Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “technical management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

Nuclear Detonation Fallout: Key Considerations for Internal Exposure and Population Monitoring

The potential for detonation of a low-yield Improvised Nuclear Device (IND) in a major U.S. urban area is a significant national concern. The Department of Homeland Security Federal Emergency Management Agency (FEMA) is providing technical guidance for regional, state and local responders who have responsibility for developing local IND response plans. Fallout exposure represents the greatest preventable injury after a nuclear detonation.

61 RADIATION PROTECTION AND DOSIMETRY↗

Technologies for Detecting Interactions between Current Plant Configuration States and Component Manipulations Directed by In-Use Procedures

This research effort is a part of the Light Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by the Department of Energy. The LWRS Program is performed in close collaboration with industry R&D programs that provide the technical foundations for licensing and managing the long term, safe, and economical operation of current nuclear power plants (NPPs). The LWRS Program serves to help the United States (U.S.) nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of these NPPs and extension of their current operating licenses. A new area of LWRS research, Outage Risk Management Improvement (ORMI) seeks to improve the management of nuclear power plant outages through the development of tools to assist in evaluating pending activities against requirements to detect undesired interactions. Significant efforts are expended to manage the nuclear risk of an outage. The utilities conduct pre outage risk assessments, based on a very detailed review of the outage schedule, to identify where combinations of outage work and equipment out of service would result in degraded conditions with respect to nuclear safety or regulatory compliance. Probabilistic risk assessment studies are conducted to quantify the incremental core damage frequency as a result of the outage activities and system unavailability. These studies are usually presented to site and fleet management, the site plant operational review committee, and the NPP’s independent Nuclear Safety Review Board for concurrence that the outage is planned safely and that reasonable measures have been taken to reduce the added risk of conducting the outage. During the outage, the plant configuration is monitored continuously to ensure that it conforms to the approved safety plan. Deviations must be assessed and approved by management committees and, in some cases, the plant operational review committee. In virtually all outage meetings and job briefings, the current nuclear safety status of the plant is communicated, including information on the specific equipment that is being relied on to meet the requirements of the nuclear safety plan. In addition, Operations and the Outage organizations implement several layers of physical and administrative barriers to prevent unintended interaction with the systems and equipment credited for nuclear safety. In spite of all these efforts, nuclear safety challenges still occur too frequently in outages. While some of these are due to failures of equipment credited for safety, the majority occur because of human error. These typically involve some form of interaction between work activities and plant configuration changes. Some of them are very subtle and are extremely challenging to detect in advance. Nevertheless, they are not acceptable and represent clear opportunities to improve nuclear safety during outages. This project will develop tools and strategies to minimize these interactions.

99 GENERAL AND MISCELLANEOUS↗

Prototype System for Detecting Interactions between Current Plant Configuration States and Component Manipulations Directed by In-Use Procedures

This research effort is a part of the Light Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by the Department of Energy. The LWRS Program is performed in close collaboration with industry R&D programs that provide the technical foundations for licensing and managing the long term, safe, and economical operation of current nuclear power plants (NPPs). The LWRS Program serves to help the United States (U.S.) nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of these NPPs and extension of their current operating licenses. The Outage Risk Management Improvement Pilot Project seeks to improve the management of nuclear power plant outages through the development of tools to assist in evaluating pending activities against requirements to detect undesired interactions. Significant efforts are expended to manage the nuclear risk of an outage. The utilities conduct pre outage risk assessments, based on a very detailed review of the outage schedule, to identify where combinations of outage work and equipment out of service would result in degraded conditions with respect to nuclear safety or regulatory compliance. Probabilistic risk assessment studies are conducted to quantify the incremental core damage frequency as a result of the outage activities and system unavailability. These studies are usually presented to site and fleet management, the site plant operational review committee, and the NPP’s independent Nuclear Safety Review Board for concurrence that the outage is planned safely and that reasonable measures have been taken to reduce the added risk of conducting the outage. During the outage, the plant configuration is monitored continuously to ensure that it conforms to the approved safety plan. Deviations must be assessed and approved by management committees and, in some cases, the plant operational review committee. In virtually all outage meetings and job briefings, the current nuclear safety status of the plant is communicated, including information on the specific equipment that is being relied on to meet the requirements of the nuclear safety plan. In addition, Operations and the Outage organizations implement several layers of physical and administrative barriers to prevent unintended interaction with the systems and equipment credited for nuclear safety. In spite of all these efforts, nuclear safety challenges still occur too frequently in outages. While some of these are due to failures of equipment credited for safety, the majority occur because of human error. These typically involve some form of interaction between work activities and plant configuration changes. Some of them are very subtle and are extremely challenging to detect in advance. Nevertheless, they are not acceptable and represent clear opportunities to improve nuclear safety during outages. This project will develop tools and strategies to minimize these interactions. This report describes a prototype tool designed to support plant personnel in controlling work during NPP outages to prevent unintended interactions. A software application was created to manage and display important configuration information and utilize natural language processing to access the impacts of upcoming procedures and work orders. Initial industry feedback is also presented.

