Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Trade Studies”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

Space Station Environmental Control/Life Support System engineering

The present paper is concerned with a systems engineering study which has provided an understanding of the overall Space Station ECLSS (Environmental Control and Life Support System). ECLSS/functional partitioning is considered along with function criticality, technology alternatives, a technology description, single thread systems, Space Station architectures, ECLSS distribution, mechanical schematics per space station, and Space Station ECLSS characteristics. Attention is given to trade studies and system synergism. The Space Station functional description had been defined by NASA. The ECLSS will utilize technologies which embody regenerative concepts to minimize the use of expendables.

Miller, C. W.↗

Propulsion Technology Assessment: Science & Enabling Technologies to Explore the Interstellar Medium

As part of a larger effort led by the Keck Institute for Space Studies at the California Institute of Technology, the Advanced Concepts Office at NASA's George C. Marshall Space Flight Center conducted a study to assess what low-thrust advanced propulsion system candidates, existing and near term, could deliver a small, Voyager-like satellite to our solar system's heliopause, approximately 100 AU from the center of the sun, within 10 years and within a 2025 to 2035 launch window. The advanced propulsion system trade study consisted of three candidates, including a Magnetically Shielded Miniature (MaSMi) Hall thruster, a solar sail and an electric sail. Two aerial densities, and thus characteristic accelerations, 0.426 mm/s2 and 0.664 mm/s2, were analyzed for the solar sail option in order understand the impact of near and long term development of this technology. Similarly, two characteristic accelerations, 1 mm/s2 and 2 mm/s2, were also analyzed for the electric sail option in addition to tether quantities of 10 and 20, respectively, and individual tether length of 20 km. A second analysis was conducted to determine what existing solid rocket motor kick stage(s) would be required to provide additional thrust at various points in the trajectory, assuming an earth departure characteristic energy capability provided by a Space Launch System (SLS) Block 1B vehicle architecture carrying an 8.4 meter payload fairing. Two trajectory profiles were considered, including an escape trajectory using a Jupiter gravity assist (E-Ju), and an escape trajectory first performing a Jupiter gravity assist followed by an Oberth maneuver around the sun and an optional Saturn gravity assist (E-Ju-Su-Sa). The Oberth maneuver would need to be performed very close to the sun, wherein this study assumed a perihelion distance of approximately 11 solar radii, or 0.05 AU, away from the surface. The heat shield technology required to perform this type of ambitious maneuver was assumed to be similar to that of NASA's Solar Probe Plus mission, which is slated to launch in July 2018. With respect to a SLS Block 1B earth departure characteristic energy capability of 100 sq km/s2 for the E-Ju trajectory option, results indicated that compared to having no advanced propulsion system onboard, both the MaSMi Hall thruster and solar sail options subtract approximately 8 to 10 years from the total trip time while the electric sail outperforms all options by subtracting up to 20 years. With respect to an average kick stage velocity capability of 2.5 to 3.5 km/s at perihelion, the most sensitive segment of the E-Ju-Su-Sa trajectory option, results indicated that both the MaSMi Hall thrust and solar sail options only subtract 1 to 3 years from the total trip time whereas the electric sail again outperforms all other options by subtracting up to 5 years. In other words, if the Technology Readiness Level of an electric sail could be increased in time, this propulsion technology could not only enable a satellite to reach 100 AU in 10 years but it could potentially do so even faster. Completing such an ambitious mission in that short of a timespan would be very attractive to many as it would be well within the average career span of any of those involved.

Hopkins, Randall C.↗

Propulsion Technology Assessment: Science and Enabling Technologies to Explore the Interstellar Medium

