Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “outage”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

Assessment of Energy Technology Options for the Island of Molokai, Hawaii: Analysis of Floating Solar, Pumped Storage Hydropower, and Backup Energy Systems [Slides]

This presentation summarizes analysis done by researchers at the National Laboratory of the Rockies and Pacific Northwest National Laboratory to evaluate the potential for and explore project concepts of electricity generation and storage additions on the island of Molokai, Hawaii, as identified in the Community Energy Resilience Action Plan (CERAP) by the Molokai Clean Energy Hui (MCEH), Sustainable Molokai, and the Hawaii Natural Energy Institute (HNEI). These electricity generation and storage additions include distributed photovoltaics (PV), battery energy storage, and generators for critical facilities on the island that can provide backup energy to the facilities during grid disruptions and outages, a floating PV (FPV) system on Kualapuu Reservoir, and pumped storage hydropower (PSH) systems scaled to act as a significant or primary source of energy storage on the Molokai grid. This presentation accompanies the full technical report published under the same title.

14 SOLAR ENERGY↗

Modeling Combined Heat and Power Systems in REopt

This webinar will explore how the National Laboratory of the Rockies' REopt(R) web tool can evaluate the techno-economics of combined heat and power (CHP) technologies and systems to assess performance and financial viability. REopt can analyze both standalone CHP systems, and systems paired with other on-site energy resources. Participants will gain practical insights into using REopt to optimize site energy strategies, reduce energy costs, and improve site energy security and outage recovery.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Framework for Modeling 3D-Printed Concrete Construction to Assess Energy Efficiency and Backup Power Trade-Offs in a Mixed-Use, New Construction Neighborhood Development

This paper presents a framework that expands the URBANopt(TM) modeling platform to include 3D-printed concrete wall assemblies and assess energy efficiency and backup power trade-offs in new housing developments. Applied to a planned mixed-use neighborhood in Oil City, Pennsylvania, the workflow integrates building energy and distributed energy resource (DER) modeling to evaluate envelope and equipment upgrades alongside DER operations. Results show that advanced 3D-printed envelopes combined with efficient systems and onsite photovoltaics (PV) and storage reduce energy use intensity and sustain critical loads during outages. The framework supports planning for emerging construction technologies by quantifying key trade-offs between energy efficiency and backup power performance.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Assessment of Energy Technology Options for the Island of Molokai, Hawaii: Analysis of Floating Solar, Pumped Storage Hydropower, and Backup Energy Systems

This report documents analysis done by researchers at the National Laboratory of the Rockies and Pacific Northwest National Laboratory to evaluate the potential for and explore project concepts of electricity generation and storage additions on the island of Molokai, Hawaii, as identified in the Community Energy Resilience Action Plan (CERAP) by the Molokai Clean Energy Hui (MCEH), Sustainable Molokai, and the Hawaii Natural Energy Institute (HNEI). These electricity generation and storage additions include distributed photovoltaics (PV), battery energy storage, and generators for critical facilities on the island that can provide backup energy to the facilities during grid disruptions and outages, a floating PV (FPV) system on Kualapuu Reservoir, and pumped storage hydropower (PSH) systems scaled to act as a significant or primary source of energy storage on the Molokai grid.

13 HYDRO ENERGY↗

NASCOM network: Ground communications reliability report

A reliability performance analysis of the NASCOM Network circuits is reported. Network performance narrative summary is presented to include significant changes in circuit configurations, current figures, and trends in each trouble category with notable circuit totals specified. Lost time and interruption tables listing circuits which were affected by outages showing their totals category are submitted. A special analysis of circuits with low reliabilities is developed with tables depicting the performance and graphs for individual reliabilities.

Source record↗

ATS-6 attenuation diversity measurements at 20 and 30 GHz

The results of data obtained at The University of Texas at Austin in conjunction with the ATS-6 millimeter wave experiment are presented. Attenuation measurements at 30 GHz and sky noise data at 20 GHz were obtained simultaneously at each of two sites separated by 11 km. Space diversity reduces outage time for a system in Austin, Texas with a 10 dB fade margin at 30 GHz from 15 hours to 16 minutes per year. The maximum cloud height shows a good correlation to the maximum attenuations measured.

