Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “UTILITY INTERCONNECTIONS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

Uranium and Beryllium Decontamination and Decommissioning in a Developed Neighborhood - 17494

In September 2008, the United States Environmental Protection Agency (EPA), Region 1, issued an Administrative Order by Consent (AOC) that required the completion of a Non-Time-Critical Removal Action for the Nuclear Metals, Inc. Site (Site), which is located in Concord, Massachusetts. The AOC required decontamination and demolition of the site buildings and structures. The Site was originally used for radiological research and production, and included foundry equipment for melting metals, extrusion presses and metal working equipment, pickling and etching tanks, and electroplating equipment. In the 1970's, Nuclear Metals, Inc. developed a large scale depleted uranium manufacturing, operation, which included the manufacturing of penetrators, or bullets, from depleted uranium (DU) as a defense contractor for the U.S. Army. Later operations included production of beryllium alloy materials. The Site included a two-story, five-section interconnected building, a tank house, a hydrogen peroxide tank house, two gas cylinder storage huts, and four 'Butler' metal storage buildings, which had a combined footprint of approximately 17,000 square meters (185,000 square feet). The buildings were principally contaminated with DU and beryllium dust, along with asbestos, PCBs, lead and other constituents. The required removal action at the Site consisted of building stabilization activities to remove flammable materials, install temporary utilities and control dust to create a safe work environment within the buildings for site workers; removal of hazardous materials; demolition of all structures and equipment; and off-site disposal of waste materials. The Decontamination and Decommissioning (D and D) activities and highlights of some of the public involvement work required to complete building D and D work in a residential community are discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterizing cyber tools for monitoring power grid systems: what information is available and who needs it?

Abstract—The power grid is a complex, interconnected system that requires the coordination of multiple entities ensure the reliability of the system. System operators must be aware of the impacts of various natural and man-made contingencies through telemetry from their control systems, and they must also be aware of the integrity and availability of the cyber assets on their systems. A team of researchers from PNNL and INL have conducted a series of observations and interviews at power utilities to identify what information needs to be available for both control room dispatchers and cyber security analysts to maintain situation awareness of cyber security to effectively monitor the cyber assets on utility control systems. The researchers interviewed and observed control room dispatchers and spoke with regional control system engineers and cyber security analysts to define the context in which such information would be used. The results of this work will inform the design of a tool that will enhance cyber situation awareness and help facilitate effective communication between the various roles and organizations with utility and other regional authorities during contingencies. Index Terms—

24 POWER TRANSMISSION AND DISTRIBUTION↗

Design and Evaluation of a Secure Virtual Power Plant.

For three years, Sandia National Laboratories, Georgia Institute of Technology, and University of Illinois at Urbana-Champaign investigated a smart grid vision in which renewable-centric Virtual Power Plants (VPPs) provided ancillary services with interoperable distributed energy resources (DER). This team researched, designed, built, and evaluated real-time VPP designs incorporating DER forecasting, stochastic optimization, controls, and cyber security to construct a system capable of delivering reliable ancillary services, which have been traditionally provided by large power plants or other dedicated equipment. VPPs have become possible through an evolving landscape of state and national interconnection standards, which now require DER to include grid-support functionality and communications capabilities. This makes it possible for third party aggregators to provide a range of critical grid services such as voltage regulation, frequency regulation, and contingency reserves to grid operators. This paradigm (a) enables renewable energy, demand response, and energy storage to participate in grid operations and provide grid services, (b) improves grid reliability by providing additional operating reserves for utilities, independent system operators (ISOs), and regional transmission organization (RTOs), and (c) removes renewable energy high-penetration barriers by providing services with photovoltaics and wind resources that traditionally were the jobs of thermal generators. Therefore, it is believed VPP deployment will have far-reaching positive consequences for grid operations and may provide a robust pathway to high penetrations of renewables on US power systems. In this report, we design VPPs to provide a range of grid-support services and demonstrate one VPP which simultaneously provides bulk-system energy and ancillary reserves.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Grid Ready, Flexible Large Power Transformer