As part of a larger effort led by the Keck Institute for Space Studies at the California Institute of Technology, the Advanced Concepts Office at NASA’s George C. Marshall Space Flight Center conducted a study to assess what low-thrust advanced propulsion system candidates, existing and near term, could deliver a small, Voyager-like satellite to our solar system’s heliopause, approximately 100 AU from the center of the sun, within 10 years and within a 2025 to 2035 launch window. The advanced propulsion system trade study consisted of three candidates, including a Magnetically Shielded Miniature (MaSMi) Hall thruster, a solar sail and an electric sail. Two aerial densities, and thus characteristic accelerations, 0.426 mm/s(exp 2) and 0.664 mm/s(exp 2), were analyzed for the solar sail option in order understand the impact of near and long term development of this technology. Similarly, two characteristic accelerations, 1 mm/s(exp 2) and 2 mm/s(exp 2), were also analyzed for the electric sail option in addition to tether quantities of 10 and 20, respectively, and individual tether length of 20 km. A second analysis was conducted to determine what existing solid rocket motor kick stage(s) would be required to provide additional thrust at various points in the trajectory, assuming an earth departure characteristic energy capability provided by a Space Launch System (SLS) Block 1B vehicle architecture carrying an 8.4 meter payload fairing. Two trajectory profiles were considered, including an escape trajectory using a Jupiter gravity assist (E-Ju), and an escape trajectory first performing a Jupiter gravity assist followed by an Oberth maneuver around the sun and an optional Saturn gravity assist (E-Ju-Su-Sa). The Oberth maneuver would need to be performed very close to the sun, wherein this study assumed a perihelion distance of approximately 11 solar radii, or 0.05 AU, away from the surface. The heat shield technology required to perform this type of ambitious maneuver was assumed to be similar to that of NASA’s Solar Probe Plus mission, which is slated to launch in July 2018. With respect to a SLS Block 1B earth departure characteristic energy capability of 100 km(exp 2)/s(exp 2) for the E-Ju trajectory option, results indicated that compared to having no advanced propulsion system onboard, both the MaSMi Hall thruster and solar sail options subtract approximately 8 to 10 years from the total trip time while the electric sail outperforms all options by subtracting up to 20 years. With respect to an average kick stage velocity capability of 2.5 to 3.5 km/s at perihelion, the most sensitive segment of the E-Ju-Su-Sa trajectory option, results indicated that both the MaSMi Hall thrust and solar sail options only subtract 1 to 3 years from the total trip time whereas the electric sail again outperforms all other options by subtracting up to 5 years. In other words, if the Technology Readiness Level of an electric sail could be increased in time, this propulsion technology could not only enable a satellite to reach 100 AU in 10 years but it could potentially do so even faster. Completing such an ambitious mission in that short of a timespan would be very attractive to many as it would be well within the average career span of any of those involved.

Hopkins, Randall C.↗

Space tug avionics definition study. Volume 3: Avionics baseline configuration definition

The baseline avionics systems for the space tug is comprised of a central digital computer that integrates the functions of all of the tug's subsystems by means of a redundant digital data bus. The major subsystems of the avionics system are: data management; communications; guidance, navigation, and control; rendezvous and docking; electrical power; and instrumentation. The baseline avionics system for the space tug resulting from system and subsystem trade studies is defined. Tug interfaces with the spacecraft, orbiter and the ground, and the baseline philosophy and configuration for onboard checkout of the tug are included. Baseline configurations, functional and operational features, component details and characteristics, and the supporting software are included in the subsystem descriptions.

Source record↗

Exploration Studies Technical Report - Volume 3: Special Reports, Studies, and Indepth Systems Assessments

The NASA Office of Exploration has been tasked with defining and recommending alternatives for an early 1990's national decision on a focused program of human exploration of the solar system. The Mission Analysis and System Engineering (MASE) group, which is managed by the Exploration Studies Office at the Johnson Space Center, is responsible for coordinating the technical studies necessary for accomplishing such a task. This technical report describes the process that has been developed in a case study approach. The four case studies that were developed in FY88 include: 1. Human expedition to Phobos 2. Human expeditions to Mars 3. Lunar observatory 4. Lunar outpost to early Mars evolution The final outcome of this effort is a set of programmatic and technical conclusions and recommendations for the following year's work. Volume III is a collection of trade study results, indepth systems assessments, and workshop reports which describe aspects of FY 1988 analyses in more depth.

Interplanetary flight↗

Autonomous hazard detection and avoidance

During GFY 91, Draper Laboratory was awarded a task by NASA-JSC under contract number NAS9-18426 to study and evaluate the potential for achieving safe autonomous landings on Mars using an on-board autonomous hazard detection and avoidance (AHDA) system. This report describes the results of that study. The AHDA task had four objectives: to demonstrate, via a closed-loop simulation, the ability to autonomously select safe landing sites and the ability to maneuver to the selected site; to identify key issues in the development of AHDA systems; to produce strawman designs for AHDA sensors and algorithms; and to perform initial trade studies leading to better understanding of the effect of sensor/terrain/viewing parameters on AHDA algorithm performance. This report summarizes the progress made during the first year, with primary emphasis on describing the tools developed for simulating a closed-loop AHDA landing. Some cursory performance evaluation results are also presented.

