Integration Test and Evaluation (IT&E) Flight Test Series 6 Live Virtual Constructive - Distributed Environment (LVC-DE) Test Report

The goals of the Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) (also UAS-NAS) Project are to reduce the barriers for UAS access and its integration into the NAS. The UAS-NAS project and industry stakeholders conducted a series of flight tests integrating technologies from the Modeling & Simulation (M&S), Human Systems Integration (HSI), and Communication and Control (C2), and Integration, Test & Evaluation (IT&E) research areas. The last of the flight test series, Flight Test Series 6 (FT6) was conducted in late 2019 and focused on evaluating the interaction of the airborne non-cooperative surveillance system and the Detect and Avoid (DAA) technology. The DAA system generated conflict alert and guidance for pilots using a Research Ground Control System (RGCS) to avoid intruder aircraft. The conflict alerting and guidance information was presented on the RGCS’s display using symbology developed by the human factors team. The objective of FT6 was to investigate the interoperability of Low Size, Weight, and Power (Low SWaP) sensors with the DAA alerting, guidance, and display requirements. To support this goal, the distributed test environments (DTE) were developed at Ames Research Center (ARC) and Armstrong Flight Research Center (AFRC) and securely linked over a Virtual Private Network (VPN). These environments took advantage of existing Live Virtual Constructive (LVC) technologies to support research observation at both Centers with the insertion of live UAS and manned intruder aircraft into a simulated NAS environment with Air Traffic Control (ATC) and constructive manned aircraft. The experiment was distributed between AFRC flight operations and research facilities and the Distributed Simulation Research Laboratory (DSRL) and Software Development Laboratory (SDL) in building N243 at ARC. The Air Traffic Controller and pseudo pilots operated from the DSRL and SDL, respectively, using the Multi-Aircraft Control System (MACS). The test subject and researchers operated from the Research Ground Control Station (RGCS) at AFRC using the Vigilant Spirit Control Station (VSCS) and associated DAA software and displays. Flight Operation for the unmanned aircraft (UA) and manned intruder traffic was conducted at AFRC. Virtual traffic was managed by ARC. Voice distribution was accomplished using a combination of disparate communication systems at ARC and AFRC. The purpose of this document is to record the development, design, and execution of activities in support of the FT6 efforts from the perspective of the ARC IT&E team. Furthermore, the Armstrong IT&E team has published a thorough FT6 Test Report, with emphasis on flight test support, facilities and vehicle development; this report complements the Armstrong report. Analysis of collected FT6 data will be conducted and reported by the M&S and HSI teams and will be published in separate reports.

UAS-NAS↗

Constructing a Raman Spectroscopy System

The project aims to understand how Raman spectroscopy works by constructing a system based on existing concepts of the technique and utilizing NASA’s available tools and software to analyze the collected data. Once the data is successfully interpreted and proven, other improvements to the assembled system will then be explored. Part of the paper goes through several phases of construction of the system and improvements made. Nevertheless, the data obtained and the results were unsatisfactory as they need to be further analyzed for accuracy. The ultimate ambition was to be able to assist NASA with its objective of implementing a remote and compact Raman spectroscopy system on a rover for future planetary surface characterization such as Mars and lunar surfaces via a Raman spectroscopy system that the agency’s Senior Engineer, Dr. M. Nurul Abedin, has been working on since the early 2000s [2,3,4].

Jake Nguyen↗

In-Space Manufacturing and Planetary Surface Construction: A "Make It, Don't Take It" Approach to Long Duration Human Exploration

This presentation will focus on technology development efforts at NASA Marshall Space Flight Center (MSFC) related to the long term sustainability of human spaceflight operations. NASA’s in-space manufacturing (ISM) project is developing approaches for on-demand manufacturing of metals, printed electronics, and recycling. These technologies will be demonstrated onboard the International Space Station (ISS) before transitioning to more logistically remote platforms such as Gateway or a foundational lunar surface habitat. Based on quantitative analyses, the operations and logistics approach used for ISS (which relies on storage of a large volume of spares and frequent cargo resupply), will not be transferrable to long duration, long endurance missions beyond low earth orbit. The deployment of manufacturing and recycling technologies on crewed platforms will enable on-demand manufacturing of spares at the point of use and conversion of nuisance materials to manufacturing feedstock, reducing both launch mass and waste material. This talk will also include information on NASA’s 3D Printed Habitat Centennial Challenge, which concluded in 2019 and served to advance the state of the art for large scale 3D printing with indigenous materials similar to those which would be available on a planetary surface. MSFC also recently began work on the Moon-to-Mars Planetary Autonomous Construction Technologies (MMPACT) project, which seeks to demonstrate capabilities for the creation of infrastructure on the lunar surface via construction of landing pads and habitats with lunar regolith based materials.

