Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “installations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

Low Earth Orbiter: Terminal

In response to the current government budgetary environment that requires the National Aeronautics and Space Administration (NASA) to do more with less, NASA/Goddard Space Flight Center's Wallops Flight Facility has developed and implemented a class of ground stations known as a Low Earth Orbiter-Terminal (LEO-T). This development thus provides a low-cost autonomous ground tracking service for NASA's customers. More importantly, this accomplishment provides a commercial source to spacecraft customers around the world to purchase directly from the company awarded the NASA contract to build these systems. A few years ago, NASA was driven to provide more ground station capacity for spacecraft telemetry, tracking, and command (TT&C) services with a decreasing budget. NASA also made a decision to develop many smaller, cheaper satellites rather than a few large spacecraft as done in the past. In addition, university class missions were being driven to provide their own TT&C services due to the increasing load on the NASA ground-tracking network. NASA's solution for this ever increasing load was to use the existing large aperture systems to support those missions requiring that level of performance and to support the remainder of the missions with the autonomous LEO-T systems. The LEO-T antenna system is a smaller, cheaper, and fully autonomous unstaffed system that can operate without the existing NASA support infrastructure. The LEO-T provides a low-cost, reliable space communications service to the expanding number of low-earth orbiting missions around the world. The system is also fostering developments that improve cost-effectiveness of autonomous-class capabilities for NASA and commercial space use. NASA has installed three LEO-T systems. One station is at the University of Puerto Rico, the second system is installed at the Poker Flat Research Range near Fairbanks, Alaska, and the third system is installed at NASA's Wallops Flight Facility in Virginia. This paper will describe the current NASA implementation of the LEO-T network of antenna systems, the customers now being supported, and the services NASA can now offer with this new breed of autonomous ground stations. In addition, the paper will define the technical capabilities of the system and the cost effectiveness of using the systems including the capital costs of installation.

Kremer, Steven E.↗

{Interball-1 Plasma, Magnetic Field, and Energetic Particle Observations}

Funding from NASA was received in two installments. The first installment supported research using Russian/Czech/Slovak/French Interball-1 plasma, magnetic field, and energetic particles observations in the vicinity of the magnetopause. The second installment provided salary support to review unsolicited proposals to NASA for data recovery and archiving, and also to survey ISTP data provision efforts. Two papers were published under the auspices of the grant. Sibeck et al. reported Interball-1 observations of a wave on the magnetopause with an amplitude in excess of 5 R(sub E), the largest ever reported to date. They attributed the wave to a hot flow anomaly striking the magnetopause and suggested that the hot flow anomaly itself formed during the interaction of an IMF discontinuity with the bow shock. Nemecek et al. used Interball-1's VDP Faraday cup to identify large transient increases in the magnetosheath density. They noted large variations in simultaneous Wind observations of the IMF cone angle, but were unable to establish any relationship between the cone angle variations at Wind and the density variations at Interball-1. Funds from the second installment were used to review over 20 proposals from various researchers in the scientific community who sought NASA support to restore or archive past observations. It also supported a survey of ISTP data provisions which was used as input to a Senior Review of ongoing NASA ISTP programs.

Sibeck, David G.↗

The Interaction of Solar wind Discontinuities with the Earth's Bow Shock

Funding from NASA Grant No. NAG54679 was received in three installments. The first year's installment amounted to only one month of salary support and was used to prepare survey plots. The second year's installment allowed us to complete two research papers concerning the interaction of solar wind discontinuities with the Earth's bow shock. In the first (published) paper, we reported that the discontinuities launch slow mode waves into the magnetosheath and the slow mode waves always propagate antisunward through the flank magnetosheath. Because the sunward/antisunward sense of the magnetosheath magnetic field reverses across local noon, so does the (north/south or east/west) sense of the velocity fluctuations associated with the waves. Wind, Geotail, and IMP-8 observations were used for this study. In the second study, we used Wind and Interball-1 observations to demonstrate that pressure pulses in the magnetosheath occur in pairs and that they bound pressure cavities and/or brief intervals of outward magnetopause motion. This paper is now in press. Funding from the third year's installment has been used to investigate the two aspects of the foreshock. Two manuscripts are now in preparation for submission to the Journal of Geophysical Research. The first reports that waves within the foreshock account for many instances of poor correlations between two solar wind monitors. Remaining cases of poor correlation occur during intervals of nearly constant IMF orientations and magnetic field strengths. While the former category pose a significant difficulty for space weather forecasts, the latter do not. The second study surveys IMP-8 observations of the foreshock. We find that diamagnetic cavities are common, particularly during periods of high solar wind velocity and low solar wind density. Plasma densities, temperatures, and magnetic field strengths fall during intervals of enhanced energetic particle fluxes. The cavities are bounded by regions of decelerated solar wind plasma and enhanced densities and magnetic field strengths.

