Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Workforce Development”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

Altitude Testing of Large Liquid Propellant Engines

The National Aeronautics and Space Administration entered a new age on January 14, 2004 with President Bush s announcement of the creation the Vision for Space Exploration that will take mankind back to the Moon and on beyond to Mars. In January, 2006, after two years of hard, dedicated labor, engineers within NASA and its contractor workforce decided that the J2X rocket, based on the heritage of the Apollo J2 engine, would be the new engine for the NASA Constellation Ares upper stage vehicle. This engine and vehicle combination would provide assured access to the International Space Station to replace that role played by the Space Shuttle and additionally, would serve as the Earth Departure Stage, to push the Crew Excursion Vehicle out of Earth Orbit and head it on a path for rendezvous with the Moon. Test as you fly, fly as you test was chosen to be the guiding philosophy and a pre-requisite for the engine design, development, test and evaluation program. An exhaustive survey of national test facility assets proved the required capability to test the J2X engine at high altitude for long durations did not exist so therefore, a high altitude/near space environment testing capability would have to be developed. After several agency concepts the A3 High Altitude Testing Facility proposal was selected by the J2X engine program on March 2, 2007 and later confirmed by a broad panel of NASA senior leadership in May 2007. This facility is to be built at NASA s John C. Stennis Space Center located near Gulfport, Mississippi. 30 plus years of Space Shuttle Main Engine development and flight certification testing makes Stennis uniquely suited to support the Vision For Space Exploration Return to the Moon. Propellant handling infrastructure, engine assembly facilities, a trained and dedicated workforce and a broad and varied technical support base will all ensure that the A3 facility will be built on time to support the schedule needs of the J2X engine and the ultimate flight of the first Ares I vehicle. The A3 facility will be able to simulate pre-ignition altitude from sea-level to 100,000 feet and maintain it up to 650 seconds. Additionally the facility will be able to accommodate initial ignition, shutdown and then restart test profiles. A3 will produce up to 5000 lbm/sec of superheated steam utilizing a Chemical Steam generation system. Two separate inline steam ejectors will be used to produce a test cell vacuum to simulate the 100,000 ft required altitude. Operational capability will ensure that the facility can start up and shutdown without producing adverse pressure gradients across the J2X nozzle. The facility will have a modern thrust measurement system for accurate determination of engine performance. The latest advances in data acquisition and control will be incorporated to measure performance parameters during hotfire testing. Provisions are being made in the initial design of the new altitude facility to allow for testing of other, larger engines and potential upper stage launch vehicles that might require vacuum start testing of the engines. The new facility at Stennis Space Center will be complete and ready for hotfire operations in late 2010.

Maynard, Bryon T.↗

MO-DE-304-00: Workforce Assessment Committee Update

The Abt study of medical physicist work values for radiation oncology physics services, Round IV is completed. It supersedes the Abt III study of 2008. The 2015 Abt study measured qualified medical physicist (QMP) work associated with routine radiation oncology procedures as well as some special procedures. As before, a work model was created to allow the medical physicist to defend QMP work based on both routine and special procedures service mix. The work model can be used to develop a cost justification report for setting charges for radiation oncology physics services. The Abt study Round IV was designed to empower the medical physicist to negotiate a service or employment contract with providers based on measured national QMP workforce and staffing data. For a variety of reasons, the diagnostic imaging contingent of AAPM has had a more difficult time trying estimate workforce requirements than their therapy counterparts. Over the past several years, the Diagnostic Work and Workforce Study Subcommittee (DWWSS) has collected survey data from AAPM members, but the data have been very difficult to interpret. The DWWSS has reached out to include more AAPM volunteers to create a more full and accurate representation of actual clinical practice models on the subcommittee. Though much work remains, through hours of discussion and brainstorming, the DWWSS has somewhat of a clear path forward. This talk will provide attendees with an update on the efforts of the subcommittee. Learning Objectives: Understand the new information documented in the Abt studies. Understand how to use the Abt studies to justify medical physicist staffing. Learn relevant historical information on imaging physicist workforce. Understand the process of the DWWSS in 2014. Understand the intended path forward for the DWWSS.