materials↗

Reduced Organic Outgassing in the NASA Osiris-Rex and Hayabusa2 Curation Facility by Careful Selection and Implementation of Cleanroom Construction Materials

In October 2021, NASA Johnson Space Center (JSC) Astromaterials Acquisition and Cu-ration Office in JSC bldg. 31 completed construction and commissioning of the OSIRIS-REx and Hayabusa2cleanroom laboratory suites along with new precision cleaning and advanced curation laboratories: •OSIRIS-REx Curation Cleanroom: ISO Class 5•Hayabusa2 Curation Cleanroom: ISO Class 5•Final Precision Cleaning Cleanroom: ISO Class 5•Advanced Precision Cleaning Cleanroom: ISO Class 6•PreClean Precision Cleaning Cleanroom: ISO Class 6•Advanced Curation Cleanroom: ISO Class 7The new curation facilities are designed for initial receiving, basic characterization, curation processing, and preliminary examination of carbonaceous asteroidal material. The facilities are also designed to enable long-term pristine sample storage to preserve the scientific integrity of each sample to enable decades of future re-search by the international science community. The scientific study of organics in general is critical for both missions. The OSIRIS-REx mission executed a stringent contamination control plan [1] where all sample hardware at time of sample acquisition would be at Level 100 A/2 per IEST-STD-CC1246D (non-volatile residue (NVR) < 500 ng/cm2). In addition, the mission imposed a requirement of <180 ng/cm2 for amino acids (and hydrazine) [1]. Given these mission requirements, long-term storage preservation requirements, and information from the Organic Contamination Baseline Study at JSC [2], the JSC Curation team decided to carefully select cleanroom construction materials that would not hinder the scientific search for amino acids and the study of organics in the samples [3].

astromaterials curation↗

Could Road Constructions Be More Hazardous Than an Earthquake in Terms of Mass Movement?

Roads can have a significant impact on the frequency of mass wasting events in mountainous areas. However, characterizing the extent and pervasiveness of mass movements over time has rarely been documented due to limitations in available data sources to consistently map such events. We monitored the evolution of a road network and assessed its effect on mass movements for a 11-year window in Arhavi, Turkey. The main road construction projects run in the area are associated with a hydroelectric power plant as well as other road extension works and are clearly associated with the vast majority (90.1%) of mass movements in the area. We also notice that the overall number and size of the mass movements are much larger than in the naturally-occurring comparison area. This means that the sediment load originating from the anthropogenically induced mass movements is larger than its counterpart associated with naturally occurred landslides. Notably, this extra sediment load could cause river channel aggregation, reduce accommodation space and as a consequence, it could lead to an increase in the probability and severity of flooding along the river channel. This marks a strong and negative effect of human activities on the natural course of earth surface processes. We also compare frequency-area distributions of human-induced mass movements mapped in this study and co-seismic landslide inventories from the literature. By doing so, we aim to better understand the consequences of human effects on mass movements in a comparative manner. Our findings show that the damage generated by the road construction in terms of sediment loads to river channels is compatible with the possible effect of a theoretical earthquake with a magnitude greater than Mw=6.0.

Hakan Tanyas↗

Autonomous In-space Construction, Maintenance, and Reconfiguration Using Programmable Meta-Material

