Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Certification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

Development Status of the J-2X

In June 2006, the NASA Marshall Space Flight Center (MSFC) and Pratt & Whitney Rocketdyne began development of an engine for use on the Ares I crew launch vehicle and the Ares V cargo launch vehicle. The development program will be completed in December 2012 at the end of a Design Certification Review and after certification testing of two flight configuration engines. A team of over 600 people within NASA and Pratt & Whitney Rocketdyne are currently working to prepare for the fall 2008 Critical Design Review (CDR), along with supporting an extensive risk mitigation test program. The J-2X will power the Ares I upper stage and the Ares V earth departure stage (EDS). The initial use will be in the Ares I, used to launch the Orion crew exploration vehicle. In this application, it will power the upper stage after being sent aloft on a Space Shuttle-derived. 5-segment solid rocket booster first stage. In this mission. the engine will ignite at altitude and provide the necessary acceleration force to allow the Orion to achieve orbital velocity. The Ares I upper stage, along with the J-2X. will then be expended. On the Ares V. first stage propulsion is provided by five RS-68B engines and two 5-segment boosters similar to the Ares I configuration. In the Ares V mission. the J-2X is first started to power the EDS and its payload. the Altair lunar lander. into earth orbit, then shut-down and get prepared for its next start. The EDS/Altair will remain in a parking orbit, awaiting rendezvous and docking with Orion. Once the two spacecraft are mated, the J-2X will be restarted to achieve earth departure velocity. After powering the Orion and Altair, the EDS will be expended. By using the J-2X Engine in both applications, a significant infrastructure cost savings is realized. Only one engine development is required, and the sustaining engineering and flight support infrastructures can be combined. There is also flexibility for changing, the production and flight manifest because a single production line can support both missions with minimal differences between each engine configuration kit.

Kynard, Mike↗

Mentoring SFRM: A New Approach to International Space Station Flight Controller Training

The Mission Operations Directorate (MOD) of the Johnson Space Center is responsible for providing continuous operations support for the International Space Station (ISS). Operations support requires flight controllers who are skilled in team performance as well as the technical operations of the ISS. Space Flight Resource Management (SFRM), a NASA adapted variant of Crew Resource Management (CRM), is the competency model used in the MOD. ISS flight controller certification has evolved to include a balanced focus on development of SFRM and technical expertise. The latest challenge the MOD faces is how to certify an ISS flight controller (operator) to a basic level of effectiveness in 1 year. SFRM training uses a two-pronged approach to expediting operator certification: 1) imbed SFRM skills training into all operator technical training and 2) use senior flight controllers as mentors. This paper focuses on how the MOD uses senior flight controllers as mentors to train SFRM skills. Methods: A mentor works with an operator throughout the training flow. Inserted into the training flow are guided-discussion sessions and on-the-job observation opportunities focusing on specific SFRM skills, including: situational leadership, conflict management, stress management, cross-cultural awareness, self care and team care while on-console, communication, workload management, and situation awareness. The mentor and operator discuss the science and art behind the skills, cultural effects on skills applications, recognition of good and bad skills applications, recognition of how skills application changes subtly in different situations, and individual goals and techniques for improving skills. Discussion: This mentoring program provides an additional means of transferring SFRM knowledge compared to traditional CRM training programs. Our future endeavors in training SFRM skills (as well as other organization s) may benefit from adding team performance skills mentoring. This paper explains our mentoring approach and discusses its effectiveness and future applicability in promoting SFRM/CRM skills.

Huning, Therese↗

Guidance and Control Software Project Data - Volume 1: Planning Documents

The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the planning documents from the GCS project. Volume 1 contains five appendices: A. Plan for Software Aspects of Certification for the Guidance and Control Software Project; B. Software Development Standards for the Guidance and Control Software Project; C. Software Verification Plan for the Guidance and Control Software Project; D. Software Configuration Management Plan for the Guidance and Control Software Project; and E. Software Quality Assurance Activities.

Hayhurst, Kelly J.↗

Mentoring SFRM: A New Approach to International Space Station Flight Control Training

The Mission Operations Directorate (MOD) of the Johnson Space Center is responsible for providing continuous operations support for the International Space Station (ISS). Operations support requires flight controllers who are skilled in team performance as well as the technical operations of the ISS. Space Flight Resource Management (SFRM), a NASA adapted variant of Crew Resource Management (CRM), is the competency model used in the MOD. ISS flight controller certification has evolved to include a balanced focus on development of SFRM and technical expertise. The latest challenge the MOD faces is how to certify an ISS flight controller (Operator) to a basic level of effectiveness in 1 year. SFRM training uses a twopronged approach to expediting operator certification: 1) imbed SFRM skills training into all Operator technical training and 2) use senior flight controllers as mentors. This paper focuses on how the MOD uses senior flight controllers as mentors to train SFRM skills.

