Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DECOMMISSIONING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

Development of Advanced Remote Cutting Technology for Reactor Internals Segmentation - 18274

Since the Three Mile Island decommissioning in the 1980's, Westinghouse has been involved in dismantling and segmentation of commercial reactors. With dozens of components segmented and packaged across the globe, Westinghouse has continued to evaluate the state of the art cutting technologies for their applications in the nuclear industry. While there have been well documented issues of certain cutting technologies in field applications, there are advancements of these technologies which prove them applicable for specific areas of the decommissioning process. During 2017, Westinghouse embarked on a revision of its plasma arc cutting (PAC) technology as part of an extensive innovation program for reactor internals segmentation. While these systems were used in Yankee Rowe and Three Mile Island, new plasma arc cutting systems improve the versatility and have much better precision of cutting. While bringing this technology into the future, Westinghouse is adapting the mounting and application so that it is compatible with the existing mechanical cutting portfolio. This means that in the event that a mechanical cutting technique is unable to perform as intended, a plasma cutting alternative will be available with minimal time to switch cutting methods. A test program for underwater PAC was performed, and the test gave a good reference of cutting speed and handling in different plate thicknesses which can be used when evaluating the use of the new cutting technology for future projects. PAC technology has proven that it could have a future in reactor vessel internals segmentation projects as a complement to the existing mechanical cutting methods under water. Thicknesses up to at least 25 mm can be cut with a much higher speed than the existing mechanical cutting methods in use. This and other cutting technology developments as part of the innovation program provide exciting new possibilities for dismantling and segmentation projects. While each of the techniques presents definite benefits for operators and, more importantly, customers, there are risks that need to be mitigated through engineered processes and controls. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Adaptation of Commercially Available Robots for Conditioning and Packaging ILW at Sellafield - 18282

The Legacy Ponds and Silos at Sellafield site contain some of the most hazardous Intermediate Level Waste (ILW) in the UK. As part of a multi-billion pound decommissioning programme, this waste will be retrieved and transported across the site for conditioning and packaging in the Box Encapsulation Plant (BEP). Current plans are to commence plant active commissioning in 2022, which will represent a major milestone in the UK nuclear decommissioning programme. Within the plant, skips of waste will be transferred from the shielded transport package into standard 3 cubic metre ILW containers. Waste from the Pile Fuel Storage Pond and First Generation Magnox Storage Pond will be immobilised in cementitious grout before being transferred to an adjacent store. Waste from the Magnox Swarf Storage Silo will not be immobilised in grout, but will be packaged, providing multi-barrier containment. During the concept design, the project team selected commercially available robots as the most viable technology for carrying out the numerous dexterous and repetitive tasks involved in characterising, conditioning and packaging the waste within the shielded 'hot' cells. Significant technical challenges had to be overcome during the design to adapt a commercially available robot for use within a high radiation / high contamination environment, where human access is not safe even for short periods of time. These challenges included: - Designing robot assemblies that could be retrofitted into the existing cell structure that was constructed as part of an earlier project but never completed; - Designing robot assemblies that could be recovered to their 'transport' position without requiring manual intervention; - Designing robot assemblies that could be remotely removed and replaced with new ones if they failed part way through the plant operational life; - Designing through-wall service and power connections that allow maintenance and recovery; - Designing control systems and human-machine interfaces that enable both manual and automated operation of the robot, whilst avoiding collisions with the in-cell cranes and other in cell furniture; - Assessing the radiation tolerance of all items. Bespoke computer simulations and full-scale development trials have been carried out, using non-active test materials, in order to demonstrate the Technology Readiness Level (TRL) required by Sellafield Limited (SL) at each stage of the project [1]. The results of these trials have been recorded in both video and written form so that they can form part of the project's Knowledge Management database. Detailed designs and specifications for the robot assemblies have been updated to incorporate the recommendations from the development trials. Procurement and manufacture of robot assemblies has already commenced to deliver two waste handling robots, two waste container lidding / swabbing robots and associated critical spares. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a Waste Management Organization for the Whiteshell Laboratories Closure Project - 18317

