Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “appendix”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

First Scientific Working Group Meeting of Airborne Doppler Lidar Wind Velocity Measurement Program, appendix C

The problem is to operate on two scalar fields to produce a vector field, to produce user products from the vector field, and to establish reliability of results. Data problems encountered include sparse measurements, irregular distribution, varying quality, imperfect orthogonality, aliasing due to sampling volume, and measurements not simultaneous. Desired algorithm characteristics, solution elements, and characteristics of the model are listed. The seven simulation elements, eight algorithm steps and the required user inputs are given.

Lee, R. W.↗

First Scientific Working Group Meeting of Airborne Doppler Lidar Wind Velocity Measurement Program, appendix J

Three projects are suggested which could be done using the Doppler lidar. The first is a cooperative effort at BAO, the purpose of which is to check out instrumentation and contribute to boundary layer investigations at BAO. The second concerns unintended weather modification. Its purpose is to detect mechanisms by which regions of industry and urbanization modify weather. The cirrus cloud study proposes to characterize cirrus clouds by their lidar signal and to compare lidar and visually observed characteristics.

Koenig, L. R.↗

Coal gasification systems engineering and analysis. Appendix A: Coal gasification catalog

The scope of work in preparing the Coal Gasification Data Catalog included the following subtasks: (1) candidate system subsystem definition, (2) raw materials analysis, (3) market analysis for by-products, (4) alternate products analysis, (5) preliminary integrated facility requirements. Definition of candidate systems/subsystems includes the identity of and alternates for each process unit, raw material requirements, and the cost and design drivers for each process design.

Source record↗

Coal gasification systems engineering and analysis. Appendix B: Medium B+U gas design

A four module, 20,000 TPD, based on KT coal gasification technology was designed. The plant processes Kentucky No. 9 coal with provisions for up to five percent North Alabama coal. Medium BTU gas with heat content of 305 BTU/SCF and not more than 200 ppm sulfur is the primary plant product. Sulfur is recovered for scale as prilled sulfur. Ash disposal is on site. The plant is designed for zero water discharge. Trade studies provided the basis for not using boiler produced steam to drive prime movers. Thus process derived steam in excess of process requirements in superheated for power use in prime movers. Electricity from the TVA grid is used to supply the balance of the plant prime mover power requirements. A study of the effect of mine mouth coal cleaning showed that coal cleaning is not an economically preferred route. The design procedure involved defining available processes to meet the requirements of each system, technical/economic trade studies to select the preferred processes, and engineering design and flow sheet development for each module. Cost studies assumed a staggered construction schedule for the four modules beginning spring 1981 and a 90% on stream factor.

Source record↗

Coal gasification systems engineering and analysis. Appendix C: Alternate product facility designs

The study of the production of methane, methanol, gasoline, and hydrogen by an add-on facility to a Koppers-Totzek based MBG plant is presented. Applications to a Texaco facility are inferred by evaluation of delta effects from the K-T cases. The production of methane from an add-on facility to a Lurgi based MBG plant and the co-production of methane and methanol from a Lurgi based system is studied. Studies are included of the production of methane from up to 50 percent of the MBG produced in an integrated K-T based plant and the production of methane from up to 50 percent of the MBG produced from an integrated plant in which module 1 is based on K-T technology and modules 2, 3, and 4 are based on Texaco technology.

Source record↗

Coal gasification systems engineering and analysis. Appendix D: Cost and economic studies

The detailed cost estimate documentation for the designs prepared in this study are presented. The include: (1) Koppers-Totzek, (2) Texaco (3) Babcock and Wilcox, (4) BGC-Lurgi, and (5) Lurgi. The alternate product cost estimates include: (1) Koppers-Totzek and Texaco single product facilities (methane, methanol, gasoline, hydrogen), (2) Kopers-Totzek SNG and MBG, (3) Kopers-Totzek and Texaco SNG and MBG, and (4) Lurgi-methane and Lurgi-methane and methanol.