99 GENERAL AND MISCELLANEOUS↗

Meteorological Tower Network Expansion Pilot Project Siting Considerations to Ensure Data Quality and Representativeness of Three New Meteorological Towers at Los Alamos National Laboratory

Associated with the Meteorological Tower Network Expansion Pilot Project by the Environmental Protection and Compliance (EPC) Compliance Programs (CP) Meteorology and Air Quality (MAQ) team, the purpose of this technical report is to establish requisite justification for the siting of three 10-meter high instrumented meteorological towers at three new locations on the Los Alamos National Laboratory (LANL) site. These towers and their associated instrumentation are similar in scope to the existing 10-meter meteorological tower that is collecting meteorological data in Mortandad Canyon (MDCN). The conclusions and recommendations in this technical report will inform LANL management, EPC-CP MAQ staff, and other LANL divisions of the criteria employed for the selection of the final location for siting these three new towers. Meeting such comprehensive criteria will ensure that all data acquired will be spatially representative for meeting the diverse Safety Basis (SB), emergency management, and operations organizations programmatic needs and analytical data input requirements to its codes.

54 ENVIRONMENTAL SCIENCES↗

HydroSource Data Dictionary

In recent years, Oak Ridge National Laboratory (ORNL) has conducted innovative hydropower research sponsored by the US Department of Energy Water Power Technologies Office (WPTO) to address important questions regarding technology advancement, existing hydropower assets, future hydropower potential, environmental concerns, policy and regulatory decisions, and market trends to support hydropower sustainability in the United States. Data from this research supports a broad and diverse user base including US federal, state, and local governments; national laboratories; hydropower industry; academia; nonprofit organizations; and other end users. The development of a relational database system is needed to ensure proper management of the continuously increasing breadth and depth of these data to guarantee their future value and reliability for advancing hydropower research and supporting the goals and objectives of our partners and US hydropower stakeholders. During FY 2018, ORNL’s HydroSource team reconciled data from ORNL’s WPTO-funded projects to create the HydroSource Data Model, Version 1 (HSDM1) schema. The HSDM1 schema provides the essential step in data assimilation toward unifying ORNL’s WPTO-funded data into a relational database management system. This report provides technical documentation of the HSDM1 schema to help guide future development and implementation of the HydroSource database system.

13 HYDRO ENERGY↗

Current Challenges, Constraints and Recommendations for Reducing Cost of Physical Security at US Commercial Nuclear Power Plants

Economic or financial causes have led to closure or announced early retirement of several US nuclear reactors in the last five years. The published report "Economic and Market Challenges Facing the U.S. Nuclear Commercial Fleet – Cost and Revenue Study" by Idaho National Laboratory identified 63 of the 79 studied nuclear power plants (NPPs) lost money in the year 2016. The revenue gap analysis performed in the study also concluded that additional revenue is required to return most of these nuclear power units to profitable operations. This can be achieved by reducing operation and maintenance (O&M) costs that accounts for about 70% of total operating expenditures for an NPP. The Light Water Reactor Sustainability (LWRS) Program conducts research and development, sponsored by the US Department of Energy, that provides a technical foundation for licensing and managing the long-term safe and economical operation of current nuclear power plants, utilizing the unique capabilities of the national laboratory system. Reduction in O&M costs aligns with the LWRS program’s mission of providing science-based solutions to the nuclear industry to implement technologies and methodologies for safe, efficient, economical, and long-term operation.