Whiteshell Laboratories (WL) has been generating and managing radioactive waste for over fifty years in support of a wide variety of research and operational applications. The current mission of the WL site, located in Manitoba, Canada, is to fully decommission the site to an approved end-state criterion and to disposition the waste in compliance with national and provincial regulations. To expedite the decommissioning schedule from over thirty years to nine years, which was a contractual commitment for the site operating company, Canadian Nuclear Laboratories (CNL), it became apparent that a centralized and optimized organization be established to coordinate all waste management activities and to fulfill the mission to process, condition, transport and disposition all radioactive wastes, which include Low-Level Waste (LLW), Intermediate-Level Waste (ILW) and High-Level Waste (HLW). The WL Waste Management Division was effectively established as a two-person operation in 2016 and has rapidly expanded to fulfill the mandate of managing nearly 30,000 cubic meters of LLW, ILW and HLW. This paper outlines the early lessons learned from managing important organizational changes without disrupting ongoing work practices; developing executive-level waste management strategies based on options studies and cost-benefit analysis comparisons; selection of storage vs. disposal disposition strategies; evaluation and selection of transportation methods and packages for LLW, ILW and HLW; and the need to develop an entire suite of programmatic documentation and procedures to support and instill a strong conduct of operations culture. The waste management strategy, which now focuses on transporting the waste to another province (Ontario) in a disposal ready form, represents the first large-scale radioactive waste transportation campaign in Canada that includes all three classes of waste. This paper provides additional insight on the overall waste management strategies for the WL Closure Project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote In-bore Laser Cutting and Welding Tools for use in Future Nuclear Fusion Reactors - 18348

The maintenance, replacement and decommissioning of future nuclear fusion reactors will require quick and reliable cutting and joining of in-vessel pipework. Initial design studies for nuclear fusion reactors for power generation have estimated cutting and welding could account for up to 60% of the maintenance duration using conventional in-situ processing techniques (dry-mechanical cutting and arc welding) and that new methods are required to expedite the process. Additionally, the expected radioactivity and limited access at the cutting and welding sites mean that these processes cannot be done manually and robotic tools are required. To this end, remote in-bore laser cutting and welding tools have been developed for use in 90 mm internal diameter steel pipes. Here, we will present the designs of the remote in-bore laser cutting and welding tools, and how the tools fit within the overall remote maintenance strategy of a nuclear fusion reactor. Initial high-power laser trials were performed with prototype tools which successfully demonstrated their laser processing, thermal management and dust protection functionality. Although the tools described herein have been developed specifically for use within the fusion reactor environment, however the tool design and technology demonstrated here is readily transferable to many remote applications in challenging environments such as fission reactor maintenance, nuclear decommissioning and other in-accessible pipework. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Used Fuel Dry Storage Systems and Components for Shutdown Plants to Expedite Defueling of Spent Fuel Pool - 18378

