Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “transaction”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

Enabling Evaluation of a Southern Company Distribution Feeder on NREL ADMS Test Bed: Cooperative Research and Development (Final Report)

The objective of this project is to enable evaluation of a Southern Company distribution feeder on the Advanced Distribution Management System (ADMS) test bed. The long-term goal is to evaluate a federated distributed energy resource (DER) management solution that aggregates DERs through either direct control, transactive control or an aggregator to provide bulk services while observing distribution system voltage and power constraints. The DER aggregation needs to be coordinated with an ADMS that is responsible for reliable power delivery across the distribution systems. This project takes the first step towards enabling such evaluation by deploying an ADMS from Oracle (Southern Company's ADMS supplier) with a Southern Company feeder at NREL.

24 POWER TRANSMISSION AND DISTRIBUTION↗

LEED: A Lightwave Energy-Efficient Datacenter

The Lightwave Energy-Efficient Datacenter (LEED) program is a disruptive “green-field” approach that provides a quantum leap in the energy efficiency of datacenters. LEED’s fundamental value proposition is that a novel and re-architected optical network—RotorNet— can deliver “more bandwidth per buck” as well as unique system-level attributes that significantly improve overall datacenter energy efficiency and performance. LEED has developed three system-level testbeds. The first testbed uses calibrated hardware and software power measurements to determine server energy efficiency as a function of network bandwidth and workload. These measurements have shown that increasing network communications bandwidth dramatically increases server energy efficiency providing a realistic path to the overall ENLITENED program goal of doubling the number of transactions per joule. The second testbed demonstrates key hardware: a prototype low-loss, high-port count optical “selector switch”. This switch was fabricated, racked, and tested. Measured switch characteristics include loss, bandwidth, crosstalk, switch time, system-level switch time (including the transceivers), and bit error rate. The third testbed demonstrates a fully working and manufactured pinwheel design which dramatically lowers the cost of design, while delivering high switch radix and low reconfiguration times. The LEED project has tied these three novel photonic switch prototypes together with production servers and software through the development of a novel FPGA-based NIC platform called Corundum. Corundum ensures that the packet-switched protocols supported by commodity operating systems and devices can interface with the Rotor switch design. The LEED group has used this combined hardware and software prototype to characterize applications running at a commercially relevant scale. The project has used a combination of enhanced optical modulation amplitude (OMA) modulators, broadband multiplexers and demultiplexers, avalanche photodiodes, and a novel burst-mode receivers to enable the insertion of LEED-developed optical switches without the need for expensive optical amplification. Our modeling has shown that measured LEED-developed device characteristics can achieve link characteristics of 2 pJ/bit including both transceivers and the Rotor switch. In summary, the LEED program has demonstrated a credible and practical path, through novel hardware and software, to realize the program objectives of ENLITENED. The net result will ensure that the United States maintains its strength in the crucial sector of Information Technology, which is vital to both our economic security and our national security.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Implementation Guide of Customer-Focused Key Performance Indicators for Electric Vehicle Charging

This report describes how individual and unique messages that are sent over in OCPP sessions and/or transactions are used to calculate the interim set of key performance indicators (KPI) established by ChargeX Consortium’s Working Group 1: Defining the Charging Experience in the report entitles “Customer-Focused Key Performance Indicators for Electric Vehicle Charging.

33 - ADVANCED PROPULSION SYSTEMS↗

Energy Cost Estimate Tool v2.0: Methodology and Usage

Information about home energy costs is essential for appraisers, lenders, and buyers, but reliable data are often unavailable in real estate transactions. To fill this gap, the National Laboratory of the Rockies developed the Energy Cost Estimate (ECE) tool. The tool provides flexible, data-driven estimates of annual household energy use and costs across the contiguous United States, using only a small number of inputs typically found in mortgage appraisals. This report presents the methodology behind version 2.0 of the ECE tool, demonstrates how users can generate estimates through its interface, and discusses its applications and limitations.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Database Performance Monitoring for DUNE

This project improves Checkmk monitoring for DUNE Rucio PostgreSQL database services by adding clearer dashboard visibility for connection and lock behavior. The work began with a request to monitor database performance metrics such as connection usage, configured limits, lock activity, wait behavior, query performance, storage trends, and saturation alerts. Existing Checkmk PostgreSQL checks were reviewed, and gaps were identified in how connection states and lock modes were displayed. To address these gaps, two DSG-specific local checks were added for dune_rucio_prod: one for connection-state monitoring and one for lock-state monitoring. These checks report active, idle, idle-in-transaction, total, usage-percent, lock-mode, waiting-lock, and wait-age metrics. The added metrics supplement built-in Checkmk monitoring and provide DUNE application developers with clearer service states, history graphs, dashboard widgets, and alerts.