NASA ARC's Coded Structures Laboratory (CSL) is developing autonomous construction, maintenance, and reconfiguration technologies to meet long-duration and deep space infrastructure needs, in accordance with long-term NASA goals of "in-space reliance" and "mass-less exploration." We seek to achieve these capabilities by utilizing a "programmable meta-material" approach that integrates emerging advances in materials (mechanical meta-materials), manufacturing (cooperative mobile robotics), and autonomy (multi-agent planning algorithms). Through the ARMADAS project, we have shown assembly of high-performance engineered cellular materials using multiple cooperating mobile robotic assemblers. In this paper, we describe how such a programmable meta-material architecture may shift the paradigm of how we design, build, manufacture, and operate future space infrastructure and assets. The core of a programmable meta-material architecture consists of 3 main technology sub-areas: the structure, the assembly agents, and the assembly algorithms. We co-design these systems to ensure an adaptable system that can create and reconfigure structures from a base set of building block components. From this core technology, we can branch out and expand the capability of the system through additional secondary component types and robotic agents to perform activities such as inspections, maintenance, repair, payload installation, or perform power and communications interconnect. As these technologies mature, future designers will be able to utilize the system to rapidly integrate and operate assets in space or on planetary surfaces from a set of well-tested part library, or create their own modules to integrate into the system. A core trait to the development of this system is the automation approach. Because of the modular and functional discrete (pixel-like) nature of the structural system, a diverse set of powerful algorithms for analysis, planning, and simulation can be adapted and leveraged to optimize construction, maintenance, and dynamic reorganization (as hardware with programmable form and function). With an ability to free the design space from launch vehicle constraints and fundamentally shift how a mission is designed and conducted, we discuss the influence of a programmable meta-material architecture on mission design, build, and operations. For the "design phase", we discuss project lifecycle effects, costs, time, and performance. For the "build phase", we discuss reusability, ISRU, manufacturing, material logistics, and scalability. And for "operations", we discuss autonomy, maintenance and upgrades, reliability, and reconfiguration. Autonomy and modularity are the primary enabling traits of this system. Engineering systems that utilize a modular and reconfiguration building block approach such as digital communication and computation systems, currently lead all other areas of technology in size and complexity scalability. NASA is extending the benefits and flexibility of digital systems to hardware systems, to optimize materials lifecycle management and expand our space exploration mission capabilities.

in space assembly↗

Coronado Ecological Conservation: Assessing Vegetation Change Due to Border Wall Construction and Shifting Social Trails

Species monitoring is essential in mitigating the impacts of plant invasion, such as radical changes in an area’s ecosystem, degraded soil health, increased wildfire severity, landslides, and increased flooding. NASA DEVELOP partnered with the National Park Service (NPS) to investigate invasive species in disturbed lands: specifically, areas affected by off-trail walking and US-Mexico border construction activities. The team assessed how construction has impacted the distribution of Lehmann’s lovegrass and Russian thistle invasives throughout Coronado National Memorial, AZ from 1986 to 2022. Using data from Landsat 5 and 8, Sentinel-2, the National Agriculture Imagery Program, and PlanetScope, the team computed vegetation indices including the Normalized Difference Vegetation Index, Normalized Difference Moisture Index, Modified Soil Adjusted Vegetation Index 2, Enhanced Vegetation Index, and Tasseled Cap Wetness, Brightness, and Greenness transformations as vegetation health indicators to input into various machine learning algorithms. To minimize noise, the team conducted Principal Component Analysis on the vegetation indices and spectral bands before running k-means++ clustering and random forest classification algorithms. Between all datasets, we found the median area fully overtaken by invasive plants was 5.37% of the park’s total area in 2022. The NPS will use the end products to help increase restoration efforts in disturbed areas with high concentrations of invasive plants. The NPS’s collection of ground data for 2022–2023, in conjunction with future data collection, will notably improve the accuracy of classification models, leading to more precise monitoring of invasive spread over time.

Carson Schuetze↗

Bringing the Flight Surgeon Console Into the Artemis Era: Constructing A Quick Reference Guide for the Orion Vehicle

BACKGROUND: Historically, NASA flight surgeons working on control console have had access to a quick reference guide that provides tailored clinical information for a variety of medical conditions, symptoms, and events that crew members may experience on the International Space Station (ISS). With the development of the Orion vehicle and its new medical system intended for the Artemis missions, a new quick reference guide is required to reflect the capabilities of this new medical system. OVERVIEW: The Flight Surgeon Quick Reference Guide(FSQRG)offers a variety of information to flight surgeons. For each condition/symptom/event, the guide describes what actions and procedures crew members will perform either automatically or at the instruction of the flight surgeon. The guide describes what further information should be collected, lists potential diagnoses, and further actions available to be taken by the Flight Surgeon or crew. The guide also describes what medications are available to the crew, common clinical decision-making tools, and other terrestrial practices. Due to the significant differences between the ISS and the Orion vehicle in both structure and mission scope, Orion’s medical system is significantly smaller than the ISS’s. When constructing the new guide for the Orion vehicle we began with the ISS version of the guide as a template. We then replaced ISS crew procedure references with their Orion counterpart if one existed. We also added new Orion crew procedure references where clinically appropriate. Reductions or additions to the medical equipment/medication references were made until they were consistent with resources available on Orion. Finally, we constructed a resource matrix that allows flight surgeons to easily identify the location of medications and equipment required for crew procedures. DISCUSSION: The information provided in the updated FSQRG allows flight surgeons to make quick and clinically accurate decisions that can be accomplished within the scope of the Orion vehicle medical system. This timely and accurate decision making becomes more important as missions go beyond low earth orbit and communication becomes more delayed. Such quick reference guides also have the potential to reflect medical systems on future vehicles, missions, and partner vehicles.

