Analysis of ELAP and mitigation strategies in Maanshan PWR with PCTRAN
On March 11, 2011, the Fukushima Daiichi Nuclear Power Plant, owned by Tokyo Electric Power Company, encountered a beyond design basis earthquake/tsunami and the flood crippled the on-site emergency power and electric transmission systems. The ELAP (Extended Loss of Alternating Current Power) and LUHS (Loss of Ultimate Heat Sink) events severely damaged the core cooling systems and the safety functions of the containment. As a result, three reactor cores were damaged. Also, the cooling capability of nuclear spent fuel pools was lost due to loss of AC and DC power. Existing Station Blackout (SBO) analyses have demonstrated that even with leakage from Reactor Coolant Pump (RCP) seals, the core could maintain coolable only when heat transfer exists between primary loop and secondary loop. Depend on the availability of DC power in different plant designs, the SBO coping times were shown to be 4 to 16 hours. According to INPO event report, it is necessary to analyze the consequences if current coping times are extended with increased core water inventory loss from pump seals. In an ELAP scenario, all active system including Emergency Core Cooling System (ECCS) and motor driven AFW were out of power supply, results in degradation of core cooling capability. Moreover, the fuel exposed risk would increase due to continuously Reactor Coolant System (RCS) inventory loss through pump seals. Therefore, mitigation strategy must be applied prior to core uncovering to prevent its damage and assure plant safety. This research utilized a fast running NPP safety simulation code, PCTRAN, to assess reactor performances in the situations of ELAP of Maanshan PWR. Also, the sensitivity study of injection flow rates and effectiveness of mitigation strategy were demonstrated. (authors)