GE Research and its partner Prolec GE have proposed a novel and breakthrough concept to improve the flexibility and interchangeability of large power transformers (LPTs). LPTs refer in this report to transformers with a power rating equal or greater than 100 MVA. The concept consists of a 3-phase autotransformer bank having one specified high voltage side (HV) voltage and three configurable low voltage side (LV) voltage taps. Moreover, the leakage impedance is adjustable offline using taps which allows to accommodate short-circuit requirements for a wide range of LPTs applications. The research performed aimed to develop and validate a cost-effective design of a flexible LPT and to demonstrate its competitiveness with the LPT fleet currently in operation in the U.S. The concept is intended for the long-term replacement of existing LPTs. In this project, the U.S based population of LPTs was analyzed to determine their commonality in power, voltage classes, and impedance range. Up to 9,700 units, currently deployed in the NERC’s Eastern and Western interconnection regions, were evaluated. This analysis yielded the specifications of two flexible LPTs to be designed to demonstrate the manufacturability and competitiveness of the concept: a 345 kV, 230 MVA and a 230 kV, 100 MVA LPTs. The two LPTs are both configurable to 161 kV, 138 kV, and 115 kV on the LV side and allow leakage impedance variation between 4% and 14%. The design output showed that the flexible LPT is manufacturable and competitive with conventional LPT. The proposed design has a power efficiency of 99.5% and a total active part weight increase ranging only between 15% and 28% relative to conventional LPTs it can be substituted with. Indeed, for the flexible LPT, the higher the LV side voltage is, the higher is its power rating. Hence, flexible LPTs are more competitive when compared with the largest conventional LPT they can replace. Power systems analyses were carried out to evaluate the performance of the flexible LPT when replacing an existing conventional LPT. These analyses showed that short-circuit and inrush currents will remain respectively within 15% and 9.4% of their original levels suggesting that no substations equipment is likely to be replaced due the installation of the flexible LPT. In addition, the analyses showed that the transient overvoltage anticipated at the impedance configuration switch will be manageable and will not pose any particular risk during lightning or switching events. This research proved that the deployment of flexible LPTs in the U.S power grid can greatly improve the grid reliability and its resiliency especially in the event of the loss of multiple LPTs. Moreover, the concept can significantly help reduce LPTs’ spare inventory by providing a high spare coverage level. The performed analysis showed that the designed 345 kV flexible LPT can serve as a spare for up to 34 units currently in operation in the U.S while the designed 230 kV flexible LPT can replace up to 101 units. Flexible LPTs offer new opportunities to U.S utilities to improve interchangeability of LPTs in the transmission system and to better strategize the upcoming renewal of about 70% of the population of LPTs anticipated to retire within the next two decades.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Recent Photovoltaic Performance Data in the USA (Presentation)

This paper presents performance data from nearly 50,000 Photovoltaic systems totaling 1.7 Gigawatts installed capacity in the USA from 2009 to 2012. 90% of the systems performed to within 10% or better of expected performance. Only 2-4% of the data indicate issues significantly affecting the system performance. Special causes of underperformance and their impacts are delineated by reliability category. Delays and interconnections dominate project-related issues particularly in the first year, but total less than 0.5% of all systems. Hardware-related issues are dominated by inverter problems totaling less than 0.4% and underperforming modules to less than 0.1%.

14 SOLAR ENERGY↗

Solid state lighting component

An LED component comprising an array of LED chips mounted on a planar surface of a submount with the LED chips capable of emitting light in response to an electrical signal. The LED chips comprise respective groups emitting at different colors of light, with each of the groups interconnected in a series circuit. A lens is included over the LED chips. Other embodiments can comprise thermal spreading structures included integral to the submount and arranged to dissipate heat from the LED chips.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Hydrogen Storage for Flexible Fossil Fuel Power Generation: Integration of Underground Hydrogen Storage with Gas Turbine (Final Report)

