Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “deployable payload mission”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

NASA's Space Launch System Begins Integration, Stacking in Preparation for Artemis I Launch

The Artemis era of human lunar exploration is nearing take-off as NASA’s new super heavy-lift launch vehicle, the Space Launch System (SLS), begins stack-ing and integration operations in mid-2020 at Kennedy Space Center (KSC) in Florida. With a planned upgrade path to progressively more powerful vehicles and availability in crew and cargo configurations, SLS provides a unique and flexible launch solution to send crew, large-scale infrastructure and robotic probes to deep space. The SLS Block 1 vehicle, the initial variant to fly, is optimized for lunar missions with a proven propulsion system consisting of four liquid hydrogen (LH2)/liquid oxygen (LOX)-fed RS-25 engines and twin five-segment solid rocket boosters (SRBs). The Block 1 vehicle can also be outfitted with an industry-standard 5 m-class payload fairing (the “cargo” configuration) and will launch at least 27 metric tons (t) of mass to trans-lunar injection (TLI). SLS is the backbone of NASA’s Artemis program, which will return the agency’s human spaceflight program to the Moon for the first time since 1972. For the Artemis I mission, SLS will send an uncrewed Orion spacecraft to TLI, where it will enter a distant retrograde lunar orbit and fly 38,000 nmi past the Moon – farther than any spacecraft built for humans has ever traveled. The SLS Block 1 vehicle for Artemis I completed manufacturing in 2019. Several elements, including the upper stage, have been delivered to the Exploration Ground Systems (EGS) program at KSC and are being prepped for integration and stack-ing. The five-segment solid rocket boosters – the largest and most powerful ever built for flight – are also complete. The booster motor segments for the Artemis I flight are scheduled to ship from prime contractor Northrop Grumman’s Utah facilities and begin stacking and integration at KSC in June 2020. The SLS core stage is the largest rocket stage NASA has ever built in terms of volume and height, and includes the avionics and the tanks that feed cryogenic propellant to the four RS-25s (formerly Space Shuttle Main Engines [SSMEs]). They have been modified with an updated controller and nozzle insulation to protect them from the hotter launch environment. The SLS core stage is currently being test-ed at NASA’s Stennis Space Center (SSC) in a series of “green run” tests to verify it meets design and performance requirements. Following the green run test series, which is scheduled to culminate with a full-duration hot-fire of the four RS-25 engines, the core stage will ship to KSC and be stacked between the sol-id rocket boosters in the Vehicle Assembly Building (VAB). Integration of the vehicle will continue with the upper stage, known as the Interim Cryogenic Propulsion Stage (ICPS) and the Launch Vehicle Stage Adapter (LVSA) on the core stage. Another adapter, the Orion Stage Adapter (OSA), connects SLS to Orion and provides housing for 13 6U CubeSat payloads manifested on Artemis I. The CubeSats will be released in deep space after Orion separates from the vehicle, and the flight marks the first ride share opportunity for independent small-sats to deep space. The second major SLS variant to come online, Block 1B, replaces the single-engine ICPS with a four-engine LH2/LOX Exploration Upper Stage (EUS). This more powerful upper stage, along with other vehicle up-grades, will enable the Block 1B vehicle to launch 38-42 t to TLI, depending on crew or cargo configuration. The final evolution of the vehicle, Block 2, will onramp evolved solid rocket boosters to increase mass to TLI to 43-46 t, de-pending on crew or cargo configuration. The Block 1B/Block 2 vehicles can be outfitted with an 8.4 m-diameter payload fairing in 19.1 m or 27.4 m lengths, to provide unprecedented volume for payloads. With the initial Block 1 vehicle completely manufactured and the core stage in final testing before shipping to KSC, the SLS Program and its industry partners have made significant progress manufacturing subsequent vehicles. For the second Block 1 vehicle, the solid rocket motor segments are complete, as are the RS-25 engines with controllers. All five major components of the Artemis II core stage – the forward skirt, LOX and LH2 tanks, intertank and engine section – are manufactured and technicians are installing subsystems at NASA’s rocket factory, Michoud Assembly Facility. The RL-10 engine for the Artemis II ICPS is complete and panels have been machined for its LH2 tank. In addition, panels are machined for the vehicle’s two adapters, with welding scheduled to begin in summer 2020. Flight hard-ware is also in production for the third SLS vehicle, with several booster motor segments cast. The pace of development on the EUS has increased, with the goal to complete Critical Design Review (CDR) in December 2020. Several EUS test rings have been machined at Michoud. The EUS is designed to exe-cute a variety of missions – human spaceflight, deployment of deep-space infra-structure, or high-C3 missions to the outer solar system – with crew and cargo configurations available beginning in the mid-2020s. The near-term goal for the nation’s powerful new space exploration asset, however, is to launch the Arte-mis program, and send the first woman and the next man to the lunar surface. At the Astrodynamics Specialist Conference, the SLS program will update the community on the progress of the initial Block 1 vehicle in final green run test-ing, integration and stacking. In addition, this paper will provide an update to the community on the manufacturing status of subsequent Block 1 and Block 1B vehicles.

