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance, and in accordance with 40 Code of Federal Regulations (CFR) 61, National Emission Standards for Hazardous Air Pollutants. The purpose of these orders is to 1) implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations, and 2) to establish standards and requirements for the operations of DOE and DOE contractors with respect to protection of the environment and members of the public against undue risk from radiation. This plan describes the organizations responsible for conducting environmental monitoring across the INL Site, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. Detailed monitoring procedures, program plans, or other governing documents used by contractors or agencies to implement requirements are referenced in this plan. This plan covers all planned monitoring and environmental surveillance. Non-routine activities such as special research studies and characterization of individual sites for environmental restoration are outside the scope of this plan.

54 ENVIRONMENTAL SCIENCES↗

Open Energy Data Initiative (OEDI) FY22-24 (Final Technical Report)

Final technical report for the Open Energy Data Initiative (OEDI) project covering fiscal years FY22 through FY24. The DOE Open Energy Data Initiative (OEDI) is a partnership between the National Renewable Energy Laboratory (NREL), the U.S. Department of Energy (DOE), and major cloud providers including Amazon, Microsoft, and Google to provide universal access to big data in the cloud. At the heart of OEDI is a centralized repository of high-value energy research datasets aggregated from the U.S. Department of Energy's Program Offices, National Laboratories and other collaborators. It aggregates smaller, domain-specific repositories, allows direct data submissions, and includes support for big data through its energy data lakes. OEDI's data lakes make high-value data universally accessible and help researchers, collaborators and the general public overcome many of the obstacles to accessing and using big data.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

U.S. Department of Energy's initiatives for proliferation prevention program: solidification technologies for radioactive waste treatment in Russia

Large amounts of liquid radioactive waste have existed in the U.S. and Russia since the 1950's as a result of the Cold War. Comprehensive action to treat and dispose of waste products has been lacking due to insufficient funding, ineffective technologies or no proven technologies, low priority by governments among others. Today the U.S. and Russian governments seek new, more reliable methods to treat liquid waste, in particular the legacy waste streams. A primary objective of waste generators and regulators is to find economical and proven technologies that can provide long-term stability for repository storage. In 2001, the V.G. Khlopin Radium Institute (Khlopin), St. Petersburg, Russia, and Pacific Nuclear Solutions (PNS), Indianapolis, Indiana, began extensive research and test programs to determine the validity of polymer technology for the absorption and immobilization of standard and complex waste streams. Over 60 liquid compositions have been tested including extensive irradiation tests to verify polymer stability and possible degradation. With conclusive scientific evidence of the polymer's effectiveness in treating liquid waste, both parties have decided to enter the Russian market and offer the solidification technology to nuclear sites for waste treatment and disposal. In conjunction with these efforts, the U.S. Department of Energy (DOE) will join Khlopin and PNS to explore opportunities for direct application of the polymers at predetermined sites and to conduct research for new product development. Under DOE's 'Initiatives for Proliferation Prevention'(IPP) program, funding will be provided to the Russian participants over a three year period to implement the program plan. This paper will present details of U.S. DOE's IPP program, the project structure and its objectives both short and long-term, training programs for scientists, polymer tests and applications for LLW, ILW and HLW, and new product development initiatives. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Laboratory Directed Research & Development: FY23 Annual Report

Sandia is a federally funded research and development center (FFRDC) focused on developing and applying advanced science and engineering capabilities to mitigate national security threats. This is accomplished through the exceptional staff leading research at the Labs and partnering with universities and companies. Sandia’s LDRD program aims to maintain the scientific and technical vitality of the Labs and to enhance the Labs’ ability to address future national security needs. The program funds foundational, leading-edge discretionary research projects that cultivate and utilize core science, technology, and engineering (ST&E) capabilities. Per Congressional intent (P.L. 101-510) and Department of Energy (DOE) guidance (DOE Order 413.2C, Chg 1), Sandia’s LDRD program is crucial to maintaining the nation’s scientific and technical vitality

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Samuel P. Massie Chair of Excellence Program

