Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “plant operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

SMART-COM – Scalable Multi-Agent Adaptive Resolution Tools for Collaborative Outage Management

The purpose of this grant was to conduct scientific research and prototype applications to support NPP outage staff in their adaptive decision-making in efficient scheduling and resource allocation while preventing violation of safety technical specifications. The project contributed to scientific knowledge and engineering methods in (1) user interface design, (2) scheduling optimization and risk estimation, and (2) natural language processing that would benefit the nuclear power plants in minimizing schedule overruns and even unexpected shutdowns. The research team conducted site visits at a test reactor facility and an operating nuclear power plant to gather necessary information and inputs for research and development of a software application to support NPP staff in executing their outages. The final software application consisted of three modules. First, the natural language processing module supports interactive processing of technical documentation to build a database for outage staff to query non-permissible actions on system components. This module can alleviate outage staff from reviewing extensive documentation and minimize violation of technical specifications, especially in time-sensitive situations. Second, the schedule optimization module schedules outage activities and compute risk indices that outperform existing software and current practice. This module can reduce completion time of an outage that typically have too many activities for human to optimize based on current practice that does not apply the latest operations research. Finally, the visualization module presents progress and risk information of the overall outage and individual activities, as well as enabling access to the natural language processing and schedule optimization modules. This module can provide outage staff with situation awareness that are necessary to make risk-informed decisions in response to unexpected events during the execution of an outage.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Existing Hydropower Assets (EHA) Capacity Factor Plant Database, 2005-2024

Existing Hydropower Asset (EHA) Annual Capacity Factor is a geospatial point-level dataset containing annual capacity factors over the years (2005-2024) and key characteristics of operational U.S. hydropower plants with 1 megawatt or greater of nameplate capacity. EIA form 860 and EHA are the primary sources of the derived data. Pumped storage and hybrid plants are excluded.

Johnson, Megan [ORNL] (ORCID:0000000290141741)↗

Natural Language Processing-Enhanced Nuclear Industry Operating Experience Data Analysis: Aggregation and Interpretation of Multi-Report Analysis Results

Industry-wide operating experience is a critical source of raw data for reliability and risk model parameter estimations for nuclear power plants. A large portion of operating experience data are failure events stored as reports that contain unstructured data, such as narratives. In current practice, a failure report is usually reviewed and manually coded by analysts. The coding is based on extracting several event characteristics such as system name, component type, sub-part type, failure mode, and failure cause. Event narratives are mostly used to help understand events and extract their characteristics. In this line of research, we aim to maximize the usage of event narratives by leveraging natural language processing (NLP) methods to automatically convert an event narrative to a causal graph. This research has promise to improve physical understanding of failure initiation and propagation and to facilitate use of non-failure data (e.g., near-misses and degradations) to complement the limited data pool of failures. In our previous work, we developed an NLP tool and applied it to analyze a number of licensee event reports submitted by U.S. nuclear power plants to the Nuclear Regulatory Commission. In this paper, we will report our recent research progress in aggregating the results of multiple reports, developing network model(s), and drawing statistical insights.

99 GENERAL AND MISCELLANEOUS↗

Nuclear Power Plant Infrastructure Evaluations for Removal of Spent Nuclear Fuel

This report provides evaluations of the NPP site infrastructure and near-site transportation infrastructure for removing SNF from 19 NPP sites and the Morris Independent Spent Fuel Storage Installation (ISFSI). The material to be removed from the NPP sites includes both the SNF and the greater-than-Class C low-level radioactive waste (GTCC waste)3 that is stored, or will be stored, at the sites. This report is an update of the report Nuclear Power Plant Infrastructure Evaluations for Removal of Spent Nuclear Fuel (Maheras et al. 2021) and includes expansion of the site evaluations to include operating nuclear power plant (NPP) sites and to incorporate updated site inventory data. Figures that include the number of spent nuclear fuel (SNF) assemblies and metric tons heavy metal (MTHM) in a single figure have also been added to the report.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Conceptual design study of potential early commercial MHD powerplant. Report of task 2 results

The conceptual design of one of the potential early commercial MHD power plants was studied. The plant employs oxygen enrichment of the combustion air and preheating of this oxygen enriched air to an intermediate temperature of 1200 F attainable with a tubular type recuperative heat exchanger. Conceptual designs of plant componets and equipment with performance, operational characteristics, and costs are reported. Plant economics and overall performance including full and part load operation are reviewed. The projected performance and estimated cost of this early MHD plant are compared to conventional power plants, although it does not offer the same high efficiency and low costs as the mature MHD power plant. Environmental aspects and the methods incorporated in plant design for emission control of sulfur and nitrogen are reviewed.