Steve Creech↗

The Hayabusa2 Sample Return Mission and Its Small Carry-On Impactor Experiment

On December 3, 2014 the Hayabusa2 Spacecraft was launched by JAXA to investigate and return samples from carbonaceous Asteroid (162173) Ryugu. The spacecraft's payload contains several remote sensing instruments that are designed to characterize the asteroid's surface and to help identify scientifically interesting locations from which samples can be obtained safely. The data collected by these instruments will also help place any obtained samples in context with respect to the global characteristics of Ryugu. In addition to the suite of remote sensing instruments and the sampling device, Hayabusa2 also includes a small carry-on impactor (SCI) payload experiment, which is designed to impact the surface of the asteroid and excavate fresh material for subsequent collection. The SCI consists of a 30 cm diameter 2 kg copper disk that is accelerated by an explosive charge into the surface of Ryugu at approximately 2 km/s. The resultant crater formed during this experiment is estimated to be approximately between 2 - 10 meters in diameter with an ejecta blanket extending to 10 - 100 meters on the asteroid. Hayabusa2 will not be able to observe the impact experiment directly due to considerations of spacecraft safety since there is some risk of collisions with debris from the explosion and ejecta from the crater. However, prior to moving safely away, the spacecraft will deploy a small imaging system called Deployable Camera 3 (DCAM3). DCAM3 will detach from Hayabusa2 just before the detonation of the SCI and will image the moment of impact, crater formation, and ejecta propagation. These data will be transmitted to Hayabusa2 and will help constrain the near-surface properties of Ryugu and also impact scaling laws for small bodies in low gravity environments. These data could also be useful for gaining insights into determining asteroid physical properties from higher velocity impact events (e.g., DART and HERA data of Didymos).

Abell, Paul A.↗

International Space Station Satellite Deployment: Jettison Policy and Best Practices for Satellite Payload Developers

The International Space Station (ISS) deploys dozens of small satellites into Low Earth Orbit (LEO) each year. This presentation and associated paper cover the ISS Jettison Policy requirements and review/approval process, as well as best practices for satellite Payload Developers who have satellites manifested for deployment from ISS. Specifically, topics will include ISS Jettison Policy requirements to limit generation of orbital debris, limit risk of collision with ISS, and limit risk of collision with ISS visiting vehicles. The paper will include details on the ISS Program jettison candidate analysis and approval process, timelines for data submittal to ISS Program, resources for small satellite developers, and design & analysis recommendations for small satellite developers to maximize their likelihood of successful deployment from ISS. New Station deploy capabilities and ways the ISS Program addresses and facilitates innovations in small satellite technology, including propulsion systems, deorbit devices, constellation development, and novel tech demos, will also be explored. The 2024 session topic that best fits this abstract is Orbital Debris, SSA & STM. The ISS Jettison Policy intends to quantify and control the risks of deploying and operating small satellites, not only to ensure the safety of the humans flying in space, but also to preserve the orbital environment for world space activities and enable the significant benefits brought by such utilization. The ISS Program is committed to working with smallsat providers to address their challenges and enable safe, accessible, innovative missions. The Policy has grown with the industry, with each deploy yielding hard-earned lessons learned that improve our process – not only for the next deploy campaign, but with applicability and adaptability for future applications in LEO and beyond.

Jettison Policy↗

Technology Demonstration Missions

Technology Demonstration Missions (TDM) is in its third year of execution, being initiated in 2010 and baselined in January of 2012. There are 11 projects that NASA Marshall Space Flight Center (MSFC) has contributed to or led: (1) Evolvable Cryogenics (eCryo): Cyrogenic Propellant Storage and Transfer Engineering Development Unit (EDU), a proof of manufacturability effort, used to enhance knowledge and technology related to handling cryogenic propellants, specifically liquid hydrogen. (2) Composites for Exploration Upper Stage (CEUS): Design, build, test, and address flight certification of a large composite shell suitable for the second stage of the Space Launch System (SLS). (3) Deep Space Atomic Clock (DSAC): Spaceflight to demo small, low-mass atomic clock that can provide unprecedented stability for deep space navigation. (4) Green Propellant Infusion Mission (GPIM): Demo of high-performance, green propellant propulsion system suitable for Evolved Expendable Launch Vehicle (EELV) Secondary Payload Adapter (ESPA)-class spacecraft. (5) Human Exploration Telerobotics (HET): Demonstrating how telerobotics, remote control of a variety of robotic systems, can take routine, highly repetitive, dangerous or long-duration tasks out of human hands. (6) Laser Communication Relay Demo (LCRD): Demo to advance optical communications technology toward infusion into deep space and near Earth operational systems, while growing the capabilities of industry sources. (7) Low Density Supersonic Decelerator (LDSD): Demo new supersonic inflatable decelerator and parachute technologies to enable Mars landings of larger payloads with greater precision at a wider range of altitudes. (8) Mars Science Laboratory (MSL) Entry Descent & Landing Instrumentation (MEDLI): Demo of embedded sensors embedded in the MSL heat shield, designed to record the heat and atmospheric pressure experienced during the spacecraft's high-speed, hot entry in the Martian atmosphere. (9) Solar Electric Propulsion (SEP): 50-kW class spacecraft that uses flexible blanket solar arrays for power generation and an electric propulsion system that delivers payload from low-Earth orbit to higher orbits. (10) Solar Sail Demonstration (SSD): Demo to validate sail deployment techniques for solar sails that are propelled by the pressure of sunlight. (11) Terrestrial HIAD Orbit Reentry (THOR): Demo of a 3.7-m Hypersonic Inflatable Aerodynamic Decelerator (HIAD) entry vehicle to test second generation aerothermal performance and modeling.

