Wind Energy Management System EMS Integration Project: Incorporating Wind Generation and Load Forecast Uncertainties into Power Grid Operations

The power system balancing process, which includes the scheduling, real time dispatch (load following) and regulation processes, is traditionally based on deterministic models. Since the conventional generation needs time to be committed and dispatched to a desired megawatt level, the scheduling and load following processes use load and wind and solar power production forecasts to achieve future balance between the conventional generation and energy storage on the one side, and system load, intermittent resources (such as wind and solar generation), and scheduled interchange on the other side. Although in real life the forecasting procedures imply some uncertainty around the load and wind/solar forecasts (caused by forecast errors), only their mean values are actually used in the generation dispatch and commitment procedures. Since the actual load and intermittent generation can deviate from their forecasts, it becomes increasingly unclear (especially, with the increasing penetration of renewable resources) whether the system would be actually able to meet the conventional generation requirements within the look-ahead horizon, what the additional balancing efforts would be needed as we get closer to the real time, and what additional costs would be incurred by those needs. To improve the system control performance characteristics, maintain system reliability, and minimize expenses related to the system balancing functions, it becomes necessary to incorporate the predicted uncertainty ranges into the scheduling, load following, and, in some extent, into the regulation processes. It is also important to address the uncertainty problem comprehensively by including all sources of uncertainty (load, intermittent generation, generators’ forced outages, etc.) into consideration. All aspects of uncertainty such as the imbalance size (which is the same as capacity needed to mitigate the imbalance) and generation ramping requirement must be taken into account. The latter unique features make this work a significant step forward toward the objective of incorporating of wind, solar, load, and other uncertainties into power system operations. Currently, uncertainties associated with wind and load forecasts, as well as uncertainties associated with random generator outages and unexpected disconnection of supply lines, are not taken into account in power grid operation. Thus, operators have little means to weigh the likelihood and magnitude of upcoming events of power imbalance. In this project, funded by the U.S. Department of Energy (DOE), a framework has been developed for incorporating uncertainties associated with wind and load forecast errors, unpredicted ramps, and forced generation disconnections into the energy management system (EMS) as well as generation dispatch and commitment applications. A new approach to evaluate the uncertainty ranges for the required generation performance envelope including balancing capacity, ramping capability, and ramp duration has been proposed. The approach includes three stages: forecast and actual data acquisition, statistical analysis of retrospective information, and prediction of future grid balancing requirements for specified time horizons and confidence levels. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on a histogram analysis, incorporating all sources of uncertainties of both continuous (wind and load forecast errors) and discrete (forced generator outages and start-up failures) nature. A new method called the “flying brick” technique has been developed to evaluate the look-ahead required generation performance envelope for the worst case scenario within a user-specified confidence level. A self-validation algorithm has been developed to validate the accuracy of the confidence intervals.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluating the Grid Impact of Oregon Offshore Wind [Slides]

This analysis used high-resolution offshore wind data and a detailed production cost model (PCM) of the Western Interconnection to explore the value and operational impact of integrating offshore wind along Oregon's coastline. Leveraging local technical stakeholder expertise and input, we determined a set of scenarios to explore. These scenarios vary both offshore wind capacities and the Western Interconnection generation and transmission infrastructure. From the scenario modeling and analysis, we identified the following key findings. In addition, we simulated a subset of the scenarios for a range of historical weather years (2007-2013), to understand the robustness of our findings to different weather conditions. Trans-coastal transmission constraints and congestion are the key drivers to the curtailment of Oregon offshore wind. Once power can be delivered into the Willamette Valley, there are few system constraints that lead to a significant curtailment of offshore wind off the coast of Oregon. Approximately 2.6 GW of installed offshore wind capacity can be integrated into Oregon's power system without major upgrades to trans-coastal transmission while avoiding significant curtailment. The system value provided by offshore wind ranges between $\$65$ /MWh and $\$85$ /MWh across the various scenarios considered. Offshore wind heavily influences the flow of the cross Cascade transmission. Across all scenarios, we found a robust relationship of approximately 500-550 MW decrease in the hourly flow of the cross Cascade transmission for every 1,000 MW of hourly offshore wind generation. However, we also found there was not a strong relationship between the highest cross-Cascade transmission flow hours and high offshore wind generation, limiting the extent to which offshore wind can be considered a non-wires alternative to cross cascade transmission. Depending on the meteorological year, 880-1,580 MW and 1,650-3,100 MW can be counted on to serve coastal loads with 2.6 GW and 5 GW of offshore wind capacity, respectively. Offshore wind allows for more optimal daily and hourly scheduling of hydropower, while still complying with various technical and regulatory constraints on the water resource. Oregon offshore wind has the potential to contribute to the evening net load peak in California (i.e., mitigate duck curve challenges), however transmission congestion between California and Oregon limits this contribution. Co-located storage at the point of interconnection for offshore wind reduces curtailment when trans-coastal transmission is not upgraded, providing a non-wires alternative to increase offshore wind capacity beyond 2.6 GW.