97 MATHEMATICS AND COMPUTING↗

Duluth Transit Authority Battery-Electric Bus Evaluation

Duluth Transit Authority (DTA) collaborated with the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to evaluate a fleet of seven battery-electric buses (BEBs) in revenue service in Duluth, Minnesota. The focus of the evaluation was to compare performance and cost of the BEBs to that of conventional technology buses in similar service and track progress over time. DTA enlisted the help of the Center for Transportation and the Environment (CTE) to manage the project and provide technical services with the BEB fleet and infrastructure. This report summarizes the results of the BEB evaluation and contains a combination of analyses performed by NREL and by CTE during the overall data collection period of December 2018 through February 2022.

33 ADVANCED PROPULSION SYSTEMS↗

Responses to International Accrediting Services (IAS) Biennial Onsite Assessment of ALAB to CA ELAP Requirements

The purpose of this assessment was to perform an evaluation of the laboratory’s quality system, capabilities, and personnel qualifications to determine the extent of conformance to the current TNI standards and the rules enacted by the 2020 California Environmental Laboratory Accreditation Program (ELAP) for accreditation of environmental laboratories. The scope of the assessment included the California Code, Health and Safety Code – HSC § 100829 and 100830, the 2016 TNI-2 requirements, published methods, and the laboratory’s Quality Management System including administrative and technical operating procedures.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Managing Subsurface Pressure Buildup and Interference in Commercial-Scale CO 2 Storage Project with Proximal Injection Wells

Large-scale decarbonization using carbon capture and storage (CCS) is likely to involve many commercial-scale CO 2 storage projects located in close proximity to each other. This close proximity raises concerns over pressure interference among the storage projects. Pressure interference between injection and storage efforts can reduce the practicable CO 2 storage resource and force wells to inject CO 2 at a lower rate to avoid the fracture pressure thresholds per United States Environmental Protection Agency (EPA) Class VI well regulations to preserve injection and confining zone integrity and potentially mitigate against inducing seismic activity. These analyses employ numerical full-physics reservoir modeling to evaluate how pressure buildup fronts and CO 2 plumes evolve under commercial-scale injection volumes of CO 2 in which multiple storage sites located in close proximity occur in tandem. The simulation models mimic injection at pseudo basin-scale and assume homogeneous saline formation(s) as storage targets with a pair of upper and lower homogeneous seal layer/s. These analyses specifically investigate the efficacy of two basin-wide reservoir pressure management strategies in addressing the technical challenges associated with pressure buildup and CO 2 plume commingling. The strategies explored include: 1) enlarging the area of injection well spacing (WS) and 2) storing CO 2 in a stacked sequence (SSS) of saline formations compared to a single formation. The storage and confining zones properties assumed were held common across the scenarios, unless specified otherwise. Analyses results show that after injecting 4 million tons per year for 30 years using 4 separate wells (each injecting 1 million metric tons per year), the radius of CO 2 plume extends to a mere 3 km or less from injection wells. Meanwhile, the radius of pressure buildup ranges on the order of tens to a few hundreds of kilometers, depending on the magnitude of pressure buildup threshold that one would use to define the front. CO 2 plume commingling from different injection wells appears to occur 50 years post-injection, especially under scenarios with narrowly spaced (i.e., < 5 km apart) injection well locations. Findings from sensitivity cases on the well spacing suggest that storage formations modeled would require different well spacing to avoid fracture pressure thresholds. For instance, modeled storage formations with high fracture gradients (i.e., 0.8 psi/ft) would need less than 5–km well spacing, whereas those with lower fracture gradients (i.e., 0.7 psi/ft) would need approximately 20–km well spacing, based on assumed modeling parameters. Under stacked injection, the pressure challenges (described above) still exist but are more alleviated due to distributing the same injection volume across more available reservoir volume. These analyses demonstrate that stacked-sequence storage can effectively address the challenges, while still providing the same target CO 2 storage volumes and allowing a large number of storage projects to be deployed in the same basin by better utilizing the available storage resource across different reservoir depths. Among cases modeled, the resulting pressure buildup front is most suppressed when each storage project distributes injection volumes over several wells, each of which injects a portion of the total CO 2 across the stacked sequence. This strategy results in the smallest CO 2 aerial footprint amongst scenarios evaluated but also shows the largest reduction in the pressure buildup at the top of perforation at the injection wells (upwards of approximately 42 percent compared to the commercial-scale single-formation storage), the result of which is crucial to maintain caprock integrity. The findings presented by this research draw attention to the importance of greater coordination among storage operators and regulatory stakeholders to foster the upscaling and deployment of CCS. These analyses provide insights into required decision-making when considering multi-project deployment in a shared basin. Because these analyses evaluate a very specific geologic situation, they bear further investigations across other geologic situations.