McDougal, John↗

Passive Thermal Control for the Low Density Supersonic Decelerator (LDSD) Test Vehicle Spin Motors Sub-System

Future missions to Mars will require improved entry, descent, and landing (EDL) technology over the Viking-heritage systems which recently landed the largest payload to date, the 900 kg Mars Science Laboratory. As a result, NASA's Low Density Supersonic Decelerator (LDSD) project is working to advance the state of the art in Mars EDL systems by developing and testing three key technologies which will enable heavier payloads and higher altitude landing sites on the red planet. These technologies consist of a large 33.5 m diameter Supersonic Disk Sail (SSDS) parachute and two different Supersonic Inflatable Aerodynamic Decelerator (SIAD) devices - a robotic class that inflates to a 6 m diameter torus (SIAD-R), and an exploration class that inflates to an 8 m diameter isotensoid (SIADE). All three technologies will be demonstrated on test vehicles at high earth altitudes in order to simulate the Mars EDL environment. Each vehicle will be carried to altitude by a large helium balloon, released, spun up using spin motors to stabilize the vehicle's trajectory, and accelerated to supersonic speeds using a large solid rocket motor. The vehicle will then be spun down using another set of spin motors, and will deploy either the SIAD-R or SIAD-E, followed by the SSDS parachute until the vehicle lands in the ocean. Component level testing and bounding analysis are used to ensure the survival of system components in extreme thermal environments and predict temperatures throughout the flight. This paper presents a general description of the thermal testing, model correlation, and analysis of the spin motor passive thermal control sub-system to maintain spin motor performance, prescribed vehicle trajectory, and structural integrity of the test vehicle. The spin motor subsystem is predicted to meet its requirements with margin.

thermal analysis↗

AMPAS - A new active experiment mission

A new concept for an active experiments mission is presented: The Active Magnetospheric Particle Acceleration Satellite (AMPAS). It is proposed to fly a dual-payload tethered satellite to study three important areas of magnetopsheric physics: (1) electric and magnetic field structures of the Earth's magnetosphere, (2) electron beam-plasma interactions, and (3) far ultraviolet (FUV) signatures of energetic electron precipitation. The tethered system is to be flown in a gravity-gradient stabilized configuration with a 70 deg circular orbit at altitudes in the range 300-800 km. The upper payload will carry two electron beam accelerators (1-10 keV, 1 A) and a plasma contractor to electrically neutralize the payload, while the lower will carry a complement of optical imaging and plasma diagonstics instrumentation. Upward directed beams are injected to 'sound' electric and magnetic field structures, including parallel electric fields in the auroral region, while simultaneous optical instruments aimed downwards measure characteristics of reflected beam pulses precipitating into the upper atmosphere below the satellite. Downward directed beams, and simultaneous plasma wave, particle and optical measurements, are used for the investigation of beam-plasma interactions and electron precipitation studies. The payloads are to be connected by a 1-6 km long tether to be deployed in stages. The configuration of the beam source and the plasma and optical diagnostics on separate, tethered payloads allows the diagnostics to be performed outside of the disturbed region around the source payload, and plasma wave and particle observations of beam-plasma interactions to be performed at well-defined locations relative to the source.

Neubert, T.↗

Overview and Performance of the LOFTID Instrumentation Suite

On November 10, 2022, NASA launched the Low-earth Orbit Flight Test of an Inflatable Decelerator (LOFTID) vehicle as a secondary payload mounted inside the launch vehicle adaptor on an Atlas V out of the Vandenburg Space Force Base (VSFB). The primary payload, Joint Polar Satellite System-2 (JPSS-2), was delivered successfully to a sun synchronous trajectory shortly after launch, at which point the Centaur upper stage performed a burn to de-orbit the system. Once on the desired trajectory to enter the atmosphere the payload adaptor canister was ejected by the payload adapter separation system to expose the packed LOFTID vehicle, then the LOFTID aeroshell, a Hypersonic Inflatable Aerodynamic Decelerator (HIAD), was deployed and inflated as planned. The Centaur pointed the LOFTID vehicle to the desired attitude to enter the atmosphere, spun the assembly to roughly three rpm, and separated the reentry vehicle. The LOFTID vehicle entered the atmosphere over Alaska at >8km/sec and decelerated as designed demonstrating stable flight from hypersonic entry through subsonic parachute deployment. On-board visible light cameras captured the reactions of the heatshield through all phases of flight, and co-located infrared light cameras captured the temperature distribution of the aft side of the heat shield anchored to a distribution of thermocouples on the inflatable structure (IS) in the field of view. Thermocouples were also embedded in the forward side of the aeroshell both in the Flexible Thermal Protection System (FTPS) as well as the IS. Heat Flux Gages and Pressure Transducers measured the heating rate and surface pressure experienced by the rigid nose of the reentry vehicle. Loadcells measured the interface loads between the IS and the rigid centerbody. This paper will discuss many of the key instruments flown on the successful LOFTID technology demonstration mission and will provide some high level results, while pointing to more detailed papers on the post-flight analyses.

