Cost Modelling for Energy Efficient Window Replacements

This paper detailed data collection and cost-modeling efforts to understand the hardware and non-hardware (soft) cost of residential, energy efficient window replacements. NREL created a bottom-up cost model that details costs associated with window materials, installation labor, company overhead, and administrative costs. NREL did not find a single cost area for improvement but observed several non-cost barriers to increased window replacements. The non-cost barriers associated with window replacements are consumer education, lack of communication of the value of window replacement to consumers, and difficulty for consumers to identify quality products and installation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Exploring Renewable Energy Opportunities in Select Southeast Asian Countries: A Geospatial Analysis of the Levelized Cost of Energy of Utility-Scale Wind and Solar Photovoltaics

The costs of renewable energy-based electricity generation have fallen precipitously in recent years to levels that are increasingly competitive with traditional generation such as fossil fuel-based generation. As these costs become increasingly competitive, private developers, policymakers, and energy system planners are searching for opportunities to harness high-quality renewable energy resources. Developing economies are setting ambitious targets and exploring how cost-effective, grid-connected renewable energy options can help power economic growth and meet growing electricity demands. This includes the member states of the Association of Southeast Asian Nations (ASEAN) that are determined to reach a target of 23% of renewable energy in the region's total primary energy supply by 2025. A critical gap to identifying opportunities and scaling up renewable energy is the lack of quality data and analyses to support decisions on the investment and deployment of renewables - including wind and solar photovoltaics (PV). This work supports decision making by providing high-quality data and spatial analysis of the cost of utility-scale wind and solar PV generation in select countries of Southeast Asia - specifically, the ASEAN member states. Generation costs are expressed as the levelized cost of energy (LCOE) - a commonly used metric that represents the net present value of the unit cost of electricity during the lifetime of a particular electricity generation technology. This is the first spatial estimate of LCOE for these technologies within the ASEAN member states - providing insights into the roles that renewable energy resource quality and other factors may play in generation costs.

14 SOLAR ENERGY↗

Utilizing FLEX Equipment for O&M Cost Reduction in Nuclear Power Plants

There are many ways of reducing the O&M costs; this work presents an innovative framework of reducing O&M costs by utilizing the onsite Flex equipment at NPPs. Flex strategies were postulated by the U.S. Nuclear Regulatory Commission (NRC) in the wake of Fukushima Dai-ichi accident to address beyond-design-basis accidents and improve plant flexibility. Onsite Flex includes equipment such as portable pumps, generators, batteries, compressors, and other supporting equipment or tools, all stored in a dedicated and secure building designed to withstand external hazards. In the past years, several NPPs have invested in procuring and maintaining the onsite Flex asset that stands unutilized most of the time. Recently there have been active efforts to develop strategies through which NPPs can take credit for the Flex equipment. This work focuses on identifying areas where Flex equipment can be utilized during normal plant operation and develop a framework that would aide in reduction of O&M costs without impacting plant safety. Earlier work in the current project, published in INL/EXT 18 51531, had presented the risk- and cost-analysis framework for utilizing FLEX portable equipment during technical specification required shutdown due to component failure. The licensee event report (LER) database of the NRC shows that the commercial NPPs in the US reported 86 technical specification required shutdowns since year 2010. When a component failure or unavailability leads to a technical specification required shutdown, the NPPs suffers both direct costs in terms of loss of revenue arising from the loss of generation and indirect costs in form of reporting and inspection required by the NRC. The earlier work developed the following framework and implemented it on a demonstration probabilistic risk assessment (PRA) model to utilize the portable Flex equipment when a component failure could potentially lead to a technical specification required shutdown: 1. Identify the components, the failure or unavailability of which would result in a 10 CFR 50.73(a)(2)(i)A-reportability requirement, postulated by the NRC for technical specification required shutdown to be reported in NRC’s LER database. 2. Identify the Flex equipment that can be utilized as a standby to the failed component. 3. Develop a probabilistic risk assessment (PRA) model that incorporates the Flex equipment within the current plant PRA model. 4. Perform PRA calculations to determine change in core damage frequency and change in risk-informed allowable outage time. 5. Perform cost-benefit analysis to determine the economic feasibility of implementing the Flex equipment The current work, presented in this report, implement the above framework in a plant PRA model obtained from a US commercial nuclear power plant by prestaging onsite FLEX equipment as a redundancy to the existing auxiliary feedwater system, and pre-coordinating with offsite FLEX centers. The new configuration increased the allowable outage time by about a fifty percent overall for the diesel generator being out of service. The benefits to NPPs of utilizing the Flex equipment during normal operations, and performing the PRA developed in this work, include: 1. A risk-informed plant shutdown alternative to the current technical specification required shutdown. 2. Extension of allowable outage time to initiate technical specification required shutdown. 3. Reducing economic impact of component failure, avoiding plant shutdown, and maximizing generation. 4. Save the direct and indirect costs associated with technical specification required shutdown.