60 APPLIED LIFE SCIENCES↗

MO-DE-304-02: Diagnostic Workforce Subcommittee Status and Direction

The Abt study of medical physicist work values for radiation oncology physics services, Round IV is completed. It supersedes the Abt III study of 2008. The 2015 Abt study measured qualified medical physicist (QMP) work associated with routine radiation oncology procedures as well as some special procedures. As before, a work model was created to allow the medical physicist to defend QMP work based on both routine and special procedures service mix. The work model can be used to develop a cost justification report for setting charges for radiation oncology physics services. The Abt study Round IV was designed to empower the medical physicist to negotiate a service or employment contract with providers based on measured national QMP workforce and staffing data. For a variety of reasons, the diagnostic imaging contingent of AAPM has had a more difficult time trying estimate workforce requirements than their therapy counterparts. Over the past several years, the Diagnostic Work and Workforce Study Subcommittee (DWWSS) has collected survey data from AAPM members, but the data have been very difficult to interpret. The DWWSS has reached out to include more AAPM volunteers to create a more full and accurate representation of actual clinical practice models on the subcommittee. Though much work remains, through hours of discussion and brainstorming, the DWWSS has somewhat of a clear path forward. This talk will provide attendees with an update on the efforts of the subcommittee. Learning Objectives: Understand the new information documented in the Abt studies. Understand how to use the Abt studies to justify medical physicist staffing. Learn relevant historical information on imaging physicist workforce. Understand the process of the DWWSS in 2014. Understand the intended path forward for the DWWSS.

60 APPLIED LIFE SCIENCES↗

Common occupational classification system amendments for Accelerator Science and Engineering workforce

A common system to classify occupations and skills is essential to support accelerator workforce planning between the Department of Energy (DOE) National Laboratories. In 2025, ten DOE laboratories conducted a census of their accelerator science and engineering workforce and projected their accelerator workforce needs for the next ten years. To support this, revision 3 of the “Common Occupational Classification System” (COCS) was used as a common taxonomy. Modifications were made to include accelerator-specific skills and specialisms. COCS was originally developed for DOE Office of Environmental Restoration and Waste Management in 1996. The framework provides a high-level functional structure that can be expanded with further occupations and specialisms and remains well aligned to DOE laboratory roles nearly 30 years later. Accelerator occupations and specialisms were added to the framework for the 2025 effort to quantify the accelerator workforce. This document is a companion document to COCS and provides a definition for these new occupations and specialisms that do not appear in COCS. Proceeding with a stable taxonomy is seen as essential such that its use becomes easier each year; the taxonomy as used for the 2025 effort is recommended to be continued.

43 PARTICLE ACCELERATORS↗

NASA's Space Launch System Development Status

Development of the National Aeronautics and Space Administration's (NASA's) Space Launch System (SLS) heavy lift rocket is shifting from the formulation phase into the implementation phase in 2014, a little more than 3 years after formal program establishment. Current development is focused on delivering a vehicle capable of launching 70 metric tons (t) into low Earth orbit. This "Block 1" configuration will launch the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back in December 2017, followed by its first crewed flight in 2021. SLS can evolve to a130t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. Benefits associated with its unprecedented mass and volume include reduced trip times and simplified payload design. Every SLS element achieved significant, tangible progress over the past year. Among the Program's many accomplishments are: manufacture of core stage test barrels and domes; testing of Solid Rocket Booster development hardware including thrust vector controls and avionics; planning for RS- 25 core stage engine testing; and more than 4,000 wind tunnel runs to refine vehicle configuration, trajectory, and guidance. The Program shipped its first flight hardware - the Multi-Purpose Crew Vehicle Stage Adapter (MSA) - to the United Launch Alliance for integration with the Delta IV heavy rocket that will launch an Orion test article in 2014 from NASA's Kennedy Space Center. The Program successfully completed Preliminary Design Review in 2013 and will complete Key Decision Point C in 2014. NASA has authorized the Program to move forward to Critical Design Review, scheduled for 2015 and a December 2017 first launch. The Program's success to date is due to prudent use of proven technology, infrastructure, and workforce from the Saturn and Space Shuttle programs, a streamlined management approach, and judicious use of new technologies. The result is a safe, affordable, sustainable, and evolutionary path to development of an unprecedented capability for future missions across the solar system. In an environment of economic challenges, the nationwide SLS team continues to meet ambitious budget and schedule targets. This paper will discuss SLS Program and technical accomplishments over the past year and provide a look at the milestones and challenges ahead.