Sibeck, David G.↗

Evaluation Metrics for the Paragon XP/S-15

On February 17th 1993, the Numerical Aerodynamic Simulation (NAS) facility located at the NASA Ames Research Center installed a 224 node Intel Paragon XP/S-15 system. After its installation, the Paragon was found to be in a very immature state and was unable to support a NAS users' workload, composed of a wide range of development and production activities. As a first step towards addressing this problem, we implemented a set of metrics to objectively monitor the system as operating system and hardware upgrades were installed. The metrics were designed to measure four aspects of the system that we consider essential to support our workload: availability, utilization, functionality, and performance. This report presents the metrics collected from February 1993 to August 1993. Since its installation, the Paragon availability has improved from a low of 15% uptime to a high of 80%, while its utilization has remained low. Functionality and performance have improved from merely running one of the NAS Parallel Benchmarks to running all of them faster (between 1 and 2 times) than on the iPSC/860. In spite of the progress accomplished, fundamental limitations of the Paragon operating system are restricting the Paragon from supporting the NAS workload. The maximum operating system message passing (NORMA IPC) bandwidth was measured at 11 Mbytes/s, well below the peak hardware bandwidth (175 Mbytes/s), limiting overall virtual memory and Unix services (i.e. Disk and HiPPI I/O) performance. The high NX application message passing latency (184 microns), three times than on the iPSC/860, was found to significantly degrade performance of applications relying on small message sizes. The amount of memory available for an application was found to be approximately 10 Mbytes per node, indicating that the OS is taking more space than anticipated (6 Mbytes per node).

Traversat, Bernard↗

Free-Spinning-Tunnel Investigation of a 1/28-Scale Model of the North American FJ-4 Airplane with External Fuel Tanks, TED No. NACA AD 3112

A supplementary investigation to determine the effect of external fuel tanks on the spin and recovery characteristics of a l/28-scale model of the North American FJ-4 airplane has been conducted in the Langley 20-foot free-spinning tunnel. The model had been extensively tested previously (NACA Research Memorandum SL38A29) and therefore only brief tests were made to evaluate the effect of tank installation. Erect spin tests of the model indicate that flat-type spins-are more prevalent with 200-gallon external fuel tanks than with tanks not installed. The recovery technique determined for spins without tanks, rudder reversal to full against the spin accompanied by simultaneous movement of ailerons to full with the spin, is recommended for spins encountered with external tanks installed. If inverted spins are encountered with external tanks installed, the tanks should be jettisoned and recovery attempted by rudder reversal to full against the spin with ailerons maintained at neutral.

Healy, Frederick M.↗

Genesis Noble Gas Measurements

The original thrust of our Genesis funding was to extend and refine the noble gas analytical capabilities of this laboratory to improve the precision and accuracy of noble gas measurements in order to optimize the scientific return from the Genesis Mission. This process involved both instrumental improvement (supplemented by a SRLIDAP instrument grant) and refinement of technique. The Genesis landing mishap shifted our emphasis to the irregular aluminum heat shield material from the flat collector wafers. This has required redesign of our laser extraction cells to accommodate the longer focal lengths required for laser extraction from non-flat surfaces. Extraction of noble gases from solid aluminum surfaces, rather than thin coatings on transparent substrates has required refinement of controlled-depth laser ablation techniques. Both of these bring new problems, both with potentially higher blanks form larger laser cells and the larger quantities of evaporated aluminum which can coat the sapphire entrance ports. This is mainly a problem for the heavy noble gases where larger extraction areas are required, necessitating the new aluminum vapor containment techniques described below. With the Genesis Mission came three new multiple multiplier noble gas mass spectrometers to this laboratory, one built solely by us (Supergnome-M), one built in collaboration with Nu-Instruments (Noblesse), and one built in collaboration with GVI (Helix). All of these have multiple multiplier detection sections with the Nu-Instruments using a pair of electrostatic quad lenses for isotope spacing and the other two using mechanically adjustable positions for the electron multipliers. The Supergnome-M and Noblesse are installed and running. The GVI instrument was delivered a year late (in March 2005) and is yet to be installed by GVI. As with all new instruments there were some initial development issues, some of which are still outstanding. The most serious of these are performance issues with the miniature channel electron multipliers. The delayed installation of Helix by the GVI is partly due to failure of the initial batch of Burle channel multipliers to perform as expected. A number of the channel multipliers designed for Noblesse by Burle have also failed upon baking. Burle has now refined the design of these and we have installed two of the new multipliers and are assessing their performance. The remaining multipliers Will be upgraded to the new design from Burle once we confirm that the problem has been fixed.

