Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Feasibility Study”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

Material Testing in Support of the ISS Electrochemical Disinfection Feasibility Study

The International Space Station Program recognizes the risk of microbial contamination in their potable and non-potable water sources. With the end of the Space Shuttle Program, the ability to send up shock-kits of biocides in the event of an outbreak becomes even more difficult. Currently, the US Segment water system relies primarily on iodine to mitigate contamination concerns. To date, several small cases of contamination have occurred which have been remediated. NASA, however, realizes that having a secondary method of combating a microbial outbreak is a prudent investment. NASA is looking into developing hardware that can generate biocides electrochemically, and potentially deploying that hardware. The specific biocides that the technology could generate include: hydrogen peroxide, oxone, hypochlorite and peracetic acid. In order to use these biocides on deployed water systems, the project must determine that all the materials in the potential application are compatible with the biocides at their anticipated administered concentrations. This paper will detail the materials test portion of the feasibility assessment including the plan for both metals and non-metals along with results to date.

Clements, Anna↗

A feasibility study of a microgravity enhancement system for Space Station Freedom

The current low frequency microgravity requirements for Space Station Freedom (SSF) call for a level of less than 1 micro-g over 50 percent of all the laboratory racks for continuous periods of 30 days for at least 180 days per year. While this requirement is attainable for some of the laboratory modules for the Permanently Manned Configuration (PMC), it cannot be met for the Man-Tended Configuration (MTC). To improve the microgravity conditions in the laboratory modules, the Microgravity Enhancement System (MESYS) will apply a continuous thrust to SSF, to negate the disturbing gravity gradient and drag forces. The MESYS consists of a sensor, continuous throttle-able thrusters, and a control system. Both a proof mass system and nano-g accelerometer were evaluated for use as the sensor. The net result of the MESYS will be to shift the microgravity contours from the center of mass to a chosen location. Results indicate the MESYS is not feasible for the MTC since it will require 5073 kg of hydrazine fuel and 7660 watts of electrical power for 30 days of operation during average atmospheric conditions. For the PMC, the MESYS is much more practical, since only 4008 kg of fuel and 5640 watts of electrical power will be required for 30 days of operation during average atmospheric conditions.

Diamond, Preston S.↗

A feasibility study of a microgravity enhancement system for Space Station Freedom

The current low frequency microgravity requirements for Space Station Freedom (SSF) call for a level of less than 1 micro-g over 50 percent of all the laboratory racks for continuous periods of 30 days for at least 180 days per year. While this requirement is attainable for some of the laboratory modules for the Permanently Manned Configuration (PMC), it can not be met for the Man-Tended Configuration (MTC). In addition, many experiments would prefer even lower acceleration levels. To improve the microgravity environment, the Microgravity Enhancement System (MESYS) will apply a continuous thrust to SSF, to negate the disturbing gravity gradient and drag forces. The MESYS consists of a sensor, throttle-able thrusters and a control system. Both a proof mass system and accelerometer were evaluated for use as the sensor. The net result of the MESYS will be to shift the microgravity contours from the center of mass to a chosen location. Results indicate the MESYS is not feasible for MTC since it will require 5,073 kg of hydrazine fuel and 7,660 watts of power for 30 days of operation during average atmospheric conditions. For PMC, the MESYS is much more practical since only 4,008 kg of fuel and 5,640 watts of power are required.

Diamond, Preston S.↗

Feasibility Study for Disposal Control Rod Assemblies Using UNF-ST&DARDS As-Loaded Zion Dual Purpose Cask Models