Hals, F. A.↗

Data Analytics Applied to Coal Fired Boilers for Detecting Leaks

Data analytics were used to detect boiler leaks from five different coal-fired boilers including both subcritical and supercritical systems. Discriminant functions were developed that detected leaks up to two weeks prior to forced plant shutdowns for repairs. The leaks were identified to occur at different sections of the boiler for each plant, including waterwalls, economizer and superheater using conventional process measurement data. Leaking conditions were detected with a high degree of confidence (≪ 1% misclassified observations) and were able to distinguish normal operations from those time periods with steam leaks even while operating the power plants in power cycling mode.Multivariable statistical analyses, including Principal Component (PCA), cluster, and Fischer Discriminant Analysis (FDA) were used to characterize the leak occurrence. Normal and operational states with steam leaks were provided in the original process datasets. These datasets were split into two different groups for training and validation purposes. The data were sorted chronologically, and every third observation was assigned to training the Discriminant Function Model (DFM) while the rest were reserved for validation. PCA was used to reduce dimensionality of the original datasets. Canonical and FDA analyses were used to investigate the relationship between process variables. The outcome of the analyses revealed that nearly 35,000 observations were classified correctly; less than 0.05% of total observations were misclassified to be leaking, i.e. both false positives and false negatives.

Indrawan, Natarianto↗

DEMONSTRATION OF A MULTI-STAGE TESTING AND EVALUATION APPROACH FOR A SAFETY-RELATED DIGITAL UPGRADE AT A NUCLEAR POWER PLANT

There is an imminent need for existing United States nuclear power plants to reduce their operating and maintenance costs to remain economically viable. Digital technology provides significant opportunity for the existing nuclear power plant fleet to transform that way in which work is accomplished to reduce costs and allow the fleet to remain economically competitive. However, a careful understanding of the human-technology integration is needed to ensure the continued safe and reliable operation of these existing plants with new digital capabilities. This work presents interim findings in applying human factors engineering to a safety-significant digital upgrade for a United States nuclear power plant, following the new Alternative Review Process in the recently revised Digital Instrumentation and Control Interim Staff Guidance Licensing Process, Revision 2. The interim results described in this work provides an industry perspective, based on ongoing work, to recent work published from Vazquez, Green, and Desaulniers (2022).

99 GENERAL AND MISCELLANEOUS↗

A Comparison of Preconstruction and Operational Wake Loss Estimates for Land-Based Wind Plants

Recent studies suggest that biases between wind plant pre-construction energy yield estimates and actual energy production are decreasing over time. However, variability in energy yield prediction accuracy across different projects and wind energy consultants remains high. Wake effects are one of the largest categories comprising the pre-construction energy yield assessment process. To assess the accuracy of wake loss predictions, we compare pre-construction wake loss estimates provided by 8 consultants to the estimated operational wake losses for 10 North American wind plants, as part of the Wind Plant Performance Prediction (WP3) Benchmark project. We estimate operational wake losses using supervisory control and data acquisition (SCADA) data by comparing total wind plant energy production to the potential energy production based on the power produced by freestream wind turbines. In the presentation, we will discuss the overall wake loss prediction bias as well as the project-to-project variability in the prediction accuracy. Further, we will highlight challenges encountered when estimating operational wake losses, including the impact of complex terrain and the presence of neighboring wind plants.

benchmark↗

Enhanced Component Performance Study: Motor Operated Valves 1998–2022

This report presents an enhanced performance evaluation of motor-operated valves (MOVs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2022 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The MOV failure modes considered are fail to open or close (FTOC), fail to operate or control (FTOP), and spurious operation (SO). The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire study period. The following increasing trend was identified for MOVs for the most recent 10-year period: • Low-demand MOV frequency of FTOC demands (demands per reactor year). The following decreasing trends were identified for MOVs for the most recent 10-year period: • Low-demand MOV FTOC failure probability • Low-demand MOV frequency of FTOC events (failures per reactor year).