Hohenberg, Charles M.↗

SRMS Assisted Docking and Undocking for the Orbiter Repair Maneuver

As part of the Orbiter Repair Maneuver (ORM) planned for Return to Flight (RTF) operations, the Shuttle Remote Manipulator System (SRMS) must undock the Orbiter, maneuver it through a complex trajectory at extremely low rates, present it to an EVA crewman at the end of the Space Station Remote Manipulator System to perform the Thermal Protection System (TPS) repair, and then retrace back through the trajectory to dock the Orbiter with the Orbiter Docking System (ODS). The initial and final segments of this operation involve the interaction between the SRMS, ISS, Orbiter and ODS. Previously, a technique entitled "SRMS assisted docking" for installation of a payload to the ODS had been developed and was utilized for the Russian provided Docking Module on STS-74 during Shuttle-Mir missions and both the Node 1 and FGB elements on STS-88/Flight 2A. This procedure consisted of the SRMS grappling the respective payload, maneuvering it to a pre-install position inches above the ODS Androgynous Peripheral Attachment System (APAS) ring, commanding the SRMS into Test mode (which allows brakes-off motion of the joints), and then down-firing Primary Reaction Control System (PRCS) jets in order to effect a capture of the APAS latches. Once a successful capture had been achieved, then the AP AS was operated through its nominal retraction sequence to complete the mating sequence. While this technique can once again be used for the tail end docking portion of the ORM, the initial undocking of the orbiter and ISS vehicles with the assistance of the SRMS has yet to be attempted on orbit. The objective here is to determine the most efficient means to separate or extract the vehicles. Two techniques were analyzed in support of RTF: (1) the 'nominal' demating from the mated interface, and (2) the SRMS performing the operation (either in an active or passive fashion). In the first operation, the demating process would replicate standard undocking operations, with the exception that the SRMS is allowed to arrest the resulting motion. The second operation would be to extend the APAS ring to a ready to dock position, open the capture latches, and then detach the vehicles using the SRMS either actively or passively. In the active case, the APAS ring is extended and latched, and the SRMS is commanded to pull the two interfaces apart (assuming that the effective pull force of the SRMS can overcome the spec values of the combined latch resistance). In the passive case, the SRMS brakes are engaged and the AP AS mechanism is commanded to retract, pulling the two interfaces apart. Since the emphasis of both STS-74 and STS-88 had solely been on the installation operation, as opposed to the separation operation, two new models required development and incorporation within simulation tools designed to analyze those scenarios. These enhancements included: (1) a detailed demating dynamics model to characterize the pusher spring characteristics during undocking, and (2) contact and mechanical system modeling of the back side of the latches to represent unlatching dynamics. This paper first provides an overview of the Monte-Carlo screening analysis for the installation (both nominal and contingency), including the variation of separation distance, misalignment conditions, SRMS joint/brake parameter characteristics, and PRCS jet combinations and corresponding thrust durations. The resulting 'optimum' solution is presented based on trade studies between predicted capture success and integrated system loads. This paper then discusses the upgrades to the APAS math model associated with the new SRMS assisted undocking technique and reviews simulation results for various options investigated for either the active and passive separation of the ISS from the Orbiter.