This report documents an initial evaluation to support future use of disposal control rod assemblies (DCRAs) for post-closure criticality control in dual purpose canisters (DPCs). The work described herein is an extension of previous efforts performed by Walker using inputs generated by the Used Nuclear Fuel-Storage, Transportation & Disposal Analysis Resource and Data System (UNFST&DARDS) for the Zion site DPCs with as-loaded isotopic compositions. The results of this analysis demonstrate that there are multiple pathways to using DCRA for post-closure criticality control. Various configurations of DCRA material, diameter, number of rods per DCRA, and number and location of DCRAs within a DPC were shown to be effective in varying degrees for the set of DPCs analyzed by Walker. Because of the variations in DPC as-loaded isotopic compositions considered in an array of DCRA parametric sweeps, it can be concluded that a DPC-specific methodology is feasible (i.e., a one-size-fits-all approach may not be needed). Instead, the utility program created for this work can be expanded to develop capabilities to provide DPC-specific DCRA arrangements to limit cost and weight and to allow for operational considerations.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Systems level feasibility study for the detection of extra-solar planets. Volume 1: Infrared interferometer (IRIS) known as the Stanford Concept

A sensor system for the direct detection of extrasolar planets from an Earth orbit is evaluated: a spinning, infrared interferometer (IRIS). It is shuttle deployed, free flying, requires no on-orbit assembly and no reservicing over a design life of five years. The sensor concept and the mission objectives are reviewed, and the performance characteristics of a baseline sensor for standard observation conditions are derived. A baseline sensor design is given and the enabling technology discussed. Cost and weight estimates are performed; and a schedule for an IRIS program including technology development and assessment of risk are given. Finally, the sensor is compared with the apodized visual telescope sensor (APOTS) proposed for the same mission. The major conclusions are: that with moderate to strong technology advances, particularly in the fields of long life cryogenics, dynamical control, mirror manufacturing, and optical alignment, the detection of a Jupiter like planet around a Sunlike star at a distance of 30 light years is feasible, with a 3 meter aperture and an observation time of 1 hour. By contrast, major and possibly unlikely breakthroughs in mirror technology are required for APOTS to match this performance.

Source record↗

Laser-assisted high-energy proton pulse extraction for feasibility study of co-located muon source at the SNS

Here, we have experimentally demonstrated the first non-intrusive 1-GeV proton beam extraction for the generation of muons with a temporal structure optimized for Muon Spin Relaxation/Rotation/Resonance (μSR) applications. The proton pulses are extracted based on the laser neutralization of 1 GeV hydrogen ion (H - ) beam in the high energy beam transport of the Spallation Neutron Source (SNS) accelerator. The maximum flux of the extracted proton beam based on laser neutralization causes only 0.2% reduction of the total proton beam used for neutron production, a marked difference from the 20% reduction at other co-located muon and neutron facilities, and thus the proposed method will result in negligible impact on the SNS operation. This paper describes the development of a fiber/solid-state hybrid laser system that has high flexibility of pulse structure and output power, initial experiments on laser neutralization of beam and separation of H 0 beam from the existing SNS accelerator beam line, conversion of H 0 to proton at the SNS linac dump, and measurement results of 30 ns/50 kHz proton pulses. This system conclusively demonstrates the feasibility of laser-based proton beam extraction to power a world-leading μSR facility at the SNS.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

A Digital Twin Feasibility Study (Part II):Non-Deterministic Predictions of Fatigue Life Using In-Situ Diagnostics and Prognostics

The Digital Twin (DT) concept has the potential to revolutionize the way systems and their components are designed, managed, maintained, and operated across a vast number of fields from engineering to healthcare. The focus of this work is the implementation of DT for the health management of fatigue critical structures. This paper is the second part of a two-part series. The first of the series demonstrated the use of multi-scale, initiation-to-failure crack growth modeling to form non-deterministic predictions of fatigue life. In this second part, a general method for reducing uncertainty in fatigue life predictions is presented that couples in-situ diagnostics and prognostics in a probabilistic framework. Monte Carlo methods and high-fidelity finite element models are used to (i) generate probabilistic estimates of crack state throughout the life of the same geometrically complex test specimen and (ii) predict fatigue life with decreasing uncertainty as more of these diagnoses are obtained. The ability to predict accurately and in the presence of uncertainty is demonstrated, suggesting that the proposed DT method is feasible for fatigue life prognosis and should be pursued further with a focus on increasing application realism.

