Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “field testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

Large-Eddy Simulations and Lidar Measurements of Vortex-Pair Breakup in Aircraft Wakes

Results of large-eddy simulations of an aircraft wake are compared with results from ground-based lidar measurements made at NASA Langley Research Center during the Subsonic Assessment Near-Field Interaction Flight Experiment field tests. Brief reviews of the design of the field test for obtaining the evolution of wake dispersion behind a Boeing 737 and of the model developed for simulating such wakes are given. Both the measurements and the simulations concentrate on the period from a few seconds to a few minutes after the wake is generated, during which the essentially two-dimensional vortex pair is broken up into a variety of three-dimensional eddies. The model and experiment show similar distinctive breakup eddies induced by the mutual interactions of the vortices, after perturbation by the atmospheric motions.

Lewellen, D. C.↗

PHASE II VAULT TESTING OF THE ARGONNE RFID SYSTEM

The U.S. Department of Energy (DOE) (Environmental Management [EM], Office of Packaging and Transportation [EM-45]) Packaging and Certification Program (DOE PCP) has developed a Radio Frequency Identification (RFID) tracking and monitoring system, called ARG-US, for the management of nuclear materials packages during transportation and storage. The performance of the ARG-US RFID equipment and system has been fully tested in two demonstration projects in April 2008 and August 2009. With the strong support of DOE-SR and DOE PCP, a field testing program was completed in Savannah River Site's K-Area Material Storage (KAMS) Facility, an active Category I Plutonium Storage Facility, in 2010. As the next step (Phase II) of continued vault testing for the ARG-US system, the Savannah River Site K Area Material Storage facility has placed the ARG-US RFIDs into the 910B storage vault for operational testing. This latest version (Mark III) of the Argonne RFID system now has the capability to measure radiation dose and dose rate. This paper will report field testing progress of the ARG-US RFID equipment in KAMS, the operability and reliability trend results associated with the applications of the system, and discuss the potential benefits in enhancing safety, security and materials accountability. The purpose of this Phase II K Area test is to verify the accuracy of the radiation monitoring and proper functionality of the ARG-US RFID equipment and system under a realistic environment in the KAMS facility. Deploying the ARG-US RFID system leads to a reduced need for manned surveillance and increased inventory periods by providing real-time access to status and event history traceability, including environmental condition monitoring and radiation monitoring. The successful completion of the testing program will provide field data to support a future development and testing. This will increase Operation efficiency and cost effectiveness for vault operation. As the next step (Phase II) of continued vault testing for the ARG-US system, the Savannah River Site K Area Material Storage facility has placed the ARG-US RFIDs into the 910B storage vault. Deploying the ARG-US RFID system lends to a reduced need for manned surveillance and increased inventory periods by providing real-time access to status and event history traceability, including radiation and environmental monitoring. The successful completion of the testing program will provide field data to support future development and testing.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

One Year Performance Results for the Prism Solar Installation at the New Mexico Regional Test Center: Field Data from February 15 2016 - February 14 2017.

A 9.6 kW test array of Prism bifacial modules and reference monofacial modules installed in February 2016 at the New Mexico Regional Test Center has produced one year of performance data. The data reveal that the Prism modules are out-performing the monofacial modules, with bifacial gains in energy over the twelve-month period ranging from 17% to 132%, depending on the orientation and ground albedo. These measured bifacial gains were found to be in good agreement with modeled bifacial gains using equations previously published by Prism Solar. The most dramatic increase in performance was seen among the vertically mounted, west-facing modules, where the bifacial modules produced more than double the energy of monofacial modules in the same orientation. Because peak energy generation (mid- morning and mid-afternoon) for these bifacial modules may best match load on the electric grid, the west-facing orientation may be more economically desirable than traditional south-facing module orientations (which peak at solar noon).

14 SOLAR ENERGY↗

Coupled Thermal-Hydrologic-Chemical Coupled Model for In-Drift Disposal Test

The simulation work presented in this report supports DOE-NE Used Fuel Disposition Campaign (UFDC) goals related to the development of drift scale in-situ field testing of heat-generating nuclear waste (HGNW) in salt formations. Numerical code verification and validation is an important part of the lead-up to field testing, allowing exploration of potential heater emplacement designs, monitoring locations, and perhaps most importantly the ability to predict heat and mass transfer around an evolving test. Such predictions are crucial for the design and location of sampling and monitoring that can be used to validate our understanding of a drift scale test that is likely to span several years.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Investigations of a bearing fault detector for railroad bearings

The laboratory tests are described which were conducted on new and damaged bearings to determine the feasibility of using high-frequency vibration as a diagnostic tool. A high-frequency band pass filter and demodulator was assembled to permit field measurements of the high-frequency vibrations. Field tests were conducted on an actual truck and on an axle assembly run in a grease test rig. These field tests were directed toward demonstration of the suitability and capabilities of the high-frequency technique for field application. Two specific areas of field application were identified as being cost effective for railroad use. One area is the examination of railroad roller bearings at a derailment site, and the second is as a wayside detector to supplement present hot box detectors for defective roller bearings.