Space Station Remote Manipulator System↗

Alignment Pins for Assembling and Disassembling Structures

Simple, easy-to-use, highly effective tooling has been devised for maintaining alignment of bolt holes in mating structures during assembly and disassembly of the structures. The tooling was originally used during removal of a body flap from the space shuttle Atlantis, in which misalignments during removal of the last few bolts could cause the bolts to bind in their holes. By suitably modifying the dimensions of the tooling components, the basic design of the tooling can readily be adapted to other structures that must be maintained in alignment. The tooling includes tapered, internally threaded alignment pins designed to fit in the bolt holes in one of the mating structures, plus a draw bolt and a cup that are used to install or remove each alignment pin. In preparation for disassembly of two mating structures, external supports are provided to prevent unintended movement of the structures. During disassembly of the structures, as each bolt that joins the structures is removed, an alignment pin is installed in its place. Once all the bolts have been removed and replaced with pins, the pins maintain alignment as the structures are gently pushed or pulled apart on the supports. In assembling the two structures, one reverses the procedure described above: pins are installed in the bolt holes, the structures are pulled or pushed together on the supports, then the pins are removed and replaced with bolts. The figure depicts the tooling and its use. To install an alignment pin in a bolt hole in a structural panel, the tapered end of the pin is inserted from one side of the panel, the cup is placed over the pin on the opposite side of the panel, the draw bolt is inserted through the cup and threaded into the pin, the draw bolt is tightened to pull the pin until the pin is seated firmly in the hole, then the draw bolt and cup are removed, leaving the pin in place. To remove an alignment pin, the cup is placed over the pin on the first-mentioned side of the panel, the draw bolt is inserted through the cup and threaded into the pin, then the draw bolt is tightened to pull the pin out of the hole.

Campbell, Oliver C.↗

Characterization of the Effect of Wing Surface Instrumentation on UAV Airfoil Performance

Recently proposed flight research at NASA Dryden Flight Research Center (DFRC) has prompted study into the aerodynamic effects of modifications made to the surfaces of laminar airfoils. The research is focused on the high-aspect ratio, laminar-flow type wings commonly found on UAVs and other aircraft with a high endurance requirement. A broad range of instrumentation possibilities, such as structural, pressure, and temperature sensing devices may require the alteration of the airfoil outer mold line as part of the installation process. This study attempts to characterize the effect of installing this additiona1 instrumentation on key airfoil performance factors, such as transition location, lift and drag curves, and stall point. In particular, the general case of an airfoil that is channeled in the spanwise direction is considered, and the impact on key performance characteristics is assessed. Particular attention is focused on exploring the limits of channel depth and low-Reynolds number on performance and stall characteristics. To quantify the effect of increased skin friction due to premature transition caused by protruding or recessed instrumentation, two simplified, conservative scenarios are used to consider two potential sources of diaturbance: A) that leading edge alterations would cause linearly expanding areas (triangles) of turbulent flow on both surfaces of the wing upstream of the natural transition point, and B) that a channel or bump on the upper surface would trip turbulent flow across the whole upper surface upstream of the natural transition point. A potentially more important consideration than the skin friction drag increment is the change in overall airfoil performance due to the installation of instrumentation along most of the wingspan. To quantify this effect, 2D CFD simulations of the flow over a representative mid-span airfoil section were conducted in order to assess the change in lift and drag curves for the airfoil in the presence of disturbed flow due to the installed instrumentation. A discussion as to the impact on high-altitude and low-speed operation of this and similar aircraft is provided.