Abstract In 1994 the Department of Energy established the DOE Chair of Excellence Professorship in Environmental Disciplines Program. In 2004, the Massie Chair of Excellence Professor at Howard University transitioned from Dr. Edward Martin to Dr. James H. Johnson, Jr. At the time of his appointment Dr. Johnson served as professor of civil engineering and Dean of the College of Engineering, Architecture and Computer Sciences. Program activities under Dr. Johnson were in the following areas: • Increase the institution’s capacity to conduct scientific research and technical investigations at the cutting-edge. • Promote interactions, collaborations and partnerships between the private sector, Federal agencies, majority research institutes and other HBCUs. • Assist other HBCUs in reaching parity in engineering and related fields. • Mentor young investigators and be a role model for students.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RAPID Manufacturing Institute Final Report

The Rapid Advancement of Process Intensification Deployment (RAPID) Manufacturing Institute, founded in 2017, is a public/private partnership between the U.S. Department of Energy and the American Institute of Chemical Engineers (AIChE). RAPID promotes the development, deployment and commercialization of Process Intensification (PI) and Modular Chemical Process Intensification (MCPI) technologies, enabling U.S. manufacturing to reduce energy consumption, improve process efficiencies and lower investment and operating costs. This mission was carried out through parallel work breakdown structure elements including the establishment of committees to guide the operations and technical direction of RAPID, the establishment of management practices and institute processes, education and workforce development (EWD), and six technical focus areas for the development of technologies to advance PI and MCPI. Throughout the initial six-year cooperative agreement, RAPID worked to meet performance metrics which focused on the operation and sustainment of the institute, education and workforce development and the development of PI and MCPI for the advancement of U.S. manufacturing. All these metrics were successfully met through a total of 43 projects which leveraged $\$$70M Federal with $\$$90M cost share. As a result of these efforts, 84 private and public organizations were brought together by RAPID as members to co-invest in R&D, commercialization and deployment of innovative technologies. In the research portfolio, 82% of the 38 projects achieved > 20% energy efficiency improvement. A RAPID Test Network was developed with 51 testbed facilities to enable access to resources, facilities, tools, and expertise. Eight EWD programs were also developed with over 13,000 impressions. RAPID’s efforts to research, develop, demonstrate, and deploy high-impact PI and modular process technology solutions have enabled reduced energy use, increased sustainability, and improved profitability for U.S. manufacturing.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

System Analysis Support of Consent-Based Siting Efforts - 23400

To better enable informed decision-making regarding the back end of the nuclear fuel cycle, the Integrated Waste Management (IWM) program within the U.S. Department of Energy, Office of Nuclear Energy (DOE-NE) has been sponsoring the development and application of system analysis tools capable of analyzing various system options for the management of spent nuclear fuel (SNF) and high-level radioactive waste. With these tools, integrated waste management system (IWMS) architecture analyses are being conducted to support the future deployment of a comprehensive nuclear waste management system that considers all major back-end aspects of the nuclear fuel cycle (i.e., transportation, storage, and disposal). System analyses and assessments typically use these modeling and simulation tools to investigate things like the implications of changes in various assumptions and parameters such as acceptance rates, receipt logic, facility capacities and capabilities, use of standardized canisters, and different assumed system operation start dates. Some example system analysis results have been published previously. With the passage of the consolidated appropriations acts for fiscal years 2021 and 2022, Congress provided funding and direction for the DOE to move forward with interim storage to support near-term action in managing the nation’s SNF as an important component of an IWMS. Consent-based siting is a phased, adaptive, and collaborative approach to siting facilities that focuses on the needs and concerns of people and communities. Communities participate in the siting process by working carefully through a series of phases and steps with the DOE (as the implementing organization). Each step and phase helps a community determine whether and how hosting a facility to manage SNF is aligned to the community’s goals. By its nature, a consent-based siting process must be transparent, flexible, adaptive, and responsive to community concerns. Thus, the phases and steps are intended to serve as a guide, not a prescriptive set of instructions. System analysis research analysts interface with DOE’s consent-based siting for a federal interim storage program and can perform preliminary system analyses as requested to support various aspects of the consent-based siting team’s work. This paper provides an overview of IWM program’s system analysis activities that support the ongoing consent-based siting process. The questions that decision-makers, planners, communities, and stakeholders might have during the consent-based siting process are similar to questions that have been explored by system analysts previously. Specifically, this paper discusses work that will inform consent-based siting efforts in the areas of community impacts, cost estimates, various SNF acceptance rates by potential facilities, potential consolidated interim storage facility (CISF) capacities and configurations, and the implications of a CISF on the overall waste management system. It is expected that system analysis will continue to be performed to support the consent-based siting process in the future.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Revised Proposed Policy For Implementing Section 180(C) Of The Nuclear Waste Policy Act