42 ENGINEERING↗

Low-Cost Recuperative Heat Exchanger for Supercritical Carbon Dioxide Power Systems (Final Scientific/Technical Report)

Closed Brayton super-critical CO 2 power cycles are well suited to waste heat bottoming cycles, due to their increased efficiency and compactness, relative to Rankine steam bottoming cycles. Since waste heat applications would be retrofits, the power system compactness is important. To achieve high efficiency, these power cycles require high pressure recuperative type heat exchangers, of substantial heat duty. Current Printed Circuit Heat Exchangers (PCHE), originally developed for high pressure gas and oil applications, can be used as recuperators, but costs are higher than desired. Altex is developing a purpose-built high pressure and effectiveness recuperator to provide the reliability, compactness, performance and pressure capability of current recuperators, but at a reduced cost. The High Effectiveness Low Cost (HELC) recuperative heat exchanger design yields volume and weight metrics of .0024 m 3 /UA and 10.2 kg/UA, which are 4% and 77.3% below recuperator target metrics, respectively. A 50 kW test article was designed and fabricated. Performance tests on water and oil showed that the HELC design model could predict heat transfer, to within 10% of the measured value. This model was then used to project HELC performance, when operating on supercritical CO 2 . Besides performance tests, the test article was hydrostatically tested, for integrity at up to 4,000 psi pressure. At these conditions, some distortion of channels was encountered. To mitigate distortion, the inserts were redesigned and these results were used to project the cost of 500 kW and 5,083 kW HELC units. The cost metric for the 5,083 kW unit was determined to be $\$ $1,349/UA, which is 10% lower than the recuperator desired cost metric desired target of $\$ $1,500/UA. In addition, the 5,083 kW unit HELC cost of $\$ $61.09/kW is 33.6% lower than the $\$ $92/kW estimated cost for a PCHE. Hydrostatic pressure tests, at up to 4,000psi, showed that the unit did not leak. However, channels were distorted at this pressure differential. Design updates to minimize stress concentrations and distortion were prepared and analyzed, to show that distortion could be controlled, but to date tests have not been run to prove the design. Project results show the potential of the HELC approach, but more work is required to confirm this potential, at the larger scales of interest.

14 SOLAR ENERGY↗

A Generalized Nuclear Code of Accounts for Cost Estimation Standardization

This is a joint INL-EPRI study. Link to corresponding page at the Electric Power Research Institute (EPRI): https://www.epri.com/research/products/000000003002028937 Recent Advanced Reactor (AR) designs typically offer features and attributes that depart from traditional water-cooled reactors in terms of fuel forms, coolants, structural materials, size, safety margins, and other important design and operational aspects. These departures, relative to the industry experience, will likely present a challenge for potential owner-operators when evaluating one or more AR designs for commercial deployment on a like-for-like basis. This is further exacerbated with new classes of reactors gaining prominence (e.g., microreactors) and new emerging applications (e.g., floating barge reactors or space propulsion reactors). The differences in design-specific technologies are compounded by the differences in approach to cost estimation. The lack of consistency in build up toward cost estimates creates a challenge when comparing competing concepts and evaluating their associated cost drivers. The outcome of a 2019 Scoping Study conducted by the Electric Power Research Institute (EPRI) indicated the need for a cost modeling guide (CMG), which would be underpinned by a technology-neutral and inclusive Generalized Nuclear Code of Accounts (GN-COA). A code of accounts (COA) is a tool by which costs are identified in even more specific categories, providing clarity on what specific costs are included in an estimate. A parallel independent effort was meanwhile taking place at Idaho National Laboratory via funding by the Systems Analysis Integration (SA&I) campaign of the Office of Nuclear Energy under the U.S. Department of Energy (U.S. DOE-NE) to also update the COA structure to enable more flexibility and encompass a wider variety of reactor technologies. After being made aware of these synergistic efforts, the two parties decided to combine efforts and develop a joint new standard format for nuclear cost estimation that builds on previous structures. This document describes the development of this joint GN-COA and provides guidance on the implementation of the tool, which is provided as the associated GN-COA Excel document. The main attributes of this novel COA format are that all items are functionally defined (in order to be technology and application agnostic) and grouped into logical arrangements that facilitate the tabulation of costs for reactor constructions under consideration. The intent is for the GN-COA to form a standard that is endorsed by future vendors and customers.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Lessons Learned for Transmission Cost Allocation in U.S. Regional Markets