Ratnayake, Nalin A.↗

Improved Cryostat for Cooling a Wide Panel

An improved cryostat has been developed for cooling a wide panel evenly over its surface to a temperature of -423 F (approximately equal to -253 C) by use of liquid helium. Originally, the cryostat was to be used in measuring apparent strains in wide aluminum/lithium panels as functions of temperature in order to develop data for temperature compensation of the readings of strain gauges on a tank containing liquid hydrogen. Relative to the cryostat used previously for this purpose, the improved cryostat can be prepared for a test in less time, and it loses less helium during each test. Each wide panel to be tested is instrumented with thermocouples in preparation for a test. The previous cryostat was made of two aluminum halves that, for each test, were sandwiched together and sealed around the instrumented wide panel to be tested. The panel was thus enclosed in a plenum. The cryostat and adjacent panel areas protruding from the cryostat were then coated with a thermally insulating foam. During a test, liquid helium was made to flow into the plenum through a port on the bottom. The helium vaporized and expanded, filling the plenum with cold helium gas, which eventually flowed out of the plenum through a port on the top. The nature of the flow was such that a significant portion of the helium did not come into contact with the wide panel; hence, cooling was less efficient than it might otherwise have been. After completion of each test, the foam and the cryostat were separated from the panel. The cryostat was cleaned and prepared for installation on another instrumented wide panel for the next test. It took 28 hours to install the cryostat onto the instrumented panel, apply the foam, and perform ancillary operations in preparation for a test. The volume of liquid helium consumed during each test was 750 liters. The improved cryostat (see figure) includes an upper section and a lower section, both of which include permanent housings made of a thermally insulating foam 2-in. (approximately equal to 5-cm) thick. A liquid-helium- injection manifold is attached to the inside of the top section. The bottom section includes an outlet for helium gas. The manifold contains slots that, when the cryostat is installed on the panel, are located approximately 1 in. (approximately equal to 2.5 cm) from the wide panel. The array of slots spans a substantial portion of the area of the panel. The top and bottom sections of the cryostat are sealed to the panel by use of polytetrafluoroethylene cord and aluminum tape. Liquid helium is fed into the manifold from the top. The helium leaves the manifold through the slots and thus impinges directly on the panel. Hence, all the helium entering the cryostat must come into contact with the panel before leaving the cryostat. After a test, the cryostat is removed from the panel and reinstalled onto another panel for the next test. Installation of the cryostat on an instrumented panel takes a negligible amount of time, in comparison with the 28 hours associated with the previous cryostat. The amount of liquid helium consumed during a test in the improved cryostat is 500 liters - 250 liters less than before.

Clifton, W. B.↗

Veggie Hardware Validation Test Preliminary Results and Lessons Learned

The Veggie hardware validation test, VEG-01, was conducted on the International Space Station during Expeditions 39 and 40 from May through June of 2014. The Veggie hardware and the VEG-01 experiment payload were launched to station aboard the SpaceX-3 resupply mission in April, 2014. Veggie was installed in an Expedite-the-Processing-of-Experiments-to-Space-Station (ExPRESS) rack in the Columbus module, and the VEG-01 validation test was initiated. Veggie installation was successful, and power was supplied to the unit. The hardware was programmed and the root mat reservoir and plant pillows were installed without issue. As expected, a small amount of growth media was observed in the sealed bags which enclosed the plant pillows when they were destowed. Astronaut Steve Swanson used the wet/dry vacuum to clean up the escaped particles. Water insertion or priming the first plant pillow was unsuccessful as an issue prevented water movement through the quick disconnect. All subsequent pillows were successfully primed, and the initial pillow was replaced with a backup pillow and successfully primed. Six pillows were primed, but only five pillows had plants which germinated. After about a week and a half it was observed that plants were not growing well and that pillow wicks were dry. This indicated that the reservoir was not supplying sufficient water to the pillows via wicking, and so the team reverted to an operational fix which added water directly to the plant pillows. Direct watering of the pillows led to a recovery in several of the stressed plants; a couple of which did not recover. An important lesson learned involved Veggie's bellows. The bellows tended to float and interfere with operations when opened, so Steve secured them to the baseplate during plant tending operations. Due to the perceived intensity of the LED lights, the crew found it challenging to both work under the lights and read crew procedures on their computer. Although the lights are not a safety hazard, for visual comfort crewmembers were advised to wear sunglasses when working with the plants and then they can lift glasses to read procedures. Steve Swanson had already trail-blazed this procedure when he initiated VEG-01. The temperature and humidity data logger was relocated mid-experiment to provide measurements on both sides of the unit. Images of the plants were downlinked weekly, and videos of installation and harvest were recorded. This imaging frequency was not sufficient to monitor and respond to changes in plant growth. Plants, samples, and data loggers will be returned on SpaceX-4, scheduled to return the fall of 2014. Lessons learned will be translated into hardware and operational modifications for future Veggie payloads.