Patrick E Leser↗

Hydrodynamic Modeling Analysis for Leque Island and zis a ba Restoration Feasibility Study

Ducks Unlimited, Inc. in collaboration with Washington State Department of Fish and Wildlife (WDFW), and Stillaguamish Tribe of Indians have proposed the restoration of Leque Island and zis a ba (formerly Matterand) sites near the mouth of Old Stillaguamish River Channel in Port Susan Bay, Washington. The Leque Island site, which is owned by WDFW, consists of nearly 253 acres of land south of Highway 532 that is currently behind a perimeter dike. The 90-acres zis a ba site, also shielded by dikes along the shoreline, is located just upstream of Leque Island and is owned by Stillaguamish Tribes. The proposed actions consider the removal or modification of perimeter dikes at both locations to allow estuarine functions to be restored. The overall objective of the proposed projects is to remove the dike barriers to 1) provide connectivity and access between the tidal river channel and the restoration site for use by juvenile migrating salmon and 2) create a self-sustaining tidal marsh habitat. Ducks Unlimited engaged Pacific Northwest National Laboratory (PNNL) to develop a three-dimensional hydrodynamic model of the Port Susan Bay, Skagit Bay, and the interconnecting Leque Island region for use in support of the feasibility assessment for the Leque Island and zis a ba restoration projects. The objective of this modeling-based feasibility assessment is to evaluate the performance of proposed restoration actions in terms of achieving habitat goals while assessing the potential hydraulic and sediment transport impacts to the site and surrounding parcels of land.

54 ENVIRONMENTAL SCIENCES↗

Deep Direct-Use Feasibility Study Estimation of Reservoir Properties for the Tuscarora Sandstone

This dataset contains black-and-white photographic images of individual core segments from well Preston 119 and photomicrographs taken of petrographic thin sections from well Clay 513. Minipermeameter measurement results of 2,260 samples for fracture and matrix permeability on core segments for well Preston 119. These results are summarized in figures, spreadsheets, and PowerPoints. Microsoft Excel will be necessary to examine the permeability data and software capable of reading a .PDF file will be needed to view the file of annotated core CT scans. Microsoft Powerpoint will be necessary to view the photomicrograph presentation.

15 GEOTHERMAL ENERGY↗

Deep Direct-Use Feasibility Study Reservoir Productivity Uncertainty Analysis for the Tuscarora Sandstone, Morgantown, WV

This dataset contains figures that summarize the Tuscarora Sandstone core permeability data collected from the Preston 119 well in Preston County, WV, and summary results of a stochastic analysis that was used to estimate reservoir productivity for the currently unexplored Tuscarora Sandstone below Morgantown, West Virginia. Uncertainties in reservoir productivity considered the thickness of the reservoir, rock permeability, and fluid viscosity. A Monte Carlo analysis of these uncertain properties was used to predict reservoir flow productivity for the case of a matrix-dominated reservoir, and a fracture-dominated reservoir. These results are summarized in figures, spreadsheets, and maps.

15 GEOTHERMAL ENERGY↗

Feasibility Study of Jupiter Icy Moons Orbiter Permanent Magnet Alternator Start Sequence

The Jupiter Icy Moons Orbiter (JIMO) mission was a proposed, (recently cancelled) long duration science mission to study three moons of Jupiter: Callisto, Ganymede, and Europa. One design of the JIMO spacecraft used a nuclear heat source in conjunction with a Brayton rotating machine to generate electrical power for the electric thrusters and the spacecraft bus. The basic operation of the closed cycle Brayton system was as follows. The working fluid, a heliumxenon gas mixture, first entered a compressor, then went through a recuperator and hot-side heat exchanger, then expanded across a turbine that drove an alternator, then entered the cold-side of the recuperator and heat exchanger and finally returned to the compressor. The spacecraft was to be launched with the Brayton system off-line and the nuclear reactor shut down. Once the system was started, the helium-xenon gas would be circulated into the heat exchangers as the nuclear reactors were activated. Initially, the alternator unit would operate as a motor so as to drive the turbine and compressor to get the cycle started. This report investigated the feasibility of the start up sequence of a permanent magnet (PM) machine, similar in operation to the alternator unit, without any position or speed feedback sensors ("sensorless") and with a variable load torque. It is found that the permanent magnet machine can start with sensorless control and a load torque of up to 30 percent of the rated value.