99 GENERAL AND MISCELLANEOUS↗

The Maintainable Fusion Pilot Plant

The US fusion community has coalesced around the goal of building an FPP as described by the National Academies of Science, Engineering, and Medicine (NASEM). In addition to demonstrating the viability of the technologies necessary to operate such a plant, including demonstration of net energy and electricity production, NASEM found that a “fusion pilot plant will need to demonstrate the ability to efficiently perform remote maintenance and replacement in support of the design of a power plant, taking into account details of the consequences of the fusion environment, such as material activation and tritium retention in components.” Current designs of fusion demonstration reactors do usually foresee a regular exchange of their first wall modules, including the tritium breeding blankets. In the European Power Plant Conceptual Studies, it is assumed that a fusion reactor will need to change its divertor every 2 years and its first wall blanket module every 5 to 6 years to reach acceptable availability. Underlying this capability are remote-handling technologies to keep the outage for the exchange of these components short. There are many uncertainties in the remote-handling schemes, and most schemes are at a preconceptual level at best. In addition, the exchange of these components would either produce an enormous rad-waste stream or would require an enormous refurbishment activity with huge cost-prohibitive hot-cells. Past Fusion Nuclear Science Facility (FNSF) preconceptual studies have led to hot cell dimensions of an unbelievable size, likely costing tens of billions of dollars. Already at The Way (previously International Thermonuclear Experimental Reactor, ITER), hot-cells have become cost-prohibitive, demanding redesigns of the ITER first wall to reduce the toxic rad-waste/inventory. In this in-situ PFC repair project, a concept for a long-life, maintainable first wall module concept is developed and tested. This first wall concept relies on innovative remote handling to repair the first wall modules in-situ, avoiding costly refurbishments outside of the tokamak vessel. This approach was highlighted in the Fusion Energy Sciences Advisory Committee (FESAC) report on Transformative Enabling Capabilities for Efficient Advance Toward Fusion Energy. In general, the damage of the first wall armor is due to particle and radiation exposures. Load conditions vary from one fusion reactor design to another. In tokamaks, first wall Plasma Facing Components (PFCs) are exposed to far-Scrape-Off-Layer plasma fluxes, electromagnetic radiation, energetic CX neutrals, and potentially runaway electron beams. Protecting the first wall to the worst-case load conditions would require the design of a very thick first wall armor. Transient heat and particle fluxes due to disruptions or edge localized modes can lead to excessive heat loads resulting potentially in melting PFCs down to the cooling channel. Catastrophic events like these need to be avoided by appropriate disruption mitigation systems. However, failure of these systems will still put a first wall at an unacceptable risk. Hence, a first wall design needs to accommodate the occasional transient heat loads by introducing sacrificial limiters, which will absorb these transients.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Preliminary results of geothermal desalting operations at the East Mesa test site Imperial Valley, California

The Bureau of Reclamation has erected at its Geothermal Resource Development site two experimental test vehicles for the purpose of desalting hot fluids of geothermal origin. Both plants have as a feed source geothermal well Mesa 6-1 drilled to a total depth of 8,030 feet and having a bottom hole temperature of 400 F. Formation fluid collected at the surface contained 24,800 mg/1 total dissolved solids. The dissolved solids consist mainly of sodium chloride. A multistage distillation (3-stage) plant has been operated intermittently for one year with no operational problems. Functioning at steady-state conditions with a liquid feed rate of 70 g/m and a temperature of 221 F, the final brine blowdown temperature was 169 F. Product water was produced at a rate of about 2 g/m; average total dissolved solids content of the product was 170 mg/1. A product quality of 27.5 mg/1 at a pH of 9.5 was produced from the first stage.