Pien, Homer↗

Principles from Two Small SRM-Based Launcher Design/Developments

Two solid rocket motor based launch vehicles are in design and development at MSFC, a 4-stage Earth-to-Orbit vehicle cube-satellite launcher, and the 2-stage Mars Ascent Vehicle for the Mars sample return mission. Trade studies that refined these designs have benefited from developments in understanding sensitivities and approximate modeling. The development and practice of that has demonstrated 3 principles: PRINCIPLE I: Identify mission-specific key design drivers — particularly interactions (and focus knowledge-development on those). PRINCIPLE II: Agility — don’t lock down your derived requirements early — keep trading, and characterizing sensitivities. PRINCIPLE III: Use multi-fidelity tools to improve “understanding value generated per modeling effort cost.” The designer should expect different design solution techniques to derive from different mission needs. This paper shows how two launch vehicle designs developed and adapted to those needs.

Kibbey, Timothy P.↗

Aeroelastic Tailoring of the NASA Common Research Model via Novel Material and Structural Configurations

This work explores the use of tow steered composite laminates, functionally graded metals (FGM), thickness distributions, and curvilinear rib/spar/stringer topologies for aeroelastic tailoring. Parameterized models of the Common Research Model (CRM) wing box have been developed for passive aeroelastic tailoring trade studies. Metrics of interest include the wing weight, the onset of dynamic flutter, and the static aeroelastic stresses. Compared to a baseline structure, the lowest aggregate static wing stresses could be obtained with tow steered skins (47% improvement), and many of these designs could reduce weight as well (up to 14%). For these structures, the trade-off between flutter speed and weight is generally strong, although one case showed both a 100% flutter improvement and a 3.5% weight reduction. Material grading showed no benefit in the skins, but moderate flutter speed improvements (with no weight or stress increase) could be obtained by grading the spars (4.8%) or ribs (3.2%), where the best flutter results were obtained by grading both thickness and material. For the topology work, large weight reductions were obtained by removing an inner spar, and performance was maintained by shifting stringers forward and/or using curvilinear ribs: 5.6% weight reduction, a 13.9% improvement in flutter speed, but a 3.0% increase in stress levels. Flutter resistance was also maintained using straightrotated ribs although the design had a 4.2% lower flutter speed than the curved ribs of similar weight and stress levels were higher. These results will guide the development of a future design optimization scheme established to exploit and combine the individual attributes of these technologies.

Jutte, Christine V.↗

Risk Balance: A Key Tool for Mission Operations Assurance

The Mission Operations Assurance (MOA) discipline actively participates as a project member to achieve their common objective of full mission success while also providing an independent risk assessment to the Project Manager and Office of Safety and Mission Success staff. The cornerstone element of MOA is the independent assessment of the risks the project faces in executing its mission. Especially as the project approaches critical mission events, it becomes imperative to clearly identify and assess the risks the project faces. Quite often there are competing options for the project to select from in deciding how to execute the event. An example includes choices between proven but aging hardware components and unused but unproven components. Timing of the event with respect to visual or telecommunications visibility can be a consideration in the case of Earth reentry or hazardous maneuver events. It is in such situations that MOA is called upon for a risk balance assessment or risk trade study to support their recommendation to the Project Manager for a specific option to select. In the following paragraphs we consider two such assessments, one for the Stardust capsule Earth return and the other for the choice of telecommunications system configuration for the EPOXI flyby of the comet Hartley 2. We discuss the development of the trade space for each project's scenario and characterize the risks of each possible option. The risk characterization we consider includes a determination of the severity or consequence of each risk if realized and the likelihood of its occurrence. We then examine the assessment process to arrive at a MOA recommendation. Finally we review each flight project's decision process and the outcome of their decisions.

operations↗

Feasibility Study of a Pressure-fed Engine for a Water Recoverable Space Shuttle Booster

Detailed mass properties are presented for a gimbaled, fixed thrust, regeneratively cooled engine having a coaxial pintle injector. The baseline design parameters for this engine are tabulated. Mass properties are also summarized for several other engine configurations i.e., a hinge nozzle using a Techroll seal, a gimbaled duct cooled engine and a regeneratively cooled engine using liquid injection thrust vector control (LITVC). Detailed engine analysis and design trade studies leading to the selection of a regeneratively cooled gimbaled engine and pertaining to the selection of the baseline design configuration are also given.