As the nation continues to encourage, through market structures and financial incentives, the proliferation of intermittent renewable electricity, how to optimize the ever-changing electric grid and identify means to retain and improve resilience, while ensuring continued reductions in GHG emissions, will be critical. According to Bloomberg, wind & solar generated 10.5% of US electricity in 2020 and that percentage continues to grow. In support of expanding renewable energy use, and to address its intermittent nature, this project will develop the Hydrogen Storage for Flexible Fossil Fuel Power Generation platform that is dispatchable, reliable, repeatable and have the ability to produce zero or negative carbon power while interfacing with geology capable of CO2 and hydrogen storage. GTI Energy (GTIE) and team members Illinois State Geological Survey (ISGS), Mitsubishi Heavy Industries America (MHIA), Ameren Illinois, Hexagon Purus, and the Low Carbon Resources Initiative (LCRI) completed a Phase I Conceptual Study under contract DE-FE0032012 for Hydrogen Storage for Flexible Fossil Fuel Power Generation: Integration of Underground Hydrogen Storage with Gas Turbine. The Hydrogen Storage for Flexible Fossil Fuel Power Generation platform addresses the intermittent nature of the expanding use of Variable Renewable Energy (VRE) generation. The low cost of the electricity (COE) generated results in greater dispatch and more operation at higher power levels (higher efficiency), fewer short intervals, and fewer start/stop cycles. The reliable, resilient system can produce zero carbon power and store hydrogen. It will demonstrate hydrogen storage in geologic formations like those used in natural gas underground storage thus enabling large scale storage of hydrogen in sedimentary strata across the United States rather than in geographically restricted salt caverns. The Phase I study confirmed the system is feasible and generates power at lower cost than other low carbon approaches. The demonstration defines the pathway for broad commercial application and will accelerate the development of larger systems suitable for centralized utility scale electricity production. The study advanced the maturity of the H 2 storage-based system with flexible power generation by completing a Pre-FEED study (Phase II). The Pre-FEED focused on the selected Energy Farm on the University of Illinois Urbana-Champaign (UIUC) site that includes above ground and underground hydrogen storage, low-carbon hydrogen production (GTI’s Compact Hydrogen Generator, CHG) with underground CO2 sequestration, and a 40-MW class gas turbine. The Pre-FEED addressed the entire system and its interconnection to the natural gas and electric grid and mitigation of key risks, such as storage behavior, load-following, and system operation. During Phase 1 of the project, the team completed key tasks, which moved the entire demonstration project, specific components and approaches closer to commercialization. These Phase I Accomplishments include: Completing System Requirements Review; Completing System Layout and Modeling - Heat & Mass Balance and Process Flow Diagram; Completing modelling of 9 turbine performance cases; Evaluating rock strata for underground storage of hydrogen and sequestration of carbon dioxide; Completing initial modelling of underground storage of hydrogen and withdrawal with evaluation of loss and water production; Identifying roadable storage for above ground hydrogen storage; Identifying existing electrical infrastructure for receiving/delivering electricity; Identifying existing gas supply infrastructure for receiving natural gas; Document concept design/development plans in required reports. Conclusions: The 12-month Feasibility study in Phase I study was completed and confirmed the system is feasible and generates power at lower cost than other low carbon approaches and even lower cost than the reference NGCC plant without carbon capture when taking advantage of 45Q carbon credits. The study enabled the fidelity of the concept to be improved and allowed identification of the requirements for the system. Defining the individual system and component requirements was performed via the system requirements review with the whole team. These requirements were then incorporated into and iterated with our Heat & Mass Balance process model and process flow diagrams were generated to reflect the overall system. This information was then used to complete the TEA and show economic feasibility. Large scale non-salt geologic storage of hydrogen is an enabling technology for a hydrogen-fired turbine that can be retrofitted into large-scale electric generating units (EGU). Our demonstration will include 428 MWh or ~4 hours full load of hydrogen storage (above and underground). Carbon capture inherent to the CHG process can capture 90% CO 2 (with upgrades to >98%). This system provides a COE of 23% savings relative to an NGCC with a post combustion amine system. Our proposed storage system decouples carbon capture and hydrogen production from power production; therefore, we expect our proposed system’s efficiency and variable COE to be superior resulting in overall higher dispatch and reduced deep cycling. Our demonstration will be full to multi-day hydrogen storage and has the potential for longer (seasonal) duration commercially. The demonstration defines the pathway for broad commercial application and will accelerate the development of larger systems suitable for centralized utility scale electricity production.

03 NATURAL GAS↗

Fabrication and Performance Evaluation of Double-Sided Copper Nanowire Arrays as Thermal and Electrical Interfacial Layers

Reducing contact interface thermal and electrical resistances is in great demand across various industries, particularly in the semiconductor industry. This study introduces an approach using double-sided copper nanowire (Cu NW) arrays on copper sheets as both thermal and electrical interfacial layers, designed to effectively accommodate the topographical inconsistencies between contact surfaces. Further, experimental outcomes reveal a significant reduction in thermal contact resistance (TCR), with a value of 2.5 mm 2 K W –1 , thereby exceeding the efficiency of reported nanostructural thermal interface materials (TIMs). Additionally, when utilized as an electrical interfacial layer, these double-sided Cu NWs arrays dramatically reduced electrical contact resistance (ECR), outperforming traditional conductive grease in applications necessitating separable bonding, though showing comparable performance to costly silver-based conductive epoxies required for permanent, inseparable bonds. The promising results of the double-sided Cu NWs arrays in reducing both TCR and ECR, confirmed by finite element simulation, highlight their substantial potential in advancing TIMs and electrical interconnection applications across various sectors.