Lyles, Garry↗

Acquisition of Scientific Equipment

Whitworth University constructed a 63,00 sq. ft. biology and chemistry building which opened in the Fall of 2011. This project provided for new state-of-the-art science instrumentation enabling Whitworth students to develop skills and knowledge that are directly transferable to practical applications thus enhancing Whitworth student's ability to compete and perform in the scientific workforce. Additionally, STEM faculty undertake outreach programs in the area schools, bringing students to our campus to engage in activities with our science students. The ability to work with insturmentation that is current helps to make science exciting for middle school and high school students and gets them thinking about careers in science. 14 items were purchased following the university's purchasing policy, that benefit instruction and research in the departments of biology, chemistry, and health sciences. They are: Cadaver Dissection Tables with Exhaust Chamber and accessories, Research Microscope with DF DIC, Phase and Fluorescence illumination with DP72 Camera, Microscope with Fluorescence, Microcomputer controlled ultracentrifuge, Ultracentrifuge rotor, Variable Temperature steam pressure sterilizer, Alliance APLC System, DNA Speedvac, Gel Cocumentation System, BioPac MP150, Glovebox personal workstation,Lyophilizer, Nano Drop 2000/2000c Spectrophotometer, C02 Incubator.

47 OTHER INSTRUMENTATION↗

Collaborative Research: Louis Stokes Regional Center of Excellence: Louis Stokes Midwest Regional Center of Excellence (LSMRCE) for Broadening Participation in STEM

The Louis Stokes Midwest Regional Center of Excellence (LSMRCE) for Broadening Participation in STEM, a partnership of Chicago State University (CSU), aimed to increase the number of underrepresented minority (URM) students graduating with science, technology, engineering, and math (STEM) degrees and matriculating into graduate STEM programs. As a member institution of the LSMRCE, Fermi Research Alliance, LLC, (Fermilab) looked to support its continued mission of increasing URM student participation in its Summer Internship in Science and Technology (SIST) internship program. The program provided URMs with access to research skills development, mentoring and professionalization activities via paid, summer research internships at Fermilab. Students received instruction and mentoring while gaining exposure to a global laboratory workforce and community with diverse academic and professional expertise. In addition, students established professional relationships and networked with senior researchers, early career scientists, technical professionals, post-docs and other undergraduate interns to help forge collaboration, innovation and mentoring opportunities at Fermilab and LSMRCE partner institutions

99 GENERAL AND MISCELLANEOUS↗

NASA Guidelines for Promoting Scientific and Research Integrity

The National Aeronautics and Space Administration (NASA) seeks to explore and expand human knowledge of the Earth, solar system, and universe and to enable the development of aeronautical and space exploration systems. NASA's ability to achieve these purposes depends on the integrity of the research and technology activities the agency conducts and supports. The NASA workforce - as well as all external entities who review proposals for or receive NASA funding - must maintain the highest standards of scientific integrity. These responsibilities include selecting the most meritorious research activities through open and fair competition, peer review and other appropriate merit review processes, and avoidance of actual and perceived conflicts of interest; avoiding fabrication, falsification, or plagiarism in proposing, performing, or reviewing research, or in reporting research results; openly sharing results and methods not subject to classification or privacy standards; disclosing assumptions and biases in sharing and applying scientific information and data; and acting honestly and transparently in using and serving on advisory committees and in engaging in professional development activities.