For plants that have announced plans to shut down, their main priority is to off-load the Used Nuclear Fuel from the spent fuel pool to dry storage at an ISFSI so that they can proceed to 'Safe store' or other storage options, and start their decommissioning process as soon as possible. One of the major expenses for a decommissioned plant is the cost of maintenance of the spent fuel pool. Therefore, the ability of the dry storage system to store short cooled fuel is an important aspect of dry storage system for shutdown plants. When a shutdown plant evaluates the dry storage options, total cost of the transferring the fuel from the pool to ISFSI site needs to be evaluated. One of the major costs to the utility for dry storage is the cost of ISFSI pad (basemat) along with the cost of dry storage system hardware. Smaller ISFSI footprint saves utility for the cost of ISFSI site excavation, cost of engineered backfill and cost of ISFSI pad. In order to minimize the cost of dry storage systems, besides the size of the ISFSI pad as described above, other important considerations is to use high capacity systems. The highest capacity systems available in the dry storage market today are with 37 PWR or 89 BWR used fuel assemblies per canister. These dry storage systems are expected to be at the plant sites for extended duration due to the unavailability of Interim Storage Facilities or a permanent disposal sites like Yucca Mountain. Maintaining the integrity of the dry storage systems canisters and storage overpack so that they can safely protect the fuel and integrity of used nuclear fuel is maintained during storage period is of utmost importance. Robust Aging Management Program is an important aspect for dry storage systems not only at the shutdown plants but also at the operating plants. This paper will provide the update of a reduced footprint version of TN Americas NUHOMS{sup R} System with MATRIX HSM and NUHOMS{sup R} EOS Canisters that addresses the need for maximizing safety, ISFSI capacity while optimizing cost. It will provide an update on the current capabilities, design features and current status of the licensing and deployment of NUHOMS{sup R} EOS System. It will provide the current status of the MATRIX HSM along with the significant enhancement included for a robust Canister Evolved Safety Program for Aging Management. It will also describe the construction sequence; loading operations, and inspections during extended storage as a part of aging management program. The compact version of TN Americas NUHOMS{sup R} System with MATRIX HSM offers a 'Universal' Storage Overpack which is designed to accept all different designs dry storage canisters available in the industry. As UNF storage continues to drives the industry towards innovations that address the need for optimized dry storage systems, compact ISFSIs and prudent aging management programs, this new evolution of the TN Americas NUHOMS{sup R} system with MATRIX HSM and EOS Canisters offers a significant leap forward in addressing all of these challenges. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

D and D of a Large Waste Treatment Plant in Germany - 18458

With its 40 years of nuclear experience, GNS, the world leading supplier of casks for spent fuel, ILW and HLW, also offers services for conditioning and management of all types of radioactive waste, especially for the German NPP. Since 1985, GNS treats and packages ILW and LLW from the operations and phase-out of German NPP in its Duisburg plant. To enable its permanent safe final disposal, solid wastes are compacted and dried before being shipped to an interim storage facility or - later - the Konrad repository. The total premises cover 20.000 m{sup 2} (215.000 sq ft), of which 9000 m{sup 2} (97.000 sq ft) is controlled area. The Duisburg Plant has three large industrial warehouses (each 25 m x 136 m or 82 ft x 446 ft) with a total capacity of 10.200 m{sup 2} or 110.000 sqft. For the treatment of open contaminated waste, six enclosures were built. These enclosures have a special ventilation system including a specific filtration plant. In one enclosure a high compaction plant was used, in another enclosures a drying facility for drums was in operation. During peak periods, more than 900 tonne of waste were treated annually. One enclosure was mainly used for maintenance, restoration and extension of mobile facilities, which were normally used for campaigns in NPP. Due to the decreasing amount of operational waste during the nuclear phase out in Germany, GNS has decided to close the Duisburg Plant. In the first half-year of 2017, the last waste packages were treated but around 80 20'-containers are still located on site. The D and D started in January 2017. The presentation will show the first experience of decommission processes of the first three enclosures. The following steps including the techniques used will be explained in detail: - Dismantling and removal of the high compaction facility; - Dismantling and removal of the drying facility; - Cleaning and wipe tests of the empty enclosures; - Removal of the stainless steel plates of the floor; - Investigations of the lower floor parts for contamination; - Removal of contaminated underground drainpipes; - Decontamination of the concrete floor; - Dismantling of the ventilation system in three enclosures; - Dismantling of the steel constructions. An important aim during the dismantling is to reduce the amount of nuclear waste and maximize the fraction material for free release. Next to the first three enclosures, in one of the enclosure IV - VI, a 150 tons scrap shear had been installed before the construction of the enclosure building. The scrap shear has to be dismantled and handled by heavy duty lifting equipment. Only afterwards is it possible to start the decommissioning of the last three enclosures. Our goal is to transfer this very large controlled area and the whole plant to the site owner, the Duisburg Port company, after 2 years and 5 months and doing so in a way so that the industrial warehouses can be used again for all possible types of industries. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Evidence-Based Critique of U.S. Nuclear Waste Policy Using Data from Reactor and Cyclotron Sites - 18568