Gregory T Swanson↗

Overview and Performance of the LOFTID Instrumentation Suite

On November 10, 2022, NASA launched the Low-earth Orbit Flight Test of an Inflatable Decelerator (LOFTID) vehicle as a secondary payload mounted inside the launch vehicle adaptor on an Atlas V out of the Vandenburg Space Force Base (VSFB). The primary payload, Joint Polar Satellite System-2 (JPSS-2), was delivered successfully to a sun synchronous trajectory shortly after launch, at which point the Centaur upper stage performed a burn to de-orbit the system. Once on the desired trajectory to enter the atmosphere the payload adaptor canister was ejected by the payload adapter separation system to expose the packed LOFTID vehicle, then the LOFTID aeroshell, a Hypersonic Inflatable Aerodynamic Decelerator (HIAD), was deployed and inflated as planned. The Centaur pointed the LOFTID vehicle to the desired attitude to enter the atmosphere, spun the assembly to roughly three rpm, and separated the reentry vehicle. The LOFTID vehicle entered the atmosphere over Alaska at >8km/sec and decelerated as designed demonstrating stable flight from hypersonic entry through subsonic parachute deployment. On-board visible light cameras captured the reactions of the heatshield through all phases of flight, and co-located infrared light cameras captured the temperature distribution of the aft side of the heat shield anchored to a distribution of thermocouples on the inflatable structure (IS) in the field of view. Thermocouples were also embedded in the forward side of the aeroshell both in the Flexible Thermal Protection System (FTPS) as well as the IS. Heat Flux Gages and Pressure Transducers measured the heating rate and surface pressure experienced by the rigid nose of the reentry vehicle. Loadcells measured the interface loads between the IS and the rigid centerbody. This paper will discuss many of the key instruments flown on the successful LOFTID technology demonstration mission and will provide some high level results, while pointing to more detailed papers on the post-flight analyses.

spacecraft design↗

Localization of Ad-Hoc Lunar Constellations in Communication Failure Modes for Distributed Spacecraft Autonomy