Guidelines↗

High Dexterity Robotics for Safety and Emergency Response - 17104

Recently, significant advances in robotics have led to increased use in industrial and military applications. For example, the military has used explosive ordnance disposal (EOD) robots to enable responders to remotely investigate hazardous environments. While EOD robots have saved many lives, their utility is hampered by: 1) limited ability to manipulate complex objects and mechanisms (e.g. open a car door, operate power tools or turn valves), and 2) the requirement for significant operator training using joystick-type interfaces. Most robots today have simplistic manipulators and cannot easily operate in environments designed for humans as evidenced by the recent Amazon Picking Challenge and the DARPA Robotics Challenge. Simple tasks that humans perform easily, such as picking up objects or operating a cutting tool, require customized rigs that are expensive and time-consuming to use. The specialized nature of these robots limits their utility in highly unstructured environments, for example during emergency situations where a robot may need to be rapidly re-purposed for an unanticipated situation (i.e. the Fukushima nuclear disaster). Robots are needed that can perform complex human-like tasks and are easy to use for everyday and emergency tasks. In 2005 the Defense Advanced Research Projects Agency (DARPA) initiated the Revolutionizing Prosthetics (RP) Program with the goal of creating prosthetics as capable as the human arm and a human-machine interface enabling highly intuitive operation. The Johns Hopkins University Applied Physics Laboratory (JHU/APL) created the Modular Prosthetic Limb (MPL), originally developed for amputees and paralyzed individuals as part of the RP Program, to replicate the capability of the human hand and arm to the extent technologically possible. With 26 joints and over 180 sensors, it is one of the most sophisticated and fully integrated robotic arms in the world. We have also demonstrated human-machine interface techniques that are highly intuitive requiring minimal training. While the MPL was originally designed as a prosthetic, it has also been incorporated into mobile robotic systems to project human capability. Using tele-operation, we have demonstrated the ability to perform dual-arm remote operations in complex environments. For nuclear facilities, high dexterity robots combined with tele-operation offer the potential to enhance worker safety, productivity and quality. Safety enhancements include enabling remote operation in hazardous environments, remote handling of heavy or dangerous materials, and elimination of injury due to repetitive motions. Because the MPL is designed to function like a human limb, the robot can work in environments designed for humans with limited need for specialized tools. When used for routine operations, it can also maintain a level of familiarity and confidence that effectively accomplishes reinforcement training for use in emergency situations, unlike a specialized robot that might sit unused for months or years at a time. In August 2016 we demonstrated the use of the MPL at the Portsmouth Gaseous Diffusion Plant in Piketon, Ohio. Two robotic platform technologies were demonstrated to familiarize the DOE Emergency Management's (EM) workforce on the potential benefits of this technology. Here we present the results of those efforts, highlight the lessons learned during 'EM Week,' and outline potential future developments that could further advance application of these technologies to enhance worker safety. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Space Launch System Development Status

Development of NASA's Space Launch System (SLS) heavy lift rocket is shifting from the formulation phase into the implementation phase in 2014, a little more than three years after formal program approval. Current development is focused on delivering a vehicle capable of launching 70 metric tons (t) into low Earth orbit. This "Block 1" configuration will launch the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back in December 2017, followed by its first crewed flight in 2021. SLS can evolve to a130-t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. Benefits associated with its unprecedented mass and volume include reduced trip times and simplified payload design. Every SLS element achieved significant, tangible progress over the past year. Among the Program's many accomplishments are: manufacture of Core Stage test panels; testing of Solid Rocket Booster development hardware including thrust vector controls and avionics; planning for testing the RS-25 Core Stage engine; and more than 4,000 wind tunnel runs to refine vehicle configuration, trajectory, and guidance. The Program shipped its first flight hardware - the Multi-Purpose Crew Vehicle Stage Adapter (MSA) - to the United Launch Alliance for integration with the Delta IV heavy rocket that will launch an Orion test article in 2014 from NASA's Kennedy Space Center. Objectives of this Earth-orbit flight include validating the performance of Orion's heat shield and the MSA design, which will be manufactured again for SLS missions to deep space. The Program successfully completed Preliminary Design Review in 2013 and Key Decision Point C in early 2014. NASA has authorized the Program to move forward to Critical Design Review, scheduled for 2015 and a December 2017 first launch. The Program's success to date is due to prudent use of proven technology, infrastructure, and workforce from the Saturn and Space Shuttle programs, a streamlined management approach, and judicious use of new technologies. The result is a safe, affordable, sustainable, and evolutionary path to development of an unprecedented capability for future missions across the solar system. In an environment of economic challenges, the nationwide SLS team continues to meet ambitious budget and schedule targets. This paper will discuss SLS program and technical accomplishments over the past year and provide a look at the milestones and challenges ahead.