Gerstl, E.↗

Distributed processing on the Space Shuttle - A case study

A Power Extension Package (PEP) has been designed to provide additional electrical power and energy during Shuttle sortie missions. The considered investigation was conducted to determine the most suitable allocation of PEP monitoring and control functions between the Orbiter's existing (centralized) Systems Management General Purpose Computer and an embedded PEP processor. PEP monitoring and control functions are examined, and a configuration definition is considered, taking into account the 'functional migration' process, function allocation criteria, and candidate functional configurations. A trade study is conducted, giving attention to an assessment of four candidate configurations. Assessment factors are related to cost, development risk, aspects of reliability and safety, PEP design complexity, PEP/STS integration complexity, flight operations, and launch/landing site operations. A thorough (subjective) assessment of the PEP system life cycle indicates substantial benefits from a distributed processing approach.

Schoonmaker, P. B.↗

X-33 Base Region Thermal Protection System Design Study

The X-33 is an advanced technology demonstrator for validating critical technologies and systems required for an operational Single-Stage-to-Orbit (SSTO) Reusuable Launch Vehicle (RLV). Currently under development by a unique contractor/government team led by Lockheed- Martin Skunk Works (LMSW), and managed by Marshall Space Flight Center (MSFC), the X-33 will be the prototype of the first new launch system developed by the United States since the advent of the space shuttle. This paper documents a design trade study of the X-33 base region thermal protection system (TPS). Two candidate designs were evaluated for thermal performance and weight. The first candidate was a fully reusable metallic TPS using Inconel honeycomb panels insulated with high temperature fibrous insulation, while the second was an ablator/insulator sprayed on the metallic skin of the vehicle. The TPS configurations and insulation thickness requirements were determined for the predicted main engine plume heating environments and base region entry aerothermal environments. In addition to thermal analysis of the design concepts, sensitivity studies were performed to investigate the effect of variations in key parameters of the base TPS analysis.

Lycans, Randal W.↗

A Model-Based Framework for NASA Science Mission Formulation

This paper details an effort to implement NASA systems engineering standards and practices using a Digital System Model (DSM), which we also refer to as the system architecture model (SAM). Creating a SAM at the beginning of a design effort helps systems engineer identify errors, inconsistencies, and miscommunications as early as possible. Such issues can then be resolved before it becomes costly and requires significant rework to do so. A pre-formulation SAM also enables advanced trade studies at the earliest stage of concept development. This results in “win-wins” where architecture changes can reduce cost without decreasing effectiveness, or increase effectiveness without increasing cost. SAMs also streamline the creation of project documentation and facilitate superior dialogue between science, engineering, and management stakeholders. Common artifacts such as Master Equipment Lists (MELs), Science Traceability Matrices (STMs), and Mission Traceability Matrices (MTMs), can be automatically maintained through requirements and structural models in the SAM. Key performance parameters (and changes to them) can be tied to simulations in the SAM, allowing far more rapid and extensive trade space exploration. As will be shown in this work, these advantages have been realized for the first time in an actual NASA Goddard Space Flight Center (GSFC) pre-phase A and phase A concept study. Modelbased design tools have been developed in a general, modular manner to maximize reuse on future programs. Focus is placed on structural and requirements architecture modeling. Data is ingested into the SAM from existing discipline model outputs (e.g. MS Excel spreadsheets) and used to update a SysML structural model. A mission requirements model is created within the SAM, containing mission specific as well as standard GSFC mission requirements. With the linked requirements model and structural model, automated compliance checking will be performed as mission parameters evolve without the need for discipline engineers to work directly with the SAM in SysML.

MBSE↗

Definition of optical systems payloads

The various phases in the formulation of a major NASA project include the inception of the project, planning of the concept, and the project definition. A baseline configuration is established during the planning stage, which serves as a basis for engineering trade studies. Basic technological problems should be recognized early, and a technological verification plan prepared before development of a project begins. A progressive series of iterations is required during the definition phase, illustrating the complex interdependence of existing subsystems. A systems error budget should be established to assess the overall systems performance, identify key performance drivers, and guide performance trades and iterations around these drivers, thus decreasing final systems requirements. Unnecessary interfaces should be avoided, and reasonable design and cost margins maintained. Certain aspects of the definition of the Advanced X-ray Astrophysics Facility are used as an example.