As lunar missions increase in complexity inspired by NASA’s Artemis Program, they will require reliable and sufficient capability of the Position, Navigation, and Timing (PNT) system to support their scientific objectives. In addition, NASA's Commercial Lunar Payload Services (CLPS) program initiates the proliferation of public and private exploration partnerships using small satellites from commercial and private organizations, expanding traditionally confined low Earth orbit to be used for missions beyond geosynchronous orbit (Zucherman et al., 2022). Therefore, the Lunar PNT system is also required to provide navigation services compatible with the smaller platforms being sent by the public and private sectors, like CubeSats. However, traditional approaches to deep space missions’ navigation based on ground radio facilities have difficulties in providing sufficient support for the increasing number of users and communication at a distance from the Earth (Kaplev et al., 2022). In particular, the existing Lunar navigation technologies such as weak signal global positioning system (GPS) and deep space network (DSN) are not able to ensure operations of the upcoming small-scale Lunar missions due to their limitations in localization performance as well as capacity aspects. Another way to provide Lunar PNT service is to create a dedicated Lunar global navigation satellite system (GNSS) constellation, like GNSS systems on Earth. Space agencies like NASA, ESA, and JAXA are now developing the lunar communications relay and navigation systems (LCRNS) and Lunar navigation satellite systems (LNSS). In their systems, satellites will be deployed in moon orbits to provide the communication, positioning, navigation, and timing (CPNT) service at the lunar south pole region where the Artemis base camp will be expected (Murata et al., 2022). Meanwhile, common challenges considered in lunar PNT research arise from poor geometry of the terrestrial GNSS satellites when seen from the lunar user, highly perturbed lunar orbits, and limitations in power, size, and cost of the equipment on lunar satellites (Iiyama et al., 2023). It is also not clear if there will be enough Lunar users to support the cost and resources this would require as the Low-cost surface missions may not be able to support the large power, mass, and weight requirements that these navigation solutions entail (Niemoeller et al., 2022). As an alternative, existing Lunar science and exploration assets could be used to create a low-cost, autonomous, ad-hoc, and on-demand mission-centric Lunar PNT swarm capable of providing PNT services to these low-cost lunar missions (Hagenau et al., 2021). Introducing the non-dedicated and ad-hoc Lunar navigation constellation gives a way to provide PNT services on-demand. The non-dedicated swarm assets of Lunar constellations are designed to localize themselves with minimal interaction with Earth by adding cooperative autonomous localization to lunar missions, freeing up valuable bandwidth and ground segment resources. An autonomous localization of Lunar constellations is based on the concept of the decentralized PNT system with a distributed extended Kalman filter (DEKF) approach to state estimation for minimal onboard operating costs. In the distributed data processing algorithm, computation is broken down and assigned to each satellite, resulting in a considerably decreased computational amount while maintaining the accuracy of the orbit ephemeris and clock offsets as the result of centralized data processing (Wen et al., 2019). The DEKF requires spacecraft to perform two-way ranging operations with each other to communicate simultaneously, leveraging neighbor two-way intersatellite link (ISL) measurements such as pseudoranges to, and relative velocities between, visible satellites as sensor values (Frank et al., 2021). The Lunar autonomous PNT simulation (LAPS) demonstrated the feasibility of orbital asset localization among ad-hoc Lunar small-sat constellations based on the DEKF in Hagenau et al. (2021) and evaluated the matching algorithm proposed by Frank et al. (2021) in scheduling position estimation updates. In previous papers, all assets and measurements are assumed to be always available without consideration of the impact of intermittent and permanent communication failure. This study presents localization performance with increasing levels of network degradation for swarm assets and users to demonstrate the robustness of the decentralized Lunar PNT service in more realistic scenarios. Main issues arising from communication failure include spacecraft permanent or transient loss, antenna failures, message delays, etc. We tested four possible reasons for network degradation for 7 days in 21 satellites frozen with an altitude of 5500 km, evenly spaced around 3 circular, 40 inclination orbital planes where each spacecraft has two directional antennas. As anchor nodes with an independent estimate of their position are required in the DEKF approach, two ground nodes in each pole and one node in the gateway were implemented in the simulation. First, the most probable failure scenario involves the loss of a single spacecraft due to solar interference and technical malfunctions of the assets. Losing the availability of a single spacecraft means losing the two-way ISL measurement of the asset in the DEKF update. In order to provide the best possible quality of PNT service with limited time and resources, the distributed Lunar constellations must schedule the communication activities. The scheduler leverages mixed-integer linear programming (MILP) for the coordination and scheduling of the desired “as-needed” localization service (Niemoeller et al., 2022). We assume the scheduler has completely excluded the spacecraft information before the DEKF update in the failure scenario. When a random spacecraft has been turned off at a specific time, the robustness of the autonomous Lunar PNT system is evaluated. The simulation results give an 11.5% degradation in median position accuracy compared to the idealized performance excluding the asset loss. Second, a large number of assets may vanish due to major hardware problems or meteor strikes around the moon. A multiple spacecraft loss can degrade the localization performance very fast by losing the communication ability to do cross-plane measurements and in-plane measurements in a 3-plane constellation. When the matching-based scheduler is aware of ISL availability, we investigate a large number of in-plane and cross-plane asset vanishments both in close proximity and equally spaced throughout the orbital plane. According to the simulations, the loss of in-plane measurements gives 40.2% degradation while cross-plane measurements degrade 50.5% of asset localization performance among available assets. Therefore, it is concluded that cross-plane measurements are more important in improving the position estimation accuracy. Third, spacecraft failure information can be lost due to the internal message delay, resulting in the DEKF update scheduler to solve the matching problem with unavailable assets. The DEKF update cycle is comprised of network setup, communication, and computations where a global broadcast network and a 2-way ISL network setup take 6 minutes in total (Frank et al., 2021). Once the broadcast network successfully transmits and receives information, a random spacecraft may lose its availability right before solving the matching problem. This means the matching solution is no longer optimal, resulting in degradation in the localization performance. A numerical assessment shows the matching-based scheduler with knowing failure holds 11.5% of position accuracy degradation, whereas the scheduler without knowing failure gives 34% degraded localization performance without asset loss. Fourth, a transient loss of a single or multiple spacecraft may occur due to their antenna outages. After losing the two-way ISL availability for a few DEKF update cycles, the availability of spacecraft can easily be recovered as their states have been independently updated using measurements from anchor nodes. It is likely that the longer failure will result in worse localization performance. We have tested the transient failure of a random single asset for 30 min in the simulation, which is losing 3 update cycles in the DEKF system. From the simulation results, the position accuracy has been degraded to 4.84% which is better than the degraded localization performance of 11.5% from the permanent loss scenario among available assets. In conclusion, the autonomous Lunar PNT system based on the DEKF approach shows the ability to maintain resilience and robustness in the possible communication failure scenarios, ensuring that localization accuracy is preserved across various network degradation and outages. Future studies on investigating user localization performance near the South Pole and the broadcast network system will be continued in the following months.

Yeji Kim↗

The Roman Space Telescope Observatory Build, Test and Verification Status

The Nancy Grace Roman Space Telescope (“Roman”) was prioritized by the 2010 Decadal Survey in Astronomy and Astrophysics and is NASA’s next astrophysics flagship observatory. Launching no earlier than 2026, it will conduct several wide field and time domain surveys, as well as conduct an exoplanet census. Roman’s large field of view, agile survey capabilities, and excellent stability enable these objectives, yet present unique engineering and test challenges. The Roman Observatory comprises a Spacecraft and the Integrated Payload Assembly (IPA), the latter of which includes the Optical Telescope Assembly (OTA), the primary science Wide Field Instrument, a technology demonstration Coronagraph Instrument, and the Instrument Carrier, which meters the OTA to each instrument. The Spacecraft supports the IPA and includes the Bus, Solar Array Sun Shield, Outer Barrel Assembly, and Deployable Aperture Cover. It provides all required power, command handling, attitude control, communications, data storage, and stable thermal control functions as well as shading and straylight protection across the entire field of regard. This paper presents the Observatory as it begins integration and test, as well as describes key test and verification activities.

