Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Development assurance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

Low-Cost Quality Control and Nondestructive Evaluation Technologies for General Aviation Structures

NASA's Advanced General Aviation Transport Experiments (AGATE) Program has as a goal to reduce the overall cost of producing private aviation aircraft while maintaining the safety of these aircraft. In order to successfully meet this goal, it is necessary to develop nondestructive inspection techniques which will facilitate the production of the materials used in these aircraft and assure the quality necessary to maintain airworthiness. This paper will discuss a particular class of general aviation materials and several nondestructive inspection techniques that have proven effective for making these inspections. Additionally, this paper will discuss the investigation and application of other commercially available quality control techniques applicable to these structures.

Cramer, K. Elliott↗

Development of a System to Assess Biofilm Formation in the International Space Station

The design requirements for the water treatment systems aboard the International Space Station (ISS) include and require recycling as much water as possible and to treat the water for intentional contamination (hygiene, urine distillate, condensate, etc.) and unintentional contamination in the form of biofilm and microorganisms. As part of an effort to address the latter issue, a biofilm system was developed by Marshall Space Flight Center (MSFC) to simulate the conditions aboard ISS with respect to materials, flow rates, water conditions, water content, and handling. The tubing, connectors, sensors, and fabricated parts included in the system were chosen for specific attributes as applicable to emulate an orbital water treatment system. This paper addresses the design and development process of the system, as well as the configuration, operation, and system procedures for maintenance to assure that the simulation is valid for the representative data as it applies to water degradation and biofilm/microbial growth. Preliminary biofilm/microbial results are also presented.

Charles E Martin↗

Case Study: Test Results of a Tool and Method for In-Flight, Adaptive Control System Verification on a NASA F-15 Flight Research Aircraft

Adaptive control technologies that incorporate learning algorithms have been proposed to enable autonomous flight control and to maintain vehicle performance in the face of unknown, changing, or poorly defined operating environments [1-2]. At the present time, however, it is unknown how adaptive algorithms can be routinely verified, validated, and certified for use in safety-critical applications. Rigorous methods for adaptive software verification end validation must be developed to ensure that. the control software functions as required and is highly safe and reliable. A large gap appears to exist between the point at which control system designers feel the verification process is complete, and when FAA certification officials agree it is complete. Certification of adaptive flight control software verification is complicated by the use of learning algorithms (e.g., neural networks) and degrees of system non-determinism. Of course, analytical efforts must be made in the verification process to place guarantees on learning algorithm stability, rate of convergence, and convergence accuracy. However, to satisfy FAA certification requirements, it must be demonstrated that the adaptive flight control system is also able to fail and still allow the aircraft to be flown safely or to land, while at the same time providing a means of crew notification of the (impending) failure. It was for this purpose that the NASA Ames Confidence Tool was developed [3]. This paper presents the Confidence Tool as a means of providing in-flight software assurance monitoring of an adaptive flight control system. The paper will present the data obtained from flight testing the tool on a specially modified F-15 aircraft designed to simulate loss of flight control faces.

Jacklin, Stephen A.↗

Design and Calibration of a Flowfield Survey Rake for Inlet Flight Research

Flowfield rake was designed to quantify the flowfield for inlet research underneath NASA DFRC s F-15B airplane. Detailed loads and stress analysis performed using CFD and empirical methods to assure structural integrity. Calibration data were generated through wind tunnel testing of the rake. Calibration algorithm was developed to determine the local Mach and flow angularity at each probe. RAGE was flown November, 2008. Data is currently being analyzed.

Flynn, Darin C.↗

Capability Investment Strategy to Enable JPL Future Space Missions

The Jet Propulsion Laboratory (JPL) formulates and conducts deep space missions for NASA (the National Aeronautics and Space Administration). The Chief Technologist of JPL has responsibility for strategic planning of the laboratory's advanced technology program to assure that the required technological capabilities to enable future missions are ready as needed. The responsibilities include development of a Strategic Plan (Antonsson, E., 2005). As part of the planning effort, a structured approach to technology prioritization, based upon the work of the START (Strategic Assessment of Risk and Technology) (Weisbin, C.R., 2004) team, was developed. The purpose of this paper is to describe this approach and present its current status relative to the JPL technology investment.

investment strategies↗

James Webb Space Telescope (JWST) Integrated Science Instruments Module (ISIM) Electronics Compartment (IEC) Conformal Shields Composite Bond Structure Qualification Test Method