International Space Station↗

Tethered Space Satellite-1 (TSS-1): Wound About a Bolt

In the early 1990's US and Italian scientists collaborated to study the electrodynamics on a long tether between two satellites as it moved through the electrically charged portion of Earth's atmosphere called the ionosphere. Potential uses for the electrical current induced in the long wire include power and thrust generation for a satellite, momentum exchange, artificial gravity, deployment of sensors or antennas, and gravity-gradient stabilization. The Tethered Space Satellite (TSS) was a first-of-its-kind experiment with long tethers in space. It consisted of a satellite with science experiments attached to a 12.5 mile long, very thin (0.10 inch diameter) copper wire assembly wound around a spool in the deployer reel mechanism. The whole mechanism sits on a pallet that is installed into the Shuttle bay. At an altitude of 160 nautical miles above earth, the satellite would be deplodeployed from the Shuttle bay by raising it on a boom facing away from Earth. Once cleared of the bay, the deployer mechanism would slowly feed out the 12-plus miles of tether. Scientific data would be collected throughout the operation, after which the satellite would be reeled back in. A receiver spool to catch the 12.5 mile tether as it was being unwound by the deployer reel mechanism was set up to do the system-level test of deployer real mechanism prior to installing the loaded pallet into the Shuttle bay. The system level tests were required before the pallet could be installed into the Space Shuttle cargo bay. A few months before flight, the system level tests, including unreeling and reeling the tether, were completed at Kennedy Space Center (KSC) and the TSS payload was installed onto the Spacelab pallet. Some of this testing equipment was then shipped back to the contractor, Martin Marietta. Integration with the Shuttle began. Systems-level load analyses, which cannot be run until all information about each payload is finalized, was run in parallel with the physical integration of the hardware into the Shuttle payload bay. An analysis, called Coupled loads analysis, incorporates any updates to the model due to system level tests of all the different payloads, and any changes that were found during integration. Engineering analysis examines the worst case scenarios for the loads the hardware will see. The two times during the mission where the dynamic loads are the worst were 1) the first 10-second portion of Shuttle lift off, and 2) a 2-second time during landing when the landing gears hit the ground. The coupled loads analysis using the final verification loads showed that a single bolt attaching the deployer reel mechanism to the support structure had a "negative margin" - which is an indication that it might fail - during touch down. Hardware certification rules do not allow for hardware to fly with negative margins. A structural failure of one payload could have serious or catastrophic consequences to other payloads, or may significantly damage the Orbiter. The issue had to be resolved before the flight.

O'Connor, Brian↗

Emergency Locator Transmitter System Performance During Three Full-Scale General Aviation Crash Tests

Full-scale crash tests were conducted on three Cessna 172 aircraft at NASA Langley Research Center's Landing and Impact Research facility during the summer of 2015. The purpose of the three tests was to evaluate the performance of commercially available Emergency Locator Transmitter (ELT) systems and support development of enhanced installation guidance. ELTs are used to provide location information to Search and Rescue (SAR) organizations in the event of an aviation distress situation, such as a crash. The crash tests simulated three differing severe but survivable crash conditions, in which it is expected that the onboard occupants have a reasonable chance of surviving the accident and would require assistance from SAR personnel. The first simulated an emergency landing onto a rigid surface, while the second and third simulated controlled flight into terrain. Multiple ELT systems were installed on each airplane according to federal regulations. The majority of the ELT systems performed nominally. In the systems which did not activate, post-test disassembly and inspection offered guidance for non-activation cause in some cases, while in others, no specific cause could be found. In a subset of installations purposely disregarding best practice guidelines, failure of the ELT-to-antenna cabling connections were found. Recommendations for enhanced installation guidance of ELT systems will be made to the Radio Technical Commission for Aeronautics (RTCA) Special Committee 229 for consideration for adoption in a future release of ELT minimum operational performance specifications. These recommendations will be based on the data gathered during this test series as well as a larger series of crash simulations using computer models that will be calibrated based on these data

Littell, Justin D.↗

Information Management Platform for Data Analytics and Aggregation (IMPALA) System Design Document

The System Design document tracks the design activities that are performed to guide the integration, installation, verification, and acceptance testing of the IMPALA Platform. The inputs to the design document are derived from the activities recorded in Tasks 1 through 6 of the Statement of Work (SOW), with the proposed technical solution being the completion of Phase 1-A. With the documentation of the architecture of the IMPALA Platform and the installation steps taken, the SDD will be a living document, capturing the details about capability enhancements and system improvements to the IMPALA Platform to provide users in development of accurate and precise analytical models. The IMPALA Platform infrastructure team, data architecture team, system integration team, security management team, project manager, NASA data scientists and users are the intended audience of this document. The IMPALA Platform is an assembly of commercial-off-the-shelf (COTS) products installed on an Apache-Hadoop platform. User interface details for the COTS products will be sourced from the COTS tools vendor documentation. The SDD is a focused explanation of the inputs, design steps, and projected outcomes of every design activity for the IMPALA Platform through installation and validation.