17 WIND ENERGY↗

Pawnee Nation Energy Option Analyses

In 2003, the Pawnee Nation leadership identified the need for the tribe to comprehensively address its energy issues. During a strategic energy planning workshop a general framework was laid out and the Pawnee Nation Energy Task Force was created to work toward further development of the tribe’s energy vision. The overarching goals of the “first steps” project were to identify the most appropriate focus for its strategic energy initiatives going forward, and to provide information necessary to take the next steps in pursuit of the “best fit” energy options. Based on the request of Pawnee Nation’s Energy Task Force the research team, consisting Tribal personnel and Summit Blue Consulting, focused on a review of renewable energy resource development potential, funding sources and utility organizational along with energy savings options. Elements of the energy demand forecasting and characterization and demand side options review remained in the scope of work, but were only addressed at a high level. Description of Activities Performed Renewable Energy Resource Development Potential The research team reviewed existing data pertaining to the availability of biomass (focusing on woody biomass, agricultural biomass/bio-energy crops, and methane capture), solar, wind and hydropower resources on the Pawnee-owned lands. Using these data, combined with assumptions about costs and revenue streams, the research team performed preliminary feasibility assessments for each resource category. The research team also reviewed available funding resources and made recommendations to Pawnee Nation highlighting those resources with the greatest potential for financially-viable development, both in the near-term and over a longer time horizon. Energy Efficiency Options While this was not a major focus of the project, the research team highlighted common strategies for reducing energy use in buildings. The team also discussed the benefits of adopting a building energy code and introduced two model energy codes Pawnee Nation should consider for adoption. Summary of Current and Expected Future Electricity Usage The research team provided a summary overview of electricity usage patterns in current buildings and included discussion of known plans for new construction. Utility Options Review Pawnee Nation electric utility options were analyzed through a four-phase process, which included: 1) summarizing the relevant utility background information; 2) gathering relevant utility assessment data; 3) developing a set of realistic Pawnee electric utility service options, and 4) analyzing the various Pawnee electric utility service options for the Pawnee Energy Team’s consideration. III. Findings and Recommendations Due to a lack of financial incentives for renewable energy, particularly at the state level, combined mediocre renewable energy resources, renewable energy development opportunities are limited for Pawnee Nation. However, near-term potential exists for development of solar hot water at the gym, and an exterior wood-fired boiler system at the tribe’s main administrative building. Pawnee Nation should also explore options for developing LFGTE resources in collaboration with the City of Pawnee. Significant potential may also exist for development of bio-energy resources within the next decade. Pawnee Nation representatives should closely monitor market developments in the bio-energy industry, establish contacts with research institutions with which the tribe could potentially partner in grant-funded research initiatives. In addition, a substantial effort by the Kaw and Cherokee tribes is underway to pursue wind development at the Chilocco School Site in northern Oklahoma where Pawnee is a joint landowner. Pawnee Nation representatives should become actively involved in these development discussions and should explore the potential for joint investment in wind development at the Chilocco site.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Western Energy Corridor -- Energy Resource Report

The world is facing significant growth in energy demand over the next several decades. Strategic in meeting this demand are the world-class energy resources concentrated along the Rocky Mountains and northern plains in Canada and the U.S., informally referred to as the Western Energy Corridor (WEC). The fossil energy resources in this region are rivaled only in a very few places in the world, and the proven uranium reserves are among the world's largest. Also concentrated in this region are renewable resources contributing to wind power, hydro power, bioenergy, geothermal energy, and solar energy. Substantial existing and planned energy infrastructure, including refineries, pipelines, electrical transmission lines, and rail lines provide access to these resources.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Renewable Energy Assessment Methodology for Japanese OCONUS Army Installations