Infrared Missions↗

AERACEPT (Aerosol Rapid Analysis Combined Entry Probe/sonde Technology): Enabling Technology for Missions to the Venus Clouds

AERACEPT (AErosol Rapid Analysis Combined Entry Probe/sonde Technology) is an early-stage technology allowing a single aeroshell body to act as both an entry vehicle and aerosol-sampling passive descent sonde. AERACEPT does not require heat shield separation, deployable parachutes, or descent control, thus reducing the mass, volume, and complexity of planetary aerosol sampling. AERACEPT is particularly well suited for a Venus mission, where the particles of greatest interest are within the subsonic descent regime. AERACEPT uses the aeroshell’s own velocity to drive aerosol capture and separation through a series of embedded inlets. It takes advantage of recently developed thermal protection materials (3D-CC and HEEET) in combination with heritage aerosol sampling technologies from both planetary and airborne science (high-speed inlets and particle separation). The trade space for a given descent trajectory includes the particle capture efficiency for a given size, the bias introduced in the sampled particle size and concentration distributions, and the thermal alteration experienced by the particles during their brief exposure to the internal flow environment. AERACEPT is included in the Nephele mission concept study for a small spacecraft targeting the Venus middle and lower cloud layers. Nephele complements larger missions targeting Venus atmospheric gas analysis, such as DAVINCI and Venera-D, by specifically targeting cloud and haze particles. Because of the short lifetime of the probe in the lower atmosphere, Nephele requires a fast cadence of analysis of the captured particles, and includes the VOLTR dual optical spectrometer (SERS/LIBS) as part of its notional payload. Preliminary modeling based on the Nephele trajectory at 63 km to 39 km indicates AERACEPT can limit sample heating to 30-60 K above ambient. A modified particle tracking model has been implemented to estimate capture efficiency of particles larger than 0.1 µm and total sample volume as part of an inlet and interal flow path geometry trade study. Further modeling and empirical testing is underway to improve these estimates.

AERACEPT↗

ELaNa - Educational Launch of Nanosatellite Providing Routine RideShare Opportunities

Since the creation of the NASA CubeSat Launch Initiative (NCSLI), the need for CubeSat rideshares has dramatically increased. After only three releases of the initiative, a total of 66 CubeSats now await launch opportunities. So, how is this challenge being resolved? NASA's Launch Services Program (LSP) has studied how to integrate PPODs on Athena, Atlas V, and Delta IV launch vehicles and has been instrumental in developing several carrier systems to support CubeSats as rideshares on NASA missions. In support of the first two ELaNa missions the Poly-Picosatellite Orbital Deployer (P-POD) was adapted for use on a Taurus XL (ELaNa I) and a Delta n (ELaNa III). Four P-PODs, which contained a total eight CubeSats, were used on these first ELaNa missions. Next up is ELaNa VI, which will launch on an Atlas V in August 2012. The four ELaNa VI CubeSats, in three P-PODs, are awaiting launch, having been integrated in the NPSCuLite. To increase rideshare capabilities, the Launch Services Program (LSP) is working to integrate P-PODs on Falcon 9 missions. The proposed Falcon 9 manifest will provide greater opportunities for the CubeSat community. For years, the standard CubeSat size was 1 U to 3U. As the desire to include more science in each cube grows, so does the standard CubeSat size. No longer is a 1 U, 1.5U, 2U or 3U CubeSat the only option available; the new CubeSat standard will include 6U and possibly even 12U. With each increase in CubeSat size, the CubeSat community is pushing the capability of the current P-POD design. Not only is the carrier system affected, but integration to the Launch Vehicle is also a concern. The development of a system to accommodate not only the 3U P-POD but also carriers for larger CubeSats is ongoing. LSP considers payloads in the lkg to 180 kg range rideshare or small/secondary payloads. As new and emerging small payloads are developed, rideshare opportunities and carrier systems need to be identified and secured. The development of a rideshare carrier system is not always cost effective. Sometimes a launch vehicle with an excellent performance record appears to be a great rideshare candidate however, after completing a feasibility study, LSP may determine that the cost of the rideshare carrier system is too great and, due to budget constraints, the development cannot go forward. With the current budget environment, one cost effective way to secure rideshare opportunities is to look for synergy with other government organizations that share the same interest.

Skrobot, Garrett Lee↗

ELaNa - Educational Launch of Nanosatellite Enhance Education Through Space Flight

