Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “builders”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

DOE Zero Energy Ready Home Case Study: Amaris Custom Homes, St. Paul, Minnesota

For this project, Amaris worked with U.S. Department of Energy (DOE) team, NorthernSTAR Building America Partnership, to develop the first Zero Energy Ready Home (ZERH) in Minnesota's cold climate using reasonable, cost-effective, and replicable construction materials and practices. The result is a passive solar, super-efficient 3542-ft2 walkout ranch-style home with all the creature comforts. Along with meeting ZERH standards, Amaris also achieved certifications for Leadership in Energy & Environmental Design for Homes v4, MN Green Path Emerald, and a Builders Association of the Twin Cities Reggie Award of Excellence. The home achieves a HERS score of 41 without photovoltaics; with PV, the home achieves a HERS score of 5.

Building America↗

Technology Solutions Case Study: Hygrothermal Performance of a Double-Stud Cellulose Wall

Moisture problems within the building shell can be caused by a number of factors including excess interior moisture that is transported into the wall through air leakage and vapor drive, bulk water intrusion from leaks and wind-driven rain, capillary action from concrete to wood connections, and through wetted building materials such as siding wetted from rain splash back. With the increasing thickness of walls, moisture issues could increase. Several builders have successfully used “double-wall” systems to more practically achieve higher R-values in thicker framed walls. A double wall typically consists of a load-bearing external frame wall constructed with 2 × 4 framing at 16 in. on center using conventional methods. After the building is enclosed, an additional frame wall is constructed several inches inside the load-bearing wall. Several researchers have used moisture modeling software to conduct extensive analysis of these assemblies; however, little field research has been conducted to validate the results. In this project, the Building America research team Consortium for Advanced Residential Buildings monitored a double-stud assembly in climate zone 5A to determine the accu¬racy of moisture modeling and make recommendations to ensure durable and efficient assemblies.

Building America↗

New Whole-House Solutions Case Study: Zero Energy Ready Home Multifamily Project: Mutual Housing at Spring Lake

Building cost effective, high performance homes that provide superior comfort, health, and durability is the goal of the Department of Energy's (DOE's) Zero Energy Ready Homes (ZERH) program. This case study describes the development of a 62-unit multifamily community constructed by nonprofit developer Mutual Housing at the Spring Lake subdivision in Woodland, California. The Spring Lake project is expected to be the first ZERH-certified multifamily project nationwide. Building America team Alliance for Residential Building Innovation worked with Mutual Housing throughout the project. An objective of this project was to gain a highly visible foothold for residential buildings built to the DOE ZERH specification that can be used to encourage participation by other California builders.

ARBI↗

DOE Zero Energy Ready Home Case Study: Clifton View Homes, Coupeville, Washington

Ted Clifton, founder of Clifton View Homes, achieved an impressive Home Energy Rating System (HERS) score of 34 (without solar panels) on a two-story home completed in July 2011 that also earned him his first Challenge Home certification from the U.S. Department of Energy (DOE). This home also garnered a 2013 Housing Innovation Award in the "systems builder" category.

Challenge Home↗

DOE Zero Energy Ready Home Case Study, Weiss Building & Development, LLC., System Home, River Forest, Illinois

The Passive House Challenge Home located in River Forest, Illinois, is a 5-bedroom, 4.5-bath, 3,600 ft2 two-story home (plus basement) that costs about $237 less per month to operate than a similar sized home built to the 2009 IECC. For a home with no solar photovoltaic panels installed, it scored an amazingly low 27 on the Home Energy Rating System (HERS) score.An ENERGY STAR-rated dishwasher, clothes washer, and refrigerator; an induction cooktop, condensing clothes dryer, and LED lighting are among the energy-saving devices inside the home. All plumbing fixtures comply with EPA WaterSense criteria. The home was awarded a 2013 Housing Innovation Award in the "systems builder" category.

Building America↗

DOE Zero Energy Ready Home Case Study: Transformations, Inc., Custom House, Devens, Massachusetts

This single-family home features a superinsulated shell with 12-inch double walls filled with open cell spray foam, as well as R-5 triple-pane windows. The 18.33 kW photovoltaic system can produce all the electricity the home can use in a year with enough left over to power an electric car for 30,000 miles.These features helped the builder to win a 2013 Housing Innovation Award in the custom home category.