The JWST IEC conformal shields are mounted onto a composite frame structure that must undergo qualification testing to satisfy mission assurance requirements. The composite frame segments are bonded together at the joints using epoxy, EA 9394. The development of a test method to verify the integrity of the bonded structure at its operating environment introduces challenges in terms of requirements definition and the attainment of success criteria. Even though protoflight thermal requirements were not achieved, the first attempt in exposing the structure to cryogenic operating conditions in a thermal vacuum environment resulted in approximately 1 bonded joints failure during mechanical pull tests performed at 1.25 times the flight loads. Failure analysis concluded that the failure mode was due to adhesive cracks that formed and propagated along stress concentrated fillets as a result of poor bond squeeze-out control during fabrication. Bond repairs were made and the structures successfully re-tested with an improved LN2 immersion test method to achieve protoflight thermal requirements.

Thermal Vacuum Testing Chamber↗

Overview of Risk Mitigation for Safety-Critical Computer-Based Systems

This report presents a high-level overview of a general strategy to mitigate the risks from threats to safety-critical computer-based systems. In this context, a safety threat is a process or phenomenon that can cause operational safety hazards in the form of computational system failures. This report is intended to provide insight into the safety-risk mitigation problem and the characteristics of potential solutions. The limitations of the general risk mitigation strategy are discussed and some options to overcome these limitations are provided. This work is part of an ongoing effort to enable well-founded assurance of safety-related properties of complex safety-critical computer-based aircraft systems by developing an effective capability to model and reason about the safety implications of system requirements and design.

Torres-Pomales, Wilfredo↗

Technical Reference Suite Addressing Challenges of Providing Assurance for Fault Management Architectural Design

Research into complexities of software systems Fault Management (FM) and how architectural design decisions affect safety, preservation of assets, and maintenance of desired system functionality has coalesced into a technical reference (TR) suite that advances the provision of safety and mission assurance. The NASA Independent Verification and Validation (IVV) Program, with Software Assurance Research Program support, extracted FM architectures across the IVV portfolio to evaluate robustness, assess visibility for validation and test, and define software assurance methods applied to the architectures and designs. This investigation spanned IVV projects with seven different primary developers, a wide range of sizes and complexities, and encompassed Deep Space Robotic, Human Spaceflight, and Earth Orbiter mission FM architectures. The initiative continues with an expansion of the TR suite to include Launch Vehicles, adding the benefit of investigating differences intrinsic to model-based FM architectures and insight into complexities of FM within an Agile software development environment, in order to improve awareness of how nontraditional processes affect FM architectural design and system health management.

Fitz, Rhonda↗

Evaluation of 10V Chip Polymer Tantalum Capacitors for Space Applications

Due to low ESR and safe failure mode, new technology chip polymer tantalum capacitors (CPTC) have gained popularity in the electronics design community, first in commercial applications, and now in hi-rel and space systems. The major drawbacks of these parts are high leakage currents, degradation under environmental stresses, and a relatively narrow temperature range of operating and storage conditions. Several studies have shown that a certain amount of moisture in polymer cathodes is necessary for a normal operation of the parts. This might limit applications of CPTCs in space systems and requires analysis of long-term exposure to deep vacuum conditions on their performance and reliability. High leakage currents and limited maximum operational temperature complicate accelerated testing that is necessary to assess long-term reliability and require new screening and qualification procedures for quality assurance. A better understanding of behavior of CPTCs as compared to traditional, MnO2, capacitors is necessary to develop adequate approaches for QA system for space applications. A specific of CPTCs is that different materials and processes might be used for low-voltage (10 V and less) and high-voltage (above 10 V) capacitors, so performance and degradation processes in these groups require separate analysis. In this work, that is a part of the NASA Electronic Parts and Packaging (NEPP) program, degradation of AC and DC characteristics under environmental stresses at different temperatures and voltages have been studied in nine lots of commercial and automotive grade capacitors rated to 10 V. Results of analysis of leakage currents, high temperature storage (HTS) up to 5000 hrs in vacuum and air at different temperatures, and Highly Accelerated Life Testing (HALT) in the range from 85 C to 145 C are presented. Temperature and voltage acceleration factors were calculated based on approximation of distributions of degradation rates with a general log-linear Weibull model. Mechanisms of degradation and failures, and requirements for screening and qualification testing are discussed.

Tantalum Capacitors↗

NASA's Journey to Safety Culture

One of the organizational causes of the Shuttle Columbia mishap found by the Columbia Accident Investigation Board (CAIB) Report was a "Broken Safety Culture". Since its release, NASA has strived to improve its Safety Culture In 2009, the Chief of the Office of Safety and Mission Assurance asked a member of the Air Force Safety Center and of the CAIB for assistance to develop a NASA Safety Culture Program. This presentation describes the journey that NASA personnel has taken developing a NASA Safety Culture Program to "repair" its Safety Culture.