Concrete at nuclear facilities becomes radioactive when it is exposed to a neutron flux, and when such facilities are vacated, decommissioning activities are enacted to make the site safe for reuse. These activities generate wastes that the public expects to be managed in their best interest. This paper provides side-by-side comparisons of concrete bio-shielding encountered at typical reactor and cyclotron decommissioning projects. Three sites are considered, and results from characterization samples are used to demonstrate that the wastes generated by such sites are similar in terms of content and risk. First, the dose potential represented by each waste is determined from mass-based radioactivity concentration with the RESRAD-BUILD computer code. The resulting doses are translated into population-risk estimates by applying dose-response predictions from the National Academy of Sciences' 2006 BEIR VII report. In terms of possible adverse health outcomes, the risk of solid cancer or leukemia associated with the wastes this paper examines is 8 to 50 extra cases per 100,000 persons. The regulatory framework applicable to each site is also reviewed, and the waste management strategies used at each site are contrasted. This paper demonstrates that the wastes it examines are virtually indistinguishable. Contrary to this finding, the wastes are regulated, managed, and disposed in very different manners according to current U.S. nuclear waste policy. The value of this paper is that the side-by-side comparisons it presents provides an opportunity to examine the risk-benefit of existing policies in terms of the benefits or disparities they represent. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

International Training to Promote Successful Environmental Remediation Projects - 18636

The International Atomic Energy Agency (IAEA) supports the efforts of its Member States to manage their nuclear and radiological liabilities, including radioactive waste management, decommissioning of facilities, and remediation of contaminated sites. As part of a project addressing Constraints in Decommissioning and Environmental Remediation (the CIDER Project), the IAEA is developing initiatives to further support capacity development specifically to promote implementation of safe, appropriate, and cost-effective environmental remediation (ER) projects. The IAEA sponsors numerous initiatives to provide its Member States training on important topics related to ER. It has become clear in recent years, however, that the existing training should be augmented with more in-depth training to provide for the development of the critical expertise needed to address significant ER challenges. ER projects typically are very complex, requiring the integration of numerous scientific and engineering disciplines, along with effective project planning and management. There are many examples of ER projects where considerable work has been completed, qualified technical staff are available, and adequate funding has been obtained, yet actual progress towards a final solution has been limited. In such cases, it appears that a key barrier is the lack of capacity to develop strategies, make fully informed decisions, plan for and manage activities, and implement successful ER actions. In light of the above, the IAEA has placed a priority on capacity development across the broad spectrum of ER project implementation. Efforts are underway to develop a new training program to develop capacity at the institutional and individual levels to equip course graduates to effectively integrate all areas of expertise in the planning and execution of ER projects. The target audience includes decision-makers; project managers, planners, and implementers; and academics. The core capabilities to be developed via this program include knowledge and skills related to: (1) radiation issues and radionuclide behavior; (2) health and safety protection principles and requirements; (3) identification, evaluation, and selection of ER technologies and approaches; (4) ongoing, constructive dialogue with stakeholders; (5) project planning, management, and communication; (6) cost estimation and funding development; and (7) implementation of appropriate site monitoring activities. The IAEA is collaborating with multiple organizations to develop and implement this training program, to leverage existing training programs and materials, and to coordinate on the development of sustainable training solutions. This paper will present the status of this initiative and work accomplished thus far. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Successes and Lessons Learned in the Design, Construction and Use of a Tool for Sampling the WR-1 Reactor Core - 1900z