On July 23, 2007, the U.S. Department of Energy's (DOE) Office of Civilian Radioactive Waste Management (OCRWM) published in the Federal Register its Notice of Revised Proposed Policy for Section 180(c) of the Nuclear Waste Policy Act (NWPA). In developing this document, OCRWM worked closely with stakeholders to seek their input on DOE's implementation of Section 180(c). This paper discusses the degree to which DOE incorporated stakeholder input into the document, initial stakeholder reactions to the published draft policy, and DOE's next steps as it works to implement Section 180(c). In conclusion: Many stakeholder participants have expressed their enthusiastic support of the work accomplished through the Section 180(c) Topic Group. The stakeholder input was very valuable for DOE as it considered how to structure the Revised Proposed Policy. In turn, DOE has been able to develop a working relationship with the stakeholders that allows for greater trust and resultant problem-solving as the program progresses. The Department intends to continue to seek stakeholder input into the development of the pilot program and future planning for the OCRWM transportation program. The timing of OCRWM's future work for the 180(c) program will depend on schedule considerations and be subject to available appropriations. For fiscal year 2008, OCRWM will wrap-up the Section 180(c) comment period and begin discussions with stakeholders regarding the pilot program. However, implementation of the pilot program may be two or more years in the future. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Addressing an aging facility: improving reliability of the defense waste processing facility at the Savannah River Site - 15539

The High Level Waste program at the Savannah River Site significantly reduces environmental risks associated with the storage of radioactive waste from legacy efforts to separate fissionable nuclear material from irradiated targets and fuels. The Defense Waste Processing Facility treats and immobilizes High Level Waste into a durable borosilicate glass for safe, permanent storage. Construction of the facility began in 1983 and radioactive operations commenced in 1996. In an effort to support the disposition of radioactive waste and accelerate tank closure for the balance of the Savannah River Site mission, the Defense Waste Processing Facility recently underwent an extensive reliability review in 2013 to understand future needs as well as to address aging infrastructure. As a product of this review, a Performance Improvement Plan was developed to systematically address three major focus areas including, a) asset preservation, b) facility housekeeping, and 3) process improvements. Since issuance of the plan, significant progress has been made in each of these areas to improve the reliability and predictability of the Defense Waste Processing Facility. Providing consistent, constructive, and concise communications is vital in the face of a changing budgetary environment. The Savannah River Site case study provides an example of the U.S. Department of Energy - Savannah River (DOE-SR) and SRR partnering to inform stakeholders about cleanup progress at the site. DOE-SR and SRR periodically and consistently provide both annual written progress reports under the Federal Facility Agreement and quarterly written progress reports under the landfill permit to the government regulators. Through the Liquid Waste System Plans, DOE-SR and SRR constructively and concisely summarize both the significant progress made and explain how a changed budget can impact the goals moving forward. Furthermore, DOE-SR and SRR informs the community and general public about the Site's progress and future during Citizens Advisory Board meetings. In addition, through the new proposed model for complex-wide communications, stakeholders can better understand how budget constraints will affect them. The set-aside program would also encourage stakeholder participation and involvement in helping each state and site obtain extra funding through performance evaluations. Waste management organizations can benefit in a number of ways from an effective partnership approach to communicate with stakeholders about available funding. Keeping an open and honest dialogue with regulatory agencies can help preserve confidence, thus mitigating or completely avoiding costly and distracting fines and penalties. Informing the public not only promotes trust, but also spurs the public to exercise its right to demand more information and voice any concerns to elected or DOE officials. With this approach, DOE can receive better understanding and cooperation from stakeholders in a changing budgetary landscape. Furthermore, a set-aside competitive program would encourage efficiency and innovation that could lead to further cost savings for the government while providing extra funding for cleanup efforts. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Air Shipment of Highly Enriched Uranium Spent Nuclear Fuel from Romania