Dillinger, Tracy↗

Challenges and Opportunities of International Cooperation for Safety & Mission Assurance (SMA) on the European Service Module (ESM) of the Orion Program

ESA is providing the ESM to NASA for the Orion Program in accordance with the Implementing Arrangement (IA) established between the two Agencies in 2012. This IA is a barter agreement, in which ESA provides Service Module vehicles for the first two flights of Orion in exchange for two servicing missions to the ISS. This arrangement has provided opportunities and challenges to both communities. It represents an important opportunity for ESA to build on its experience in the development and operations of ATV and play an active role in the development and flight of a manned space vehicle. This paper will explore some of the unique aspects of this arrangement as it affects Safety & Mission Assurance (SMA).The assessment of ESM compliance with applicable safety requirements is the responsibility of the Joint Safety and Engineering Review Panel (JSERP). The JSERP has two features that are relatively unique amongst NASA safety panels. First, NASA Engineering and SMA organizations co-chair this Panel. Previously, Safety has chaired, with Engineering as a member of the Panel. Inclusion of Engineering as a co-chair has offered greater leverage within the technical community. Second, the JSERP includes a second set of co-chairs from ESA Engineering and ESA Product Assurance and Safety (PA/S) organizations. This recognizes the international arrangement as one of partnership.Another source of both opportunity and challenge is the differing experience base of ESA and NASA. NASA has decades of experience in manned spaceflight, dating back to the Mercury program and following through Gemini, Apollo, Apollo-Soyuz, Skylab, Shuttle and the International Space Station. The risk posture for manned missions is much more rigorous than for unmanned missions. ESA brings a wealth of knowledge as well, with their flights of Ariane and Automated Transfer Vehicle (ATV), development and operation of the Columbus module on ISS, and satellite programs. The result is that both parties have developed paradigms related to risk and failure that contribute to ESM discussions.Orion represents humanity's first venture beyond Low-Earth Orbit (LEO) in over fifty years. Much of that experience is captured in program documents, but first-hand knowledge is limited to a few spaceflight veterans. Missions to LEO have offered the opportunity of direct, near-instantaneous communications and assistance, and the ability to return to Earth within a matter of hours in case of emergency. Outward-bound missions do not have these features and will require a more autonomous spacecraft with attendant safety-related issues.This paper will explore these and other challenges as we approach the flight of the first Orion vehicle.

Ciancone, Michael L.↗

Development and Use of the SPACE Computer Code for Analyzing the Space Station Electrical Power System

This special publication tells the story of the dedicated efforts of very talented individuals to create a preeminent space electrical power system modeling and simulation tool called SPACE, short for System Power Analysis for Capability Evaluation. This computer model has evolved for 30 years, withstanding the test of time and obsolescence, and garnering international recognition for its ability to simulate complex space electrical power systems. The analytical results from this model have saved millions of dollars in hardware redesign, testing, and verification for NASA's International Space Station (ISS) and its European and Russian partners. SPACE has played a pivotal role in the station's design and development and continues to support its ongoing operation. It has also extended its reach beyond the ISS to other key NASA programs, where it guides the design and planned operation of NASA's Multi-Purpose Crew Vehicle Orion and simulates electric power system operation in a dusty atmosphere on Mars' surface. The SPACE lineage was created by a core civil servant staff, supplemented by a cadre of interns and other temporary helpers. They created a tightly integrated tool that includes all phenomena that impact a solar array and battery space power system performance. SPACE is self-contained, requiring no other software modules and associated license fees. SPACE "rings true" in that is has been extensively validated with ISS on-orbit telemetry data. This report is being released as the generation of engineers who created it are nearing retirement, passing the baton to a new generation. This next generation will carry the code into the future, no doubt further evolving it to be able to assure mission planners that newly conceived systems will successfully power NASA's next endeavors. As a previous SPACE code developer and analyst, I have worked alongside many of the people mentioned in this report. The engineers who created the code, along with those just now learning it, are among the best and brightest at NASA. It is an honor to write this foreword as the present Branch Chief under which the legacy of SPACE continues to thrive.