Huning, Therese↗

An Analytical Assessment of NASA's N+1 Subsonic Fixed Wing Project Noise Goal

The Subsonic Fixed Wing Project of NASA's Fundamental Aeronautics Program has adopted a noise reduction goal for new, subsonic, single-aisle, civil aircraft expected to replace current 737 and A320 airplanes. These so-called 'N+1' aircraft - designated in NASA vernacular as such since they will follow the current, in-service, 'N' airplanes - are hoped to achieve certification noise goal levels of 32 cumulative EPNdB under current Stage 4 noise regulations. A notional, N+1, single-aisle, twinjet transport with ultrahigh bypass ratio turbofan engines is analyzed in this study using NASA software and methods. Several advanced noise-reduction technologies are analytically applied to the propulsion system and airframe. Certification noise levels are predicted and compared with the NASA goal.

Berton, Jeffrey J.↗

Revisiting Training and Verification Process Implementation for Risk Reduction on New Missions at NASA Jet Propulsion Laboratory

In 2003 we proposed an effort to develop a core program of standardized training and verification practices and standards against which the implementation of these practices could be measured. The purpose was to provide another means of risk reduction for deep space missions to preclude the likelihood of a repeat of the tragedies of the 1998 Mars missions. We identified six areas where the application of standards and standardization would benefit the overall readiness process for flight projects at JPL. These are Individual Training, Team Training, Interface and Procedure Development, Personnel Certification, Interface and procedure Verification, and Operations Readiness Testing. In this paper we will discuss the progress that has been made in the tasks of developing the proposed infrastructure in each of these areas. Specifically we will address the Position Training and Certification Standards that are now available for each operational position found on our Flight Operations Teams (FOT). We will also discuss the MGSS Baseline Flight Operations Team Training Plan which can be tailored for each new flight project at JPL. As these tasks have been progressing, the climate and emphasis for Training and for V and V at JPL has changed, and we have learned about the expansion, growth, and limitations in the roles of traditional positions at JPL such as the Project's Training Engineer, V and V Engineer, and Operations Engineer. The need to keep a tight rein on budgets has led to a merging and/or reduction in these positions which pose challenges to individual capacities and capabilities. We examine the evolution of these processes and the roles involved while taking a look at the impact or potential impact of our proposed training related infrastructure tasks. As we conclude our examination of the changes taking place for new flight projects, we see that the importance of proceeding with our proposed tasks and adapting them to the changing climate remains an important element in reducing the risk in the challenging business of space exploration.

verifications↗

Small Airframe Manufacturer's Icing Perspective

This viewgraph presentation describes the icing effects, risk mitigation practices, and icing certifications for various Cessna small aircraft models. NASA's role in the development of simulation tools for icing certifications is also discussed.

Hoppins, Jim↗

Replacement/Refurbishment of JSC/NASA POD Specimens

The NASA Special NDE certification process requires demonstration of NDE capability by test per NASA-STD-5009. This test is performed with fatigue cracked specimens containing very small cracks. The certification test results are usually based on binomial statistics and must meet a 90/95 Probability of Detection (POD). The assumption is that fatigue cracks are tightly closed, difficult to detect, and inspectors and processes passing such a test are well qualified for inspecting NASA fracture critical hardware. The JSC NDE laboratory has what may be the largest inventory that exists of such fatigue cracked NDE demonstration specimens. These specimens were produced by the hundreds in the late 1980s and early 1990s. None have been produced since that time and the condition and usability of the specimens are questionable.