Anderson carter↗

Material Inspectability Assessment Related to Lunar Construction Technology Development

For the building of lunar structures on the Moon using lunar regolith-based construction materials, ensuring their structural integrity and employing methods optimal for such tasks is crucial. In this technical memorandum (TM) the detectability of simulated void defects in a cementitious-based lunar construction material is compared between different nondestructive evaluation (NDE) methods, especially methods which have potential to be developed into space qualified instruments. Primarily, simulated voids, introduced during fabrication as foam spheres, were used for this evaluation. Furthermore, smaller, unintended void defects were used to assess the detectability. The results highlights trade-offs between the NDE methods in terms of detection limit, correct size indication, penetration depth, and potential for reduction in size, weight, and power (SWaP).

Nondestructive Evaluation↗

Launch Complex 39B, SWMU 009, 2023 Performance Monitoring and Air Sparge Expansion Construction Completion Report, Kennedy Space Center, Florida

The 2023 Performance Monitoring and Construction Completion Report (PM-CCR) presents the findings, observations, and results for Air Sparging (AS) operations and expansion activities, as well as sitewide groundwater monitoring for Launch Complex 39B (LC39B), Solid Waste Management Unit (SWMU) 009, at Kennedy Space Center (KSC), Florida. The reporting period for activities covered under this PM-CCR is from January 1, 2023, to December 31, 2023. At LC39B, AS operations began in 2017 in the area west of the launch pad, in the liquid oxygen (LOX) tank area located northwest of the launch pad, and in an area outside of the perimeter fence to protect nearby Outstanding Florida Waters (OFW). The LC39B AS system was installed with 279 AS wells to depths ranging from 23 to 60 feet below land surface (bls), including the sump, correlating to top of screen depths ranging from 20 to 57 feet bls. In December 2022, a total of 22 AS wells were abandoned to support launch pad crane operations, and in November 2023, the system was expanded with five additional AS wells installed to 13 or 17 feet bls near the LOX tank. The remedial objective of the LC39B AS Interim Measure (IM) is to actively decrease concentrations of contaminants of concern (COCs) in groundwater, specifically trichloroethene (TCE), cis-1,2-Dichloroethene (cDCE), and vinyl chloride (VC), to less than their respective Natural Attenuation Default Concentrations (NADCs), so LC39B can transition into a Long-Term Monitoring (LTM) program. This PM-CCR presents the following information for LC39B: • AS system operations and maintenance (O&M) (Year 7 of operation) from January 2023 to December 2023, to include AS trailer relocation in March 2023 and subsequent replacement and re-start in June 2023. • Construction completion details for AS system expansion, which included installation of five new AS wells and one new monitoring well in November 2023. As part of expansion activities, soil samples were also collected for petroleum analysis; no exceedances were identified, and no further investigation for petroleum is warranted. • Performance monitoring results for groundwater sampling events conducted in May/June 2023 (30 wells) and November 2023 (31 wells) in the AS IM area and in the Low Concentration Plume (LCP) areas located north and east of the launch pad for volatile organic compound (VOC) analysis. • Sampling results for one monitoring well, LOX-IW0012S, which is sampled for aluminum on an annual basis (May/June 2023). This well was resampled in November 2023 for both total and dissolved aluminum. Due to a communication error with the laboratory, the May/June 2023 sample was analyzed for total aluminum only. • Groundwater sampling results for per- and polyfluoroalkyl substances (PFAS) collected from seven monitoring wells during the May/June 2023 event to further investigate the Former Sewage Treatment Plant #6 and Percolation Pond area, west of the launch pad. O&M and performance monitoring results show that the AS system at LC39B is operating as designed and meeting performance criteria. Overall runtime was 45 percent (%) during the reporting period (January to December), but the operational runtime was 78% during the timeframe when the system could run (June to December). The most significant downtime contributor was post-launch crane operations following the Artemis launch on November 16, 2022, which lasted until June 2023. During that timeframe, the AS trailer at LC39B was relocated to another KSC remediation site (Wilson Corners) and was subsequently replaced with the AS trailer