Kenny, Barbara H.↗

Feasibility Study of a Rotorcraft Health and Usage Monitoring System ( HUMS): Usage and Structural Life Monitoring Evaluation

The objective of this study was to evaluate two techniques, Flight Condition Recognition (FCR) and Flight Load Synthesis (FLS), for usage monitoring and assess the potential benefits of extending the retirement intervals of life-limited components, thus reducing the operator's maintenance and replacement costs. Both techniques involve indirect determination of loads using measured flight parameters and subsequent fatigue analysis to calculate the life expended on the life-limited components. To assess the potential benefit of usage monitoring, the two usage techniques were compared to current methods of component retirement. In addition, comparisons were made with direct load measurements to assess the accuracy of the two techniques. The data that was used for the evaluation of the usage monitoring techniques was collected under an independent HUMS Flight trial program, using a commercially available HUMS and data recording system. The usage data collect from the HUMS trial aircraft was analyzed off-line using PC-based software that included the FCR and FLS techniques. In the future, if the technique prove feasible, usage monitoring would be incorporated into the onboard HUMS.

Dickson, B.↗

CO2-Binding Organic Liquids Gas Capture with Polarity-Swing-Assisted Regeneration Full Technology Feasibility Study B1 - Solvent-based Systems

PNNL, Fluor Corporation and Queens University (Kingston, ON) successfully completed a three year comprehensive study of the CO2BOL water-lean solvent platform with Polarity Swing Assisted Regeneration (PSAR). This study encompassed solvent synthesis, characterization, environmental toxicology, physical, thermodynamic and kinetic property measurements, Aspen Plus™ modeling and bench-scale testing of a candidate CO2BOL solvent molecule. Key Program Findings The key program findings are summarized as follows: • PSAR favorably reduced stripper duties and reboiler temperatures with little/no impact to absorption column • >90% CO2 capture was achievable at reasonable liquid-gas ratios in the absorber • High rich solvent viscosities (up to 600 cP) were successfully demonstrated in the bench-scale system. However, the projected impacts of high viscosity to capital cost and operational limits compromised the other levelized cost of electricity benefits. • Low thermal conductivity of organics significantly increased the required cross exchanger surface area, and potentially other heat exchange surfaces. • CO2BOL had low evaporative losses during bench-scale testing • There was no evidence of foaming during bench scale testing • Current CO2BOL formulation costs project to be $35/kg • Ecotoxicity (Water Daphnia) was comparable between CO2BOL and MEA (169.47 versus 103.63 mg/L) • Full dehydration of the flue gas was determined to not be economically feasible. However, modest refrigeration (13 MW for the 550 MW reference system) was determined to be potentially economically feasible, and still produce a water-lean condition for the CO2BOLs (5 wt% steady-state water loading). • CO2BOLs testing with 5 wt% water loading did not compromise anhydrous performance behavior, and showed actual enhancement of CO2 capture performance. • Mass transfer of CO2BOLs was not greatly impeded by viscosity • Facile separation of antisolvent from lean CO2BOL was demonstrated on the bench cart • No measurable solvent degradation was observed over 4 months of testing – even with 5 wt% water present

Heldebrant, David J↗

TU-C-BRE-04: 3D Gel Dosimetry Using ViewRay On-Board MR Scanner: A Feasibility Study