Vogel, W. J.↗

Attenuation diversity measurements at 20 and 30 GHz

The results of data obtained at The University of Texas at Austin in conjunction with the ATS-6 millimeter wave experiment are presented. Attenuation measurements at 30 GHz and sky noise data at 20 GHz were obtained for 93 days simultaneously at each of two sites separated by 11 km and for 314 days at one site. The ratio of the loss at 30 GHz to that at 20 GHz due to rain varied from about 2 to about 4 with a median value of 2.65. This value was used to estimate 30 GHz losses for the 38.6% of time during attenuation events for which the satellite link was not available. Space diversity reduced outage time for a system in Austin, Texas, with a 10 db fade margin at 30 GHz from 3.8 hours to 4.1 minutes for the 93 days. Extrapolated to a yearly base this corresponds to 15 hours and to 16 minutes respectively. A plot of maximum observed cloud height against maximum hourly attenuation indicates that for a given attenuation level a lower limit is set for the maximum cloud height.

Vogel, W. J.↗

Multiline radar scan

Scanning scheme is more efficient than conventional scanning. Originally designed for optical radar in space vehicles, scheme may also find uses in site-surveillance security systems and in other industrial applications. It should be particularly useful when system must run on battery energy, as would be case in power outages.

Levinson, S.↗

Low cost Ku-band earth terminals for voice/data/facsimile

A Ku-band satellite earth terminal capable of providing two way voice/facsimile teleconferencing, 128 Kbps data, telephone, and high-speed imagery services is proposed. Optimized terminal cost and configuration are presented as a function of FDMA and TDMA approaches to multiple access. The entire terminal from the antenna to microphones, speakers and facsimile equipment is considered. Component cost versus performance has been projected as a function of size of the procurement and predicted hardware innovations and production techniques through 1985. The lowest cost combinations of components has been determined in a computer optimization algorithm. The system requirements including terminal EIRP and G/T, satellite size, power per spacecraft transponder, satellite antenna characteristics, and link propagation outage were selected using a computerized system cost/performance optimization algorithm. System cost and terminal cost and performance requirements are presented as a function of the size of a nationwide U.S. network. Service costs are compared with typical conference travel costs to show the viability of the proposed terminal.

Kelley, R. L.↗

GCF HSD error control

A selective repeat automatic repeat request (ARQ) system was implemented under software control in the Ground Communications Facility error detection and correction (EDC) assembly at JPL and the comm monitor and formatter (CMF) assembly at the DSSs. The CMF and EDC significantly improved real time data quality and significantly reduced the post-pass time required for replay of blocks originally received in error. Since the remote mission operation centers (RMOCs) do not provide compatible error correction equipment, error correction will not be used on the RMOC-JPL high speed data (HSD) circuits. The real time error correction capability will correct error burst or outage of two loop-times or less for each DSS-JPL HSD circuit.

Hung, C. K.↗

Storage systems for solar thermal power

A major constraint to the evolution of solar thermal power systems is the need to provide continuous operation during periods of solar outage. A number of high temperature thermal energy storage technologies which have the potential to meet this need are currently under development. The development status is reviewed of some thermal energy storage technologies specifically oriented towards providing diurnal heat storage for solar central power systems and solar total energy systems. These technologies include sensible heat storage in caverns and latent heat storage using both active and passive heat exchange processes. In addition, selected thermal storage concepts which appear promising to a variety of advanced solar thermal system applications are discussed.

Calogeras, J. E.↗

Results of thin-route satellite communication system analyses including estimated service costs

Ways for determining optimum satellite and terrestrial system architectures and parameters for providing the most economical telephone service to remote areas of the U.S. are explored. Several configurations for an isolated rural telephone system, covering all the states plus Alaska, employing satellites is considered. Both direct-to-the-user and community-type of systems are evaluated using UHF and Ku-band RF equipment for the rural/satellite links. The effect of multiple spot beams, outage, signal quality, modulation method, satellite accessing, forward error correction, and the number of users are also evaluated. The total cost for a 5-minute call from an isolated rural user to a TELCO user was shown to be as low as $1.30 for a system with 1.8 X 10 to the sixth rural users.

Wright, D. L.↗

Thermal infrared array, phase 1. Volume 1: Technical

The recommended design configuration for the focal plane array of a 1,000 element linear pushbroom system consists of 32 modules; the complete configuration is built by butting together two 1024 linear arrays. Each of the linear arrays is formed by edge butting 16 modules together. By staggering the modules of the two rows, the channel outages which occur where the modules are edge butted can be eliminated. Two stages TDI operation is performed by the post processing electronics, which reduces the design complexity of the focal plane. Systems studies show that: (1) a single focal plane design can satisfy both the LEO and SEOS mission configurations; (2) available optical designs can meet mission goals; (3) MTF can be traded with optical complexity in a future study; (4) a chopping mechanism can be devised to modifying modulate radiation to a 4-inch focal plane as well as insert two calibration sources at the required frequencies for chopping and calibration; (5) radiative cooling technology should be suitable for a future sensor in either mission configuration; and (6) cold shielding is not a requirement.

