Discussion of several problem areas during the Apollo 13 operation
Apollo 13 flight rescue operation as function of flight crew performance and Mission Control Center
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Apollo 13 flight rescue operation as function of flight crew performance and Mission Control Center
A simplified method is described for determining the position of the lunar roving vehicle on the lunar surface during Apollo 15. The method is based upon sun compass azimuth measurements of three lunar landmarks. The difference between the landmark azimuth and the sun azimuth is measured and the resulting data are voice relayed to the Mission Control Center for processing.
The modular space station mockup is described in detail with emphasis on the interior arrangements of the crew living spaces, control center, and general purpose laboratory facilities. The results of three mockup reviews are also presented.
A color enhancement system designed for the Applications Technology Satellite (ATS) spin scan experiment has been adapted for the analysis of Nimbus infrared radiation measurements. For a given scene recorded on magnetic tape by the Nimbus scanning radiometers, a virtually unlimited number of color images can be produced at the ATS Operations Control Center from a color selector paper tape input. Linear image interpolation has produced radiation analyses in which each brightness-color interval has a smooth boundary without any mosaic effects. An annotated latitude-longitude gridding program makes it possible to precisely locate geophysical parameters, which permits accurate interpretation of pertinent meteorological, geological, hydrological, and oceanographic features.
The operational modes for the guidance system operations plan for Program SKYLARK 1 are presented. The procedures control the guidance and navigation system interfaces with the flight crew and the mission control center. The guidance operational concept is designed to comprise a set of manually initiated programs and functions which may be arranged by the flight crew to implement a large class of flight plans. This concept will permit both a late flight plan definition and a capability for real time flight plan changes.
An investigation was made into the temporary loss of command module color television picture by the ground station converter at Mission Control Center. Results show the picture loss was caused by a false synchronization pulse that resulted from the inability of the black level clipping circuit to respond adequately to the video signal when bright sunlight suddenly entered the camera's field of view.
The modular space station will operate as a general purpose laboratory (GPL). In addition, the space station will be able to support many attached or free-flying research and application modules that would be dedicated to specific projects like astronomy or earth observations. The GPL primary functions have been organized into functional laboratories including an electrical/electronics laboratory, a mechanical sciences laboratory, an experiment and test isolation laboratory, a hard data process facility, a data evaluation facility, an optical sciences laboratory, a biomedical and biosciences laboratory, and an experiment/secondary command and control center.
Apollo program experience in recovery-support communications is reviewed, and the working relationships among NASA, the Department of Defense, and commercial communications facilities are discussed. The organization, facilities, philosophy, and funding of recovery-support communications are described. The relocation of two recovery control centers is discussed, as are the functions of primary and secondary recovery ships, aircraft, and relay satellities. The possibility of using ships of opportunity for recovery operations is considered. Finally, the means by which money, manpower, and resources have been saved and longlines leased are delineated.
A battery of 11 body balance tests was administered to 7 men before and after 14 days of bedrest. Seven men who had not undergone bed rest served as controls. During bed rest, each subject underwent daily either isotonic, isometric, or no leg exercise. The results showed that, for the bed-rested no exercise, isotonic exercise, and isometric exercise groups, 2 weeks of bed rest produces significant body balance decrements on 3, 4, and 5 of the 11 tests, respectively. Daily leg exercise did not prevent the debilitating effects of bed rest on body balance. After bed rest, balance skill was relearned rapidly so that in most tests, performance had reached prebed-rest levels by the third recovery day. These data suggest that balance impairment is not due to loss of muscular strength in the legs but, perhaps, to a bed-rest-related change in the neurally coded information to postural control centers.
The activities associated with the operational aspects ot the Skylab Student Project experiments began with the participation of flight operations personnel on the National Science Teachers Association Selection Board and ended with the performance of the student experiments by the Skylab flightcrews. The operational criteria used during the compatibility analysis to determine which of the 25 national winners could be flown on board the Skylab vehicle are reviewed, the factors involved in the assignment of the experiments to Skylab missions are discussed, the activities associated with training the flightcrews in the operation of the student experiments are described, and the actual performance of the experiments during the mission and the associated ground operations in the Mission Control Center are detailed.
