Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “test plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

Advanced System Thermal Fluids Solver Development for SAM

This work summarizes a feasibility study on testing numerical algorithms that are suitable and efficient for advanced system analysis code development under the mutli-physics framework, MOOSE. The key is the implementation of a high-order one-dimensional staggered-grid finite volume method (SG-FVM), and its direct interaction with the linear/nonlinear solver, PETSc. Leveraging the existing capabilities of the SAM code, significant code coverages were established in the finite volume method code. This in turn allows for a suite of test problems with different problem sizes and levels of complexity to be used to quantify the performance improvement of the finite volume method code. As evidently shown in this study, the implemented SG-FVM demonstrated superior performance improvement against a direct finite element method implementation through MOOSE for the wide range of selected problems. On two computer systems, the speedup was observed to be significant, with at least one order of magnitude of solving time reduction. In addition, for a complex reactor model, transient simulation was performed using the finite volume method code, the results of which agree very well with the reference results from the finite element method code. Overall, this study demonstrates a successful feasibility study on the proposed numerical algorithms and software structure to support advanced system analysis tool development. In this work, short-term priority development and testing items were identified, and long-term code adoption and integration plans were made for the eventual deployment of the finite volume method in the SAM code.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

CRADA 2022-03 Final Report: Advanced Bearing Materials for Harsh Service Conditions

Develop advanced bearing materials for hydrogen gas turbines and wind turbines. Two candidate materials have been selected based on Ames lab’s recent work on high entropy alloys and shape memory alloys. These materials are designed to exhibit a balance of hardness, strength, toughness, and corrosion resistance. The hydrogen diffusion coefficient in the NiTi based shape memory alloy is two order of magnitude lower than that of the conventional case hardened bearing steel. We plan to atomize these materials into powders, additive manufacture cylindrical bearings, then test these bearing for rolling-contact fatigue, corrosion properties, and hydrogen embrittlement. We are a vertically integrated team comprises of national labs, bearing manufacturers, raw material powders makers, and aircraft gas turbine manufacturer.

Argibay, Nicolas [Ames Laboratory (AMES), Ames, IA↗

Four-Stage Multi-Physics Simulations to Assist Temperature Sensor Design for Industrial-Scale Coal-Fired Boiler

The growth of renewable energy sources presents a pressing challenge to the operation and maintenance of existing fossil fuel power plants, given that fossil fuel remains the predominant fuel source, responsible for over 60% of electricity generation in the United States. One of the main concerns within these fossil fuel power plants is the unpredictable failure of boiler tubes, resulting in emergency maintenance with significant economic and societal consequences. A reliable high-temperature sensor is necessary for in situ monitoring of boiler tubes and the safety of fossil fuel power plants. In this study, a comprehensive four-stage multi-physics computational framework is developed to assist the design, optimization installation, and operation of the high-temperature stainless-steel and quartz coaxial cable sensor (SSQ-CCS) for coal-fired boiler applications. With the consideration of various operation conditions, we predict the distributions of flue gas temperatures within coal-fired boilers, the temperature correlation between the boiler tube and SSQ-CCS, and the safety of SSQ-CCS. With the simulation-guided sensor installation plan, the newly designed SSQ-CCSs have been employed for field testing for more than 430 days. The computational framework developed in this work can guide the future operation of coal-fired plants and other power plants for the safety prediction of boiler operations.

42 ENGINEERING↗

Novel Diglycolamide Extractant?s Performance in Liquid-Liquid Separations for Pilot Scale Application

Modified diglycolamide (DGA) extractants show high affinity for light lanthanides and improved separation factors compared to phosphonic acids used commercially. Previous studies with DGAs included flowsheet design and implementation into solvent extraction equipment but with low extractant concentration. Modifications on the alkyl chains of previous DGA extractants led to a competitive product for light rare earth separation with a higher extractant concentration. The scope of this project is to test a recently developed DGA extractant for application in pilot scale solvent extraction equipment with single stage testing, by narrowing down scrubbing conditions, and collecting distribution values for flowsheet planning.

42 ENGINEERING↗

Criticality Safety SU based USL Calculation for UCl3-NaCl Fuel Salt Operations

The Molten Chloride Reactor Experiment (MCRE) is a fast spectrum, molten salt fueled reactor that is planned to be constructed and operated in the Laboratory for Operation and Testing in the U.S. (LOTUS) testbed, formerly known as the ZPPR cell, at Idaho National Laboratory (INL). MCRE will provide valuable data to support design, licensing, and operation of full scale commercialized molten salt reactor designs.