Source record↗

NASCOM network ground communications availability report

A performance analysis of NASCOM Network circuits is presented. An objective of 99.80 percent availability has been established for all network circuits and an acceptable level of 99.50. A network narrative summary for the current month includes changes in network configurations, current month's totals for modes of service and trouble category losses, a discussion of trends, and significant losses that affected the performance indexes of individual or groups of circuits. A table and narrative summary of those circuits that failed to meet the objective of 99.80% availability for all network circuits and an acceptable level of 99.50. Lost time and interruption tables showing all circuits affected by outages, by trouble category, with their total time and events, scheduled operating hours, and individual availability indexes also are included. Selected circuits whose availabilities have or continue to affect the overall network availability are also analyzed.

Source record↗

Analysis of potential benefits of integrated-gasifier combined cycles for a utility system

Potential benefits of integrated gasifier combined cycle (IGCC) units were evaluated for a reference utility system by comparing long range expansion plans using IGCC units and gas turbine peakers with a plan using only state of the art steam turbine units and gas turbine peakers. Also evaluated was the importance of the benefits of individual IGCC unit characteristics, particularly unit efficiency, unit equivalent forced outage rate, and unit size. A range of IGCC units was analyzed, including cases achievable with state of the art gas turbines and cases assuming advanced gas turbine technology. All utility system expansion plans that used IGCC units showed substantial savings compared with the base expansion plan using the steam turbine units.

Choo, Y. K.↗

Requirements for a transformerless power conditioning system

Requirements for development of a Transformerless Power Conditioning Subsystem (TPCS) that will meet utility, manufacturer, and customer needs are detailed. Issues analyzed include current utility guidelines, safety and grounding issues that appear as local codes, various kinds of TPCS connections that can be developed, dc injection, and a brief survey of TPCS circuit topologies that will meet requirements. The major result is that a finite time exists for control operation before dc injection into the distribution transformer causes customer outage (on the order of seconds). This time permits the control system to sense a dc injection condition and remove the TPCS from the utility system. Requirements for such a control system are specified. A three wire connection will ensure balanced operation for customer loads and two wire connections caused average value dc to be injected into single phase loads. This type of connection also allows for the lowest array voltage. The conclusion is that requirements for a TPCS can be determined and that there are not showstopping issues preventing implementation. The actual design and topology of the TPCS was left for further study.

Klein, J.↗

A Study of DSN Traveling Wave Maser System Reliability

Reliability and availability characteristics of the DSN traveling wave maser (TWM) Assemblies are reported for the years 1981 through 1983, the charcteristics determined are: mean time between failures (MTBF) - 1200 hours; mean time to restore service (MTTRS) - 2.5 hours; and availability - 99.83%. The TWM MTBF is very good as compared to other DSN subsystems and assemblies. The TWM MTTRS is currently about three times as long as the average of other DSN subsystems. The dominant cause of TWM failures is contamination of the helium gas in the closed cycle refrigerators. Station configurations that do not provide TWM redundancy are subject to reception outages for long periods of time. Recommendations are made to improve the TWM Assembly availability characteristics for future mission support operations.

Stevens, R.↗

AC motor and generator requirements for isolated WECS

After surveying electrically driven loads used on productive farms, the investigators chose three pumps for testing at voltages and frequencies far outside the normal operating range. These loads extract and circulate water and move heat via air, and all are critical to farm productivity. The object was to determine the envelope of supply voltage and frequency over which these loads would operate stably for time intervals under 1 hour. This information is among that needed to determine the feasibility of supplying critical loads, in case of a utility outage, from a wind driven alternator whose output voltage and frequency will vary dramatically in most continental wind regimes. Other related work is surveyed. The salient features and limitations of the test configurations used and the data reduction are described. The development of simulation models suitable for a small computer are outlined. The results are primarily displayed on the voltage frequency plane with the general conclusion that the particular pump models considered will operate over the range of 50 to 90 Hz and a voltage band which starts below rated, decreases as frequency decreases, and is limited on the high side by excessive motor heating. For example, centrifugal pump operating voltage ranges as extensive .4 to 1.4 appear possible. Particular problems with starting, stalling due to lack of motor torque, high speed cavitation, and likely overheating are addressed in a listing of required properties for wind driven alternators and their controllers needed for use in the isolated or stand alone configuration considered.

Park, G. L.↗