Whiteshell Laboratories, located in Manitoba, Canada, provided research facilities for the Canadian nuclear industry since the early 1960's. The facility was centered on an organically cooled, heavy water moderated nuclear reactor in the world, Whiteshell Reactor 1 (WR-1). WR-1 was safely shut down in 1985, de-fueled and drained, and has been in a safe Storage with Surveillance (Deferred Decommissioning) state until present day. In support of an Environmental Assessment for proposed In Situ Decommissioning of WR-1, detailed characterization information regarding the reactor core components (calandria, calandria tubes, pressure tubes) was necessary to verify inventory estimates and neutron activation models produced circa 1992. The Fuel Channels of WR-1 (pressure tubes) were expected to be the most activated components of the reactor core, and to account for about 60% of the reactor core inventory. The interior surface of the fuel channel is also the most readily accessible surface within the reactor core. As such the decision was made to collect a sample of one of each of 3 Fuel Channel material types (Stainless Steel, Zr-2.5Nb, Ozhenite) for comparison to modelled estimates of neutron activation of various core materials. The expected dose rates from the samples were between 5 and 100 mSv (500-10,000 mrem) on contact based on a 200 mg sample. Sampling the Fuel Channels required verification the Fuel Channel was drained of organic coolant, removal of residual organic coolant from the Fuel Channel wall, removal of material from the interior surface of the Fuel Channel at the centerline of flux (∼25' below the operator position), and extraction of that material from the core. Several options for existing tooling and technologies, including hydraulic scrapers, and horizontal drill technologies, were looked at for their applicability to WR-1. While suitable approaches to higher radiation field sample collection, they were overly complex, costly and time consuming for the configuration at WR-1. In an effort to reduce costs, and to simplify the sampling process, a specialized and simple tool was developed to mechanically scrape a small sample of the interior wall of the Fuel Channels, collect the sample into a vial, and remove the sample from the core for analysis. The tool was designed, constructed, tested and implemented in the field entirely by Canadian Nuclear Laboratories Staff. The tool required no powered components, or electronic guidance or measurements; and was designed and constructed for a fraction of the cost of other commercially available technologies for sample collection within reactor cores. The samples were successfully collected without any injuries, contamination events or equipment failures. The tool remains operational in the event additional sampling is required. This paper provides additional details of the design, construction, testing and use of the tool and the successes and lessons learned during the various stages of design and implementation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In-can Melter for Fukushima Waste: From Laboratory Scale Tests to the Industrial Design Definition - 19021

The In-Can melter process is being developed and qualified to treat waste arising from decommissioning and dismantling operations. This robust, simple and versatile in situ vitrification process is designed for high or medium level waste and is compact enough to be implemented in a decommissioned cell or close to the waste to be treated. It is developed to treat liquid and solid waste, to produce a small amount of secondary waste and to minimize investment and operating costs. The In-Can vitrification process is also developed with a modular design in order to be adapted regarding to nuclear operators' needs and requirements. The close collaboration between the CEA and Orano constitutes a unique structure able to provide a full and integrated solution, from the scenarios studies and matrix design definitions to the industrial implementation. The evaluation of the In-Can process for Fukushima water treatment secondary waste is a project led by Orano, CEA and ANADEC. This paper presents the first results of this project from the scenarios and glass formulation studies to the feasibility evaluation to Fukushima Daiichi Nuclear Power Station implementation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Destructive and Non-Destructive Characterization of various LLW/ILW at NRG - 19078

The Nuclear Research and consultancy Group is located at Petten, the Netherlands, and operates the High Flux Reactor (HFR). The HFR is used for isotope production for medical purposes and material research. During its exploitation several types of radioactive waste are produced, which partly have accumulated at the reactor site. In addition, NRG operated the Low Flux Reactor (LFR), a small 30 kWmax Argonaut type reactor which was used for research and education purposes. Over the past decade several projects on waste management and decommissioning were carried out requiring various approaches, including the radiochemical characterisation of the different emerging waste streams as required by the Dutch regulator. This paper focuses on the practices and technical aspects of the destructive and non-destructive characterization of various types of low- and intermediate-level waste arising from a number of nuclear activities performed at the premises of NRG, i.e. the Dutch legacy waste management program, the treatment of ion exchange resins, and the decommission of the Low-Flux Reactor. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary Evaluation of Removing Spent Nuclear Fuel from Shutdown Nuclear Power Plant Sites - 2018 - 19101