Carnell, Andrew↗

TPSAS-NF1676L-10751-DND

Developed in the late 1960's, the NASA Langley Research Center's 14-by-22-Foot Subsonic Tunnel was not originally conceived to test and evaluate the aeroacoustic characteristics of flight vehicles. However, sometime after the tunnel's inception, a need to do so developed. To facilitate acoustic measurements, a removable microphone traverse was designed and built. The implemented solution was functional yet time consuming to install and remove. Comprised of numerous interlocking parts, each installation of the system required three weeks of non-productive tunnel time, numerous personnel, and specialized equipment. A recently renewed focus on aeroacoustic testing brought about a desire to improve the operational efficiency of this type of testing in the 14-by 22-Foot Subsonic Tunnel. Specifically, a goal was established to reduce non-productive installation time from three weeks to just three shifts. In addition, no specialized equipment was to be required for installation and removal. Meeting these goals required the development of a new microphone traverse system. This presentation will provide details of the newly designed, built and commissioned traverse which meets the stated objectives.

Low speed wind tunnel↗

Summary of Testing Results for the Structural Heat Intercept, Insulation, and Vibration Evaluation Rig (SHIIVER)

Testing was completed on the Structural Heat Intercept, Insulation, and Vibration Evaluation Rig (SHIIVER) between August 2019 and January 2020. SHIIVER was designed to be a test bed for the scaling of cryogenic fluid management technologies as applied to large upper stages and long duration in-space stages. The baseline SHIIVER design consists of uninsulated structural skirts attached to a propellant tank insulated with polyurethane Spray-On Foam Insulation (SOFI). The initial testing of the SHIIVER hardware was with liquid hydrogen and sought to demonstrate the use of boil-off vapor to intercept heat on a structural skirt, multilayer insulation (MLI) on the tank domes, and the radio frequency mass gauge (RFMG). Testing was completed in four stages: a baseline thermal vacuum test prior to installation of the MLI on the tank domes, a thermal vacuum test after the MLI installation, a reverberant acoustic test, and a subsequent thermal vacuum test to verify that no damage occurred during the reverberant acoustic testing. Each thermal vacuum test with chamber wall at ambient temperature and vacuum level in the 10-6 torr range was conducted continuously between approximately 90% full and 25% full. Test results showed that the vapor cooling reduced the heat load to the tank by approximately 10%, but the boil-off by less than 3% at 50% full, with and without MLI installed on the domes. The MLI installed on the domes reduced the heat load to the tank by approximately 40% at all fill levels, but the boil-off by approximately 25% at 90% full and 45% below 65% full. The RFMG performed well over all fill ranges, and several RF tank modes were used to gauge the mass of fluid in the tank. SHIIVER was then exposed to an acoustic environment of 147 dB OASPL (overall sound pressure level) in a reverberant chamber. The acoustic environment envelopes the upper stage internal acoustic level of several different modern launch vehicles. No structural or thermal performance changes were observed after exposure to the acoustic environment. Final thermal vacuum testing after the acoustic testing showed no degradation to the MLI due to the acoustic environment as measured via system heat loads

SHIIVER↗

Wilson Corners SWMU 001 2019-2020 Annual Long-Term Monitoring Report Kennedy Space Center, Florida