Castner, Willard L.↗

Planning for Plume Diagnostics for Ground Testing of J-2X Engines at the SSC

John C. Stennis Space Center (SSC) is the premier test facility for liquid rocket engine development and certification for the National Aeronautics and Space Administration (NASA). Therefore, it is no surprise that the SSC will play the most prominent role in the engine development testing and certification for the J-2X engine. The Pratt & Whitney Rocketdyne J-2X engine has been selected by the Constellation Program to power the Ares I Upper Stage Element and the Ares V Earth Departure Stage in NASA s strategy of risk mitigation for hardware development by building on the Apollo program and other lessons learned to deliver a human-rated engine that is on an aggressive development schedule, with first demonstration flight in 2010 and human test flights in 2012. Accordingly, J-2X engine design, development, test, and evaluation is to build upon heritage hardware and apply valuable experience gained from past development and testing efforts. In order to leverage SSC s successful and innovative expertise in the plume diagnostics for the space shuttle main engine (SSME) health monitoring,1-10 this paper will present a blueprint for plume diagnostics for various proposed ground testing activities for J-2X at SSC. Complete description of the SSC s test facilities, supporting infrastructure, and test facilities is available in Ref. 11. The A-1 Test Stand is currently being prepared for testing the J-2X engine at sea level conditions. The A-2 Test Stand is currently being used for testing the SSME and may also be used for testing the J-2X engine at sea level conditions in the future. Very recently, ground-breaking ceremony for the new A-3 rocket engine test stand took place at SSC on August 23, 2007. A-3 is the first large - scale test stand to be built at the SSC since the A and B stands were constructed in the 1960s. The A-3 Test Stand will be used for testing J-2X engines under vacuum conditions simulating high altitude operation at approximately 30,480 m (100,000 ft). To achieve the simulated altitude environment, chemical steam generators using isopropyl alcohol, LOX, and RELEASED - Printed documents may be obsolete; validate prior to use. water would run for the duration of the test and would generate approximately 2096 Kg/s of steam to reduce pressure in the test cell and downstream of the engine. The testing at the A-3 Test Stand is projected to begin in late 2010, meanwhile the J-2X component testing on A-1 is scheduled to begin later this year.

SaintCyr, William W.↗

An Analytical Assessment of NASA's N(+)1 Subsonic Fixed Wing Project Noise Goal

The Subsonic Fixed Wing Project of NASA s Fundamental Aeronautics Program has adopted a noise reduction goal for new, subsonic, single-aisle, civil aircraft expected to replace current 737 and A320 airplanes. These so-called "N+1" aircraft--designated in NASA vernacular as such since they will follow the current, in-service, "N" airplanes--are hoped to achieve certification noise goal levels of 32 cumulative EPNdB under current Stage 4 noise regulations. A notional, N+1, single-aisle, twinjet transport with ultrahigh bypass ratio turbofan engines is analyzed in this study using NASA software and methods. Several advanced noise-reduction technologies are empirically applied to the propulsion system and airframe. Certification noise levels are predicted and compared with the NASA goal.

Berton, Jeffrey J.↗

NASA Human-Rating Requirements

NASA's Procedural Requirements 87052B defines the Human-Rating Certification process and related technical requirements for human spaceflight programs developed by and for NASA. The document specifies Agency-level responsibilities related to the certification, processes to be established by the program, and technical requirements.

Groen, Frank↗

History and Benefits of Engine Level Testing Throughout the Space Shuttle Main Engine Program

Rocket engine testing is important throughout a program s life and is essential to the overall success of the program. Space Shuttle Main Engine (SSME) testing can be divided into three phases: development, certification, and operational. Development tests are conducted on the basic design and are used to develop safe start and shutdown transients and to demonstrate mainstage operation. This phase helps form the foundation of the program, demands navigation of a very steep learning curve, and yields results that shape the final engine design. Certification testing involves multiple engine samples and more aggressive test profiles that explore the boundaries of the engine to vehicle interface requirements. The hardware being tested may have evolved slightly from that in the development phase. Operational testing is conducted with mature hardware and includes acceptance testing of flight assets, resolving anomalies that occur in flight, continuing to expand the performance envelope, and implementing design upgrades. This paper will examine these phases of testing and their importance to the SSME program. Examples of tests conducted in each phase will also be presented.

VanHooser, Katherine↗

Marshall Application Realignment System (MARS) Architecture

The Marshall Application Realignment System (MARS) Architecture project was established to meet the certification requirements of the Department of Defense Architecture Framework (DoDAF) V2.0 Federal Enterprise Architecture Certification (FEAC) Institute program and to provide added value to the Marshall Space Flight Center (MSFC) Application Portfolio Management process. The MARS Architecture aims to: (1) address the NASA MSFC Chief Information Officer (CIO) strategic initiative to improve Application Portfolio Management (APM) by optimizing investments and improving portfolio performance, and (2) develop a decision-aiding capability by which applications registered within the MSFC application portfolio can be analyzed and considered for retirement or decommission. The MARS Architecture describes a to-be target capability that supports application portfolio analysis against scoring measures (based on value) and overall portfolio performance objectives (based on enterprise needs and policies). This scoring and decision-aiding capability supports the process by which MSFC application investments are realigned or retired from the application portfolio. The MARS Architecture is a multi-phase effort to: (1) conduct strategic architecture planning and knowledge development based on the DoDAF V2.0 six-step methodology, (2) describe one architecture through multiple viewpoints, (3) conduct portfolio analyses based on a defined operational concept, and (4) enable a new capability to support the MSFC enterprise IT management mission, vision, and goals. This report documents Phase 1 (Strategy and Design), which includes discovery, planning, and development of initial architecture viewpoints. Phase 2 will move forward the process of building the architecture, widening the scope to include application realignment (in addition to application retirement), and validating the underlying architecture logic before moving into Phase 3. The MARS Architecture key stakeholders are most interested in Phase 3 because this is where the data analysis, scoring, and recommendation capability is realized. Stakeholders want to see the benefits derived from reducing the steady-state application base and identify opportunities for portfolio performance improvement and application realignment.