Downey, J. A., III↗

Rapid Response Risk Assessment in New Project Development

A capability for rapidly performing quantitative risk assessments has been developed by JSC Safety and Mission Assurance for use on project design trade studies early in the project life cycle, i.e., concept development through preliminary design phases. A risk assessment tool set has been developed consisting of interactive and integrated software modules that allow a user/project designer to assess the impact of alternative design or programmatic options on the probability of mission success or other risk metrics. The risk and design trade space includes interactive options for selecting parameters and/or metrics for numerous design characteristics including component reliability characteristics, functional redundancy levels, item or system technology readiness levels, and mission event characteristics. This capability is intended for use on any project or system development with a defined mission, and an example project will used for demonstration and descriptive purposes, e.g., landing a robot on the moon. The effects of various alternative design considerations and their impact of these decisions on mission success (or failure) can be measured in real time on a personal computer. This capability provides a high degree of efficiency for quickly providing information in NASA s evolving risk-based decision environment

Graber, Robert R.↗

Nuclear stage configuration studies for Mars missions

Several nuclear-propulsion stage configuration options for the February 2016 Mars Exploration Initiative mission are examined. Special attention is given to the 75,000-lb-thrust nuclear engine used for the major propulsive maneuvers. The reference mission, which will last 435 days, with the stay on Mars for 30 days, assumes that the nuclear thermal rocket (NTR) engine delivers a specific impulse of 925 sec with an engine thrust-to-weight ratio of 4. Results are given of trade studies performed on the NTR engine thrust level, engine thrust-to-weight ratio, and engine Isp. Attention is also given to the Mars transfer vehicle, the Mars transportation system (MTS), the MTS crew compartment, and the MTS tanks.

Emrich, W. J., Jr.↗

System design of the Pioneer Venus spacecraft. Volume 13: Preliminary development plans

This Pioneer Venus Study final report describes the following baseline configurations: (1) Thor/Delta Spacecraft Baseline is the baseline presented at the midterm review on 26 February 1973, (2) Atlas/Centaur Spacecraft Baseline is the baseline resulting from studies conducted since the midterm, but prior to receipt of the NASA execution phase RFP, and subsequent to decisions to launch both the multiprobe and orbiter missions in 1978 and use the Atlas/Centaur launch vehicle, and (3) Atlas/Centaur Spacecraft Midterm Baseline is the baseline presented at the 26 February 1973 review and is only used in the launch vehicle utilization trade study.

Mixon, M. S.↗

Lunar Transportation Facilities and Operations Study, option 1

Throughout the Option I period of the Lunar Transportation Facilities and Operations Study (LTFOS), McDonnell Douglas Space Systems Company - Kennedy Space Center (MDSSC-KSC) provided support to both the Planetary Surface Systems (PSS) Office at the National Aeronautics and Space Administration (NASA) at the Johnson Space Center and to the Flight and Ground Systems Projects Office (Payload Projects Management) at the Kennedy Space Center. The primary objective of the Option I phase of the study was to assist the above NASA centers in developing Space Exploration Initiative (SEI) concepts. MDSSC-KSC conducted three analyses which provided launch and landing detail to the proposed exploration concepts. One analysis, the Lunar Ejecta Assessment, was conducted to determine the effects of launch and landing a vehicle in a dusty environment. A second analysis, the Thermal/Micrometeoroid Protection Trade Study, was refined to determine the impacts that Reference Architecture Option 5A would have on thermal/micrometeoroid protection approaches. The third analysis, the Centaur Prelaunch Procedure Analysis, used a Centaur prelaunch test and checkout flow to identify key considerations that would be important if a Lunar Excursion Vehicle (LEV) was to use an expander cycle liquid oxygen-liquid hydrogen engine. Several 'quick look' assessments were also conducted. One quick look assessment, the Storable Propellant Quick Look Assessment, was conducted to identify design considerations that should be made if storable propellants were to be used instead of liquid oxygen and liquid hydrogen. The LEV Servicer Maintenance Analysis provided an early look at the effort required to maintain an LEV Servicer on the lunar surface. Also, support was provided to the PSS Logistics Manager to develop initial LEV Servicer cost inputs. Consideration was given to the advanced development that must be provided to accomplish a lunar and/or Mars mission. MDSS-KSC also provided support to both MASE and PSS by reviewing and commenting on architecture documents and concept definitions to ensure adequate considerations were given to the launch and landing function of an exploration initiative.

Source record↗