Since 2005, Pacific Northwest National Laboratory (PNNL) has been asked by Installation Management Command (IMCOM) to conduct strategic assessments at selected US Army installations of the potential use of renewable energy resources, including solar, wind, geothermal, biomass, waste, and ground source heat pumps (GSHPs). IMCOM has the same economic, security, and legal drivers to develop alternative, renewable energy resources overseas as it has for installations located in the US. The approach for continental US (CONUS) studies has been to use known, US-based renewable resource characterizations and information sources coupled with local, site-specific sources and interviews. However, the extent to which this sort of data might be available for outside the continental US (OCONUS) sites was unknown. An assessment at Camp Zama, Japan was completed as a trial to test the applicability of the CONUS methodology at OCONUS installations. It was found that, with some help from Camp Zama personnel in translating and locating a few Japanese sources, there was relatively little difficulty in finding sources that should provide a solid basis for conducting an assessment of comparable depth to those conducted for US installations. Project implementation will likely be more of a challenge, but the feasibility analysis will be able to use the same basic steps, with some adjusted inputs, as PNNL’s established renewable resource assessment methodology.

09 BIOMASS FUELS↗

Stochastic Methods Applied to Power System Operations with Renewable Energy: A Review

Renewable energy resources have been rapidly integrated into power systems in many parts of the world, contributing to a cleaner and more sustainable supply of electricity. Wind and solar resources also introduce new challenges for system operations and planning in terms of economics and reliability because of their variability and uncertainty. Operational strategies based on stochastic optimization have been developed recently to address these challenges. In general terms, these stochastic strategies either embed uncertainties into the scheduling formulations (e.g., the unit commitment [UC] problem) in probabilistic forms or develop more appropriate operating reserve strategies to take advantage of advanced forecasting techniques. Other approaches to address uncertainty are also proposed, where operational feasibility is ensured within an uncertainty set of forecasting intervals. In this report, a comprehensive review is conducted to present the state of the art through Spring 2015 in the area of stochastic methods applied to power system operations with high penetration of renewable energy. Chapters 1 and 2 give a brief introduction and overview of power system and electricity market operations, as well as the impact of renewable energy and how this impact is typically considered in modeling tools. Chapter 3 reviews relevant literature on operating reserves and specifically probabilistic methods to estimate the need for system reserve requirements. Chapter 4 looks at stochastic programming formulations of the UC and economic dispatch (ED) problems, highlighting benefits reported in the literature as well as recent industry developments. Chapter 5 briefly introduces alternative formulations of UC under uncertainty, such as robust, chance-constrained, and interval programming. Finally, in Chapter 6, we conclude with the main observations from our review and important directions for future work.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Policy and Regulatory Environment for Utility-Scale Energy Storage: Bangladesh

Bangladesh has experienced significant economic growth and poverty reduction over the past several decades. Recognizing the central role electricity plays in economic development, the Government of Bangladesh (GOB) has established policies to accelerate the growth of the electric power sector. The Bangladesh power grid is transforming into one marked by declining reliance on domestic natural gas reserves and oil-based rental power plants, increasing renewable energy contribution, and shifting demand patterns. The GOB is now reconsidering its prior plans to increase the share of coal capacity in the generation mix to meet demand, shifting its focus instead to electricity imports from neighboring countries, nuclear generation, liquified natural gas imports, and domestic renewable resources such as wind and solar. However, investments in the transmission and distribution system, as well as ancillary services, have not kept pace with investments in generation resources over the past decade. Thus, Bangladesh electricity consumers still experience outages and poor power quality despite adequate installed capacity. On the demand side, population growth and industrialization have fueled steady growth in electricity consumption as efforts to expand access to electricity enabled near-universal electricity access by mid-2020. The combined changes in the mix of generation resources and patterns of electricity demand present new challenges and opportunities in operating and maintaining a reliable power system. Energy storage has the potential to help meet these challenges and accelerate Bangladesh’s energy transition. Declining costs for some energy storage technologies make them increasingly cost-effective solutions to provide a wide range of grid services. Previous analyses of energy storage in the region have identified several potential applications for storage at the bulk system level, including energy arbitrage, ancillary services, and transmission network support. The potential for storage to meet these needs depends on many factors, including physical characteristics of the power system and the policy and regulatory environments in which these energy storage assets would operate. This report applies an Energy Storage Readiness Assessment the National Renewable Energy Laboratory developed for policy makers and regulators to identify priority areas of focus as they continue to develop the appropriate suite of policies, programs, and regulations to enable storage deployment. This assessment uses a simple evaluation scheme to identify the barriers and opportunities for utility-scale energy storage within Bangladesh’s policy and regulatory environment.