Bowers, Elliot [Cabrillo Coll.]↗

How Argonne's Intense Pulsed Neutron Source came to life and gained its niche : the view from an ecosystem perspective.

At first glance the story of the Intense Pulsed Neutron Source (IPNS) at Argonne National Laboratory (ANL) appears to have followed a puzzling course. When researchers first proposed their ideas for an accelerator-driven neutron source for exploring the structure of materials through neutron scattering, the project seemed so promising that both Argonne managers and officials at the laboratory's funding agency, the Department of Energy (DOE), suggested that it be made larger and more expensive. But then, even though prototype building, testing, and initial construction went well a group of prominent DOE reviewers recommended in fall 1980 that it be killed, just months before it had been slated to begin operation, and DOE promptly accepted the recommendation. In response, Argonne's leadership declared the project was the laboratory's top priority and rallied to save it. In late 1982, thanks to another review panel led by the same scientist who had chaired the panel that had delivered the death sentence, the project was granted a reprieve. However, by the late 1980s, the IPNS was no longer top priority within the international materials science community, at Argonne, or within the DOE budget because prospects for another, larger materials science accelerator emerged. At just this point, the facility started to produce exciting scientific results. For the next two decades, the IPNS, its research, and its experts became valued resources at Argonne, within the U.S. national laboratory system, and within the international materials science community. Why did this Argonne project prosper and then almost suffer premature death, even though it promised (and later delivered) good science? How was it saved and how did it go on to have a long, prosperous life for more than a quarter of a century? In particular, what did an expert assessment of the quality of IPNS science have to do with its fate? Getting answers to such questions is important. The U.S. government spends a lot of money to produce science and technology at multipurpose laboratories like Argonne. For example, in the mid-1990s, about the time the IPNS's fortunes were secured, DOE spent more than $6 billion a year to fund nine such facilities, with Argonne's share totaling $500 million. And an important justification for funding these expensive laboratories is that they operate expensive but powerful scientific tools like the IPNS, generally considered too large to be built and managed by universities. Clearly, 'life and death' decision making has a lot to tell us about how the considerable U.S. federal investment in science and technology at national laboratories is actually transacted and, indeed, how a path is cleared or blocked for good science to be produced. Because forces within Argonne, DOE, and the materials science community obviously dictated the changing fortunes of the IPNS, it makes sense to probe the interactions binding these three environments for an understanding of how the IPNS was threatened and how it survived. In other words, sorting out what happened requires analyzing the system that includes all three environments. In an attempt to find a better way to understand its twists and turns, I will view the life-and-death IPNS story through the lens of an ecological metaphor. Employing the ideas and terms that ecologists use to describe what happens in a system of shared resources, that is, an ecosystem, I will describe the IPNS as an organism that vied with competitors for resources to find a niche in the interrelated environments of Argonne, DOE, and the materials science community. I will start with an explanation of the Argonne 'ecosystem' before the advent of the IPNS and then describe how the project struggled to emerge in the 1970s, how it scratched its way to a fragile niche in the early 1980s, and how it adapted and matured through the turn of the 21st century. The paper will conclude with a summary of what the ecosystem perspective shows about the life and death struggle of the IPNS and reflect on what that perspective reveals about how research is produced in the laboratory.

43 PARTICLE ACCELERATORS↗

Lawrence Livermore National Security CFO Processes Functional Management Assessment