Lyles, Garry↗

Savannah River nuclear solutions criticality safety training and qualification program and professional development/retention - 14507

Many years ago, at the Savannah River Site, the need for technically competent and qualified criticality safety (CS) staff was identified. Over the intervening years an extensive training and qualification (T and Q) program was developed. In 2008 Savannah River Nuclear Solutions (SRNS), the current site M and O contractor, inherited the T and Q program developed by the prior site contractors. Since then SRNS has initiated changes to the T and Q program to better fit the current regulatory environment, ensuring compliance with ANSI/ANS-8.26 [1], and implementing the idea of continuous improvement. Currently, a significant fraction of the SRNS CS staff either will be or are eligible for retirement. Therefore, SRNS is pursuing recent Nuclear Engineering college graduates and/or experienced criticality engineers. The challenges associated with hiring and maintaining criticality staff include, but are not limited to, increased workforce mobility and increased competition for fewer criticality resources. For example, the recent trend in company benefits is to eliminate longer term benefits such as pensions to make the benefits more transportable in terms of 401 Ks and Health Savings Accounts. In addition, there have been reductions in DOE funding for professional development through participation in ANS committees or attendance at Criticality related conferences. SRNS has investigated a number of possibilities on how to retain CS staff, but in the current environment has not identified any 'golden eggs'. Regardless, SRNS is exploring additional paths to incentivize the engineers to stay long term. SRNS is working to improve/maintain its workforce by creating a CS engineer pipeline. SRNS provides a training budget for new engineers and offers a formalized and mentored training program. For experienced criticality engineers, the SRNS T and Q program is flexible enough to allow 'credit' for previous accomplishments at other sites. SRNS is also striving to be proactive in supporting professional development by identifying specific monies in the planning phases of the annual budget requests. The current posture of SRNS is to maintain 'open' requisitions for both experienced staff looking for other opportunities, and for recent college graduates. As opportunities arise, either from within or without, SRNS evaluates the potential candidates and advances offers of employment. Until the longer term need is met SRNS intends to hire at least two staff members per year. Those staff members then enter the T and Q program and when appropriate, based on their experience and/or training accomplishments, begin assisting the current staff with program/facility CS support. (authors)

42 ENGINEERING↗

Integrated Vehicle Ground Vibration Testing of Manned Spacecraft: Historical Precedent

For the first time in nearly 30 years, NASA is developing a new manned space flight launch system. The Ares I will carry crew and cargo to not only the International Space Station, but onward for the future exploration of the Moon and Mars. The Ares I control system and structural designs use complex computer models for their development. An Integrated Vehicle Ground Vibration Test (IVGVT) will validate the efficacy of these computer models. The IVGVT will reduce the technical risk of unexpected conditions that could place the vehicle or crew in jeopardy. The Ares Project Office's Flight and Integrated Test Office commissioned a study to determine how historical programs, such as Saturn and Space Shuttle, validated the structural dynamics of an integrated flight vehicle. The study methodology was to examine the historical record and seek out members of the engineering community who recall the development of historic manned launch vehicles. These records and interviews provided insight into the best practices and lessons learned from these historic development programs. The information that was gathered allowed the creation of timelines of the historic development programs. The timelines trace the programs from the development of test articles through test preparation, test operations, and test data reduction efforts. These timelines also demonstrate how the historical tests fit within their overall vehicle development programs. Finally, the study was able to quantify approximate staffing levels during historic development programs. Using this study, the Flight and Integrated Test Office was able to evaluate the Ares I Integrated Vehicle Ground Vibration Test schedule and workforce budgets in light of the historical precedents to determine if the test had schedule or cost risks associated with it.