42 ENGINEERING↗

Blueprint: Coordinated Vulnerability Disclosure (CVD) Adaption and Adoption Guide for Industry To Create Their Own CVD Program

This guide provides a series of steps and guidance for electric vehicle supply equipment (EVSE) industry members to set up their own coordinated vulnerability disclosure (CVD) program by utilizing the Software Engineering Institute/Computer Emergency Response Team (SEI/CERT)’s CVD how-to guide. Due to the complexity of CVD, and with the existing resources out there, this guide is intended that this portion of the blueprint is an extension of the CVD how-to guide, not meant as a replacement. This guide is meant to outline a process for what to do when you discover a vulnerability on EVSE equipment. It is written for developers, vendors and security researchers as well as management. This is not a technical document. It is meant to be accessible for both technical and non-technical roles.

33 ADVANCED PROPULSION SYSTEMS↗

Analysis of scanner data for crop inventories

Accomplishments for a machine-oriented small grains labeler T&E, and for Argentina ground data collection are reported. Features of the small grains labeler include temporal-spectral profiles, which characterize continuous patterns of crop spectral development, and crop calendar shift estimation, which adjusts for planting date differences of fields within a crop type. Corn and soybean classification technology development for area estimation for foreign commodity production forecasting is reported. Presentations supporting quarterly project management reviews and a quarterly technical interchange meeting are also included.

Horvath, R.↗

Local governments LANDSAT applications program

The approach used to develop the internal capabilities of local governments to handle and evaluate LANDSAT data included remote sensing training, development of a low-cost digital image processing system, and technical assistance. Cost sharing, program management and coordination, and networking were also employed to address problems related to land use, water resources, environmental assessment, and air quality as experienced by urban planners. Local experiences gained in Atlanta, Georgia; Henrico County, Virginia; Oklahoma City; Oklahoma; and San Jose, California are described. Policy recommendations formulated for transferring remote sensing technologies to local governments are included.

Source record↗

A flight test design for studying airborne applications of air to ground duplex data link communications

The Automatic En Route Air Traffic Control (AERA) and the Advanced Automated System (AAS) of the NAS plan, call for utilization of data links for such items as computer generated flight clearances, enroute minimum safe altitude warnings, sector probes, out of conformance check, automated flight services, and flow management of advisories. A major technical challenge remaining is the integration, flight testing, and validation of data link equipment and procedures in the aircraft cockpit. The flight test organizational chart, was designed to have the airplane side of data link experiments implemented in the NASA Langley Research Center (LaRC) experimental Boeing 737 airplane. This design would enable investigations into implementation of data link equipment and pilot interface, operations, and procedures. The illustrated ground system consists of a work station with links to a national weather database and a data link transceiver system. The data link transceiver system could be a Mode-S transponder, ACARS, AVSAT, or another type of radio system such as the military type HF data link. The airborne system was designed so that a data link transceiver, workstation, and touch panel could be interfaced with an input output processor to the aircraft system bus and thus have communications access to other digital airplane systems.