42 ENGINEERING↗

Analysis of Unit-Level Changes in Operations with Increased SPP Wind from EPRI/LCG Balancing Study

Wind power development in the United States is outpacing previous estimates for many regions, particularly those with good wind resources. The pace of wind power deployment may soon outstrip regional capabilities to provide transmission and integration services to achieve the most economic power system operation. Conversely, regions such as the Southeastern United States do not have good wind resources and will have difficulty meeting proposed federal Renewable Portfolio Standards with local supply. There is a growing need to explore innovative solutions for collaborating between regions to achieve the least cost solution for meeting such a renewable energy mandate. The Department of Energy funded the project 'Integrating Midwest Wind Energy into Southeast Electricity Markets' to be led by EPRI in coordination with the main authorities for the regions: SPP, Entergy, TVA, Southern Company and OPC. EPRI utilized several subcontractors for the project including LCG, the developers of the model UPLAN. The study aims to evaluate the operating cost benefits of coordination of scheduling and balancing for Southwest Power Pool (SPP) wind transfers to Southeastern Electric Reliability Council (SERC) Balancing Authorities (BAs). The primary objective of this project is to analyze the benefits of regional cooperation for integrating mid-western wind energy into southeast electricity markets. Scenarios were defined, modeled and investigated to address production variability and uncertainty and the associated balancing of large quantities of wind power in SPP and delivery to energy markets in the southern regions of the SERC. DOE funded Oak Ridge National Laboratory to provide additional support to the project, including a review of results and any side analysis that may provide additional insight. This report is a unit-by-unit analysis of changes in operations due to the different scenarios used in the overall study. It focuses on the change in capacity factors and the number of start-ups required for each unit since those criteria summarize key aspects of plant operations, how often are they called upon and how much do they operate. The primary analysis of the overall project is based on security-constrained unit commitment (SCUC) and economic dispatch (SCED) simulations of the SPP-SERC regions as modeled for the year 2022. The SCUC/SCED models utilized for the project were developed through extensive consultation with the project utility partners, to ensure the various regions and operational practices are represented as best as possible in the model. SPP, Entergy, Oglethorpe Power Company (OPC), Southern Company, and the Tennessee Valley Authority (TVA) actively participated in the project providing input data for the models and review of simulation results and conclusions. While other SERC utility systems are modeled, the listed SERC utilities were explicitly included as active participants in the project due to the size of their load and relative proximity to SPP for importing wind energy.

17 WIND ENERGY↗

Securing Vehicle Charging Infrastructure

As the US electrifies the transportation sector, cyber attacks targeting vehicle charging could bring consequences to electrical system infrastructure. This is a growing area of concern as charging stations increase power delivery and must communicate to a range of entities to authorize charging, sequence the charging process, and manage load (grid operators, vehicles, OEM vendors, charging network operators, etc.). The research challenges are numerous and are complicated because there are many end users, stakeholders, and software and equipment vendors interests involved. Poorly implemented electric vehicle supply equipment (EVSE), electric vehicle (EV), or grid communication system cybersecurity could be a significant risk to EV adoption because the political, social, and financial impact of cyberattacks - or public perception of such - ripples across the industry and has lasting and devastating effects. Unfortunately, there is no comprehensive EVSE cybersecurity approach and limited best practices have been adopted by the EV/EVSE industry. There is an incomplete industry understanding of the attack surface, interconnected assets, and unsecured interfaces. Thus, comprehensive cybersecurity recommendations founded on sound research are necessary to secure EV charging infrastructure. This project is providing the power, security, and automotive industry with a strong technical basis for securing this infrastructure by developing threat models, determining technology gaps, and identifying or developing effective countermeasures. Specifically, the team is creating a cybersecurity threat model and performing a technical risk assessment of EVSE assets, so that automotive, charging, and utility stakeholders can better protect customers, vehicles, and power systems in the face of new cyber threats.