Purpose: MR based 3D gel has been proposed for radiation therapy dosimetry. However, access to MR scanner has been one of the limiting factors for its wide acceptance. Recent commercialization of an on-board MR-IGRT device (ViewRay) may render the availability issue less of a concern. This work reports our attempts to simulate MR based dose measurement accuracy on ViewRay using three different gels. Methods: A spherical BANG gel dosimeter was purchased from MGS Research. Cylindrical MAGIC gel and Fricke gel were fabricated in-house according to published recipes. After irradiation, BANG and MAGIC were imaged using a dual-echo spin echo sequence for T2 measurement on a Philips 1.5T MR scanner, while Fricke gel was imaged using multiple spin echo sequences. Difference between MR measured and TPS calculated dose was defined as noise. The noise power spectrum was calculated and then simulated for the 0.35 T magnetic field associated with ViewRay. The estimated noise was then added to TG-119 test cases to simulate measured dose distributions. Simulated measurements were evaluated against TPS calculated doses using gamma analysis. Results: Given same gel, sequence and coil setup, with a FOV of 180×90×90 mm3, resolution of 3×3×3 mm3, and scanning time of 30 minutes, the simulated measured dose distribution using BANG would have a gamma passing rate greater than 90% (3%/3mm and absolute). With a FOV 180×90×90 mm3, resolution of 4×4×5 mm3, and scanning time of 45 minutes, the simulated measuremened dose distribution would have a gamma passing rate greater than 97%. MAGIC exhibited similar performance while Fricke gel was inferior due to much higher noise. Conclusions: The simulation results demonstrated that it may be feasible to use MAGIC and BANG gels for 3D dose verification using ViewRay low-field on-board MRI scanner.

60 APPLIED LIFE SCIENCES↗

SU-E-T-521: Feasibility Study of a Rotational Step-And-Shoot IMRT Treatment Planning Approach

Purpose: Rotational step-and-shot IMRT (r-IMRT) could improve delivery efficiency with good dose conformity, especially if it can leverage the burst mode of the accelerator where radiation is turned on/off momentarily while the gantry rotates continuously. The challenge for the r-IMRT planning is to minimize the number of beams to achieve a fast and smooth rotational delivery. Methods: Treatment plans for r-IMRT were created using an in-house treatment planning system. To generate the plan using a very few beams, gantry angle was optimized by weighting the beam monitoring unit (MU), and beam shape optimization was a combination of column search with k-means clustering. A prostate case and a head and neck case were planned using r-IMRT. The dosimetry is compared to s-IMRT planned with Varian Eclipse treatment planning system. Results: With the same PTV dose coverage D95=100%, the r-IMRT plans shows comparable sparing as the s-IMRT plans in the prostate for the rectum D10cc and the bladder Dmean, and in the head and neck for the spinal cord Dmax, the brain stem Dmax, the left/right parotid Dmean, the larynx Dmean, and the mandible Dmean. Both plans meet the established institutional clinical dosimetric criteria. The r-IMRT plan uses 19 beam/405 MU for the prostate, and 68 beam/880 MU for the head and neck, while the s-IMRT uses 7 beam/724 MU and 9 beam/1812 MU, respectively. Compared to the corresponding s-IMRT, r-IMRT has a reduction of MUs of 44% for the prostate case and 41% for the head and neck case. Conclusions: We have demonstrated the feasibility of a rotational step and shoot IMRT treatment planning approach that significantly shortens the conventional IMRT treatment beam-on time without degrading the dose comformity.

60 APPLIED LIFE SCIENCES↗

Spaceflight Operations Services Grid (SOSG) Prototype Implementation and Feasibility Study