Belshe, Andrea↗

The Right Stuff: A Look Back at Three Decades of Flight Controller Training for Space Shuttle Mission Operations

This paper will summarize the thirty-year history of Space Shuttle operations from the perspective of training in NASA Johnson Space Center's Mission Control Center. It will focus on training and development of flight controllers and instructors, and how training practices have evolved over the years as flight experience was gained, new technologies developed, and programmatic needs changed. Operations of human spaceflight systems is extremely complex, therefore the training and certification of operations personnel is a critical piece of ensuring mission success. Mission Control Center (MCC-H), at the Lyndon B. Johnson Space Center, in Houston, Texas manages mission operations for the Space Shuttle Program, including the training and certification of the astronauts and flight control teams. This paper will give an overview of a flight control team s makeup and responsibilities during a flight, and details on how those teams are trained and certified. The training methodology for developing flight controllers has evolved significantly over the last thirty years, while the core goals and competencies have remained the same. In addition, the facilities and tools used in the control center have evolved. These changes have been driven by many factors including lessons learned, technology, shuttle accidents, shifts in risk posture, and generational differences. Flight controllers will share their experiences in training and operating the Space Shuttle throughout the Program s history. A primary method used for training Space Shuttle flight control teams is by running mission simulations of the orbit, ascent, and entry phases, to truly "train like you fly." The audience will learn what it is like to perform a simulation as a shuttle flight controller. Finally, we will reflect on the lessons learned in training for the shuttle program, and how those could be applied to future human spaceflight endeavors.

Dittemore, Gary D.↗

Comparative Measurements of Earth and Martian Entry Environments in the NASA Langley HYMETS Facility

Arc-jet facilities play a major role in the development of heat shield materials for entry vehicles because they are capable of producing representative high-enthalpy flow environments. Arc-jet test data is used to certify material performance for a particular mission and to validate or calibrate models of material response during atmospheric entry. Materials used on missions entering Earth s atmosphere are certified in an arc-jet using a simulated air entry environment. Materials used on missions entering the Martian atmosphere should be certified in an arc-jet using a simulated Martian atmosphere entry environment, which requires the use of carbon dioxide. Carbon dioxide has not been used as a test gas in a United States arc-jet facility since the early 1970 s during the certification of materials for the Viking Missions. Materials certified for the Viking missions have been used on every entry mission to Mars since that time. The use of carbon dioxide as a test gas in an arc-jet is again of interest to the thermal protection system community for certification of new heat shield materials that can increase the landed mass capability for Mars bound missions beyond that of Viking and Pathfinder. This paper describes the modification, operation, and performance of the Hypersonic Materials Environmental Test System (HYMETS) arc-jet facility with carbon dioxide as a test gas. A basic comparison of heat fluxes, various bulk properties, and performance characteristics for various Earth and Martian entry environments in HYMETS is provided. The Earth and Martian entry environments consist of a standard Earth atmosphere, an oxygen-rich Earth atmosphere, and a simulated Martian atmosphere. Finally, a preliminary comparison of the HYMETS arc-jet facility to several European plasma facilities is made to place the HYMETS facility in a more global context of arc-jet testing capability.