Suemoto, S. H.↗

Community response of soil microorganisms to combined contamination of polycyclic aromatic hydrocarbons and potentially toxic elements in a typical coking plant

Both polycyclic aromatic hydrocarbons (PAHs) and potentially toxic elements (PTEs) of coking industries impose negative effects on the stability of soil ecosystem. Soil microbes are regarded as an essential moderator of biochemical processes and soil remediation, while their responses to PAHs-PTEs combined contamination are largely unknown. In the present study, soil microbial diversity and community composition in the typical coking plant under the chronic co-exposure of PAHs and PTEs were investigated and microbial interaction networks were built to reveal microbial co-occurrence patterns. The results indicated that the concentrations of PAHs in the soil inside the coking plant were significantly higher than those outside the plant. The mean concentration of ∑16PAHs was 2894.4 ng·g −1 , which is 5.58 times higher than that outside the plant. The average Hg concentration inside the coking plant was 22 times higher than the background value of Hebei province. The soil fungal community inside the coking plant showed lower richness compared with that of outside community, and there are significant difference in the bacterial and fungal community composition between inside and outside of coking plant ( p < 0.01). Predicted contribution of different environmental factors to each dominant species based on random forest identified 20 and 25 biomarkers in bacteria and fungi, respectively, that were highly sensitive to coking plant soil in operation, such as Betaproteobacteria,Sordariomycetes and Dothideomycetes . Bacterial and fungal communities were shaped by the soil chemical properties (pH), PTEs (Hg), and PAHs together in the coking plant soils. Furthermore, the bacterial and fungal interaction patterns were investigated separately or jointly by intradomain and interdomain networks. Competition is the main strategy based on the co-exclusion pattern in fungal community, and the competitive relationship inside the coking plant is more complex than that outside the plant. In contrast, cooperation is the dominant strategy in bacterial networks based on the co-occurrence pattern. The present study provided insights into microbial response strategies and the interactions between bacteria and fungi under long-term combined contamination.

Shen, Qihui↗

Safety-Related Instrumentation and Control Pilot Upgrade (Initial Scoping Phase Implementation Report)

This research report (1) describes the process followed and products developed during the SR I&C Pilot Project Initial Scoping Phase, and (2) captures lessons learned. Exelon Generation and LWRS collaborated to develop a Digital Transformation Strategy as part of a larger Advanced Concept of Operations. The proposed SR I&C Pilot Upgrade provides a foundation stone for this Digital Transformation that will improve plant safety, reliability, and operational performance while lowering plant Total Cost of Ownership (TCO). Initial Scoping Phase activities for this Pilot Project have been performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process (SDP), NISP-EN-04, Standard Digital Engineering Process (SDEP), and Electric Power Research Institute (EPRI) Report 3002011816, Digital Engineering Guide (DEG). Completing Initial Scoping Phase Engineering and Operations, Licensing, and Project Management Activities was necessary to sufficiently bound the scope, schedule, and estimated cost of the Project to enable utility management to authorize moving into the Conceptual Design Phase. A significant finding of the Business Case Analysis (BCA) methodology developed and applied as part of this effort was that the growth rate of material costs for sustaining the operation of obsolete SR I&C equipment is accelerating. This directly contributed to the Project Economic Analysis created to justify continuing the Project. Project Initial Scoping Phase lessons learned have also been captured to assist the larger industry in understanding the Digital Transformation Strategy and SR I&C Pilot Project Initial Scoping Phase efforts. This is in keeping with the public/private partnership that has been established between the Department of Energy (DOE) and Exelon for this effort with engagement from the NRC. By addressing first-of-a-kind (FOAK) risks and capturing lessons learned, the SR I&C Pilot Upgrade Project addresses technical, regulatory, and business risks to enable subsequent implementers of similar upgrade.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Design and evaluation of a payload to support plant growth onboard COMET 1

The paper describes the design and the operation principles of the Plant Module for Autonomous Space Support (P-MASS), designed to provide life support for a variety of plants, algae, and bacteria in low earth orbit during the maiden flight of COMET-1, scheduled for 1993. During flight (scheduled to continue for 30 days), both color video images and collected environmental data (including light intensity, temperature, relative humidity, CO2 and O2 concentrations, soil moisture, and nutrients released) will be downlinked to earth several times a day. These data will also be stored within the payload and retrieved from it after reentry and recovery.

Hoehn, A.↗

Preliminary Report on the Fundamentals of the Control of Turbine-Propeller Jet Power Plant

On the basis of the investigations so far completed on the behavior of PTL power plants under various operating conditions, in which the influence of the propeller characteristics is of considerable importance, the most important aspects of a control system for turbine-propeller jet power plants are deduced. A simple possible means for its concrete realization, which is also applicable to TL [NACA comment: TL, jet] power plants, is presented by means of examples. A control device of this kind is now being developed.

Kuhl, H.↗