One of NASA's missions is to attract and retain students in the science, technology, engineering and mathematics (STEM) disciplines. Creating missions or programs to achieve this important goal helps strengthen NASA and the nation's future work force as well as engage and inspire Americans and the rest of the world. During the last three years, in an attempt to revitalize educational space flight, NASA generated a new and exciting initiative. This initiative, NASA's Educational Launch of Nanosatellite (ELaNa), is now fully operational and producing exciting results. Nanosatellites are small secondary satellite payloads called CubeSats. One of the challenges that the CubeSat community faced over the past few years was the lack of rides into space. Students were building CubeSats but they just sat on the shelf until an opportunity arose. In some cases, these opportunities never developed and so the CubeSat never made it to orbit. The ELaNa initiative is changing this by providing sustainable launch opportunities for educational CubeSats. Across America, these CubeSats are currently being built by students in high school all the way through graduate school. Now students know that if they build their CubeSat, submit their proposal and are selected for an ELaNa mission, they will have the opportunity to fly their satellite. ELaNa missions are the first educational cargo to be carried on expendable launch vehicles (ELY) for NASA's Launch Services Program (LSP). The first ELaNa CubeSats were slated to begin their journey to orbit in February 2011 with NASA's Glory mission. Due to an anomaly with the launch vehicle, ELaNa II and Glory failed to reach orbit. This first ELaNa mission was comprised of three IU CubeSats built by students at Montana State University (Explorer Prime Flight 1), the University of Colorado (HERMES), and Kentucky Space, a consortium of state universities (KySat). The interface between the launch vehicle and the CubeSat, the Poly-Picosatellite Orbital Deployer (P-POD), was developed and built by students at California Polytechnic State University (Cal Poly). Integrating a P-POD on a NASA ELV was not an easy task. The creation of new processes and requirements as well as numerous reviews and approvals were necessary within NASA before the first ELaNa mission could be attached to a NASA launch vehicle (LV). One of the key objectives placed on an ELaNa mission is that the CubeSat and PPOD does not increase the baseline risk to the primary mission and launch vehicle. The ELaNa missions achieve this objective by placing a rigorous management and engineering process on both the LV and CubeSat teams. So, what is the future of ELaNa? Currently there are 16 P-POD missions manifested across four launch vehicles to support educational CubeSats selected under the NASA CubeSat Initiative. From this initiative, a rigorous selection process produced 22-student CubeSat missions that are scheduled to fly before the end of 2012. For the initiative to continue, organizations need to submit proposals to the annual CubeSat initiative call so they have the opportunity to be manifested and launched.

Skrobot, Garrett Lee↗

SERENE: Saturn Enceladus Return Explorer with Nuclear Electric Propulsion

A ‘quick’ Enceladus sample return mission concept was developed based on the scientist recommendations at the recent ‘Accelerating Space Science with Nuclear Technology Workshop’. The Nuclear Electric Propulsion spacecraft assumed a follow-on 40 kWe nuclear reactor using the demonstrated 40 kWe Fission Surface Power system, expected in the early 2030s. The NEP vehicle also utilized a set of NEXT-C ion thrusters as well as planned Artemis commercial launchers. By launching the 40 kW NEP vehicle on a Starship and adding the propellants of 15 tankers, the 27t probe could be sent on a direct trajectory to Saturn (no Earth or Jupiter flybys) where NEP was used for Saturn capture, spiral down, spiral up and return to the Earth. A small lander obtained the surface Enceladus sample. Using the 40 kW NEP provided a round-trip time of only 16.5 years. A second option was more attractive from a science perspective whereby the NEP vehicle would deliver a large, 6t chemical lander to low Enceladus orbit where it would grab and return a sample to Earth (similar to the recent Orbilander design but in reverse). After deploying the lander, the NEP vehicle would stay in Saturn space performing a moon tour by orbiting four more moons and mapping the large moon of Titan. This option took slightly longer (18.5 yrs) due to the chemical return leg limitations. Both options demonstrated the agility, payload capability, and sample return goals the workshop recommended. An all-chemical option with two stages was roughly analyzed but took 21.5 yrs and required a Jupiter gravity assist.

Nuclear Electric Propulsion↗

Conductive Tether Coating for Electrodynamic Tethers

The Propulsive Small Expendable Deployer System (ProSEDS), which is an on-orbit demonstration of the propulsion capabilities of electrodynamic tethers in space, is a secondary payload on a Delta 11 unmanned expendable booster. The ProSEDS tether consists of a 5 km bare electrodynamic tether and a 1 0-km non-conductive leader tether. Near the Delta 11, 160 m of the conductive tether is insulated to prevent plasma electron collection from the plasma contactor and for other science requirements. The remainder of the 5-km conductive tether is coated with a new conductive coating to collect plasma electrons. A bare metal tether easily collects electrons from the plasma, but thermal concerns preclude this design. A highly emissive conductive polymer developed by Triton Systems, Inc. has been optimized for both conductivity and thermo-optical properties. The current design for the ProSEDS conductive tether is seven individually coated strands of 28 AWG aluminum wire, coated with an atomic oxygen-resistant conductive polymer composed of a mixture of COR (Colorless Oxygen Resistant) and polyanaline (PANI) known as C-COR (Conductive-Colorless Oxygen Resistant). The conductive-coated wire strands are cold-welded to individually coated strands of the insulated tether. The insulated tether is coated with 1 mil of polyimide and an atomic oxygen resistant polymer TOR-BP. The insulated tether must stand off the entire voltage of the tether (1 200 V) at various times during the mission. All seven wires are twisted around a Kevlar-29 core using the Hi-wire design. Extensive testing has been performed at the Marshall Space Flight Center to qualify both the conductive coating and insulating coating for use on the ProSEDS tether. The conductive coating has been exposed to a plasma to verify the coatings ability to collect electrons from the space plasma from 0 to 1500 V, and to verify the coatings ability to collect electrons after atomic oxygen exposure. The insulated coating has been tested to verify its dielectric strength both in a vacuum and air. Thermal optical properties on both coatings have been measured before and after atomic oxygen testing. The results of these tests will be presented.