from the Paint & Oil Locker (POL) remediation site at KSC to resume AS system operations. Performance monitoring results in the AS IM and LCP areas continue to show reduction in COC concentrations over time when compared to baseline levels. In 2023, only one monitoring well (MW0048) detected a COC exceeding its NADC (VC at 740 micrograms per liter [µg/L]), which marks the baseline result for this new well installed during system expansion. Across the rest of the site, VC concentrations have declined or remained stable during the 2023 sampling events. Excluding MW0048, the highest VC result in 2023 was during the May/June sampling event with a concentration of 63 µg/L at MW0032, which is located near MW0048 and the AS expansion area by the LOX tank. TCE was detected in select monitoring wells in the IM area in 2023, but only two locations exceeded the State of Florida Groundwater Cleanup Target Level (GCTL): MW0032 (21 µg/L in May/June 2023 and 9.1 µg/L in November 2023) and MW0036 (5.0 µg/L in November 2023). MW0036 is also located near the LOX tank, on the north side, where the AS system is still operational (Zone Z4). cDCE and trans-1,2-dichloroethene concentrations were less than laboratory method detection limits or their respective GCTLs in all wells sampled in 2023. Near the OFW located northwest of the launch complex, all COC concentrations were less than laboratory method detection limits from monitoring wells (MW0039, MW0040, and LOXTA0002S) sampled in 2023. Aluminum results from LOX-IW0012S, which has been sampled routinely since 2006, detected a total aluminum concentration of 3,900 µg/L during the May/June 2023 sampling event. Results from the November 2023 event detected 5,700 µg/L for total aluminum and 5,500 µg/L for dissolved aluminum. These concentrations slightly decreased from the previous year but remain relatively consistent with historical detections. Aluminum will continue to be sampled on an annual basis at this well as results still exceed the GCTL of 200 µg/L and the Upper Limit of the KSC Background Concentration of 280 µg/L. PFAS results detected nine different PFAS compounds (out of 32 analyzed) from seven wells sampled. Two PFAS compounds, perfluorooctanesulfonic acid (PFOS) and perfluorooctanoic acid (PFOA), currently have FDEP Provisional GCTLs of 70 nanograms per liter (ng/L). All seven samples collected resulted in concentrations less than the FDEP Provisional GCTLs for both PFAS compounds; no exceedances were observed. PFOS and PFOA also have assigned United States Environmental Protection Agency (USEPA) Maximum Contaminant Levels (MCLs) of 4 nanograms per liter (ng/L). None of the PFOS results exceeded the USEPA MCLs. PFOA was detected in two samples above the USEPA MCL at concentrations of 5.8 ng/L (ECS-IW0009I) and 5.5 ng/L (ECS-IW0009S). Three other PFAS compounds, perfluorohexanesulfonic acid (PFHxS), perfluoro-n-nonanoic acid (PFNA), and hexafluoropropylene oxide dimer acid (GenX), currently have USEPA MCLs of 10 ng/L. PFHxS, PFNA, and GenX were not detected at concentrations greater than their respective USEPA MCLs in any of the seven wells. PFAS compounds without FDEP Provisional GCTLs or USEPA MCLs were screened against USEPA RSLs. No other detections exceeded their respective USEPA RSLs. Additional PFAS sampling will be conducted as part of a future PFAS Site Assessment. Based on O&M activities and performance monitoring, the following is recommended for LC39B: • Continue with Year 8 AS system operation within Zone Z4, which includes the AS expansion area. Zone Z3, which has been off since 2018, should remain off as no rebound has been observed. Zones Z1 and Z2, which were turned off at the end of 2022, will remain shut down as monitoring well results have consistently been below GCTLs or have low-level detections with stable or decreasing trends (Meeting Minute 2402-M10, Decision 2402-D30). • Continue with performance monitoring in 2024 with the same monitoring well network as 2023, except with the addition of MW0048 in both semi-annual events. Baseline concentrations for this well were collected during the November 2023 performance monitoring event. Semi-annual sampling should be planned for the May 2024 and November 2024 timeframes (Meeting Minute 2402-M10, Decision 2402-D31). • Continue sampling monitoring well, LOX-IW0012S, for aluminum (total and dissolved) on an annual basis in May 2024. It is also recommended to re-develop this well prior to the next sampling event (Meeting Minute 2402-M10, Decision 2402-D32). The above recommendations for LC39B were presented at the February 2024 KSCRT Meeting, with Team consensus reached on the path forward. The contents of this PM-CCR were also presented at this meeting.