Wilson, D. S.↗

Highly Permeable Rubbery Thin Film Composite Membranes for CO2 Capture from Steel Mills

This presentation will report the rational design and fabrication of NETL’s highly permeable non-aging thin film composite (TFC) membranes for CO2 capture from various industrial point sources. This talk will also cover the design, computational fluid dynamic simulation, 3D printing, and permeation testing of plate-and-frame membrane modules for an upcoming field demonstration at U. S. Steel’s Edgar Thomson Plant in Braddock, PA. The field test will demonstrate membrane-based CO2 capture from a blast furnace for decarbonization of steel manufacturing for the first time in the U.S. A mobile gas permeation test unit is currently under design and construction for the field test, which is scheduled to take place in 2025.

Zhu, Lingxiang↗

Laboratory Test Report for Fujitsu 12RLS and Mitsubishi FE12NA Mini-Split Heat Pumps

Mini-split heat pumps are being proposed as a new retrofit option to replace resistance heating in the Pacific Northwest. NREL has previously developed a field test protocol for mini-split systems to ensure consistent results from field tests. This report focuses on the development of detailed system performance maps for mini-split heat pumps so that the potential benefits of mini-split systemscan be accurately analyzed for different climate regions and housing types. This report presents laboratory test results for two mini-split heat pumps. Steady-state heating and cooling performance for the Fujitsu 12RLS and Mitsubishi FE12NA was tested under a wide range of outdoor and indoor temperatures at various compressor and fan speeds. Cycling performance for each unit was also testedunder both modes of operation. Both systems performed quite well under low loads and the experimental test data aligned with manufacturer reported values. Adequate datasets were attained to promote performance modeling of these two systems in the future.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Conceptual Design of the Package Handling System for the Deep Borehole Engineering Demonstration - 17064

Deep borehole disposal involves drilling one or more boreholes into crystalline basement rock to a depth of about 5 km, emplacing waste packages in the lower 2 km of the borehole, and sealing and plugging the upper 3 km. These depths are several times deeper than for typical mined repositories. A deep borehole field test (DBFT) is proposed to confirm the safety and feasibility of the deep borehole concept. The primary goals are to demonstrate the construction and characterization of deep boreholes, demonstrate the equipment and operations used for safe waste handling and emplacement downhole, study geologic controls on waste form stability and isolation, and evaluate the overall safety and practicality of the concept. The test will be conducted using simulated waste packages; no radioactive wastes will be handled at the deep borehole field test site. A key component of the DBFT is an engineering demonstration of the equipment and operations needed to transport waste packages to the site, move packages between the transportation and emplacement systems, and lower or retrieve packages into or out of the borehole. This paper describes the conceptualization of test package handling, from transportation and receipt through the interface with the borehole. It also describes the use of an integrated test facility to check out equipment prior to deployment at the DBFT site, and performance of the engineering demonstration at the DBFT site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of the long range position-determining system tests

The long range position-determining system (LRPDS) has been developed by the Corps of Engineers to provide the Field Army with a rapid and accurate positioning capability. The LRPDS consists of an airborne reference position set (RPS), up to 30 ground based positioning sets (PS), and a position computing central (PCC). The PCC calculates the position of each PS based on the range change information provided by each Set. The positions can be relayed back to the PS again via RPS. Each PS unit contains a double oven precise crystal oscillator. The RPS contains a Hewlett-Packard cesium beam standard. Frequency drifts and off-sets of the crystal oscillators are taken in account in the data reduction process. A field test program was initiated in November 1972. A total of 54 flights were made which included six flights for equipment testing and 48 flights utilizing the field test data reduction program. The four general types of PS layouts used were: short range; medium range; long range; tactical configuration. The overall RMS radial error of the unknown positions varied from about 2.3 meters for the short range to about 15 meters for the long range. The corresponding elevation RMS errors vary from about 12 meters to 37 meters.