Building America↗

DOE Zero Energy Ready Home Case Study: Garbett Homes, Herriman, Utah

As the first net zero-energy production home certified in Utah, this house incorporates two 94% efficient tankless water heaters and two roof-mounted solar panels that preheat the home's water supply. This home won a 2013 Housing Innovation Award in the production builder category.

advanced framing↗

DOE Zero Energy Ready Home Case Study: Transformations, Inc., Production House, Devens, Massachusetts

A collaboration with Building America team Building Science Corporation helped this builder win a 2013 Housing Innovation Award in 2013—a 2,508-ft2 home built on speculation in the Devens, MA, subdivision. For the above-grade walls, the super-insulated building shell starts with 12 inch thick double walls composed of two 2x4 16-inch on-center walls spaced 5 inches apart. The space between the walls is filled with low-density (open-cell) spray foam for an insulation value of R-45.

advanced framing↗

DOE Zero Energy Ready Home Case Study: Manatee County Habitat for Humanity, Ellenton, Florida

In this 18-home community, all homes are LEED Platinum and meet ENERGY STAR for Homes Version 3 requirements, HERS 23–53. Half way through the project, Habitat for Humanity heard about the DOE Challenge Home program and signed on, committing to build the next home, a three-bedroom, two-bath, 1,143 ft2 duplex, to Challenge Home criteria. The home is the first DOE Challenge Home in Manatee County, and was awarded a 2013 Housing Innovation Award in the affordable builder category.

Building America↗

DOE Zero Energy Ready Home Case Study: TC Legend Homes, Seattle, Washington

This house incorporates slab-on-grade, EPS roof, and radiant heating with an air-to-water heat pump that also preheats domestic hot water. Without counting in the solar panels, the home earns a home energy rating system (HERS) score of 37, with projected utility bills of about $740 a year. With the 6.4-kW photovoltaic power system installed on the roof, the home’s HERS scores drops to -1 and utility bills for the all-electric home drop to zero. This home was awarded a 2013 Housing Innovation Award in the affordable builder category.

Building America↗

Best Practices Case Study: David Weekley Homes - Eagle Springs and Waterhaven, Houston, TX

Case study describing David Weekley Homes, Houston Division, has qualified more than 1,240 homes for the DOE Builders Challenge. Advanced framed 2x6 walls with open headers and two-stud corners allow more room for R-20 damp sprayed cellulose wall cavity insulation that is covered with R-5 rigid XPS foam. A radiant barrier cuts heat gain in the R-38 insulated vented attics. Draft stopping at fireplace and duct chases and behind tubs, gluing sheetrock to framing, and extensive caulking make for air-tight homes at 3.0 ACH50.

advanced framing↗

Best Practices Case Study: Quadrant Homes - Kentlake Highlands, Kent, WA

Case study of Quadrant Homes, a Seattle area builder who, despite the recession, sold three homes a day in the first half of 2009, by letting buyers choose from 300 floor plans and 10,000 options, including an energy efficiency package designed with help from DOE’s Building America that cut energy use by 50% over a code-built home.

Building America↗

New Whole-House Solutions Case Study: Hydronic Heating Coil Versus Propane Furnace, Rehoboth Beach, Delaware

In this project involving two homes, the IBACOS team evaluated the performance of the two space conditioning systems and the modeled efficiency of the two tankless domestic hot water systems relative to actual occupant use. Each house was built by Insight Homes and is 1,715-ft2 with a single story, three bedrooms, two bathrooms, and the heating, ventilation, and air conditioning systems and ductwork located in conditioned crawlspaces. The standard house, which the builder offers as its standard production house, uses an air source heat pump (ASHP) with supplemental propane furnace heating. The Building America test house uses the same ASHP unit with supplemental heat provided by the DHW heater (a combined DHW and hydronic heating system, where the hydronic heating element is in the air handler).

air source heat pump↗

Building America Top Innovations 2013 Profile – Zero Energy-Ready Single-Family Homes

Building homes that are zero energy-ready is a goal of the U.S. Department of Energy’s Building America program and one embodied in Building America’s premier home certification program, the Challenge Home program. This case study describes several examples of successful zero energy-ready home projects completed by Building America teams and partner builders.

Building America↗