24 POWER TRANSMISSION AND DISTRIBUTION↗

PUEBLO OF ZIA RENEWABLE ENERGY DEVELOPMENT FEASIBILITY STUDY

The Pueblo of Zia will conduct a comprehensive feasibility study for best-use application(s) for development of renewable energy resources on its tribally held TRUST lands (i.e., Trust Lands of Zia Indian Reservation). The feasibility study is essential for determining the technical and economic viability of a future renewable project(s) on Zia tribal lands, including the potential economic and environmental benefits for the Tribe. Project Objectives: The feasibility study is essential for determining the technical and economic viability of future renewable project(s) on Zia tribal lands, including the potential economic and environmental benefits for the Tribe to: 1. Provide a balanced local renewable power supply for Zia Pueblo, its members, tribal offices, schools and buildings, and businesses on tribal lands 2. Provide a firm power supply for export and commercial market distribution 3. Provide economic development for the Tribe and its members, including job training and creation, each in accordance with the goals and objectives as conveyed by the Pueblo of Zia Tribal Council, Tribal Administration, and outlined in The Pueblo of Zia Comprehensive Plan and Pueblo of Zia — Zia Enterprise Zone Master Plan. A key goal of the study is to analyze the integrated development of solar, geothermal, and wind renewable energy resources at Zia Pueblo, with added potential to combine gas-fired generation to accomplish energy firming. Geothermal offers a base load source of energy, providing power continuously for end users. Wind and solar offer intermediate and peaking sources of energy, which can be harvested throughout the day, with periods of variable but predicable output. Variability will be managed in an integrated manner, using Zia Pueblo's combined renewable resources to generate high-quality power. Tasks are intended to collect, catalog, map, and analyze existing data on Zia Pueblo's renewable energy resource base and then match resource attributes with the most suitable renewable technologies for tribal energy consumption and needs. Also, key impacts on cultural and social values of Zia Pueblo will be addressed. Selected most favorable uses and technologies will be further investigated to determine initial feasibility and market for business development for up to six sites located on tribal land. The anticipated result will be the recommended development of sites that have sufficient background study completed to warrant a business plan, detailed engineering feasibility, and acquisition of project financing. Valuable technical and economic information will accrue from this study that may be applied to scale up or down the various power technology potential on Zia Pueblo for maximum benefit and best area(s) of application, project phasing and potential for future replicability and expansion.

14 SOLAR ENERGY↗

An Evaluation of Electricity Net Load Profiles and the Baseload Generation Concept

This paper investigates the amount of baseload generation that would be displaced due to renewable resources being implemented to meet state renewable portfolio standards (RPS) in the following regions: the Midwest Independent System Operator (MISO), the PJM regional transmission organization (RTO), the Electric Reliability Council of Texas (ERCOT), and the California ISO (CAISO). Modeling of these regions was done in Promod, a security constrained economic dispatch (SCED) model, for the years 2016-2030, to compare scenarios with and without the two primary intermittent renewable resources (solar and wind) attributable to the RPS regulations implemented in each state. In addition, a new statistical approach was developed for evaluating the variability in net load shapes caused by these two intermittent resources. The load variability index (LVI) was developed to apply to the hourly net load profiles for each day as a means of comparing variability in net loads.

14 SOLAR ENERGY↗

Small Wind Information (Postcard)

The U.S. Department of Energy's Wind Powering America initiative maintains a website section devoted to information about small wind turbines for homeowners, ranchers, and small businesses. This postcard is a marketing piece that stakeholders can provide to interested parties; it will guide them to this online resource.