Lemke, Paul R.↗

Ideas on the NASA Senior Review and Mission Extension Process

Extended mission budgets fund a significant part of our community, particularly young scientists who in a relatively short time are exposed to a broad range of experiences and opportunities available in space science and other STEM fields. In particular, mission-funded science offers a relatively stable funding stream that enables meaningful mentoring efforts and interactions, including apprenticeships ranging from project management, to mission operations, to data processing and analysis, to hardware and software development, to STEM-related education and outreach. It moreover provides professional contacts that fuel diversity in mission leadership and in the science and technical workforce at-large. Last but not least, it sustains the scientific productivity of NASA’s missions, which constitute major national investments meriting their full exploitation. Budgets cuts, however, are exercising pressure on the science and operations of the extended mission fleet despite being only a small portion of the overall Division budget. The history of Heliophysics has demonstrated that maintaining the operation of missions beyond their prime phase invariably leads to a much deeper knowledge of the original mission science goals, together with new applications often not foreseen during their original design. Their operation as part of the Heliophysics System Observatory (HSO)---a coordinated, 1eliophysics, multipoint observing system of the heliosphere, is a prime example. Some of the first activities undertaken by the Parker Solar Probe and Solar Orbiter missions required recreating the larger context of their new observations by using the diversity of HSO mission capabilities. The marginal cost of maintaining this valuable, working science resource, in the form of both continuing high quality data access and expertise, is small compared to the cost of the original missions or of new missions to achieve similar objectives, making the operation of extended missions, the best “science per dollar” investment in Heliophysics. We argue that reducing both extended mission operations and science budgets will have a ripple effect across the community, including reducing employment and training opportunities for young scientists, to lowering the quality/impact of the Heliophysics Systems Observatory. Instead, we suggest that the proposal process for mission extension should be re-examined. We offer several ideas for reducing costs of extended missions toward maintaining science output and streamlining the management process.

A. Vourlidas↗

Verification and Validation of a Conceptual Model of the Auto-Rigging Payload Handling and Off-Loading System Using LEGO Technic System and Three-Dimensional Printed Parts

A conceptual model (CM) can be used to validate a concept in modeling and simulation life cycles. During the 2020-2022 Coronavirus disease 2019 (COVID-19) pandemic, for employee safety NASA implemented center closures and mandatory telework for the entire workforce. During this challenging time, engineers and researchers at NASA Langley Research Center (LaRC) looked for safe and innovative approaches and methods to continue the development of CMs for various projects. Engineers and researchers at LaRC researched Auto-Rigging Payload Handling and Off-Loading System (ARPHOLS) for payload handing and off-loading a system on an inclined lunar lander deck. In this paper, the development of a CM and the verification and validation of a conceptual idea for ARPHOLS using a LEGO Technic system and three-dimensional printed parts is presented.

Design↗

Verification and Validation of a Conceptual Model of the Auto-Rigging Payload Handling and Off-Loading System Using LEGO Technic System and Three-Dimensional Printed Parts

A conceptual model (CM) can be used to validate a concept in modeling and simulation life cycles. During the 2020-2022 Coronavirus disease 2019 (COVID-19) pandemic, for employee safety NASA implemented center closures and mandatory telework for the entire workforce. During this challenging time, engineers and researchers at NASA Langley Research Center (LaRC) looked for safe and innovative approaches and methods to continue the development of CMs for various projects. Engineers and researchers at LaRC researched Auto-Rigging Payload Handling and Off-Loading System (ARPHOLS) for payload handing and off-loading a system on an inclined lunar lander deck. In this paper, the development of a CM and the verification and validation of a conceptual idea for ARPHOLS using a LEGO Technic system and three-dimensional printed parts is presented.