This is a technical paper that does not take into account the contractual limitations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). Under the provisions of the Standard Contract, DOE does not consider spent nuclear fuel in multi-assembly canisters to be an acceptable waste form, absent a mutually agreed to contract amendment. To the extent discussions or recommendations in this paper conflict with the provisions of the Standard Contract, the Standard Contract provisions prevail. The U.S. Department of Energy Office of Integrated Waste Management (DOE-IWM) continues to conduct evaluations of removing spent nuclear fuel (SNF) from shutdown nuclear power plant sites. The 14 shutdown sites included in the evaluation to date have nuclear power reactors that have been permanently shut down and the sites have been decommissioned or are undergoing decommissioning. The 14 shutdown sites are Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, San Onofre, Vermont Yankee, and Fort Calhoun. The Oyster Creek Nuclear Generating Station ceased operations in September 2018 and will be included in future evaluations. The evaluations of the shutdown sites contain four components: - A characterization of the SNF and greater-than-Class C low-level radioactive waste (GTCC waste) inventory; - A description of the on-site infrastructure at the shutdown sites; - An evaluation of the near-site transportation infrastructure and experience at the shutdown sites - An evaluation of the actions necessary to prepare for and remove SNF and GTCC waste. The primary sources for the inventory of SNF were the DOE GC-859 and RW-859 spent nuclear fuel inventory databases. This inventory has been augmented with data obtained from the shutdown sites for SNF discharges that occurred after June 2013. The primary sources for information on the conditions of site and near-site transportation infrastructure and experience included field observations and information collected during visits to the 14 shutdown sites, information provided by managers and staff at the shutdown sites, and Google Earth imagery. Extensive photographs taken during the shutdown site visits have proven to be particularly useful in documenting the current conditions at and near the shutdown sites. Tribal and state representatives, State and Regional Group representatives, and Federal Railroad Administration representatives have participated in 11 of the shutdown site visits. In addition to visiting the shutdown site, site visits often include activities such as meeting with local railroads to discuss the near-site railroad infrastructure and meeting with community engagement panels. Oyster Creek permanently ceased power operations on September 17, 2018 and fuel was removed from the reactor vessel on September 25, 2018. Planning for the Oyster Creek site visit has begun and is conducted in three stages. In the first stage, data and documents that are applicable to Oyster Creek are collected. In the second stage, questions are developed based on the data and documents collected during the first stage. These questions are submitted to the Oyster Creek site approximately one month before the site visit. The third stage involves establishing specific schedules and participants. Participants will likely include tribal and state representatives, the Council of State Governments - Eastern Regional Conference, and the Federal Railroad Administration. State participation will likely include a representative of the State Rail Safety Participation Program, the New Jersey Department of Transportation, and the New Jersey Bureau of Nuclear Engineering. The site visit is tentatively expected to occur in April or May of 2019. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenges of SLOWPOKE-2 HEU Irradiated Fuel Transportation from Canada to USA - 19123(2)