99 - GENERAL AND MISCELLANEOUS↗

Testing of Crystalline Silicotitanate to Support Tank-Side Cesium Removal System Operations - 20458

The direct feed of waste from the Hanford tank farms to the Low-Activity Waste Facility at the Hanford Waste Treatment and Immobilization Plant requires an intermediate treatment step that prepares the waste for vitrification. Washington River Protection Solutions (WRPS) selected a near-tank treatment system known as the Tank-Side Cesium Removal (TSCR) system to perform the required intermediate treatment functions. The approach in the TSCR system is to filter waste supernatant with a sintered metal dead-end filter and then use a series of ion exchange columns to remove cesium; this system has several similarities to the Tank Closure Cesium Removal system that has been deployed on the Savannah River Site. The ion exchange media proposed for use is crystalline silicotitanate (CST), which is a non-elutable media with a high affinity for cesium. Because the media is non-elutable, loaded columns will be blown down with compressed air, moved into interim storage, and replaced with new columns when cesium capacity is reached. The assumed extent and rate of drying that could be achieved in the TSCR column geometry lacked confirmation by experimental data. In addition, once the columns are loaded with cesium, they generate flammable gases (primarily hydrogen) via radiolysis acting on any resident liquids, i.e., moisture, remaining in the media bed. An assessment of available information on CST concluded that gas generation data that bounds expected operational conditions were needed to support the TSCR system safety basis and planned operations. Working with WRPS, Pacific Northwest National Laboratory (PNNL) designed and conducted testing with CST media to address the need for (a) representative in-column drying data, and (b) bounding flammable gas generation data. Drying testing was performed using a full-height column with a diameter of approximately 2 inches with injected air at temperatures of 18 deg. C and 30 deg. C. Gas generation testing was conducted in an engineered bunker that allowed simultaneous irradiation of up to eight samples at a time. These two experimental approaches used at PNNL for the CST testing are summarized and the major outcomes are presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tank 27 Solids Disturbance Testing Using M-Star for the Impact of CSMP Usage on Blend Tank Mixing Effectiveness

Savannah River Mission Completion (SRMC) plans to operate Tank 27as a blend tank for future waste disposal operations. It is desirable to avoid additional worker exposure by using the planned commercial submersible mixing pump (CSMP) installations in Risers B2 and B4 to function as the blend pumps for prolonged blend tank operations. The purpose of this task is to evaluate the impacts to mixing across a range of pump installation heights from 1 to 201 inches above the tank floor. The CSMPs shall maintain adequate blending within a 24 hour maximum timeframe and an adequate nozzle discharge velocity as outlined in U-ESR-G-00030, using the specifications of the planned CSMPs listed in PO SRRA149971 and M-DS-G-00081. Specifications include: maximum pump diameter of D=22.5 in., dual nozzles placed tangentially opposed with nominal inside diameter of 2 in., total flow range (both nozzles combined) of 500 to 1950 GPM and maximum RPM of 1800. Tank 27 is expected to have a fill height maximum of 360". This analysis began by using results from the 2010 testing and applying them to the Tank 27 design to calculate a mixing time as a function of pump flow rate. These results were modified to account for the higher liquid level in Tank 27. Once the liquid level was increased to 360 inches, the results were modified to account for a higher viscosity in Tank 27 than in the testing. Once the viscosity was increased, the effect of changing pump elevation was applied to calculations of the mixing time in Tank 27. Finally, the uncertainty from the testing was included in the analysis to recommend a blend time as a function of pump flow rate and elevation. The conclusion from this study is that the particles in tank 27 will be suspended at both the 600 and 900 gpm flow rates. Only particles above 90 micron will not be suspended in significant amounts when the flow rate is 600 gpm. At 900 gpm even 100 micron particles were thoroughly suspended in the tank. From the series of simulations it has been concluded that it will not be possible to mix tank 27 at the proposed fluid flow rates and not suspend the solid particles at the bottom of the tank.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Studies of the weak interaction in atomic systems: towards measurements of atomic parity non-conservation in francium

Abstract Tests of the standard model of particle physics should be carried out over the widest possible range of energies. Here we present our plans and progress for an atomic parity non-conservation experiment using the heaviest alkali, francium ( Z = 87), which has no stable isotope. Low-energy tests of this kind have sensitivity complementary to higher energy searches, e.g. at the large hadron collider.