Payload offloading↗

S4PST: Sustainability for Programming Systems and Tools: May Workshop Report

The US Department of Energy (DOE) Exascale Computing Project (ECP) has fostered and strengthened the use of modern software engineering practices for developing applications and libraries, and this effort has resulted in the coordinated and interoperable E4S1 and xSDK2 ecosystems. Although this approach is cost-effective, it relies on robust programming systems and tools (PST) as the underlying foundation for our HPC software. At present, our primary PST stack consists of traditional high-performance computing (HPC) languages, namely Fortran, C, C++, and the popular Python language for data analysis and AI workflows. These languages support various programming frameworks and run-time abstractions that enable parallelism and concurrency across multiple node architectures and thousands of nodes through a variety of interconnect systems. However, to accommodate users’ diverse needs, certain aspects of the HPC ecosystem are delegated to vendor-specific or third-party implementations that extend beyond a particular scientific domain. This broader scope results in a multitude of specifications and variations, which leads to a complex orchestration of many-ecosystems. Unfortunately, this complexity in the ecosystem imposes additional overhead costs on consumers during the latter stages of the development cycle. In addition to the software ecosystem challenge, the upcoming conclusion of the ECP by December 2023 has raised significant concerns within the HPC programming systems community, from both the economic and social perspectives. The ECP has implemented a management structure for software development and funding decisions across all ECP participants by following a conventional hierarchical and centralized approach. However, this structure has prompted certain considerations within the community, particularly in anticipation of the Software Sustainability initiative by the DOE’s Advanced Scientific Computing Research Program (ASCR). For the success of this new initiative, it is of utmost importance to secure consistent funding and foster close engagement with researchers and core developers of existing programming-system products. This collaboration is vital to maintaining the critical capabilities of the current software during the transition phase while proactively adapting to future technology and workforce trends. The community recognizes the significance of adapting to emerging trends and is aware of the inherent fragility of the HPC software ecosystem, particularly in relation to programming systems that cater to all users. The ability to adapt and evolve is essential to staying relevant and effectively addressing these technical, economic, and social challenges. The S4PST team, which represents one of the six ASCR Software Sustainability seedling projects, is dedicated to tackling these challenges through community-based approaches that go beyond the scope of the DOE. This involves collaboration between national laboratories with academia, non-DOE institutions, hardware and system vendors, and international partners. By fostering these partnerships, we aim to create a robust and sustainable HPC software ecosystem that can effectively meet the needs of the community. This new community effort, driven by the eight DOE labs, will take on the responsibility of guiding funding decisions for programming-systems development and maintenance with transparency and consistency across all decisions. Additionally, the team will offer common technical services to the programming systems community, irrespective of their funding situations, and facilitate community-wide incubation to proactively nurture the software ecosystem. By actively engaging with stakeholders and employing a collaborative approach, we can collectively shape the future of programming systems and ensure a robust and thriving HPC software landscape. On May 11–12, 2023, the S4PST team conducted its inaugural kick-off workshop at the Innovative Computing Laboratory (ICL) in the University of Tennessee, Knoxville, hosted by Hartwig Anzt. The workshop encompassed various sessions dedicated to presentations and discussions, with the aim of comprehending the team members’ perspectives on the vision of software sustainability. Additionally, the workshop aimed to identify the technical, economic, and social requirements for sustaining the programming-systems community in the field of HPC. This report provides a summary of the S4PST effort by highlighting five major thrust areas discussed during the workshop: (i) community, (ii) technical support, (iii) training and diversity, (iv) verification, validation and correctness, and (v) emerging technologies. It also encompasses an overview of the presentations and discussions held throughout the event, our views and potential synergies with other seedling efforts, along with the outcomes and key takeaways from our initial discussions.

97 MATHEMATICS AND COMPUTING↗

Robotics Technologies on Knowledge Management Information Tool (KM-IT) Platform - 16465

The Knowledge Management Information Tool (KM-IT) is a web-based system developed to maintain and preserve the deactivation and decommissioning (D and D) knowledge base across the Department of Energy (DOE) complex. The system was developed by the Applied Research Center (ARC) at Florida International University (FIU) with the support of the D and D community, including the DOE Office of Environmental Management (DOE EM), and with the active collaboration and support of the DOE's Energy Facility Contractors Group (EFCOG). The KM-IT system is a D and D community driven system tailored to serve the technical issues faced by the D and D workforce across the DOE Complex. New information, including vendors and technologies related to D and D, are researched and added to KM-IT on an ongoing basis. In late 2014, DOE EM provided a database of 471 robotic technologies, originally developed by NuVision Engineering and Cogentus Consulting, with a request to evaluate the potential for integrating the data into the KM-IT framework for ongoing hosting/maintenance of the information. All of the data from the original database as well as photographs, documents, and videos are now available on KM-IT. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