Splinter, Scott C.↗

The Right Stuff: A Look Back at Three Decades of Flight Controller Training for Space Shuttle Mission Operations

Operations of human spaceflight systems is extremely complex, therefore the training and certification of operations personnel is a critical piece of ensuring mission success. Mission Control Center (MCC-H), at the Lyndon B. Johnson Space Center, in Houston, Texas manages mission operations for the Space Shuttle Program, including the training and certification of the astronauts and flight control teams. This paper will give an overview of a flight control team s makeup and responsibilities during a flight, and details on how those teams are trained and certified. The training methodology for developing flight controllers has evolved significantly over the last thirty years, while the core goals and competencies have remained the same. In addition, the facilities and tools used in the control center have evolved. These changes have been driven by many factors including lessons learned, technology, shuttle accidents, shifts in risk posture, and generational differences. Flight controllers will share their experiences in training and operating the Space Shuttle throughout the Program s history. A primary method used for training Space Shuttle flight control teams is by running mission simulations of the orbit, ascent, and entry phases, to truly "train like you fly." The reader will learn what it is like to perform a simulation as a shuttle flight controller. Finally, the paper will reflect on the lessons learned in training for the shuttle program, and how those could be applied to future human spaceflight endeavors. These endeavors could range from going to the moon or to Mars. The lessons learned from operating the space shuttle for over thirty years will help the space industry build the next human transport space vehicle and inspire the next generation of space explorers.

Dittemore, Gary D.↗

The Final Count Down: A Review of Three Decades of Flight Controller Training Methods for Space Shuttle Mission Operations

Operations of human spaceflight systems is extremely complex, therefore the training and certification of operations personnel is a critical piece of ensuring mission success. Mission Control Center (MCC-H), at the Lyndon B. Johnson Space Center, in Houston, Texas manages mission operations for the Space Shuttle Program, including the training and certification of the astronauts and flight control teams. As the space shuttle program ends in 2011, a review of how training for STS-1 was conducted compared to STS-134 will show multiple changes in training of shuttle flight controller over a thirty year period. This paper will additionally give an overview of a flight control team s makeup and responsibilities during a flight, and details on how those teams have been trained certified over the life span of the space shuttle. The training methods for developing flight controllers have evolved significantly over the last thirty years, while the core goals and competencies have remained the same. In addition, the facilities and tools used in the control center have evolved. These changes have been driven by many factors including lessons learned, technology, shuttle accidents, shifts in risk posture, and generational differences. A primary method used for training Space Shuttle flight control teams is by running mission simulations of the orbit, ascent, and entry phases, to truly "train like you fly." The reader will learn what it is like to perform a simulation as a shuttle flight controller. Finally, the paper will reflect on the lessons learned in training for the shuttle program, and how those could be applied to future human spaceflight endeavors.

Dittemore, Gary D.↗

The Development of a CO2 Test Capability in the NASA JSC ARCJet for Mars Reentry Simulation

The Atmospheric Reentry Materials and Structures Evaluation Facility (ARMSEF) located at NASA Johnson Space Center is used for simulating the extreme environment experienced upon reentry for the development and certification of thermal protection systems (TPS). The facility supports a large variety of programs and was heavily leveraged for the certification and operational support of the TPS for the Orbiter and, more recently, the development of the heat shield for CEV. This paper will provide more detail into the heritage of the facility. Unique attributes of the facility include a modular aerodynamically stabilized arc heater and independently controlled O2 and N2 for the test gases. When combining the O2 and N2 in a 23:77 mass ratio respectively the Earth s atmosphere is accurately simulated and via modification of this ratio the investigation of the effects of atomic oxygen on a material s response is possible. In the summer of 2010 a development effort was started to add CO2 as a third independently controlled test gas such that, when combined with N2, opens up the possibility of accurately simulating a Martian reentry environment. This paper will discuss the test facility, especially the arc heater, in more detail. Initial testing involved relatively low concentrations of CO2 combined with N2 for the primary purpose of gathering data to answer two pressing safety concerns. The first being the rate of production of carbon monoxide (CO) within the ejector vacuum system. The main concern was that CO can be flammable and possibly explosive at high enough concentrations and pressures. The hazard control during the development phase involved the use of injecting N2 inside the test chamber diffuser to dilute and reduce the concentration of any and all CO present. A residual gas analyzer (RGA) was used to determine the relative amount of CO in the exhaust gas and provide a conversion rate of CO2 to CO. This paper will discuss in more detail the results of the RGA data and the calculated conversion rate. The second safety concern addressed is the possible formation of hydrogen cyanide (HCN) and cyanide (CN). HCN would primarily be present in the cooling water while the CN would most probably condense onto the interior surfaces of the test chamber. Water samples and wipes of the test chamber surfaces were analyzed by an industrial hygienist for the presence of HCN and CN. His paper will discuss these results in more detail. Throughout this development effort measurements of the CO2:N2 flowfield were made with heat flux and pressure probes and with laser induced fluorescence (LIF) of the atomic oxygen. This paper will discuss these results

DelPapa, Steven V.↗