Rhode, F. W.↗

A Distributed Intelligent Automated Demand Response Building Management System

The goal of the 2.5 year Distributed Intelligent Automated Demand Response (DIADR) project was to reduce peak electricity load of Sutardja Dai Hall at UC Berkeley by 30% while maintaining a healthy, comfortable, and productive environment for the occupants. We sought to bring together both central and distributed control to provide “deep” demand response1 at the appliance level of the building as well as typical lighting and HVAC applications. This project brought together Siemens Corporate Research and Siemens Building Technology (the building has a Siemens Apogee Building Automation System (BAS)), Lawrence Berkeley National Laboratory (leveraging their Open Automated Demand Response (openADR), Auto-­Demand Response, and building modeling expertise), and UC Berkeley (related demand response research including distributed wireless control, and grid-­to-­building gateway development). Sutardja Dai Hall houses the Center for Information Technology Research in the Interest of Society (CITRIS), which fosters collaboration among industry and faculty and students of four UC campuses (Berkeley, Davis, Merced, and Santa Cruz). The 141,000 square foot building, occupied in 2009, includes typical office spaces and a nanofabrication laboratory. Heating is provided by a district heating system (steam from campus as a byproduct of the campus cogeneration plant); cooling is provided by one of two chillers: a more typical electric centrifugal compressor chiller designed for the cool months (Nov-­ March) and a steam absorption chiller for use in the warm months (April-­October). Lighting in the open office areas is provided by direct-­indirect luminaries with Building Management System-­based scheduling for open areas, and occupancy sensors for private office areas. For the purposes of this project, we focused on the office portion of the building. Annual energy consumption is approximately 8053 MWh; the office portion is estimated as 1924 MWh. The maximum peak load during the study period was 1175 kW. Several new tools facilitated this work, such as the Smart Energy Box, the distributed load controller or Energy Information Gateway, the web-­based DR controller (dubbed the Central Load-­Shed Coordinator or CLSC), and the Demand Response Capacity Assessment & Operation Assistance Tool (DRCAOT). In addition, an innovative data aggregator called sMAP (simple Measurement and Actuation Profile) allowed data from different sources collected in a compact form and facilitated detailed analysis of the building systems operation. A smart phone application (RAP or Rapid Audit Protocol) facilitated an inventory of the building’s plug loads. Carbon dioxide sensors located in conference rooms and classrooms allowed demand controlled ventilation. The extensive submetering and nimble access to this data provided great insight into the details of the building operation as well as quick diagnostics and analyses of tests. For example, students discovered a short-­cycling chiller, a stuck damper, and a leaking cooling coil in the first field tests. For our final field tests, we were able to see how each zone was affected by the DR strategies (e.g., the offices on the 7th floor grew very warm quickly) and fine-­tune the strategies accordingly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Model predictive control for demand flexibility: Real-world operation of a commercial building with photovoltaic and battery systems

Hundreds of studies have investigated Model Predictive Control (MPC) for the optimal operation of building energy systems in the past two decades. However, MPC field tests are still uncommon, especially for small- and medium-sized commercial buildings and for buildings integrated with onsite renewables. This paper describes the implementation and the long-term performance evaluation of an MPC controller in a small commercial building equipped with behind-the-meter photovoltaics and electrochemical batteries. MPC controls space conditioning, commercial refrigeration, and the battery system. We tested two types of demand flexibility applications in the field: electricity bill minimization under time-of-use tariffs and responses to grid flexibility events. Results show that the proposed controller achieves 12% of annual electricity cost savings and 34% peak demand reduction against the baseline, while respecting thermal comfort and food safety. The field tests also demonstrate the ability of the MPC controller to provide a multitude of grid services including real-time pricing, demand limiting, load shedding, load shifting, and load tracking, using the same optimization framework.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Suited for Space

This viewgraph presentation describes the basic functions of space suits for EVA astronauts. Space suits are also described from the past, present and future space missions. The contents include: 1) Why Do You Need A Space Suit?; 2) Generic EVA System Requirements; 3) Apollo Lunar Surface Cycling Certification; 4) EVA Operating Cycles for Mars Surface Missions; 5) Mars Surface EVA Mission Cycle Requirements; 6) Robustness Durability Requirements Comparison; 7) Carry-Weight Capabilities; 8) EVA System Challenges (Mars); 9) Human Planetary Surface Exploration Experience; 10) NASA Johnson Space Center Planetary Analog Activities; 11) Why Perform Remote Field Tests; and 12) Other Reasons Why We Perform Remote Field Tests.