Expanding electric transmission can facilitate generator interconnection and improve grid reliability. Assigning costs for new transmission infrastructure is highly contentious because these costs can have a direct impact on energy prices and ratepayer bills. In this report, we evaluate what factors influence successful transmission cost allocation agreements. Through a review of legal disputes, existing cost allocation practices, and regional case studies, we identify potential strategies to minimize cost allocation disputes for future projects. The report also highlights the processes by which regions can update their cost allocation methods. While we do not consider cost allocation methods currently under development for compliance with FERC Order 1920, the trends and lessons learned identified in this report can inform discussions on effective cost allocation methods to reduce barriers for transmission development.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Solar Photovoltaics Resilient Fasteners Levelized Cost of Energy (LCOE) Tool

Solar photovoltaics (PV) module fasteners are one of the most common structural failure points on PV systems, particularly in high winds and coastal areas with ocean spray. Some fastener types have been shown to survive these conditions at higher rates than others. The fastener type, material, quantity, and placement all impact performance. Fasteners that fail less often typically have a higher upfront cost, but this investment can pay off in savings from less frequent torque audits (which reduces O&M costs), reduced system damage, and decreased system downtime. We developed an Excel-based tool to evaluate different module fasteners for a PV system - either a new or retrofit project - and compare differences in upfront and outyear costs to determine the expected life cycle costs and simple payback periods of different fastener options. The tool is site-specific, with inputs including system attributes (such as system size, location, price of power) and fastener attributes (such as design, washer type, nut type, use of locking hardware, materials, installation time, and torque audit requirements). A baseline fastener scenario can be compared to up to four proposed fastener scenarios. In addition to presenting expected life cycle cost implications of the different fastener options, the tool produces results showing the reductions in outyear costs needed to offset any initial cost premiums for more reliable fasteners across four categories: preventative O&M, avoided damage, reduced downtime, and reduced insurance premiums. These numbers can serve as decision aids for users when considering fastener options on new or existing projects. This poster will present the tool, methodology, and scenarios using example sites to highlight the tool capabilities and how it can inform different fastener decisions on different projects. Future work includes incorporating lifetime expected damage costs by embedding damage function curves that the authors are developing from field data.

14 SOLAR ENERGY↗

Cost Validation Using PRICE H

PRICE H was introduced into the JPL cost estimation tool set circa 2003. It became more available at JPL when IPAO funded the NASA-wide site license for all NASA centers. PRICE H was mainly used as one of the cost tools to validate proposal grassroots cost estimates. Program offices at JPL view PRICE H as an additional crosscheck to Team X (JPL Concurrent Engineering Design Center) estimates. PRICE H became widely accepted ca, 2007 at JPL when the program offices moved away from grassroots cost estimation for Step 1 proposals. PRICE H is now one of the key cost tools used for cost validation, cost trades, and independent cost estimates.

cost estimation↗

Modeling Operations Costs for Human Exploration Architectures

Operations and support (O&S) costs for human spaceflight have not received the same attention in the cost estimating community as have development costs. This is unfortunate as O&S costs typically comprise a majority of life-cycle costs (LCC) in such programs as the International Space Station (ISS) and the now-cancelled Constellation Program. Recognizing this, the Constellation Program and NASA HQs supported the development of an O&S cost model specifically for human spaceflight. This model, known as the Exploration Architectures Operations Cost Model (ExAOCM), provided the operations cost estimates for a variety of alternative human missions to the moon, Mars, and Near-Earth Objects (NEOs) in architectural studies. ExAOCM is philosophically based on the DoD Architecture Framework (DoDAF) concepts of operational nodes, systems, operational functions, and milestones. This paper presents some of the historical background surrounding the development of the model, and discusses the underlying structure, its unusual user interface, and lastly, previous examples of its use in the aforementioned architectural studies.