Electrical Power System↗

Exploration Challenges: Transferring Ground Repair Techniques to Space Flight Application

Fulfilling NASA's Vision for Space Exploration will demand an extended presence in space at distances from our home planet that exceed our current experience in space logistics and maintenance. The ability to perform repairs in lieu of the customary Orbital Replacement Unit (ORU) process where a faulty part is replaced will be elevated from contingency to routine to sustain operations. The use and cost effectiveness of field repairs for ground based operations in industry and the military have advanced with the development of technology in new materials, new repair techniques and new equipment. The unique environments, accessibility constraints and Extra Vehicular Activity (EVA) issues of space operations will require extensive assessment and evolution of these technologies to provide an equivalent and expected level of assurance to mission success. Challenges include the necessity of changes in design philosophy and policy, extremes in thermal cycling, disruptive forces (such as static charge and wind entrainment) on developed methods for control of materials, dramatically increased volatility of chemicals for cleaning and other compounds due to extremely low pressures, the limits imposed on dexterity and maneuverability by current EVA equipment and practices, and the necessity of unique verification methodology. This paper describes these challenges in and discusses the effects on the established ground techniques for repair. The paper also describes the leading repair methodology candidates and their beneficial attributes for resolving these issues with the evolution of technology.

McLemore, Carole A.↗

Systems Integration Processes for NASA Ares I Crew Launch Vehicle

NASA's Exploration Initiative will require development of many new elements to constitute a robust system of systems. New launch vehicles are needed to place cargo and crew in stable Low Earth Orbit (LEO). This paper examines the systems integration processes NASA is utilizing to ensure integration and control of propulsion and nonpropulsion elements within NASA's Crew Launch Vehicle (CLV), now known as the Ares I. The objective of the Ares I is to provide the transportation capabilities to meet the Constellation Program requirements for delivering a Crew Exploration Vehicle (CEV) or other payload to LEO in support of the lunar and Mars missions. The Ares I must successfully provide this capability within cost and schedule, and with an acceptable risk approach. This paper will describe the systems engineering management processes that will be applied to assure Ares I Project success through complete and efficient technical integration. Discussion of technical review and management processes for requirements development and verification, integrated design and analysis, integrated simulation and testing, and the integration of reliability, maintainability and supportability (RMS) into the design will also be included. The Ares I Project is logically divided into elements by the major hardware groupings, and associated management, system engineering, and integration functions. The processes to be described herein are designed to integrate within these Ares I elements and among the other Constellation projects. Also discussed is launch vehicle stack integration (Ares I to CEV, and Ground and Flight Operations integration) throughout the life cycle, including integrated vehicle performance through orbital insertion, recovery of the first stage, and reentry of the upper stage. The processes for decomposing requirements to the elements and ensuring that requirements have been correctly validated, decomposed, and allocated, and that the verification requirements are properly defined to ensure that the system design meets requirements, will be discussed.

Taylor, James L.↗

Fiber optic combiner and duplicator

The investigation of the possible development of two optical devices, one to take two images as inputs and to present their arithmetic sum as a single output, the other to take one image as input and present two identical images as outputs is described. Significant engineering time was invested in establishing precision fiber optics drawing capabilities, real time monitoring of the fiber size and exact measuring of fiber optics ribbons. Various assembly procedures and tooling designs were investigated and prototype models were built and evaluated that established technical assurance that the device was feasible and could be fabricated. Although the interleaver specification in its entirety was not achieved, the techniques developed in the course of the program improved the quality of images transmitted by fiber optic arrays by at least an order of magnitude. These techniques are already being applied to the manufacture of precise fiber optic components.

Source record↗

Stardust Blazes MOA Trail

Mission Operations Assurance (MOA) started at the Jet Propulsion Laboratory (JPL) with the Magellan and Galileo missions of the late 80's. It continued to develop and received a significant impetus with the failures of two successive missions to Mars in the late 90's. MOA continued to evolve with each successive project at JPL achieving its current maturity with the Stardust sample return to Earth.

operations assurance mission↗

Long life assurance study for manned spacecraft long life hardware. Volume 3: Long life assurance studies of components

The guidelines for selecting hardware to be used in manned spacecraft to obtain a five year operational lifetime without maintenance were developed. An analysis was conducted on the design, application, failure mechanisms, manufacturing processes and controls, screen and burn-in techniques, and quality control of hardware items. The equipment considered for evaluation include: (1) electric motors and bearings; (2) accelerometers; (3) gyroscopes and bearings; (4) compressors and pumps, (5) magnetic tape recorders; (6) plumbing components and tubing; (7) check valves; (8) pressure regulators and solenoid valves; (9) thermal control valves; (10) pressure vessels and positive expulsion devices; (11) nickel cadmium batteries; and (12) transducers.

Source record↗