The SLOWPOKE-2 (Safe Low-Power Kritical Experiment) was designed by AECL (Atomic Energy of Canada Limited) in the late 1960's. The core consists of HEU (highly enriched uranium) fuel with an enrichment of 93%. The fuel cage typically has approximately 300 fuel pins assembled in a triangular pitch between the two plates. The fuel pins are made from uranium-aluminum alloy cladded with aluminum. The SLOWPOKE-2 reactor is rated at a nominal 20 kW. with varying neutron flux, maximum being 1 E12 n/cm{sup 2}/s. The mass of the fuel cage is 5.06 kg. The life of the core can be extended by adding layers of beryllium reflector. The transportation flask for the irradiated fuel is a Type B(U)F. The shipment classification is UN3328 Class 7. To date, 4 SLOWPOKE-2 reactors have been decommissioned. The fuel from all these reactors was transported to the U.S. The CNSC (Canadian Nuclear Safety Commission) joint Canada-United States guide for approval of Type B(U) and fissile material transportation packages (RD-364) satisfies the requirements stipulated in International Atomic energy Agency (IAEA) TS-R-1 1996 edition (revised) and is acceptable to the DOT (Department of Transportation) and NRC (Nuclear Regulatory Commission) for complying with U.S. code of federal regulations 10 CFR Part 71. The export license is issued by the CNSC. The transportation licence is issued by CNSC after approval from TC (Transport Canada) and also by DOT after approval from NRC. The final home of the HEU SLOWPOKE-2 irradiated fuel is in Savannah River Site of DOE (Department of Energy). The transportation licence requires that the Type B(U)F flask is structurally sound in case of a crash. The US DOT provides a CAC (Competent Authority Certificate) which describes the irradiated fuel specifications that can be transported in the designated flask. The U.S. DOT also requires a leak test certification in accordance with ANSI N14.5-2014 to verify a leakage rate not to exceed 1 E-7 std-cm{sup 3}/s. As most SLOWPOKE-2 facilities are not located on the existing approved routes for nuclear fuel transportation, a route survey needs to be performed and submitted to the NRC. The route survey report is assessed by the NRC and issues a route approval for the transportation of the fissile material. This technical paper will discuss the detailed processes required to obtain approvals in order to transport the HEU SLOWPOKE-2 irradiated fuel from Canada to U.S. based upon recent experiences of decommissioning SLOWPOKE-2 reactors in Canada. It will provide details on the requirements of various regulators in Canada and the U.S. that govern and regulate this shipment including transportation, safety and security. It will also present lessons learned from previous experiences that can be utilized for best practice on other similar projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Maximum Inner Container Dose Rate That Will Ensure Meeting Regulatory Limit at Package Surface - 19206

Often, the shipper of radioactive material does not know the exact radioactive isotopic composition of the materials that need to be shipped. This is especially important for legacy materials that need to be removed from a site that is in the process of being decommissioned. A method of determining the acceptability of such material for shipment before it is placed in into the shipping package will allow more flexibility in planning for decommissioning activities. A series of Monte-Carlo calculations were performed to calculate the dose rate at the surface of a convenience container or a shielding pig separately and then at the surface of a new shipping package being designed by the Savannah River National Laboratory (SRNL). The purpose of these calculations is to determine the maximum dose rate at the surface of the convenience container or the shielded pig that will ensure the dose rate at the outer surface the shipping package is less that the regulatory limit of 2 mSv/h. The calculations also considered the effect of shape of the radioactive material and its possible movement inside the convenience container along with movement of the convenience container inside the confinement vessel of the shipping package. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Small Modular Reactors in Canada: Planning for Waste from the Outset - 19254

Canada is exploring the potential for on- and off-grid applications for small modular reactors (SMRs). SMRs are at an early stage of development and a road-mapping process was launched in Canada in February 2018 to better understand the views on priorities and challenges related to the possible development and deployment of SMRs. In addition to engaging partners, stakeholders and Indigenous representatives through workshops, a number of working groups were formed to advise the Road-map Secretariat on topics such as understanding the value proposition of different SMR technologies, matters associated with regulatory readiness, and issues related to waste management and transportation. The Waste Working Group (Waste WG) brought together experts from current nuclear waste generators, the organization responsible for managing Canada's nuclear fuel waste, government, and the regulator to identify waste disposal and storage considerations for Canadian SMR applications, including an analysis of waste streams, waste transportation, short and long-term disposal and storage requirements, and decommissioning considerations. Radioactive waste has been safely managed within a regulatory framework in Canada for decades. Technologies for waste storage and transport exist and also have been in use for decades, and therefore provide a technical basis to explore any specific differences that would apply to waste streams resulting from the construction, operation and decommissioning of SMRs. The Waste WG concluded that a disposal path for SMR used fuel exists through the Nuclear Waste Management Organisation's (NWMO) Adaptive Phased Management (APM) approach, but that R and D work is needed to demonstrate that SMR waste can meet the acceptance criteria. The Waste WG noted that although projects are progressing to realize disposal facilities for the two largest producers of low and intermediate level waste, small producers including potential SMR operators currently have no defined path to disposal for low and intermediate level waste. The Waste WG also highlighted that there could be potential logistical challenges with the transportation of irradiated reactor cores, in particular for remote locations, which will need to be explored. The Waste WG recognized that some uncertainties remain, and early and open communication and coordination between the SMR developers and the NWMO, and potential waste receivers will be key to ensuring a robust framework for SMR waste management from the outset in Canada. This paper explores the results of the analysis and the key findings, high-level recommendations and actions of the Waste WG. It presents the results of the Waste WG's analysis of waste categories against Canadian SMR technologies that best align to end-user requirements; identification of key gaps in research and development for waste categories; and identification of potential work that could address the key gaps. The Waste WG undertook its work between February and August 2018. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Taking in Nuclear Operation of the Plasma Facility for Treatment Industrial Radioactive Waste - 19346