The scope of the Functional Management Assessment of the CFO included a review of the CFO Organizational Structure, including deployed financial services and the division of responsibilities and internal controls between CFO and other organizations that perform financial functions across the Laboratory. In addition, the assessment team solicited input from end users and reviewers. Three issues discussed are: ISSUE 1: Financial activities and cash transactions are occurring outside the CFO organization. Approximately $200M of non-purchase order spending occurs in seven areas outside CFO control (travel, relocation, special disbursements, IPO, legal, risk management, and freight). NIF financial services have not been integrated into the CFO organization and operate outside CFO control. Business risks--There is no single point of financial accountably; Currently within the CFO and Business and Operations organizations there is a lack of clarity of roles and responsibilities for financial activities; Financial talent within the laboratory is fragmented; and Inefficiencies exist based on the current structure; An example of the above business risks associated with organizational structure can be observed in the process for reimbursement of relocation costs to employees. Currently, Human Resources and Travel both administer portions of an employee's relocation. Costs are reviewed for compliance with FAR travel guidelines and for compliance with the offer letter but there is no financial review for allowability of costs nor is there a single point where the total relocation costs are reviewed. Through the e-pay system the check is processed by the CFO organization but there is no review by that organization. ISSUE 2: Impact of involuntary separation on current and future activities. 3 risks are: (1) Loss of internal controls--with the upcoming involuntary reductions there will be a loss of personnel with institutional knowledge which will increase the risk of losing internal control on some processes. The organization needs to be cognizant of this risk and take measures to minimize financial risk and ensure on-going A-123 compliance. (2) Project Costing Implementation (PCI) delay--the implementation of PCI is key to achieving integration and reporting of financial data. Presently, business analysts spend half of their time collecting and compiling data and 94% of the labs financial management reports are created using spreadsheets. Currently, the PCI project is on schedule but the involuntary reductions may result in loss of support in this area. (3) Financial Performance Milestones not met--for FY-08 there are fixed, base and stretch financial performance milestones for the laboratory. With reductions in staff the risk of missing key milestones increases. ISSUE 3: Strategically growing the Work for Others (WFO) Portfolio. A key objective of the laboratory is to increase WFO. Greater reliance on WFO will result in additional funding sources and increase the number of control points and financial activities to be monitored thus increasing the level of financial complexity at the lab. The CFO organization should work now to improve controls and processes to accommodate these changes. In particular the following areas should be focused on: (1) Cost reporting needs to be streamlined; (2) Cost Transfer controls need to be increased; and (3) Timely monitoring and close out of contracts needs occur.

99 GENERAL AND MISCELLANEOUS↗

Leading by Example with Smart Energy Management (Fact Sheet)

The Federal Energy Management Program facilitates the Federal Government?s implementation of sound, cost-effective energy management and investment practices to enhance the nation?s energy security and environmental stewardship. FEMP does this by focusing on the needs of its Federal customers, delivering an array of products grouped into project transaction services, applied technology services, and decision support services. This document outlines FEMP services and programs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Special Report on the "Department of Energy's Efforts to Meet Accountability and Performance Reporting Objectives of the American Recovery and Reinvestment Act"

The purpose of the American Recovery and Reinvestment Act of 2009 (Recovery Act) was to jumpstart the U.S. economy, create or save millions of jobs, spur technological advances in health and science, and invest in the Nation's energy future. The Department of Energy will receive an unprecedented $38 billion in Recovery Act funding to support a variety of science, energy, and environmental initiatives. The Recovery Act requires transparency and accountability over these funds. To this end, the Office of Management and Budget (OMB) issued guidance requiring the Department to compile and report a wide variety of funding, accounting, and performance information. The Department plans to leverage existing information systems to develop accounting and performance information that will be used by program managers and ultimately reported to Recovery.gov, the government-wide source of Recovery Act information, and to OMB. The Department's iManage iPortal, a system that aggregates information from a number of corporate systems, will serve as the main reporting gateway for accounting information. In addition, the Department plans to implement a methodology or system that will permit it to monitor information reported directly to OMB by prime funding recipients. Furthermore, performance measures or metrics that outline expected outcomes are being developed, with results ultimately to be reported in a recently developed Department-wide system. Because of the significance of funds provided and their importance to strengthening the Nation's economy, we initiated this review to determine whether the Department had taken the steps necessary to ensure that Recovery Act funds can be appropriately tracked and are transparent to the public, and whether the benefits of the expenditures can be properly measured and reported clearly, accurately, and in a timely manner. Although not yet fully mature, we found that the Department's efforts to develop, refine, and apply the control structure needed to ensure accurate, timely, and reliable reporting to be both proactive and positive. We did, however, identify certain issues relating to Recovery Act performance management, accounting and reporting accuracy, and timeliness that should be addressed and resolved. In particular, at the time of our review: (1) Program officials had not yet determined whether existing information systems will be able to process anticipated transaction increases associated with the Recovery Act; (2) System modifications made to the Department's performance management system to accommodate Recovery Act performance measures had not yet been fully tested and verified; (3) The ability of prime and sub-recipients to properly segregate and report both accounting and performance information had not been determined; (4) There was a lack of coordination between Headquarters organizations related to aspects of Recovery Act reporting. For example, we observed that the Offices of Fossil Energy and Program, Analysis and Evaluation were both involved in developing job creation estimates that could yield significantly different results; and, (5) A significant portion (91 of 142, or 64 percent) of the performance measures developed for the Recovery Act activities were not quantifiable. In some instances, Project Operating Plans had not been finalized and we were not able to verify that all needed performance measures had been developed. Furthermore, the Department had not developed specific metrics to measure federal and contractor jobs creation and retention, an essential Recovery Act objective. The Department had devoted a great deal of time and resources to identifying and mitigating Recovery Act-related risks. For example, the Department developed a risk assessment tool that is intended to assist programs in identifying risks that can prevent its Recovery Act projects from meeting their intended goals. We also found that program staff and management officials at multiple levels were actively engaged in designing Recovery Act-related control and accountability programs. These efforts ranged from updating existing information systems to developing matrices designed to ensure that all required reporting and performance elements were addressed. Each of these activities required substantial effort and was accomplished within a relatively short period. Further, we noted that the Office of the Chief Financial Officer had been instrumental in helping impacted program elements identify issues that could adversely affect the Department's ability to execute its accounting, reporting, and performance monitoring responsibilities. While much has been done, additional work is necessary if the Department is to successfully manage Recovery Act-related risks. For example, as previously noted, OMB has issued guidance establishing Recovery Act monitoring and reporting requirements.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