Source record↗

Coal gasification systems engineering and analysis. Appendix E: Cost estimation and economic evaluation methodology

The cost estimation and economic evaluation methodologies presented are consistent with industry practice for assessing capital investment requirements and operating costs of coal conversion systems. All values stated are based on January, 1980 dollars with appropriate recognition of the time value of money. Evaluation of project economic feasibility can be considered a two step process (subject to considerable refinement). First, the costs of the project must be quantified and second, the price at which the product can be manufacturd must be determined. These two major categories are discussed. The summary of methodology is divided into five parts: (1) systems costs, (2)instant plant costs, (3) annual operating costs, (4) escalation and discounting process, and (5) product pricing.

Source record↗

Coal gasification systems engineering and analysis. Appendix F: Critical technology items/issues

Critical technology items and issues are defined in which there is a need for developmental research in order to assure technical and economic success for the state of the art of coal gasification in the United States. Technology development needs for the main processing units and the supporting units are discussed. While development needs are shown for a large number of systems, the most critical areas are associated with the gasifier itself and those systems which either feed the gasifier or directly receive products form the gasifier.

Source record↗

Coal gasification systems engineering and analysis. Appendix H: Work breakdown structure

A work breakdown structure (WBS) is presented which encompasses the multiple facets (hardware, software, services, and other tasks) of the coal gasification program. The WBS is shown to provide the basis for the following: management and control; cost estimating; budgeting and reporting; scheduling activities; organizational structuring; specification tree generation; weight allocation and control; procurement and contracting activities; and serves as a tool for program evaluation.

Source record↗

Monitoring and control requirement definition study for Dispersed Storage and Generation (DSG). Volume 2, appendix A: Selected DSG technologies and their general control requirements

A consistent approach was sought for both hardware and software which will handle the monitoring and control necessary to integrate a number of different DSG technologies into a common distribution dispatch network. It appears that the control of each of the DSG technologies is compatible with a supervisory control method of operation that lends itself to remote control from a distribution dispatch center.

Source record↗

Monitoring and control requirement definition study for Dispersed Storage and Generation (DSG). Volume 3, appendix B: State of the art, trends, and potential growth of selected DSG technologies

Present and future relatively small (30 MW) energy systems, such as solar thermal electric, photovoltaic, wind, fuel cell, storage battery, hydro, and cogeneration can help achieve national energy goals and can be dispersed throughout the distribution portion of an electric utility system. Based on current projections, it appears that dispersed storage and generation (DSG) electrical energy will comprise only a small portion, from 4 to 10 percent, of the national total by the end of this century. In general, the growth potential for DSG seems favorable in the long term because of finite fossil energy resources and increasing fuel prices. Recent trends, especially in the institutional and regulatory fields, favor greater use of the DSGs for the future.

Source record↗

Monitoring and control requirement definition study for Dispersed Storage and Generation (DSG). Volume 4, appendix C: Identification from utility visits of present and future approaches to integration of DSG into distribution networks

Visits to four utilities concerned with the use of DSG power sources on their distribution networks yielded useful impressions of present and future approaches to the integration of DSGs into electrical distribution network. Different approaches to future utility systems with DSG are beginning to take shape. The new DSG sources will be in decentralized locations with some measure of centralized control. The utilities have yet to establish firmly the communication and control means or their organization. For the present, the means for integrating the DSGs and their associated monitoring and control equipment into a unified system have not been decided.

Source record↗

Monitoring and control requirement definition study for Dispersed Storage and Generation (DSG). Volume 5, appendix D: Cost-benefit considerations for providing dispersed storage and generation for electric utilities

Cost benefit considerations are extremely important in obtaining the acceptance of dispersed storage and generation (DSG) by the electric utilities. These considerations involved somewhat different economic analyses depending on whether the generation is utility, customer, or combined ownership. It is necessary to get acceptance of more easily understood methods for evaluating the economics of DSG because much of the benefits of DSG may accrue in the generation and transmission portions of the utility system while the costs tend to be centered in the distribution portion of that system. The influence of factors, such as reliability, capital costs, and other economic measures were also investigated.

Source record↗