33 ADVANCED PROPULSION SYSTEMS↗

Transmission Cost Allocation Methodologies for Regional Transmission Organizations

This report describes transmission cost allocation methodologies for transmission projects developed to maintain or enhance reliability, to interconnect new generators, or to access new resources and enhance competitive bulk power markets, otherwise known as economic transmission projects.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Model Reduction for Fast Assessment of Grid Impact of High Penetration PV

A key challenge in properly analyzing the impact of solar photovoltaics (PV) during planning, interconnection and operation in the distribution grid is computational complexity. Such studies require the use of Quasi-Steady-Time-Series (QSTS) power flow to capture the complex interaction of PV with voltage regulating equipment and protection devices and a large number of scenario studies are needed to capture location specific constraints and uncertainties. In addition, a typical distribution feeder can have thousands of nodes and there can be thousands of such feeders in a given utility system. To solve this problem, a new and systematic method for distribution network reduction is proposed. The objective is to reduce the size of distribution systems by more than 80% while preserving the accuracy of power flow results. To this end, an extended Ward-equivalent method has been proposed to create an equivalent circuit. Moreover, load and PV aggregation based on the backward sweep method has been developed to further simplify the feeder. The proposed method is tested with a modified IEEE 123-node distribution test system. The simulation results demonstrate the high efficiency and accuracy of the proposed approach for distribution network reduction.

reduced order systems, load flow, load modeling, v↗

3-D Prismatic Packaging Methodologies for Wide Band Gap Power Electronics Modules

In a power module the parasitic inductance limits the dynamic high-frequency performance, and the area of the cooling surfaces limits the power capability. This paper presents a new 3D power electronic design methodology based on the concept of mutual inductance cancellation and multi-sided heat transfer. New 3D prismatic packaging concepts are proposed for Wide Band Gap (WBG) power devices, where the devices can be mounted at acute angles to adjacent interconnects or other devices. Discussion is given on electrical and thermal path optimization in a 3D space. To validate the 3D prismatic packaging methodology, a 1200V/50A SiC half-bridge power module is fabricated and tested for electrical and thermal performance and results are compared with simulations. The power density calculated for the module is 12 kW/in3 (including heatsink) and shows a 31.3% inductance reduction compared to a 2D planar module. Finally, design guidance suggested for utilizing prismatic structures is provided, together with suggested future work in the area. This paper presents the first reported true 3D power module.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Mooring System Cost Estimates for Wave Energy Farms in Shared Mooring Arrays

As wave energy converters (WECs) become more advanced and cost-efficient, so too must their mooring systems. A key question in the development plans for WECs is the cost of the mooring system, particularly for large wave farms. WEC devices deployed in a WEC farm array, where each device can be connected by shared mooring lines in various array layouts, have potential to reduce mooring system costs significantly. This paper presents the modeling and designing of mooring systems for large WEC arrays and the calculation of the cost of each mooring system to determine the change in cost as the number of WECs in a farm increases. A baseline mooring system for a single floating oscillating water column (OWC) WEC was developed for this analysis. The mooring system utilizes four anchored mooring lines connected to a square assembly of wire rope mooring lines, supported by four floating buoys, and attached to the floating WEC by four polyester rope mooring lines. This assembly, referred to as a floating cell, can be tiled to form various rectangular WEC arrays. The objective of this analysis is to determine how the mooring system cost changes as more WECs are added to an array layout, each with their own interconnected floating cell. To do this, complete mooring systems need to be designed for each WEC array layout. To narrow down the design space of a WEC array mooring system, a couple assumptions were made. It was assumed that the floating cell parameters of the baseline design were to stay constant across all floating cells in the WEC array. It was also assumed that the anchored mooring lines would be of the baseline configuration, a predominantly chain mooring line with a short section of polyester rope near the fairlead, and a drag-embedment anchor. These anchored lines were assumed to extend from the outer edges of the WEC array, inline with the headings of the wire rope mooring lines of the floating cells, or diagonal if extending from a corner of the WEC array. Full mooring systems were designed for 2xN and NxN WEC array layouts and efficiently simulated in the mooring dynamics simulation tool, MoorDyn, to ensure all dynamic constraints were met. The system costs were calculated and then refined by shortening unnecessary chain line lengths and reducing the chain diameters of the downstream anchored mooring lines. It was found that, in general, mooring system costs per WEC decrease when WECs are installed in an array. Compared to the baseline mooring system for a single WEC, the 2x3 mooring system array had the lowest mooring system cost per WEC, reducing the cost per WEC by 59%. The 3x3 and 4x4 array mooring systems also saw significant reductions in cost per WEC but had negligible cost savings between the two designs, primarily because the larger 4x4 mooring system requires larger chain diameters, which increases cost. These results provide an interesting glimpse into modeling, designing, and calculating the cost of mooring systems for large WEC arrays.

cost↗

Smart buildings with electric vehicle interconnection as buffer for local renewables?