Scanlon, Charles H.↗

HLLV avionics requirements study and electronic filing system database development

This final report provides a summary of achievements and activities performed under Contract NAS8-39215. The contract's objective was to explore a new way of delivering, storing, accessing, and archiving study products and information and to define top level system requirements for Heavy Lift Launch Vehicle (HLLV) avionics that incorporate Vehicle Health Management (VHM). This report includes technical objectives, methods, assumptions, recommendations, sample data, and issues as specified by DPD No. 772, DR-3. The report is organized into two major subsections, one specific to each of the two tasks defined in the Statement of Work: the Index Database Task and the HLLV Avionics Requirements Task. The Index Database Task resulted in the selection and modification of a commercial database software tool to contain the data developed during the HLLV Avionics Requirements Task. All summary information is addressed within each task's section.

Source record↗

Life Sciences Centrifuge Facility assessment

This report provides an assessment of the status of the Centrifuge Facility being developed by ARC for flight on the International Space Station Alpha. The assessment includes technical status, schedules, budgets, project management, performance of facility relative to science requirements, and identifies risks and issues that need to be considered in future development activities.

Benson, Robert H.↗

Contracting Officer's Technical Representatives

The Breakout Session is a traditional conference instrument used by the NASA Occupational Health Program (OHP) as a method to convene people with common interests. Typically these sessions provide discussion of current topics of high priority and currency and allow multiple views and opinions to be shared and evaluated by all participants. Since the Contracting Officer's Technical Representatives (COTRs) occupy the technical focus of support contract management, this particular group, attended by 20 representatives, addressed issues and topics at the forefront of operational concerns.

Brisbin, Steve↗

Science@NASA: Direct to People!

Science@NASA is a science communication effort sponsored by NASA's Marshall Space Flight Center. It is the result of a four year research project between Marshall, the University of Florida College of Journalism and Communications and the internet communications company, Bishop Web Works. The goals of Science@NASA are to inform, inspire, and involve people in the excitement of NASA science by bringing that science directly to them. We stress not only the reporting of the facts of a particular topic, but also the context and importance of the research. Science@NASA involves several levels of activity from academic communications research to production of content for 6 websites, in an integrated process involving all phases of production. A Science Communications Roundtable Process is in place that includes scientists, managers, writers, editors, and Web technical experts. The close connection between the scientists and the writers/editors assures a high level of scientific accuracy in the finished products. The websites each have unique characters and are aimed at different audience segments: 1. http://science.nasa.gov. (SNG) Carries stories featuring various aspects of NASA science activity. The site carries 2 or 3 new stories each week in written and audio formats for science-attentive adults. 2. http://liftoff.msfc.nasa.gov. Features stories from SNG that are recast for a high school level audience. J-Track and J-Pass applets for tracking satellites are our most popular product. 3. http://kids. msfc.nasa.gov. This is the Nursemaids site and is aimed at a middle school audience. The NASAKids Club is a new feature at the site. 4. http://www.thursdaysclassroom.com . This site features lesson plans and classroom activities for educators centered around one of the science stories carried on SNG. 5. http://www.spaceweather.com. This site gives the status of solar activity and its interactions with the Earth's ionosphere and magnetosphere.

Koczor, Ronald J.↗

Job Superscheduler Architecture and Performance in Computational Grid Environments

Computational grids hold great promise in utilizing geographically separated heterogeneous resources to solve large-scale complex scientific problems. However, a number of major technical hurdles, including distributed resource management and effective job scheduling, stand in the way of realizing these gains. In this paper, we propose a novel grid superscheduler architecture and three distributed job migration algorithms. We also model the critical interaction between the superscheduler and autonomous local schedulers. Extensive performance comparisons with ideal, central, and local schemes using real workloads from leading computational centers are conducted in a simulation environment. Additionally, synthetic workloads are used to perform a detailed sensitivity analysis of our superscheduler. Several key metrics demonstrate that substantial performance gains can be achieved via smart superscheduling in distributed computational grids.

Shan, Hongzhang↗