Romania safely air shipped 23.7 kilograms of Russian origin highly enriched uranium (HEU) spent nuclear fuel from the VVR S research reactor at Magurele, Romania, to the Russian Federation in June 2009. This was the world’s first air shipment of spent nuclear fuel transported in a Type B(U) cask under existing international laws without special exceptions for the air transport licenses. This shipment was coordinated by the Russian Research Reactor Fuel Return Program (RRRFR), part of the U.S. Department of Energy Global Threat Reduction Initiative (GTRI), in cooperation with the Romania National Commission for Nuclear Activities Control (CNCAN), the Horia Hulubei National Institute of Physics and Nuclear Engineering (IFIN-HH), and the Russian Federation State Corporation Rosatom. The shipment was transported by truck to and from the respective commercial airports in Romania and the Russian Federation and stored at a secure nuclear facility in Russia where it will be converted into low enriched uranium. With this shipment, Romania became the 3rd country under the RRRFR program and the 14th country under the GTRI program to remove all HEU. This paper describes the work, equipment, and approvals that were required to complete this spent fuel air shipment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

G3P3 Phase 3 Project Execution Plan. Issue 1

The National Solar Thermal Test Facility (NSTTF) at Sandia National Laboratories New Mexico (SNL/NM) developed this Project Execution Plan (PEP) to document its process for executing, monitoring, controlling and closing-out Phase 3 of the Gen 3 Particle Pilot Plant G3P3. This plan serves as a resource for stakeholders who wish to be knowledgeable of project objectives and how they will be accomplished. The plan is intended to be used by the development partners, principal investigator, and the federal project director. Project objectives are derived from the mission needs statement, and an integrated project team assists in development of the PEP. This plan is a living document and will be updated throughout the project to describe current and future processes and procedures. The scope of the PEP covers: Cost, schedule, and scope Project reporting Staffing plan Quality assurance plan Environment, safety, security, and health This document is a tailored approach for the Facilities Management and Operations Center (FMOC) to meet the project management principles of DOE Order 413.3B, Program and Project Management for the Acquisition of Capital Assets , and DOE G 413.3-15, DOE Guide for Project Execution Plans. This document will elaborate on content as knowledge of the project is gained or refined.

14 SOLAR ENERGY↗

New Mexico state information handbook: formerly utilized sites remedial action program

This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of New Mexico. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

052001 -- Nuclear Fuels-- Waste Processing↗

Radiological Contingency Planning for the Mars Science Laboratory Launch

The U.S. Department of Energy (DOE) provides technical support to the requesting federal agency such as the Federal Bureau of Investigation, Department of Defense, the National Space and Aeronautics and Space Administration (NASA), or a state agency to address the radiological consequences of an event. These activities include measures to alleviate damage, loss, hardship, or suffering caused by the incident; protect public health and safety; restore essential government services; and provide emergency assistance to those affected. Scheduled to launch in the fall of 2009, Mars Science Laboratory is part of NASA's Mars Exploration Program, a long-term effort of robotic exploration of the red planet. Mars Science Laboratory is a rover that will assess whether Mars ever was, or is still today, an environment able to support microbial life. In other words, its mission is to determine the planet's "habitability." The Mars Science Laboratory rover will carry a radioisotope power system that generates electricity from the heat of plutonium's radioactive decay. This power source gives the mission an operating lifespan on Mars' surface of a full Martian year (687 Earth days) or more, while also providing significantly greater mobility and operational flexibility, enhanced science payload capability, and exploration of a much larger range of latitudes and altitudes than was possible on previous missions to Mars. National Security Technologies, LLC (NSTec), based in Las Vegas, Nevada, will support the DOE in its role for managing the overall radiological contingency planning support effort. This paper will focus on new technologies that NSTec is developing to enhance the overall response capability that would be required for a highly unlikely anomaly. This paper presents recent advances in collecting and collating data transmitted from deployed teams and sensors. NSTec is responsible to prepare the contingency planning for a range of areas from monitoring and assessment, sample collection and control, contaminated material release criteria, data management, reporting, recording, and even communications. The tools NSTec has available to support these efforts will be reported. The data platform NSTec will provide shall also be compatible with integration of assets and field data acquired with other DOE, NASA, state, and local resources, personnel, and equipment. This paper also outlines the organizational structure for response elements in radiological contingency planning.