cost estimating↗

The Contribution of Environmental Siting and Permitting Requirements to the Cost of Energy for Marine and Hydrokinetic Devices

Responsible deployment of marine and hydrokinetic (MHK) devices in estuaries, coastal areas, and major rivers requires that biological resources and ecosystems be protected through siting and permitting (consenting) processes. Scoping appropriate deployment locations, collecting pre-installation (baseline) and post-installation data add to the cost of developing MHK projects, and hence to the cost of energy. Under the direction of the U.S. Department of Energy, Pacific Northwest National Laboratory scientists have developed logic models that describe studies and processes for environmental siting and permitting. Each study and environmental permitting process has been assigned a cost derived from existing and proposed tidal, wave, and riverine MHK projects. Costs have been developed at the pilot scale, and for commercial arrays. This work is carried out under the U.S. Department of Energy reference model project, with the costs for engineering, deployment strategies, mooring and anchoring configurations, and maintenance operations, being developed by a consortium of Department of Energy national laboratories and universities. The goal of the reference model is to assist the MHK industry to become a cost-competitive contributor of renewable energy, by identifying those aspects of MHK projects that contribute significantly to the cost of energy, and directing research funding towards lowering those costs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Future Costs, Benefits, and Impacts of Renewables Used to Meet U.S. Renewable Portfolio Standards

This brochure provides a brief overview of the report titled 'A Prospective Analysis of the Costs, Benefits, and Impacts of U.S. Renewable Portfolio Standards.' The report evaluates the future costs, benefits, and other impacts of renewable energy used to meet current state renewable portfolio standards (RPSs). It also examines a future scenario where RPSs are expanded. The analysis examines changes in electric system costs and retail electricity prices, which include all fixed and operating costs, including capital costs for all renewable, non-renewable, and supporting (e.g., transmission and storage) electric sector infrastructure; fossil fuel, uranium, and biomass fuel costs; and plant operations and maintenance expenditures. The analysis evaluates three specific benefits: air pollution, greenhouse gas emissions, and water use. It also analyzes two other impacts, renewable energy workforce and economic development, and natural gas price suppression. The analysis finds that the benefits or renewable energy used to meet RPS polices exceed the costs, even when considering the highest cost and lowest benefit outcomes.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

High Effectiveness, Compact, High Pressure and Low-Cost Recuperator, Presented at The Fifth International Symposium – Super-Critical CO2 Power Cycles, San Antonio, Texas, March 28-31, 2016, by Dr. John Kelly, President, Altex Technologies Corporation

Closed Brayton super-critical CO2 power cycles are well suited to waste heat bottoming cycles, due to their increased efficiency and compactness, relative to Rankine steam bottoming cycles. Since waste heat applications would be retrofits, the power system compactness is important. To achieve high efficiency, these power cycles require high pressure recuperative type heat exchangers, of substantial heat duty. Current Printed Circuit Heat Exchangers (PCHE), originally developed for high pressure gas and oil applications, can be used as recuperators, but costs are higher than desired. Altex is developing a purpose-built high pressure and effectiveness recuperator to provide the reliability, compactness, performance and pressure capability of current recuperators, but at a reduced cost. The High Effectiveness Low Cost (HELC) recuperative heat exchanger design yields volume and weight metrics of .0024 m3/UA and 10.2 kg/UA, which are 4% and 77.3% below recuperator target metrics, respectively. A 50 kW test article was designed and fabricated. Performance tests on water and oil showed that the HELC design model could predict heat transfer, to within 10% of the measured value. This model was then used to project HELC performance, when operating on supercritical CO2. Besides performance tests, the test article was hydrostatically tested, for integrity at up to 4,000 psi pressure. At these conditions, some distortion of channels was encountered. To mitigate distortion, the inserts were redesigned and these results were used to project the cost of 500 kW and 5,083 kW HELC units. The cost metric for the 5,083 kW unit was determined to be $1,349/UA, which is 10% lower than the recuperator desired cost metric desired target of $1,500/UA. In addition, the 5,083 kW unit HELC cost of $61.09/kW is 33.6% lower than the $92/kW estimated cost for a PCHE. Hydrostatic pressure tests, at up to 4,000psi, showed that the unit did not leak. However, channels were distorted at this pressure differential. Design updates to minimize stress concentrations and distortion were prepared and analyzed, to show that distortion could be controlled, but to date tests have not been run to prove the design. Project results show the potential of the HELC approach, but more work is required to confirm this potential, at the larger scales of interest.