Science Operations Services Grid is focusing on building a prototype grid-based environment that incorporates existing and new spaceflight services to enable current and future NASA programs with cost savings and new and evolvable methods to conduct science in a distributed environment. The Science Operations Services Grid (SOSG) will provide a distributed environment for widely disparate organizations to conduct their systems and processes in a more efficient and cost effective manner. These organizations include those that: 1) engage in space-based science and operations, 2) develop space-based systems and processes, and 3) conduct scientific research, bringing together disparate scientific disciplines like geology and oceanography to create new information. In addition educational outreach will be significantly enhanced by providing to schools the same tools used by NASA with the ability of the schools to actively participate on many levels in the science generated by NASA from space and on the ground. The services range from voice, video and telemetry processing and display to data mining, high level processing and visualization tools all accessible from a single portal. In this environment, users would not require high end systems or processes at their home locations to use these services. Also, the user would need to know minimal details about the applications in order to utilize the services. In addition, security at all levels is an underlying goal of the project. The Science Operations Services Grid will focus on four tools that are currently used by the ISS Payload community along with nine more that are new to the community. Under the prototype four Grid virtual organizations PO) will be developed to represent four types of users. They are a Payload (experimenters) VO, a Flight Controllers VO, an Engineering and Science Collaborators VO and an Education and Public Outreach VO. The User-based services will be implemented to replicate the operational voice, video, telemetry and commanding systems. Once the User-based services are in place, they will be analyzed to establish feasibility for Grid enabling. If feasible then each User-based service will be Grid enabled. The remaining non-Grid services if not already Web enabled will be so enabled. In the end, four portals will be developed one for each VO. Each portal will contain the appropriate User-based services required for that VO to operate.

Bradford, Robert N.↗

Four dimensional magnetic resonance imaging with retrospective k-space reordering: A feasibility study

Purpose: Current four dimensional magnetic resonance imaging (4D-MRI) techniques lack sufficient temporal/spatial resolution and consistent tumor contrast. To overcome these limitations, this study presents the development and initial evaluation of a new strategy for 4D-MRI which is based on retrospective k-space reordering. Methods: We simulated a k-space reordered 4D-MRI on a 4D digital extended cardiac-torso (XCAT) human phantom. A 2D echo planar imaging MRI sequence [frame rate (F) = 0.448 Hz; image resolution (R) = 256 × 256; number of k-space segments (N{sub KS}) = 4] with sequential image acquisition mode was assumed for the simulation. Image quality of the simulated “4D-MRI” acquired from the XCAT phantom was qualitatively evaluated, and tumor motion trajectories were compared to input signals. In particular, mean absolute amplitude differences (D) and cross correlation coefficients (CC) were calculated. Furthermore, to evaluate the data sufficient condition for the new 4D-MRI technique, a comprehensive simulation study was performed using 30 cancer patients’ respiratory profiles to study the relationships between data completeness (C{sub p}) and a number of impacting factors: the number of repeated scans (N{sub R}), number of slices (N{sub S}), number of respiratory phase bins (N{sub P}), N{sub KS}, F, R, and initial respiratory phase at image acquisition (P{sub 0}). As a proof-of-concept, we implemented the proposed k-space reordering 4D-MRI technique on a T2-weighted fast spin echo MR sequence and tested it on a healthy volunteer. Results: The simulated 4D-MRI acquired from the XCAT phantom matched closely to the original XCAT images. Tumor motion trajectories measured from the simulated 4D-MRI matched well with input signals (D = 0.83 and 0.83 mm, and CC = 0.998 and 0.992 in superior–inferior and anterior–posterior directions, respectively). The relationship between C{sub p} and N{sub R} was found best represented by an exponential function (C{sub P}=100(1−e{sup −0.18N{sub R}}), when N{sub S} = 30, N{sub P} = 6). At a C{sub P} value of 95%, the relative error in tumor volume was 0.66%, indicating that N{sub R} at a C{sub P} value of 95% (N{sub R,95%}) is sufficient. It was found that N{sub R,95%} is approximately linearly proportional to N{sub P} (r = 0.99), and nearly independent of all other factors. The 4D-MRI images of the healthy volunteer clearly demonstrated respiratory motion in the diaphragm region with minimal motion induced noise or aliasing. Conclusions: It is feasible to generate respiratory correlated 4D-MRI by retrospectively reordering k-space based on respiratory phase. This new technology may lead to the next generation 4D-MRI with high spatiotemporal resolution and optimal tumor contrast, holding great promises to improve the motion management in radiotherapy of mobile cancers.

60 APPLIED LIFE SCIENCES↗