Kosmo, Joseph J.↗

Information Displays and Crew Configurations for UTM Operations

In this paper we discuss how team configuration may influence how infor-mation is shared among team members for low-altitude Unmanned Aircraft Systems (UAS) operations. NASA collected and analyzed observation data gathered during a series of field tests for the UAS Traffic Management (UTM) project. The field tests were part of a larger effort aimed at advancing the UTM concept, conducted at six test-sites spread across the USA. Ground control station (GCS) concepts, flight-crew composition, and crew-size var-ied within and across test-sites. Flight crews took two strategic approaches to organizing their teams. The first of the two approaches was implemented by one third of the flight crews. These crews integrated the role of UTM opera-tor into the duties of existing crew members, merging the current roles with this new one, keeping the UTM Operator collocated with the flight crew. The remaining two thirds implemented a distributed team configuration, where a single UTM operator distributed support across multiple crews. Results from our data collection efforts revealed that UTM Operator location influenced whether flight crews used verbal communication versus displays to acquire UTM information.

teams↗

New vertical cryostat for the high field superconducting magnet test station at CERN

In the framework of the R and D program for new superconducting magnets for the Large Hadron Collider accelerator upgrades, CERN is building a new vertical test station to test high field superconducting magnets of unprecedented large size. This facility will allow testing of magnets by vertical insertion in a pressurized liquid helium bath, cooled to a controlled temperature between 4.2 K and 1.9 K. The dimensions of the cryostat will allow testing magnets of up to 2.5 m in length with a maximum diameter of 1.5 m and a mass of 15 tons. To allow for a faster insertion and removal of the magnets and reducing the risk of helium leaks, all cryogenics supply lines are foreseen to remain permanently connected to the cryostat. A specifically designed 100 W heat exchanger is integrated in the cryostat helium vessel for a controlled cooling of the magnet from 4.2 K down to 1.9 K in a 3 m{sup 3} helium bath. This paper describes the cryostat and its main functions, focusing on features specifically developed for this project. The status of the construction and the plans for assembly and installation at CERN are also presented.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Simplified Space Conditioning in Low-Load Homes: Results from the Fresno, California, Retrofit Unoccupied Test House

In this study, the Building America team, IBACOS, sought to determine cost-effective, energy-efficient solutions for heating and cooling houses. To this end, the team performed field testing in a retrofit unoccupied test house in Fresno, California, to evaluate three air-based heating, ventilation, and air conditioning (HVAC) distribution systems during heating, cooling, and midseason conditions. These included a typical airflow ducted system to the bedrooms, a low airflow ducted system to the bedrooms, and a system with no ductwork to the bedrooms. The relative ability of each of the three systems was assessed with respect to relevant Air Conditioning Contractors of America (ACCA) and ASHRAE standards for house temperature uniformity and stability, respectively. Computational fluid dynamics modeling also was performed and refined based on comparison to field test results to determine the air flow rate into the bedrooms of over-door and bottom-of-door air transfer grilles.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Preliminary Results of Field Emission Cathode Tests

Preliminary screening tests of field emission cathodes such as chemical vapor deposited (CVD) diamond, textured pyrolytic graphite, and textured copper were conducted at background pressures typical of electric thruster test facilities to assess cathode performance and stability. Very low power electric thrusters which provide tens to hundreds micronewtons of thrust may need field emission neutralizers that have a capability of tens to hundreds of microamperes. From current voltage characteristics, it was found that the CVD diamond and textured metals cathodes clearly satisfied the Fowler-Nordheim emission relation. The CVD diamond and a textured copper cathode had average current densities of 270 and 380 mA/sq cm, respectively, at the beginning-of-life. After a few hours of operation the cathode emission currents degraded by 40 to 75% at background pressures in the 10(exp -5) Pa to 10(exp -4) Pa range. The textured pyrolytic graphite had a modest current density at beginning-of-life of 84 mA/sq cm, but this cathode was the most stable of all. Extended testing of the most promising cathodes is warranted to determine if current degradation is a burn-in effect or whether it is a long-term degradation process. Preliminary experiments with ferroelectric emission cathodes, which are ceramics with spontaneous electric polarization, were conducted. Peak current densities of 30 to 120 mA/sq cm were obtained for pulse durations of about 500 ns in the 10(exp -4) Pa pressure range.

Sovey, James S.↗