61 RADIATION PROTECTION AND DOSIMETRY↗

Next Generation Waste Tracking: Linking Legacy Systems with Modern Networking Technologies

This report describes results from a preliminary analysis to satisfy the Department of Energy (DOE) objective to ensure the safe, secure, efficient packaging and transportation of materials both hazardous and non hazardous [1, 2]. The DOE Office of Environmental Management (OEM) through Oak Ridge National Laboratory (ORNL) has embarked on a project to further this objective. OEM and ORNL have agreed to develop, demonstrate and make available modern day cost effective technologies for characterization, identification, tracking, monitoring and disposal of radioactive waste when transported by, or between, motor, air, rail, and water modes. During the past 8 years ORNL has investigated and deployed Web 2.0 compliant sensors into the transportation segment of the supply chain. ORNL has recently demonstrated operational experience with DOE Oak Ridge Operations Office (ORO) and others in national test beds and applications within this domain of the supply chain. Furthermore, in addition to DOE, these hazardous materials supply chain partners included Federal and State enforcement agencies, international ports, and commercial sector shipping operations in a hazardous/radioactive materials tracking and monitoring program called IntelligentFreight. IntelligentFreight is an ORNL initiative encompassing 5 years of research effort associated with the supply chain. The ongoing ORNL SmartFreight programs include RadSTraM [3], GRadSTraM , Trusted Corridors, SensorPedia [4], SensorNet, Southeastern Transportation Corridor Pilot (SETCP) and Trade Data Exchange [5]. The integration of multiple technologies aimed at safer more secure conveyance has been investigated with the core research question being focused on testing distinctly different distributed supply chain information sharing systems. ORNL with support from ORO have demonstrated capabilities when transporting Environmental Management (EM) waste materials for disposal over an onsite haul road. ORNL has unified the operations of existing legacy hazardous, radioactive and related informational databases and systems using emerging Web 2.0 technologies. These capabilities were used to interoperate ORNL s waste generating, packaging, transportation and disposal with other DOE ORO waste management contractors. Importantly, the DOE EM objectives were accomplished in a cost effective manner without altering existing information systems. A path forward is to demonstrate and share these technologies with DOE EM, contractors and stakeholders. This approach will not alter existing DOE assets, i.e. Automated Traffic Management Systems (ATMS), Transportation Tracking and Communications System (TRANSCOM), the Argonne National Laboratory (ANL) demonstrated package tracking system, etc

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of defense-related uranium mines in the United States and other US DOE office of legacy management domestic and international uranium initiatives - 15335

US DOE's Office of Legacy Management (LM) has taken several initiatives to improve domestic uranium mining and milling operations in the United States and to contribute to the management of legacy uranium mining and milling sites around the world. Initiatives include completing the 2014 Report to Congress on Defense-Related Uranium Mines, managing the Title X Uranium and Thorium Program with the Office of Environmental Management, and assisting IAEA with uranium issues in member state countries. The 2014 Report to Congress identified abandoned uranium mines (AUMs) in the United States that provided uranium ore to the US Atomic Energy Commission (AEC) between 1947 and 1970. The report identified AUM locations, reclamation/remediation status, radiological risks and other hazards, costs for reclamation and remediation, and potential prioritization schemes for mine cleanup. To develop reclamation and remediation cleanup cost estimates and assess risks, AUMs were grouped into six categories by tons of uranium ore produced, ranging from Small (less than 91 metric tons [100 tons]) to Very Large (greater than 453,900 metric tons [500,000 tons]). Radiological risk was calculated using the RESRAD computer code for five exposure scenarios: offsite resident, onsite resident, occasional visitor, recreational visitor, and mine reclamation worker. Results indicate that 69 percent of the AUMs are in Colorado and Utah and 23 percent are in Arizona, Wyoming, and New Mexico; and that the majority of the AUMs (68 percent) were considered Small or Small/Medium production mines, producing less than 908 metric tons (1,000 tons) of uranium ore. Although New Mexico has fewer AUMs (247) than the other states in the Colorado Plateau region, AUMs in that state (primarily those in the Grants Mineral Belt) produced 45 percent of the 79.5 million tons of AEC-purchased uranium ore. About 50 percent of the AUMs are on public land managed by the US Bureau of Land Management; 435 AUMs are on the Navajo Nation. Risk estimates for the onsite resident scenario (plausible on tribal and non-federal land) could result in an incremental cancer risk greater than 10{sup -4}. Radon inhalation was the dominant contributor to radiological risk for the five exposure scenarios evaluated. Different state and federal agencies are conducting cleanup of some AUMs under various remedial and legal authorities. Activities constituting mine 'reclamation' may reduce radiological risks to humans to acceptable levels for many mines on federal public lands if the occasional visitor and recreational visitor exposure scenarios are assumed. Addressing physical hazards (e.g., open shafts) at mines where conditions could cause serious injuries is typically a priority of public land management agencies. At locations where mine-related groundwater contamination occurs, it is a significant contributor to cleanup costs. However, most Small and Small/Medium AUMs were likely developed above the water table, and some wet mines are located in areas where groundwater has high, naturally occurring levels of the same constituents (including radioactive elements) that are typically associated with uranium mines. LM is also administering, with the US DOE Office of Environmental Management, the Title X program, which was developed by Congress to reimburse private companies (i.e., those that held active operating licenses prior to 1978) for a portion of their reclamation costs for mill sites that processed ore sold to AEC. LM recently updated the program guidance document and established internal protocols for annually auditing companies. LM is assisting IAEA on two different initiatives: assisting developing countries with training on the basic steps to take to perform reclamation of uranium mines, and developing technical guidance and case studies related to safety and environmental assessments and post-closure management of uranium legacy sites as part of the IAEA Regulatory Supervision of Legacy Sites initiative. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Audit Report, "Fire Protection Deficiencies at Los Alamos National Laboratory"