2008 WIND TECHNOLOGIES MARKET REPORT

The U.S. wind industry experienced a banner year in 2008, again surpassing even optimistic growth projections from years past. At the same time, the last year has been one of upheaval, with the global financial crisis impacting near-term growth prospects for the wind industry, and with federal policy changes enacted to push the industry towards continued aggressive expansion. This rapid pace of development has made it difficult to keep up with trends in the marketplace. Yet, the need for timely, objective information on the industry and its progress has never been greater. This report - the third of an ongoing annual series - attempts to meet this need by providing a detailed overview of developments and trends in the U.S. wind power market, with a particular focus on 2008. As with previous editions, this report begins with an overview of key wind power installation-related trends: trends in wind capacity growth in the U.S., how that growth compares to other countries and generation sources, the amount and percentage of wind in individual states and serving specific utilities, and the quantity of proposed wind capacity in various interconnection queues in the United States. Next, the report covers an array of wind industry trends, including developments in turbine manufacturer market share, manufacturing and supply-chain investments, wind turbine and wind project size, project financing developments, and trends among wind power developers, project owners, and power purchasers. The report then turns to a discussion of wind project price, cost, and performance trends. In so doing, it reviews the price of wind power in the United States, and how those prices compare to the cost of fossil-fueled generation, as represented by wholesale power prices. It also describes trends in installed wind project costs, wind turbine transaction prices, project performance, and operations and maintenance expenses. Next, the report examines other policy and market factors impacting the domestic wind power market, including federal and state policy drivers, transmission issues, and grid integration. Finally, the report concludes with a preview of possible near- to medium-term market developments. This version of the Annual Report updates data presented in the previous editions, while highlighting key trends and important new developments from 2008. New to this edition is an executive summary of the report and an expanded final section on near- to medium-term market development. The report concentrates on larger-scale wind applications, defined here as individual turbines or projects that exceed 50 kW in size. The U.S. wind power sector is multifaceted, however, and also includes smaller, customer-sited wind turbines used to power the needs of residences, farms, and businesses. Data on these applications are not the focus of this report, though a brief discussion on Distributed Wind Power is provided on page 4. Much of the data included in this report were compiled by Berkeley Lab, and come from a variety of sources, including the American Wind Energy Association (AWEA), the Energy Information Administration (EIA), and the Federal Energy Regulatory Commission (FERC). The Appendix provides a summary of the many data sources used in the report. Data on 2008 wind capacity additions in the United States are based on information provided by AWEA; some minor adjustments to those data may be expected. In other cases, the data shown here represent only a sample of actual wind projects installed in the United States; furthermore, the data vary in quality. As such, emphasis should be placed on overall trends, rather than on individual data points. Finally, each section of this document focuses on historical market information, with an emphasis on 2008; with the exception of the final section, the report does not seek to forecast future trends.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Renewable Energy Prices in State-Level Feed-in Tariffs: Federal Law Constraints and Possible Solutions