Jason A Vaughn↗

Thermal Design and Analysis of the Supersonic Flight Dynamics Test Vehicle for the Low Density Supersonic Decelerator Project

The thermal design and analysis of the experimental Supersonic Flight Dynamics Test (SFDT) vehicle is presented. The SFDT vehicle is currently being designed as a platform to help demonstrate key technologies for NASA's Low Density Supersonic Decelerator (LDSD) project. The LDSD project is charged by NASA's Office of the Chief Technologist (OCT) with the task of advancing the state of the art in Mars Entry, Descent, and Landing (EDL) systems by developing and testing three new technologies required for landing heavier payloads on Mars. The enabling technologies under development consist of a large 33.5 meter diameter Supersonic Ringsail (SSRS) parachute and two different types of Supersonic Inflatable Aerodynamic Decelerator (SIAD) devices - a robotic class, SIAD-R, that inflates to a 6 meter diameter torus, and an exploration class, SIAD-E, that inflates to an 8 meter diameter isotensoid. As part of the technology development effort, the various elements of the new supersonic decelerator system must be tested in a Mars-like environment. This is currently planned to be accomplished by sending a series of SFDT vehicles into Earth's stratosphere. Each SFDT vehicle will be lifted to a stable float altitude by a large helium carrier balloon. Once at altitude, the SFDT vehicles will be released from their carrier balloon and spun up via spin motors to provide trajectory stability. An onboard third stage solid rocket motor will propel each test vehicle to supersonic flight in the upper atmosphere. After main engine burnout, each vehicle will be despun and testing of the deceleration system will begin: first an inflatable decelerator will be deployed around the aeroshell to increase the drag surface area, and then the large parachute will be deployed to continue the deceleration and return the vehicle back to the Earth's surface. The SFDT vehicle thermal system must passively protect the vehicle structure and its components from cold temperatures experienced during the ascent phase of the mission as well as from the extreme heat fluxes produced during the supersonic test phase by the main motor plume and aeroheating. The passive thermal design approach for the SFDT vehicle relies upon careful and complex bounding analysis of all three modes of heat transfer - conduction, convection, and radiation - coupled with a tightly managed transient power dissipation timeline for onboard electronics components throughout all mission phases.

thermal desktop↗

Structural load control during construction

In the absence of gravitational pull, the major design considerations for large space structures are stiffness for controllability, and transient dynamic loadings (as opposed to the traditional static load associated with earth-based structures). Because of the absence of gravitational loading, space structures can be designed to be significantly lighter than their counterparts on Earth. For example, the Space Shuttle manipulator arm is capable of moving and positioning a 60,000 lb payload, yet weighs less than 1,000 lbs. A recent design for the Space Station which had a total weight of about 500,000 lbs. used a primary loadcarrying keel beam which weighed less than 10,000 lbs. For many large space structures designs it is quite common for the load-carrying structure to have a mass fraction on the order of one or two percent of the total spacecraft mass. This significant weight reduction for large space structures is commonly accompanied by very low natural frequencies. These low frequencies cause an unprecedented level of operational complexity for mission applications which require a high level of positioning and control accuracy. This control problem is currently the subject of considerable research directed towards reducing the flexibility problem. In addition, however, the small mass fraction typically results in structures which are quite unforgiving to inadvertent high loadings. In other words, the structures are 'fragile.' In order to deal with the fragility issue CSC developed a load-limiting concept for space truss structures. This concept is aimed at limiting the levels of load which can occur in a large space structure during the construction process as well as during subsequent operations. Currently, the approach for dealing with large loadings is to make the structure larger. The impact this has on construction is significant. The larger structures are more difficult to package in the launch vehicle, and in fact in some instances the concept must be changed from a deployable truss to an erectable truss to permit packaging. The new load-limiting concept is aimed at permitting the use in large space structures of smaller trusses with a high level of strength robustness, in order to simplify the construction process. To date several analyses conducted on the concept have demonstrated its feasibility, and an experiment is currently being designed to demonstrate its operation.

Mikulas, Martin M., Jr.↗

First Results from the Mojave Volatiles Prospector (MVP) Field Campaign, a Lunar Polar Rover Mission Analog

The Mojave Volatiles Prospector (MVP) project is a science-driven field program with the goal to produce critical knowledge for conducting robotic exploration of the Moon. MVP will feed science, payload, and operational lessons learned to the development of a real-time, short-duration lunar polar volatiles prospecting mission. MVP achieves these goals through a simulated lunar rover mission to investigate the composition and distribution of surface and subsurface volatiles in a natural and a priori unknown environment within the Mojave Desert, improving our understanding of how to find, characterize, and access volatiles on the Moon. The MVP field site is the Mojave Desert, selected for its low, naturally occurring water abundance. The Mojave typically has on the order of 2-6% water, making it a suitable lunar analog for this field test. MVP uses the Near Infrared and Visible Spectrometer Subsystem (NIRVSS), Neutron Spectrometer Subsystem (NSS), and a downward facing GroundCam camera on the KREX-2 rover to investigate the relationship between the distribution of volatiles and soil crust variation. Through this investigation, we mature robotic in situ instruments and concepts of instrument operations, improve ground software tools for real time science, and carry out publishable research on the water cycle and its connection to geomorphology and mineralogy in desert environments. A lunar polar rover mission is unlike prior space missions and requires a new concept of operations. The rover must navigate 3-5 km of terrain and examine multiple sites in in just ~6 days. Operational decisions must be made in real time, requiring constant situational awareness, data analysis and rapid turnaround decision support tools. This presentation will focus on the first science results and operational architecture findings from the MVP field deployment relevant to a lunar polar rover mission.

Heldmann, Jennifer L.↗