The Department of Energy's Los Alamos National Laboratory (Los Alamos) maintains some of the Nation's most important national security assets, including nuclear materials. Many of Los Alamos' facilities are located in close proximity to one another, are occupied by large numbers of contract and Federal employees, and support activities ranging from nuclear weapons design to science-related activities. Safeguarding against fires, regardless of origin, is essential to protecting employees, surrounding communities, and national security assets. On June 1, 2006, Los Alamos National Security, LLC (LANS), became the managing and operating contractor for Los Alamos, under contract with the Department's National Nuclear Security Administration (NNSA). In preparation for assuming its management responsibilities at Los Alamos, LANS conducted walk-downs of the Laboratory's facilities to identify pre-existing deficiencies that could give rise to liability, obligation, loss or damage. The walk-downs, which identified 812 pre-existing fire protection deficiencies, were conducted by subject matter professionals, including fire protection experts. While the Los Alamos Site Office has overall responsibility for the effectiveness of the fire protection program, LANS, as the Laboratory's operating contractor, has a major, day-to-day role in minimizing fire-related risks. The issue of fire protection at Los Alamos is more than theoretical. In May 2000, the 'Cerro Grande' fire burned about 43,000 acres, including 7,700 acres of Laboratory property. Due to the risk posed by fire to the Laboratory's facilities, workforce, and surrounding communities, we initiated this audit to determine whether pre-existing fire protection deficiencies had been addressed. Our review disclosed that LANS had not resolved many of the fire protection deficiencies that had been identified in early 2006: (1) Of the 296 pre-existing deficiencies we selected for audit, 174 (59 percent) had not been corrected; and, (2) A substantial portion of the uncorrected deficiencies, 86 (49 percent) were considered by the walk-down teams to be significant enough to warrant compensatory actions until the deficiency was corrected or was tracked to closure through implementation of corrective actions. Further, we found that 32 of the significant deficiencies had been closed by the previous Los Alamos contractor, prior to LANS assuming responsibility for operation of the Laboratory, even though the deficiencies had not been corrected. A fire protection expert provided technical support during the audit. As an example of uncorrected problems, LANS had not resolved, by performing periodic tests, a deficiency identified in 2006 regarding a kitchen hood fire suppression system in a facility located within the Los Alamos Neutron Science Center. Such systems are required to be tested twice a year by the National Fire Protection Association standard, a standard that had been adopted by Department of Energy under DOE Order 420.1B. Yet, in 2006, the LANS walk-down team recognized that this system had not been inspected since May 2004 and noted that deficient suppression systems could result in significantly high levels of property damage and loss. After we brought this issue to management's attention on February 6, 2009, LANS officials stated that the Laboratory would correct this deficiency. As with the problems involving the fire suppression system, we observed that LANS had not always corrected life safety deficiencies involving building exits at one of its primary facilities. This included providing a secondary emergency exit for a building with occupants on multiple floor levels. LANS had removed personnel from the third floor and improved the sprinkler system of the facility, but it had still not provided a secondary exit for personnel on the second floor by the time we completed our review. NNSA has since stated that this fire protection issue will be completely addressed by relocating personnel from the second floor. Perhaps most serious, our testing revealed that a number of deficiencies were formally closed even though actual corrective action had not been completed. Notably, we observed that action had not been taken to resolve a recommendation to replace a fire alarm panel found to be unreliable. After the walk-down was conducted but prior to contract transition, the former contractor closed the recommendation in its action tracking database even though the panel had not been replaced. The walk-down team had categorized the fire alarm system as requiring replacement since it had been modified many times, was old and obsolete, and had very limited available spare parts. In fact, the walk-down team concluded that the panel 'must be considered to be unreliable and should have a very high priority for replacement'.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