State legislatures and state utility commissions trying to attract renewable energy projects are considering feed-in tariffs, which obligate retail utilities to purchase electricity from renewable producers under standard arrangements specifying prices, terms, and conditions. The use of feed-in tariffs simplifies the purchase process, provides revenue certainty to generators, and reduces the cost of financing generating projects. However, some argue that federal law--including the Public Utility Regulatory Policies Act of 1978 (PURPA) and the Federal Power Act of 1935 (FPA)--constrain state-level feed-in tariffs. This report seeks to reduce the legal uncertainties for states contemplating feed-in tariffs by explaining the constraints imposed by federal statutes. It describes the federal constraints, identifies transaction categories that are free of those constraints, and offers ways for state and federal policymakers to interpret or modify existing law to remove or reduce these constraints. This report proposes ways to revise these federal statutes. It creates a broad working definition of a state-level feed-in tariff. Given this definition, this report concludes there are paths to non-preempted, state-level feed-in tariffs under current federal law.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Portable and Transparent Message Compression in MPI Libraries to Improve the Performance and Scalability of Parallel Applications

The goal of this project has been to develop a lossless compression algorithm for message-passing libraries that can accelerate HPC systems by reducing the communication time. Because both compression and decompression have to be performed in software in real time, the algorithm has to be extremely fast while still delivering a good compression ratio. During the first half of this project, they designed a new compression algorithm called FPC for scientific double-precision data, made the source code available on the web, and published two papers describing its operation, the first in the proceedings of the Data Compression Conference and the second in the IEEE Transactions on Computers. At comparable average compression ratios, this algorithm compresses and decompresses 10 to 100 times faster than BZIP2, DFCM, FSD, GZIP, and PLMI on the three architectures tested. With prediction tables that fit into the CPU's L1 data acache, FPC delivers a guaranteed throughput of six gigabits per second on a 1.6 GHz Itanium 2 system. The C source code and documentation of FPC are posted on-line and have already been downloaded hundreds of times. To evaluate FPC, they gathered 13 real-world scientific datasets from around the globe, including satellite data, crash-simulation data, and messages from HPC systems. Based on the large number of requests they received, they also made these datasets available to the community (with permission of the original sources). While FPC represents a great step forward, it soon became clear that its throughput was too slow for the emerging 10 gigabits per second networks. Hence, no speedup can be gained by including this algorithm in an MPI library. They therefore changed the aim of the second half of the project. Instead of implementing FPC in an MPI library, they refocused their efforts to develop a parallel compression algorithm to further boost the throughput. After all, all modern high-end microprocessors contain multiple CPUs on a single die and will undoubtedly contain even larger numbers of CPUs in the future. Hence, a compute node in a parallel system is likely to have multiple processors per interconnection link. Thus, they investigated how to best exploit multiple CPUs to compress and decompress data for a single link, i.e., they developed a parallel version of the FPC algorithm called pFPC. On a 4-core 3 GHz Xeon system, pFPC exceeds 10 gigabits per second both in compression and decompression throughput while still reaching a compression ratio of 18%, which is reasonable for their double-precision floating-point datasets. At half this throughput, it achieves a 41% compression ratio. Moreover, the algorithm scales well to four cores and promises even higher throughputs on larger machines. Additional results and a description of the pFPC algorithm have recently been published in the proceedings of the Data Compression Conference. The C source code of pFPC is also publicly available.

97 MATHEMATICS AND COMPUTING↗

INFORMATION: Audit Report on "Accounting and Reporting for the American Recovery and Reinvestment Act by the Department of Energy's Funding Recipients"