The operation and maintenance of nuclear power plants, the nuclear fuel cycle in general, research laboratories and pharmaceutical, medical and industrial facilities generate low-level radioactive waste which, along with the historical radioactive waste from past nuclear activities, needs to be treated and stored, awaiting final disposal. Plasma technology offers a very effective way of treating this waste with a high volume reduction factor (VRF), free from organics, liquids and moisture, and meets without a doubt the acceptance criteria for safe storage and disposal. By means of a plasma beam of approximately 5000 deg. C, the inorganic materials are melted into a glassy slag, containing most of the radioactive isotopes while the organic material is gasified and afterwards oxidized in an afterburner and purified in an off-gas cleaning system. This paper describes the principles of plasma, the different waste feed systems, off-gas treatment and operational experience and future plasma plants. More specifically, it presents the new full-scale plasma facility for the treatment of radioactive waste at the Kozloduy Nuclear Power Plant in Bulgaria for which construction and assembly was finalized end of August 2016. It also describes in more detail the Site Acceptance Tests (SAT) of this facility. Previous paper describes the construction and testing of the plasma melting facility at the Kozloduy NPP in Bulgaria. Now the paper focus on the nuclear starting up conducted in May 2018 with real radioactive waste and illustrates the first operational results such as types of waste treated, volume reduction factors, etc The Project was co-financed through a grant by Kozloduy International Decommissioning fund (KIDSF) administrated by the EBRD and through Bulgarian national funding -Nuclear Facilities Decommissioning Fund and Radioactive Waste Fund. The KIDSF is funded by the European Union as well by the contributors to the KIDSF - Austria, Belgium, France, Greece, Ireland, The Netherlands, Spain, United Kingdom and Switzerland. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Engineering Challenges for the In Situ Disposal (ISD) of the 20 MWe Nuclear Power Demonstration (NPD) Reactor - 19407

The Nuclear Power Demonstration (NPD) reactor is the first CANDU{sup R} type power reactor to be decommissioned. This first of a kind project is to decommission the station using an In-Situ Disposal (ISD) strategy, and presents some engineering challenges to implement. Based on current technology and successful application of industry lessons learned, these challenges are being met. This paper presents a summary of those challenges, to recover from a long period of Storage With Surveillance, solve configuration management, assess the existing structure, determine the performance of the structure following seismic events during the disposal period, adapt the facility design to ISD and select a grout in-fill, and describe the regulatory and public interaction, to demonstrate the integrity of what will be a future disposal site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote Collection of Radioactive Waste at Chalk River Laboratories - 19425

Remote handling of radioactive waste may be required during a variety of decommissioning and waste management activities. Based on the level of radiation and complexity of the application, the design, development and implementation of novel electromechanical systems can offer optimal solutions. At Canadian Nuclear Laboratories, current decommissioning and waste management projects routinely employ solutions including innovative and unique tools, test rigs, mock-ups, robotics, unmanned aerial vehicles, and automated systems. CNL ability to integrate an experienced team from a wide range of technical areas make such solutions possible. In this paper, we present an example of remotely controlled systems to collect highly radioactive waste materials from storage tanks at the Chalk River Laboratories. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