This report presents a summary of the long-term monitoring (LTM) activities that occurred in 2019 and 2020 at Wilson Corners, Solid Waste Management Unit 001, at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program. Adaptive site management is being utilized through ongoing assessment, design, and interim measures. This approach also meets the requirements of Chapter 62-780, Florida Administrative Code. The goal of LTM at this site is threefold: to determine groundwater flow characteristics, monitor the downgradient concentration trends, and monitor select locations internal to the groundwater plume. Every 5 years, upgradient and side-gradient monitoring wells are sampled to verify delineation. The last time this was performed was in 2015. Sampling of these wells in 2020 was replaced with the direct push technology investigations in October 2020 and April 2021. The activities presented in this report include three field events: (1) December 2019 -groundwater gauging of 38 monitoring wells and sampling of 36 monitoring wells; (2) May 2020 - groundwater sampling of 7 monitoring wells; and (3) December 2020 - groundwater gauging of 49 monitoring wells and sampling of 43 monitoring wells. During the December 2019 and May 2020 events, monitoring wells were sampled using passive diffusion bags and were analyzed for a “full list” of volatile organic compounds (VOCs), including Freon 113. During the December 2020 event, the low flow sampling method was used, and samples were analyzed for a “select list” of VOCs, including Freon 113. The following conclusions can be made based on the 2019 and 2020 LTM results: •In December 2019 and December 2020, groundwater flow for the site was generally to the west with the individual zones only varying by occasional northerly and southerly components. This is generally consistent with historical observations at the site. •The GCTL plume continues to extend both horizontally and vertically beyond our current monitoring well network. •The vertical extent of VOCs was historically generally delineated by monitoring wells screened greater than 48 feet bls. The results from the two vertical extent monitoring wells WILC-MW0078 and WILC-MW0130 that were sampled during the 2019 and 2020 LTM indicate that groundwater VOC concentrations in both wells were greater than the GCTL. •Freon 113 was not detected above GCTLs during the 2019 and 2020 LTM events. Based on groundwater sampling activities performed during this reporting period, including recent DPT groundwater sampling conducted for the implementation of an air sparge system, the following recommendations are provided: •Install 10 new monitoring wells, which will be sampled along with 49 existing monitoring wells, to assist with delineation of the low concentration plume. The wells are listed inTable 4-1, and the proposed locations are presented on Figures4 -1 through 4-5. (Figures 4-1, 4-2, 4-3, and 4-5 also show updated plumes and proposed performance monitoring well locations. This information will be discussed and presented under a separate cover.) •Modify the annual LTM sampling plan as presented inTable 4-1. •Sampling for future events at the site will be conducted using low flow pumping methods. The next annual LTM sampling event is currently planned for December 2021. Please note the 10 new monitoring wells will not be installed before this event but will be installed as part of the upcoming IM construction and will be sampled during baseline sampling, along with the 49 existing monitoring wells. Following this sampling event, it is recommended that the Annual LTM be combined with the performance monitoring under the IM implementation, and LTM be temporarily discontinued. Objectives of the 2021 LTM are to: (i) evaluate groundwater gradient and flow direction by collecting depth to water measurements from LTM wells; (ii) continue monitoring the peripheral VOC trends in the northern, southern, and western portions of the site by monitoring existing wells and installing and monitoring new wells as recommended; and (iii) monitor select internal plume wells.

Jennifer Lynn Joyal↗

X-57 Cruise Motor GVT Using Fixed-Base Correction Technique

The National Aeronautics and Space Administration (NASA) Armstrong Flight Research Center (AFRC) completed a modal survey of the X-57 Maxwell aircraft cruise motor system to help inform cruise motor redesign efforts. X-57 Maxwell was an electric propulsion demonstrator aircraft developed by NASA to inform airworthiness standards for electrified-aircraft. The cruise motor system modal survey was completed in spring of 2023 utilizing the fixed-base correction (FBC) ground vibration test (GVT) technique developed by ATA Engineering, to decouple the motor modes from the aircraft modes. Previously during the full aircraft GVT, a detailed modal assessment of the cruise motors was not performed. Owing to the X-57 project’s phase in the aircraft development cycle when the motor redesign effort occurred, the cruise motor GVT could only be performed with the cruise motor system installed on the aircraft, with most of its installation hardware (wiring, baffling, sensors, etc.) attached. An impact hammer was used to provide excitation input at various locations within the tight confines of the cruise motor installation. To better support motor redesign efforts, the FBC methodology was utilized to fix, separate and de-couple the cruise motor modes from aircraft modal response. During the GVT, this required additional impact tap tests on candidate fixed-boundary points for each degree of freedom (DOF) to be fixed. Additional triaxial accelerometers installed at the candidate points were used to compute frequency response functions (FRFs) in X, Y, and Z directions to enable those DOFs to be numerically fixed. Test data was acquired using Hottinger Brüel & Kjær’s LAN-XI data acquisition hardware and BK Connect software. FBC post-test processing was performed using the Structural Modification Using Frequency Response Functions (SMURF) technique with ATA Engineering’s Interface between MATLAB, Analysis, Test (IMAT) software. Utilizing the FBC technique relieved test engineers from having to instrument the entire aircraft to identify and separate aircraft response from cruise motor modes of interest. The FBC technique also permitted structural analysis engineers to omit secondary components from their finite element model (FEM) of the cruise motor system. This FBC modal survey was successful, and the first time NASA AFRC utilized the FBC method on an aircraft rather than a test fixture, and also using an impact hammer rather than multiple shakers allowing significant project schedule and cost savings

Modal Survey↗