The American Recovery and Reinvestment Act of 2009 (Recovery Act) was established to jumpstart the U.S. economy, create or save millions of jobs, and invest in the Nation's energy future. The Department of Energy received approximately $37 billion through the Recovery Act to support a variety of science, energy and environmental initiatives. The Office of Management and Budget (OMB) issued guidance for carrying out stimulus-related activities which requires, among other things, that recipients ensure funds provided by the Recovery Act are clearly distinguishable from non-Recovery Act funds in all reporting systems and that recipients' actions are transparent to the public. To meet these requirements, the Department's recipients must clearly and accurately track and report on 18 separate data elements. In addition, the Department was to develop and implement a process to ensure that recipient information reported to the public was free from material omissions and significant reporting errors. Our recent report (OAS-RA-10-01, October 2009) noted that the Department had developed a quality assurance process to facilitate the quarterly reviews of recipient data and planned to test it during the first quarterly reporting cycle. To determine whether the Department's quality assurance process was effective, we examined information reported by recipients of Departmental funding as of September 30, 2009. We also sought to determine whether the Department's prime contractors were prepared to track and report on Recovery Act activities. The Department had taken a number of actions designed to ensure the accuracy and transparency of reported Recovery Act results. This process identified potential anomalies with information reported by 1,113 of 2,038, or 55 percent of recipients. We view the Department's data quality assurance efforts as both timely and significant. As noted by our audit testing, however, opportunities exist to strengthen the process. In particular: (1) Site officials did not always ensure that anomalies, once identified during the quality assurance process, were actually resolved. For example, the Department's process identified that about 740 of the approximately 10,000 jobs reported in the first quarter of Fiscal Year 2010 as created/retained were for projects reported as having no funds spent. Although these problems were referred to site officials for follow-up and/or correction, the information was never actually changed; (2) The Department did not always utilize the correct basis when evaluating the accuracy of 'funds provided' data submitted by grant recipients. For example, in its analysis process, the Department used data reflecting 'funds obligated' rather than the correct amount of 'total grant awards'. This generated a number of potential false positives; and, (3) Duplicate reports by certain recipients, resulting in overstatements of as much as $137 million of the more than $18 billion obligated, were not corrected. We observed that the Department had taken prompt action to ensure that its prime facility management contractors could properly report Recovery Act information. Notably, the seven contractors in this category included in our review had modified their accounting systems, as necessary, to ensure that they could accurately track and report on Recovery Act activities. The systems at each of these entities had been restructured so that they: (i) could separate Recovery Act and non-Recovery Act funds; and, (ii) had adequate processing capacity to handle the projected increase in transactions. We found the Department's decision to limit its reviews to the four elements that it considered to be critical (award amount, invoiced amount, jobs created/retained, and project status) to be reasonable. We concluded, however, other elements or dependent relationships should not be completely excluded from review. Beyond its initial development and implementation of its quality assurance process, the Department had taken steps to improve its ability to ensure that Recovery Act information was both accurate and transparent to the public. Specifically, officials changed the quality assurance plan based on initial data reviews. Department officials also informed us that they are in the process of updating their quality assurance process to meet new OMB requirements. For example, recent guidance directed agencies to focus on certain data elements, such as award number and recipient name, during their quality assurance reviews. In addition, subsequent to our review, the Department added two more data elements and comparisons to its quarterly assurance process, including an analysis of costs/expenditures and a comparison of the recipient reported project status to the Department's data contained in its financial system.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Facilitating Sound, Cost-Effective Energy Management (Fact Sheet)

FEMP focuses on the needs of its Federal customers, delivering an array of products grouped into project transaction services, applied technology services, and decision support services. This document outlines FEMP services and programs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Renewable Energy Development in Indian Country: A Handbook for Tribes

This handbook is designed to be an accessible reference for those who are new to tribal energy project development or seek a refresher on key development issues as they navigate the project development process. It builds upon the wealth of feedback and experiences shared by tribal and other participants in the National Renewable Energy Laboratory's tribal energy training sessions to providetribal leaders, tribal economic and energy enterprises, and those supporting them with a general overview of the renewable energy project development process as well as detailed guidance on the following: how to structure a renewable energy project transaction to protect tribal interests, with an emphasis on joint project development efforts undertaken with nontribal parties; key energydevelopment agreements, including power sale agreements, transmission and interconnection agreements, and land leases; and ways tribes can finance renewable energy projects, including the sources of funding or financing that may be available, the types of investors that may be available, and federal tax incentives for renewable energy projects.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Financing Solar Installations with New Markets Tax Credits: Denver, Colorado (Fact Sheet)

Fact sheet provides a brief overview of New Markets Tax Credits (NMTCs), a third-party financing incentive for solar installations in the public sector. NMTCs are intended to encourage economic activity in low-income and disadvantaged neighborhoods. The use of NMTCs in an innovative solar project transaction by the City of Denver, Colorado, is highlighted.

14 SOLAR ENERGY↗