The specifications and functions of the Central Data Processing (CDPF) Facility which supports the Earth Observatory Satellite (EOS) are discussed. The CDPF will receive the EOS sensor data and spacecraft data through the Spaceflight Tracking and Data Network (STDN) and the Operations Control Center (OCC). The CDPF will process the data and produce high density digital tapes, computer compatible tapes, film and paper print images, and other data products. The specific aspects of data inputs and data processing are identified. A block diagram of the CDPF to show the data flow and interfaces of the subsystems is provided.
The Earth Observatory Satellite (EOS) study is summarized to show the modular design of a general purpose spacecraft, a mission peculiar segment which performs the EOS-A mission, an Operations Control Center, a Data Processing Facility, and a design for Low Cost Readout Stations. The study verified the practicality and feasibility of the modularized spacecraft with the capability of supporting many missions in the Earth Observation spectrum. The various subjects considered in the summary are: (1) orbit/launch vehicle tradeoff studies and recommendations, (2) instrument constraints and interfaces, (3) design/cost tradeoff and recommendations, (4) low cost management approach and recommendations, (5) baseline system description and specifications, and (6) space shuttle utilization and interfaces.
The goals and program of the mission are described. Operations from preflight crew training through splashdown are included. Spacecraft and launch vehicle configurations are given. The 27 joint and unilateral experiments to be performed are described. A flight plan and a schedule of activities is included, together with brief crew biographies. The ground support system is discussed; it includes control centers in Houston and Moscow, and an ATS satellite to relay ground-air-ground communications. The global tracking network and the television transmission system are also described.
Background data and study results are presented for the interim upper stage (IUS) operations phase of the IUS/tug orbital operations study. The study was conducted to develop IUS operational concepts and an IUS baseline operations plan, and to provide cost estimates for IUS operations. The approach used was to compile and evaluate baseline concepts, definitions, and system, and to use that data as a basis for the IUS operations phase definition, analysis, and costing analysis. Both expendable and reusable IUS configurations were analyzed and two autonomy levels were specified for each configuration. Topics discussed include on-orbit operations and interfaces with the orbiter, the tracking and data relay satellites and ground station support capability analysis, and flight control center sizing to support the IUS operations.
Planning data are presented for the development phases of interim upper stage (IUS) and tug systems. Major project planning requirements, major event schedules, milestones, system development and operations process networks, and relevant support research and technology requirements are included. Topics discussed include: IUS flight software; tug flight software; IUS/tug ground control center facilities, personnel, data systems, software, and equipment; IUS mission events; tug mission events; tug/spacecraft rendezvous and docking; tug/orbiter operations interface, and IUS/orbiter operations interface.
Due to the fact that remotely piloted vehicles (RPV's) are currently being flown from fixed base control centers, kinesthetic and real world peripheral vision cues are absent. The absence of these cues complicates the piloting task, particularly during the final approach and landing phase of a mission. The pilot's task is futher complicated by errors in the displayed altitude information. To determine the influence of these errors on pilot performance during the final approach and landing phase of a mission, an experiment was conducted in which pilot subjects were asked to fly a fixed base simulation of a Piper PA-30 aircraft, using degraded altitude information. For this experiment, the chevron component of the display configuration was driven by a radio altimeter. Four altimeters were used, each with a different error characteristic, but within the range specified for the Sperry series of radio altimeters. Results indicate that for range of errors considered, there is no significant difference in landing performance that can be attributed to errors in altitude information.
The operational plans for ERTS include cloud-cover forecasting as a means of preventing the limited lifetime of the spacecraft's tape recorder to be used up on useless imagery. Each day, a forecast of the cloud cover is prepared for all land areas beneath the satellite's track and some adjacent ocean areas for each of the next day's 14 passes. The forecasts are transmitted by facsimile to the ERTS Operations Control Center at 4:00 p.m. each day, where they are used to plan the next day's operations. The forecasting techniques employed are described.
A program installed in the ATSOCC on-line computer operates with attitude sensor data to produce a smoothed real-time orbit estimate. This estimate is obtained from a Kalman filter which enables the estimate to be maintained in the absence of T/M data. The results are described of analytical and numerical investigations into the sensitivity of Control Center output to the position errors resulting from the real-time estimation. The results of the numerical investigation, which used several segments of ATS-6 data gathered during the Sensor Data Acquisition run on August 19, 1974, show that the implemented system can achieve absolute position determination with an error of about 100 km, implying pointing errors of less than 0.2 deg in latitude and longitude. This compares very favorably with ATS-6 specifications of approximately 0.5 deg in latitude-longitude.