14 SOLAR ENERGY↗

High Effectiveness, Compact, High Pressure and Low Cost Recuperator for Super-Critical CO2 Power Cycles, Paper Presented at The Fifth International Symposium – Super-Critical CO2 Power Cycles, San Antonio, Texas, March 28-31, 2016, by Dr. John Kelly, President, Altex Technologies Corporation

Closed Brayton super-critical CO2 power cycles are well suited to waste heat bottoming cycles, due to their increased efficiency and compactness, relative to Rankine steam bottoming cycles. Since waste heat applications would be retrofits, the power system compactness is important. To achieve high efficiency, these power cycles require high pressure recuperative type heat exchangers, of substantial heat duty. Current Printed Circuit Heat Exchangers (PCHE), originally developed for high pressure gas and oil applications, can be used as recuperators, but costs are higher than desired. Altex is developing a purpose-built high pressure and effectiveness recuperator to provide the reliability, compactness, performance and pressure capability of current recuperators, but at a reduced cost. The High Effectiveness Low Cost (HELC) recuperative heat exchanger design yields volume and weight metrics of .0024 m3/UA and 10.2 kg/UA, which are 4% and 77.3% below recuperator target metrics, respectively. A 50 kW test article was designed and fabricated. Performance tests on water and oil showed that the HELC design model could predict heat transfer, to within 10% of the measured value. This model was then used to project HELC performance, when operating on supercritical CO2. Besides performance tests, the test article was hydrostatically tested, for integrity at up to 4,000 psi pressure. At these conditions, some distortion of channels was encountered. To mitigate distortion, the inserts were redesigned and these results were used to project the cost of 500 kW and 5,083 kW HELC units. The cost metric for the 5,083 kW unit was determined to be $1,349/UA, which is 10% lower than the recuperator desired cost metric desired target of $1,500/UA. In addition, the 5,083 kW unit HELC cost of $61.09/kW is 33.6% lower than the $92/kW estimated cost for a PCHE. Hydrostatic pressure tests, at up to 4,000psi, showed that the unit did not leak. However, channels were distorted at this pressure differential. Design updates to minimize stress concentrations and distortion were prepared and analyzed, to show that distortion could be controlled, but to date tests have not been run to prove the design. Project results show the potential of the HELC approach, but more work is required to confirm this potential, at the larger scales of interest.

14 SOLAR ENERGY↗

Plowing Through the Cost Barrier: Zero Energy K-12 Schools for Less: Preprint

There is a perception that zero energy K–12 schools cost more than conventional schools. Zero energy schools provide a number of unique benefits to school districts, students and staff, and communities. Among other things, a zero energy school requires far less energy to operate than a conventional school and uses on-site renewable energy systems to offset that reduced energy load. The money saved on energy can often be used to enhance educational programs. But does the extra value come at a premium? Research findings indicate that not only can zero energy schools be designed and built on conventional school budgets, they can cost less. In an integrated design and construction process, the cost of zero energy measures can be offset by, for example, downsizing heating, ventilating, and air-conditioning systems, reducing both life cycle and first costs. These findings are based on an examination of 88 zero energy or zero energy ready schools across the United States built during the last 15 years. The data collected on these schools include capital costs and the experiences of owners and design teams. The goal was to understand the perceived cost barrier, given that each building was built with a predetermined budget. The results will help future school stakeholders, program administrators, and design teams counter the perceived cost barriers. Successful strategies for achieving zero energy at no initial cost are presented. The lessons learned from existing zero energy schools can help transform the market such that all new schools can be zero energy.