74 ATOMIC AND MOLECULAR PHYSICS↗

Demonstrating autonomous controls on hardware test beds is a necessity for successful missions to Mars and beyond

NASA and the Department of Defense are planning for a mission to Mars in the 2030s–2040s using nuclear thermal propulsion (NTP). NTP uses a nuclear reactor to heat flowing hydrogen and create thrust. A serious concern for crewed and uncrewed missions to Mars is the loss of reactor control. The reactor startup and initial rocket impulse are initiated in cislunar or near-earth orbital regions; therefore, radio communications between ground control and the NTP engine should occur in real time. However, radio communications can take more than 20 min, depending on planet positions, to reach Mars orbiters from ground control. To address this delay, local autonomous controls are implemented onboard the NTP engine to ensure acceptable operation. However, autonomous controls have not been demonstrated or implemented in research or power reactor contexts because of safety and reliability concerns. To enable autonomous controls development, demonstration, and validation, Oak Ridge National Laboratory has created a nonnuclear hardware-in-the-loop test bed. Sensors throughout the test bed relay system status and hardware response to the user control algorithm, including measurements of temperature, flow, pressure of a loop, control drum position, and drum speed. This paper discusses the development of this facility and user accessibility.

33 ADVANCED PROPULSION SYSTEMS↗

Advanced Material Studies for High Intensity Proton Production Targets and Windows

The titanium alloy Ti6Al4V is widely used in accelerator facilities as beam windows, which are exposed to high cycle compressive stress waves from intense pulsed proton beams. Such materials interacting with the beam are subject to various forms of radiation damage, which can adversely affect their endurance limit. However, no fatigue data is currently available for high energy proton irradiated titanium alloy. Due to limitations in proton irradiation facilities, only miniature flat samples can be used for irradiation. To address this issue, we have developed a custom-made bend fatigue tester at Fermilab specifically for testing proton irradiated titanium alloy. In this presentation, we report on the fatigue test results obtained from this custom-fatigue tester using a non-ASTM standard specimen design. We plan to validate these sparse fatigue data with ASTM standard samples using standard fatigue samples. Furthermore, we have modified another commercial bend fatigue tester to accommodate miniature samples, and discuss some inherent deficiencies of the commercial fatigue tester to test miniature samples. To overcome this issue, a new fixture design is presented, which enables satisfactory fatigue testing on miniature samples over long periods. Finally, we present an upgrade to the custom-fatigue tester, featuring this new fixture design.

43 PARTICLE ACCELERATORS↗

Advanced Material Studies for High Intensity Proton Production Targets and Windows

The titanium alloy Ti6Al4V is widely used in accelerator facilities as beam windows, which are exposed to high cycle compressive stress waves from intense pulsed proton beams. Such materials interacting with the beam are subject to various forms of radiation damage, which can adversely affect their endurance limit. However, no fatigue data is currently available for high energy proton irradiated titanium alloy. Due to limitations in proton irradiation facilities, only miniature flat samples can be used for irradiation. To address this issue, we have developed a custom-made bend fatigue tester at Fermilab specifically for testing proton irradiated titanium alloy. In this presentation, we report on the fatigue test results obtained from this custom-fatigue tester using a non-ASTM standard specimen design. We plan to validate these sparse fatigue data with ASTM standard samples using standard fatigue samples. Furthermore, we have modified another commercial bend fatigue tester to accommodate miniature samples, and discuss some inherent deficiencies of the commercial fatigue tester to test miniature samples. To overcome this issue, a new fixture design is presented, which enables satisfactory fatigue testing on miniature samples over long periods. Finally, we present an upgrade to the custom-fatigue tester, featuring this new fixture design.

43 PARTICLE ACCELERATORS↗

Marine energy supported multi-energy system planning and operation optimization for sustainable coastal community

The growing need for sustainable energy solutions in coastal areas necessitates the development of integrated systems that leverage abundant marine resources. In this study, a standalone Marine Energy Supported Multi-Energy System (MRE-MES) is designed for sustainable coastal community development, utilizing renewable marine resources, including offshore wind, wave, and solar energy, to address the energy needs of electricity, heat, freshwater, and hydrogen. The proposed MRE-MES incorporates a co-optimization model that simultaneously balances capacity planning and operational efficiency to minimize costs and environmental impacts. The system is tested under different renewable energy penetration levels and demand uncertainties, using a two-stage stochastic programming to account for variability in renewable resources and consumption needs. The experimental results indicate that in the optimal system capacity configuration, the percentage of total renewable energy generation is around 80 %, with or without capacity limitation constraints on PV, water tank, and hydrogen storage. Compared to the worst-case scenario in Monte Carlo experiments, two-stage stochastic optimization results in a more robust decision that effectively mitigates the risks posed by future uncertain demand conditions. In conclusion, the findings highlight the viability of marine energy for providing a resilient, comprehensive energy solution to coastal communities.