17 WIND ENERGY↗

Assessment of Wind/Solar Co-located Generation in Texas

This paper evaluates the opportunity to load co-located wind and solar generation capacity onto a constrained transmission system while engendering only minimal losses. It quantifies the economic and energy opportunities and costs associated with pursuing this strategy in two Texas locations one in west Texas and the other in south Texas. The study builds upon previous work published by the American Solar Energy Society (ASES) which illuminated the potential benefits of negative correlation of wind and solar generation in some locations by quantifying the economic and energy losses which would arise from deployment of solar generation in areas with existing wind generation and constrained transmission capacity. Clean Energy Associates (CEA) obtained and incorporated wind and solar resource data and the Electric Reliability Council of Texas (ERCOT)) load and price data into a model which evaluates varying levels of solar thermal, solar photovoltaic (PV) and wind capacity against an assumed transmission capacity limit at each of the two locations.

14 SOLAR ENERGY↗

Transmission Planning Studies for the Renewable Energy Zone (REZ) Process

Transmission planning studies help practitioners identify the most attractive transmission options to cost-effectively connect Renewable Energy Zones (REZs) to load while sustaining the balance between generation and demand in a variety of potential operating conditions and yielding the most benefits at minimum cost. This document focuses on the transmission planning studies of the REZ Transmission Planning process to help practitioners understand the analyses involved in studying potential transmission upgrade and expansion options, the general data requirements, and the associated modeling considerations. The REZ process is an approach to plan, approve, and build transmission infrastructure that connects REZs - geographic areas that have high-quality RE resources, suitable topography and land-use designations, and demonstrated developer interest - to the power system. The REZ process helps to increase the share of solar photovoltaic (PV), wind, and other resources while also maintaining reliability and economics.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

NREL - GE 1.5MW SLE Wind Turbine / Reviewed Data

This dataset is intended to be a public resource for anyone conducting wind turbine noise research. It contains noise spectra and equivalent sound pressure levels at 11 measurement stations. The dataset also contains wind turbine operational data and meteorological data from a met mast directly upstream of the wind turbine.

17 WIND ENERGY↗

Hybrid power plants: An effective way of decreasing loss-of-load expectation

Diversifying variable renewable resources by combining wind, solar photovoltaic, and battery assets in a hybrid power plant can increase renewable energy usage efficiency and improve system flexibility, particularly in distributed energy systems. However, the resilience impact of these systems, particularly outage mitigation, can be difficult to quantify due to uncertainty in resource, energy demand, and outage occurrence. Here, this study outlines a framework to quantify the incremental benefit of hybrid power plant assets for reducing loss-of-load expectation during random outage events. Hybrid power plant performance during outages (considering varying duration and severity) is simulated using a Monte Carlo methodology to reflect uncertainty associated with renewable resource, load demand, and outage timing. Results demonstrate the additional incremental value from increasingly hybrid designs, in which relative capacities of wind, solar photovoltaic, and storage assets contribute to lower loss-of-load expectation than the constituent technologies would alone. The value of added wind or solar capacity increases as the plant composition approaches an equal split. The value of added battery capacity depends on the outage duration and severity, but the first 50 MWh of added storage capacity is the most valuable for reducing the loss-of-load expectation for all plant designs.

14 SOLAR ENERGY↗

Why Are We Talking About Capacity Markets?

Revenue sufficiency or 'missing money' concerns in wholesale electricity markets are important because they could lead to resource (or capacity) adequacy shortfalls. Capacity markets or other capacity-based payments are among the proposed solutions to remedy these challenges. This presentation provides a high-level overview of the importance of and process for ensuring resource adequacy, and then discusses considerations for capacity markets under futures with high penetrations of variable resources such as wind and solar.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Role of Renewable Energy, Storage, and Demand Response in Karnataka's Power Sector Future

Karnataka ranks fourth among Indian states in installed capacity of renewable energy, which accounts for over 50% of its resource mix. The state is positioned to play a leading role in India's energy transition and contribute to meeting national targets for renewable energy thanks, in part, to ambitious state goals to develop Karnataka's abundant zero carbon energy resources and plans to phase out new investments in thermal plants. Power system stakeholders in Karnataka are faced with the challenge of planning a generation portfolio that accounts for the variability of wind and solar resources, meets increasing and shifting electricity demand, and satisfies operational and reliability requirements. The objective of this study is to evaluate least-cost pathways for Karnataka's electric power system through 2050. The capacity expansion model developed for this study identifies power system investment and operational decisions for every year (2020-2050) for all of India, with detailed representation of the state of Karnataka. The study led to five high-level results and provides a framework for recurring planning studies to meet changing system conditions and needs.