Deborah M Wilson↗

Launch Complex 34, SWMU CC054 2023 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring and Phase Two Expansion Construction Completion Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 14 operations and performance monitoring of the hydraulic containment (HC) Interim Measure (IM), details associated with construction and implementation of the HS 6 AS system expansion (Phase Two), and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. The timeframe for activities documented in this PMR extends from April 1, 2023 to March 31, 2024. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the shallow and deep DSZ and surrounding dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to recharacterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS and install additional recovery wells in Layer 7 to more adequately capture residual contaminant mass. The operational period for Year 14 of the HCS was from April 1, 2023 to March 31, 2024. Operational runtime for the system was 94 percent during Year 14, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2024, a total of 344,849,634 cumulative gallons of groundwater containing 94,656 pounds of chlorinated volatile organic compounds (CVOCs) have been removed by the HCS. During the reporting period covered under this report, the HCS recovered 31,176,393 gallons and approximately 6,319 pounds of CVOC mass. Total combined influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 25,000 µg/L (March 2024). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in January 2024 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2022. Full vertical profile sampling was completed at each DPT from 8 to 98 feet below land surface (bls), at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 28 to 98 feet bls. An overall decreasing trend of TCE concentrations was observed in DPT samples during this reporting period, which is a reduction from the previous event (December 2022) and the peak event in December 2021, where TCE percentages appeared to increase in all depth zones because several recovery wells were turned off during the AS pilot study in the DSZ. The maximum TCE concentration in January 2024 was 1,600,000 µg/L in the 53 feet bls depth interval at DPT594 (previous maximum result in 2022 was 1,800,000 µg/L in the 48 feet bls depth interval at DPT599). This maximum concentration in the 53 feet bls depth interval is in the deep capture zone. During the January 2024 DPT event, the largest portion of TCE mass was observed in the 48 feet bls interval above/within Layer 4. This trend remains consistent with previous years and appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, annual groundwater samples were collected from 11 deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2023 to verify vertical and horizontal delineation. Three of the wells were also sampled biweekly to evaluate operations of recovery well RW21D (screened 86 to 106 feet bls), which was installed in January 2023. Of the Layer 7/8 monitoring sampled only annually, results were non-detect or less than groundwater cleanup target levels GCTLs in December 2023, with the exception of one well, IW45D2, which had a cis-1,2-dichloroethene (cDCE), detection greater than the GCTL. Of the three wells sampled biweekly during the operational period, the well located closest to Layer 7 recovery well RW21D (IW44D2, screened 105 to 115 feet bls) had concentrations of TCE, cDCE and vinyl chloride (VC) greater than GCTLs throughout the operational period, but displayed a decreasing trend since the peak concentrations in September 2023. The maximum TCE concentration during this operational period was 190,000 µg/L at IW44D2 in September 2023, but reduced to 700 µg/L in March 2024, indicating the HCS is still effectively removing mass from the source area. Expansion of the HCS and addition of new recovery wells is ongoing and will continue to be evaluated as the groundwater recovery scheme is optimized. Details of the expansion and optimization will be provided in a future PMR. The HS 6 AS IM was initiated in 2018 with 160 AS wells and expanded in 2019 with another 140 AS wells. An additional expansion of the HS 6 AS IM was completed during the reporting period covered under this report and details of the construction implementation and startup of the expansion are detailed in Section III of this report. The new expansion, referred to as Phase Two, was implemented between August 17, 2022 and August 28, 2023, and included the installation of 190 air sparge wells to treat an additional 11.2 acres. The original configuration (referred to as Phase One) operated until Phase Two came online, then all but 52 AS wells were turned off so the components could be moved and utilized in the Phase Two area. The 52 AS wells that remain on are in a barrier configuration preventing contaminated groundwater from impacting the treated area. The HS 6 AS system (both Phase One and Two) operated normally during the reporting period covered under this report. Semi-annual performance monitoring of the Phase One configuration was conducted in April and November 2023, consistent with previous years. For the Phase Two configuration, 21 new monitoring wells were installed and sampled quarterly, with a baseline event in July 2023, and quarterly events in November 2023 and February 2024 summarized in this report. Semi-annual monitoring results collected in April and October 2023 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and VC) have decreased to less than GCTLs in nearly all wells and not impacting the surface water drainage canal, indicating the HS 6 IM continues to meet objectives. The baseline and quarterly sampling for the Phase Two configuration indicate generally decreasing concentrations in wells within and around the perimeter of the treatment area. At least two more quarters of monitoring will be conducted and once those results are evaluated a reduced the sampling frequency may be considered. Overall, the tasks associated with Year 14 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with recommendations included in the previous 2022 LC34 (Year 13) PMR. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