Capacity planning↗

Sludge Removal: Success and Partnership with T Plant - 20510

U.S. DOE contractor CH2M Hill Plateau Remediation Company (CHPRC) has safely and efficiently managed the removal of highly radioactive sludge from the 105-K West Reactor fuel storage basin (105- KW Basin) near the Columbia River. In mid-September 2019, sludge retrieval was completed after 21 storage containers were safely loaded with highly radioactive sludge and transported approximately 13 miles from the 105-KW Basin to T Plant, located in the 200 West Area on the Central Plateau of the Hanford Site. Sludge removal represents the last major source term reduction necessary before the K West Reactor and fuel storage basin can transition to closure activities in preparation for final deactivation and demolition. The technical complexity of the sludge retrieval process, coupled with the challenging physical and radiological characteristics of the waste, necessitated a methodical and deliberate approach using unique design and operational solutions to safely conduct the work. This challenge was further complicated by the need to plan and conduct the work in two separate facilities, each subject to the controls and requirements of its own nuclear facility safety basis. The project overcame these challenges through creating an integrated team that actively engaged, communicated and coordinated each phase of the project to ensure successful completion. This paper will cover how these key elements of the Sludge Removal Project led to its success: - Integrating project planning and management; - Lessons learned from design and construction; - Preparing for a successful campaign (lessons learned from testing and start-up); - Lessons learned from operating in two separate facilities, transporting sludge containers on the Hanford Site and ensuring compliance with a range of regulatory and safety basis requirements. The establishment of an integrated group spanning two facilities and multiple organizations created a team capable of overcoming the challenges necessary to successfully plan and execute the sludge retrieval mission. Sharing lessons learned from this successful project can enhance the ability of teams across the DOE complex to successfully plan and execute complex projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Update to the Phase II Corrective Action Investigation Plan for Corrective Action Units 101 and 102, Central and Western Pahute Mesa, Nevada National Security Site, Nye County, Nevada

This report is an update to the Phase II Corrective Action Investigation Plan for Corrective Action Units 101 and 102: Central and Western Pahute Mesa, Nevada Test Site, Nye County, Nevada (NNSA/NSO, 2009) activities resulting from data collection and analysis conducted between 2009 and 2019. This report contains two sections: (1) a summary of how the new data have informed the updated approach to complete the characterization activities under the corrective action investigation (CAI), and (2) a table documenting the specific activities identified in the CAIP with a status and expected outcome of each activity (see Table A-1 in Appendix A). As stated in Sections 1.5 and 1.5.1 of the CAIP, the CAIP was conceptualized to be iterative, with continuous review and assessment of the data, data analysis, and modeling to provide a guide for decisions regarding additional work. This report provides the revised plan, based on an assessment of the data, to complete the characterization activities identified in the CAIP.

54 ENVIRONMENTAL SCIENCES↗

Automated Disposal Debris Shield (ADDS) Test Stand, Version 2.0

One of the major refurbishing efforts mentioned in the National Ignition Facility (NIF) sustainability plan is improvements to prevent the debris generated during shots from reaching the high value optics. Addressing this issue will allow NIF to continue high powered shots while maintaining a manageable optic exchange rate. A major area of concern is right outside the Target Chamber in the Final Optics Assembly (FOA) where we have the Grating Debris Shield (GDS) being protected from target debris by the Automated Disposable Debris Shields (ADDS). The area that houses the ADDS will be referred to as the ADDS Doghouse. The schematic illustration of a single NIF beamline with the general area of the ADDS Doghouse outlined in red can be seen in Figure 1. Discovering methods to improve the ADDS Doghouse in preventing debris from passing through is top priority.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Advanced Test Reactor Long-Term (20-Year) Operational Strategy

The Department of Energy Office of Nuclear Energy (DOE-NE) and the Naval Nuclear Propulsion Program (NNPP) have identified the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) as a critical need for continued thermal irradiation testing capability to support and advance U.S. commercial and naval nuclear power systems. The ATR is currently the only suitable test reactor operating in the world that can provide these capabilities at volume. ATR must, then, plan to operate for at least the next 20 years. As of the beginning of 2024, ATR has operated for 57 years, with many of the original reactor structures, systems, and components installed and operated for 60 years. Some ATR Complex and reactor support equipment that is currently in use was installed 75 years ago with the startup of the Materials Testing Reactor (MTR).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