U.S. Department of Energy (DOE)--Surface Biogeochemical Research (SBR) 6th Annual PI Meeting: Abstracts

On behalf of the Subsurface Biogeochemical Research (SBR) program managers in the Climate and Environmental Sciences Division (CESD), Office of Biological and Environmental Research (BER), welcome to the 2011 SBR Principal Investigators meeting. Thank you in advance for your attendance and your presentations at this year's meeting. As the events in Japan continue to unfold, we are all reminded that the research we perform on radionuclide behavior in the environment has implications beyond legacy waste cleanup and in fact has its place in the discussion on the expanded use of nuclear power. As in the past, there are three broad objectives to the Principal Investigators meeting: (1) to provide opportunities to share research results and promote interactions among the SBR scientists and other invited guests; (2) to evaluate the progress of each project within the program; and (3) to showcase the scientific expertise and research progress over the past year to senior managers within the DOE Office of Science, the technology offices within DOE, and other invited attendees from other Federal Agencies. This past year has seen a few significant changes within BER and within the SBR program. In November, our Associate Director for BER, Anna Palmisano, retired from Federal service. Just this month, Dr. Sharlene Weatherwax (Division Director for Biological Systems Sciences) has been named as the new Associate Director for BER. In August, BER welcomed Dr. Gary Geernaert as the new Division Director for CESD. Gary joins the division from Los Alamos National Laboratory with a background in atmospheric science. Within the SBR program, a new Strategic Plan was completed last June (currently posted on the SBR and the Office of Science website). The new strategic plan is intended to foster integration within the Environmental Systems Science portion of the BER budget that includes both SBR and Terrestrial Ecosystem Sciences (TES). Both these programs share a goal of advancing a predictive understanding of environmental processes and utilizing iterative, multidisciplinary approaches to understand complex environmental systems of relevance to DOE. CESD in general is undergoing continued discussions on integration among its programs in an effort to develop a new strategic plan for the division. This effort also includes identifying opportunities for integration with BER's Biological Systems Science Division (BSSD). The program this year includes three poster presentation sessions, six plenary sessions, and three breakout sessions. The plenary session on Tuesday morning will feature introductory presentations by BER program staff and three keynote addresses from Dr. Ken Bencala (USGS), Dr. Michael (Mick) Follows (MIT) and Dr. Sue Brantley (PSU) that will lead into three breakout sessions Tuesday afternoon. The breakout sessions are intended to highlight key developments in SBR research and foster a dialog among session participants on scientific paths forward in each particular area. The SBR program managers are asking for input from the SBR community at these sessions to help guide future efforts and/or identify areas of integration within BER programs. On Wednesday, plenary sessions will continue in the morning, followed by an early afternoon poster session. After an extended break for lunch, plenary sessions will continue in the afternoon, followed by an evening poster session. Thursday's plenary session will focus on selected highlights of research efforts at the IFRC sites and on a new potential TES field effort in the Arctic. This new field site is an obvious point of integration between the SBR and TES programs.

54 ENVIRONMENTAL SCIENCES↗

A Strategy to Conduct an Analysis of the Long-Term Performance of Low-Activity Waste Glass in a Shallow Subsurface Disposal System at Hanford

The federal facilities located on the Hanford Site in southeastern Washington State have been used extensively by the U.S. government to produce nuclear materials for the U.S. strategic defense arsenal. Currently, the Hanford Site is under the stewardship of the U.S. Department of Energy (DOE) Office of Environmental Management (EM). A large inventory of radioactive and mixed waste resulting from the production of nuclear materials has accumulated, mainly in 177 underground single- and double-shell tanks located in the central plateau of the Hanford Site (Mann et al., 2001). The DOE-EM Office of River Protection (ORP) is proceeding with plans to immobilize and permanently dispose of the low-activity waste (LAW) fraction onsite in a shallow subsurface disposal facility (the Integrated Disposal Facility [IDF]). Pacific Northwest National Laboratory (PNNL) was contracted to provide the technical basis for estimating radionuclide release from the engineered portion of the IDF (the source term) as part of an immobilized low-activity waste (ILAW) glass testing program to support future IDF performance assessments (PAs).

eSTOMP↗