30 DIRECT ENERGY CONVERSION↗

Commercial Building Sensors and Controls Systems: Barriers, Drivers, and Costs

Building sensors and controls systems, including building automation systems, consists of the sensor-based devices installed in buildings and the control and automation of those devices. Optimized sensors and controls systems could lead to 29% annual energy savings in commercial buildings and are integral to the growth of grid-interactive efficient buildings. Only 8% of small commercial buildings, however, have installed sensors and controls systems. This is largely due to cost barriers. This work seeks to increase the transparency of system costs and identify specific barriers and drivers for increased adoption. To gather industry insights, the team reached out to building owners, vendors, and contractors and conducted 20 interviews with the goal of collecting cost data and market characteristics regarding building sensors and controls. The qualitative interview data was analyzed using grounded theory to identify overarching concepts, such as barriers, drivers, and future directions on the field. From this analysis, primary barriers were found to be complexity, a lack of knowledge, and money. Primary drivers were found to be the knowledge of data, savings, and remote access. The qualitative cost data was collected in the form of invoices during the interviews. The cost values were used to develop a percentage-based cost stack which identifies the average fraction of the total cost attributed to each category (hardware, software, labor, fees, and taxes). This greater understanding of costs and barriers associated with commercial building sensors and controls systems lays the groundwork for future steps in increasing system adoption, reducing energy consumption, and market transformation.

advanced building controls↗

Development of a Preliminary Decommissioning Plan Following the International Structure for Decommissioning Costing (ISDC) of Nuclear Installations - 13361

The International Structure for Decommissioning Costing (ISDC) of Nuclear Installations, published by OECD/NEA, IAEA and EC is intended to provide a uniform list of cost items for decommissioning projects and provides a standard format that permits international cost estimates to be compared. Candesco and DECOM have used the ISDC format along with two costing codes, OMEGA and ISDCEX, developed from the ISDC by DECOM, in three projects: the development of a preliminary decommissioning plan for a multi-unit CANDU nuclear power station, updating the preliminary decommissioning cost estimates for a prototype CANDU nuclear power station and benchmarking the cost estimates for CANDU against the cost estimates for other reactor types. It was found that the ISDC format provides a well defined and transparent basis for decommissioning planning and cost estimating that assists in identifying gaps and weaknesses and facilitates the benchmarking against international experience. The use of the ISDC can also help build stakeholder confidence in the reliability of the plans and estimates and the adequacy of decommissioning funding. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Environmental Cost Analysis System (ECAS) Status and Compliance Requirements for EM Consolidated Business Center Contracts - 13204

The Department of Energy (DOE) Office of Environmental Management (EM) has developed a web-accessible database to collect actual cost data from completed EM projects to support cost estimating and analysis. This Environmental Cost Analysis System (ECAS) database was initially deployed in early 2009 containing the cost and parametric data from 77 decommissioning, restoration, and waste management projects completed under the Rocky Flats Closure Project. In subsequent years we have added many more projects to ECAS and now have a total of 280 projects from 8 major DOE sites. This data is now accessible to DOE users through a web-based reporting tool that allows users to tailor report outputs to meet their specific needs. We are using it as a principal resource supporting the EM Consolidated Business Center (EMCBC) and the EM Applied Cost Engineering (ACE) team cost estimating and analysis efforts across the country. The database has received Government Accountability Office review as supporting its recommended improvements in DOE's cost estimating process, as well as review from the DOE Office of Acquisition and Project Management (APM). Moving forward, the EMCBC has developed a Special Contract Requirement clause or 'H-Clause' to be included in all current and future EMCBC procurements identifying the process that contractors will follow to provide DOE their historical project data in a format compatible with ECAS. Changes to DOE O 413.3B implementation are also in progress to capture historical costs as part of the Critical Decision project closeout process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Developing a New Model to Estimate the Costs to Decommission DOE's Active Facilities - 16368

The Active Facilities Data Collection System (AFDCS) is a major means the U.S. Department of Energy (DOE or Department) uses to estimate its out-year environmental liability for the active and surplus facilities across the Department. The previous AFDCS cost model was based on cost assumptions that date back to the mid-1990s. The model is being replaced with a model that reflects more recent facility disposition experience and costs. DOE's Office of Environmental Management's (DOE-EM) historical cost collection database provides the basis for the new AFDCS cost model. This paper describes the process that was used to update the AFDCS facility data inputs, analyze this data, and formulate historical costs and parameters. This process created a robust and reliable cost model that will provide DOE with a valid estimate of the facilities' disposition costs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