groundwater remediation↗

Extrusion-based Additive Manufacturing of Regolith-Filled Shape Memory Vitrimer Composite for Lunar Construction

The National Aeronautics and Space Administration (NASA) is visiting the moon again. This time, the objective is to explore establishing a permanent lunar base. To achieve both longterm human habitation on the moon and future deep space travel, it is crucial to make the most of the in-situ resources and build autonomous systems on the moon to support the construction of a lunar habitat. NASA’s In-situ Resource Utilization (ISRU) program aims to minimize the need to ship heavy prefabricated structures, reducing cost and enhancing sustainability. Here, we developed an economical extrusion method for printing lunar regolith-based composites using shape memory vitrimer as a binder. A rheological study is conducted to determine the extrudability of the composite with different regolith weight percentages. Several characterizations were conducted on the composites. The as-printed composites exhibited compressive and flexural strengths of 73.32 MPa and 156.59 MPa, respectively, and good impact tolerance. The composite maintained 57.92% of its mechanical properties even after the second crack healing cycle. The composites also exhibit shape fixity ratio of 90.02% and shape recovery ratio of 83.46%. The simple synthesis method, sustainability, and good thermomechanical properties make the 3D printed composite an ideal material for lunar construction applications.

Kingsley Yeboah Gyabaah↗

SRS SWPF Construction Completion

Now that construction is complete, DOE and construction contractor Parsons, are focusing on testing the Savannah River Site’s Salt Waste Processing Facility (SWPF) systems and training the workforce to operate the plant in preparation for the start of operations. Once in operation, the SWPF will significantly increase processing rates at SRS tank farms in an effort to empty the site’s high-level radioactive waste tanks.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CONSTRUCTING A NETWORK FUNDAMENTAL DIAGRAM: A SYNTHETIC ORIGIN-DESTINATION APPROACH

The Network Fundamental Diagram (NFD) is increasingly used in traffic monitoring and control. One obstacle to a wider application of NFDs in network control is the difficulty of obtaining data from all vehicles traveling in the network to construct an accurate NFD. One solution is to estimate the NFD using data from only a fraction of vehicles (i.e., probe vehicles), where the probe vehicle market penetration rate (MPR) needs to be estimated. A previous study conducted by the authors demonstrated that a distance or time weighted harmonic mean was needed to estimate the flow- and density-based MPRs, respectively using a pairing k-mean clustering approach. This paper proposes another approach that utilizes probe vehicle and observed link volume data to estimate the MPR. A heuristic model is proposed to identify the optimum locations from which to collect link traffic volume data for use in the MPR estimation. The estimated MPR can then be used to construct the NFD. Results show that these models can accurately estimate the NFD with limited probe vehicle and link traffic volume data. Accordingly, the models can be used in the field to estimate the NFD using readily available loop detector and probe vehicle data. The ideal locations for traffic volume data collection can also be proactively chosen to generate optimum estimation results. Since the models proposed here show no significant gains with an increased magnitude of collected data after a certain threshold, they will be helpful, particularly when large-scale data collection is not affordable or realistic.

Spatial Analysis, Market Penetration Rate, NFD, Sy↗

Restoring Flow Regimes after Dam Construction and Operation: Evidence from Dynamic Systems Theory

Dams provide a variety of benefits to society, including hydropower generation, flood control, recreation, and water supply for municipal, industrial, and agricultural customers. However, constructing and operating dams for these purposes can negatively impact downstream ecosystems by altering natural flow regimes and interfering with the lifecycles of aquatic and riparian species. Increased concern from environmental interests has put pressure on dam operators to quantify the flow regime changes that have resulted from dam construction and to evaluate how future modifications to dam releases may impact river systems. In this study, we present a method for analyzing the impact of dam operations by reconstructing system trajectories from hydrologic flow time series for different periods of dam operation (pre-dam, post-dam, and post-modification). We apply these methods to flow data from eight rivers in the US to determine the dimensionality of each operating period and to analyze trends based on the primary purpose of dam operation. Hydropower dams operated without flow restrictions exhibit high dimensional, stochastic behavior. However, the system dimensionality is reduced to approximately three variables when ramping restrictions are implemented, or in cases where an afterbay is present to reregulate flows. This low dimensional behavior is more similar to natural flow regimes. For dams operated primarily for flood control or water supply, the flow regimes are typically low dimensional and more deterministic.

