Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CONTRACTION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

From Partial to Global Assume-Guarantee Contracts: Compositional Realizability Analysis in FRET

Realizability checking refers to the formal procedure that aims to determine whether an implementation exists, always complying to a set of requirements, regardless of the stimuli provided by the system’s environment. Such a check is essential to ensure that the specification does not allow behavior that can force the system to violate safety constraints. In this paper, we present an approach that decomposes realizability checking into smaller, more tractable problems. More specifically, our approach automatically partitions specifications into sets of non-interfering requirements. We prove that checking whether a specification is realizable reduces to checking that each partition is realizable.We have integrated realizability checking and implemented our decomposition approach within the open-source Formal Requirements ElicitationTool (FRET). A FRET user may check the realizability of a specification monolithically or compositionally. We evaluate our approach by comparing monolithic and compositional checking and showcase the strengths of our decomposition approach on a variety of industrial-level case studies

Anastasia Mavridou↗

Summary of The Contracted Deliveries of Nasa Payloads to the Moon via Commercial Lunar Payload Services (CLPS)

NASA’s Commercial Lunar Payload Services (CLPS) initiative allows rapid acquisition of lunar delivery services from US companies for payloads that advance capabilities for scientific, technological, or commercial development of the Moon [1]. In conjunction with instrument development efforts within NASA, academia, and international partners, a considerable variety of payloads have been delivered to CLPS vendors or a rein the process of development. Note: Document attach contains extended abstract.

Paul B Niles↗

DOE ZERH Case Study: Greenhill Contracting, Green Acres #20, #26, #28, New Paltz, NY

Case study of three DOE 2015 Housing Innovation Award winning custom homes in the cold climate that got a HERS of 26, 28, and 26 without PV or -3, -1, and -3.5 with PV; with R-22 ICFs, 10” ocsf plus 2.7” c ccsf in attic; ICF basements with 4.3” ccsf under slab; tri;e-pane windows; ERVs, ground source heat pumps (COP 5.7).

Building America↗