Some conclusions from this presentation are: (1) EV Charging/discharging pattern mainly depends on the objective of the building (cost versus CO{sub 2}); (2) performed optimization runs show that stationary batteries are more attractive than mobile storage when putting more focus on CO{sub 2} emissions because stationary storage is available 24 hours a day for energy management - it's more effective; (3) stationary storage will be charged by PV, mobile only marginally; and (4) results will depend on the considered region and tariff. Final research work will show the results for 138 different buildings in nine different climate zones and three major utility service territories.

25 ENERGY STORAGE↗

A First Look at the Impact of Electric Vehicle Charging on the Electric Grid in the EV Project

ECOtality was awarded a grant from the U.S. Department of Energy to lead a large-scale electric vehicle charging infrastructure demonstration, called The EV Project. ECOtality has partnered with Nissan North America, General Motors, the Idaho National Laboratory, and others to deploy and collect data from over 5,000 Nissan LEAFsTM and Chevrolet Volts and over 10,000 charging systems in 18 regions across the United States. This paper summarizes usage of residential charging units in The EV Project, based on data collected through the end of 2011. This information is provided to help analysts assess the impact on the electric grid of early adopter charging of grid-connected electric drive vehicles. A method of data aggregation was developed to summarize charging unit usage by the means of two metrics: charging availability and charging demand. Charging availability is plotted to show the percentage of charging units connected to a vehicle over time. Charging demand is plotted to show charging demand on the electric gird over time. Charging availability for residential charging units is similar in each EV Project region. It is low during the day, steadily increases in evening, and remains high at night. Charging demand, however, varies by region. Two EV Project regions were examined to identify regional differences. In Nashville, where EV Project participants do not have time-of-use electricity rates, demand increases each evening as charging availability increases, starting at about 16:00. Demand peaks in the 20:00 hour on weekdays. In San Francisco, where the majority of EV Project participants have the option of choosing a time-of-use rate plan from their electric utility, demand spikes at 00:00. This coincides with the beginning of the off-peak electricity rate period. Demand peaks at 01:00.

33 ADVANCED PROPULSION SYSTEMS↗

Autogenic synthesis of SnO{sub 2} materials and their structural, electrochemical, and optical properties

During autogenic reactions, organometallic precursors are decomposed above their critical temperature within an enclosed chamber at high temperatures and pressures. It has recently been established that such reactions can be used to synthesize carbon-coated metal oxide and metal phosphate nanoparticles. These materials are of interest as electrodes for lithium-ion batteries. In this paper, we report the autogenic fabrication of a carbon-coated SnO{sub 2} product and a carbon-free SnO{sub 2} product after removal of the carbon coating by combustion. The major objectives of the study were to monitor any beneficial effects that carbon-coated electrodes containing a lithium alloying element such as Sn might have in improving the electrical connectivity between electrode particles, which expand and contract significantly on lithiation and delithiation, and their utility in lithium cells. Specifically, we report the compositional, structural and morphological properties, and electrochemical behavior of carbon-coated SnO{sub 2} electrodes. Given the importance of the optical properties of SnO{sub 2}, we also describe the effects of the carbon coating on the optical absorbance and photoluminescence of autogenically-prepared SnO{sub 2} materials. - Graphical abstract: One-step, solvent-free autogenic reactions yield nanosized SnO{sub 2} nanoparticles, uniformly coated and interconnected by 2-4 nm carbon layers, with improved electrochemical performance. Highlights: Black-Right-Pointing-Pointer Distinctive autogenic process synthesized SnO{sub 2} nanoparticles coated with 2-4 nm carbon layers. Black-Right-Pointing-Pointer Carbon coating improved capacity retention and cycling stability of SnO{sub 2} nanoparticles. Black-Right-Pointing-Pointer Carbon coating quenched photoluminescence of SnO{sub 2} component in SnO{sub 2}-C composite. Black-Right-Pointing-Pointer Autogenic approach is extremely versatile, holds promise for designing new nanoarchitectures.

36 MATERIALS SCIENCE↗