13 HYDRO ENERGY↗

Machine Learning for Advanced Building Construction: Preprint

High-efficiency retrofits can play a key role in reducing carbon emissions associated with buildings if processes can be scaled-up to reduce cost, time, and disruption. Here we demonstrate an artificial intelligence/computer vision (AI/CV)- enabled framework for converting exterior build scans and dimensional data directly into manufacturing and installation specifications for overclad panels. In our workflow point clouds associated with LiDAR-scanned buildings are segmented into a facade feature space, vectorized features are extracted using an iterative random-sampling consensus algorithm, and from this representation an optimal panel design plan satisfying manufacturing constraints is generated. This system and the corresponding construction process is demonstrated on a test facade structure constructed at the National Renewable Energy Laboratory (NREL). We also include a brief summary of a techno-economic study designed to estimate the potential energy and cost impact of this new system.

building retrofits↗

Machine Learning for Advanced Building Construction

High-efficiency retrofits can play a key role in reducing carbon emissions associated with buildings if processes can be scaled-up to reduce cost, time, and disruption. Here we demonstrate an artificial intelligence/computer vision (AI/CV)-enabled framework for converting exterior build scans and dimensional data directly into manufacturing and installation specifications for overclad panels. In our workflow point clouds associated with LiDAR-scanned buildings are segmented into a facade feature space, vectorized features are extracted using an iterative random-sampling consensus algorithm, and from this representation an optimal panel design plan satisfying manufacturing constraints is generated. This system and the corresponding construction process is demonstrated on a test facade structure constructed at the National Renewable Energy Laboratory (NREL). We also include a brief summary of a techno-economic study designed to estimate the potential energy and cost impact of this new system.

build scans↗

Removing of Core Constructions of the MR and RFT Reactors in NRC 'Kurchatov Institute' - 16054

In frame of the FTP 'Providing nuclear and radiation safety of Russia in 2008 and for the period till 2015' works of a decommissioning of the MR and RFT research reactors are carried out in National Research Center 'Kurchatov Institute'. Within these works, the equipment of 9 loop-back facilities of the MR reactor was dismantled. In the conditions, which are most approached to natural, one researched a heat, hydrodynamic and strength characteristics of elements of cores and the capital equipment of the majority of power reactors at these facilities. In 2014-2015 dismantle of core constructions of the MR reactor was carried out and dismantle of a graphite laying of the RFT reactor is begun. The beryllium blocks, which were constructional elements of the core, and the graphite blocks playing a reactor reflector role were also taken, packed into cases or containers and removed: part on an accumulative platform, and part are placed in storage of high level radioactive waste of the Center for decay and further sending for long storage. Works were performed by remote controlled mechanisms, control of their performance was exercised by means of remote diagnostics: Gammavizor, the scanning spectrometer systems. The following methods and the organizational principles were applied to providing of radiation safety of these works: - the constant radiation control including individual control of a dose of external radiation, control of volume activity of radionuclides in air, annual control of internal radiation doses of the personnel; - dust suppression and fixing of radioactive contamination by dispersion of polymeric structures; - carrying out decontamination on a shift basis rooms with use of detergents; - use of the remote controlled mechanisms equipped with hydraulic scissors, nippers, application of the diamond are sharp that allowed to perform the majority of technological operations remotely, using 'cold' methods of fragmentation; - development on each type of works of the operation project and schedules. As a result, of works of 2011-2014 of the decommissioning of the MR and RFT research reactors more than 630 t of the equipment were dismantled. From them more than 455 t of radioactive waste was. The total activity of radwaste exceeded 300.0 GBq. From the pool of the reactor, about 160 channels of loop-back installations and near 230 beryllium and graphite are taken, fragmented and packed. The total activity on radionuclides {sup 60}Co and {sup 137}Cs of them was near 55 TBq. From the territory of the center about 2550 m{sup 3} of firm and 4600 m{sup 3} of liquid radwaste are removed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