Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Technical Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

E2C Cohorts: Implementation Funding Projects - Impact Summary [Slides]

From August 2024 to October 2025, 11 Clean Cities and Communities coalitions supported projects to advance transportation goals by gathering input from local stakeholders, and using the resulting insights to develop new plans and programs for local partners. This effort leveraged information and best practices shared during the 2024 E2C Cohort on Integrating Community Priorities into Electric Vehicle Plans and Projects. These coalitions supported partners across the country to develop plans for electric vehicle integration through one-on-one technical assistance and tailored local engagement. This deck summarizes the individual projects completed by coalitions, and the overall reach and impact of all of this program.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Columbia Crew Survival Investigation Report

NASA commissioned the Columbia Accident Investigation Board (CAIB) to conduct a thorough review of both the technical and the organizational causes of the loss of the Space Shuttle Columbia and her crew on February 1, 2003. The accident investigation that followed determined that a large piece of insulating foam from Columbia s external tank (ET) had come off during ascent and struck the leading edge of the left wing, causing critical damage. The damage was undetected during the mission. The CAIB's findings and recommendations were published in 2003 and are available on the web at http://caib.nasa.gov/. NASA responded to the CAIB findings and recommendations with the Space Shuttle Return to Flight Implementation Plan. Significant enhancements were made to NASA's organizational structure, technical rigor, and understanding of the flight environment. The ET was redesigned to reduce foam shedding and eliminate critical debris. In 2005, NASA succeeded in returning the space shuttle to flight. In 2010, the space shuttle will complete its mission of assembling the International Space Station and will be retired to make way for the next generation of human space flight vehicles: the Constellation Program. The Space Shuttle Program recognized the importance of capturing the lessons learned from the loss of Columbia and her crew to benefit future human exploration, particularly future vehicle design. The program commissioned the Spacecraft Crew Survival Integrated Investigation Team (SCSIIT). The SCSIIT was asked to perform a comprehensive analysis of the accident, focusing on factors and events affecting crew survival, and to develop recommendations for improving crew survival for all future human space flight vehicles. To do this, the SCSIIT investigated all elements of crew survival, including the design features, equipment, training, and procedures intended to protect the crew. This report documents the SCSIIT findings, conclusions, and recommendations.

Source record↗

The National Transonic Facility - Status and operational planning

The National Transonic Facility is scheduled to be completed in 1982. Several technical concerns remain, including thermal stress constraints which may limit the rate at which temperatures can be changed, seal performance in the cryogenic environment, and the tunnel process controls which could affect data acquisition rate. The current design affords the capability of dealing with all these concerns if they become problems. The outstanding instrument need is a real-time model surface deformation measurement system. Finally, an examination of the occupancy cost and the cost of liquid nitrogen for high Reynolds number tests indicates that operating costs should not be an inhibiting factor in the use of the facility.

Howell, R. R.↗

Wallops Flight Facility Integration and Testing Customer Handbook

The Wallops Integration and Testing Handbook is a guide for planning operations at Wallops testing facilities. It provides a summary of the capabilities and technical specifications of available facilities. This handbook prescribes the information to be provided by the user that will enable the integration and testing team to effectively plan for and support the facility user’s project. Note that each facility plans for availability based on current workloads/ mission schedules. For example, sounding rockets may have between 20 and 35 missions in work at one time. Also note that special training, such as cleanroom certification, electrostatic discharge (ESD) or confined space training may be required for entrance to some facilities.

Adam Hammoudi↗

Evolution of the Lunar Receiving Laboratory to the Astromaterial Sample Curation Facility: Technical Tensions Between Containment and Cleanliness, Between Particulate and Organic Cleanliness

The Lunar Receiving Laboratory (LRL) was planned and constructed in the 1960s to support the Apollo program in the context of landing on the Moon and safely returning humans. The enduring science return from that effort is a result of careful curation of planetary materials. Technical decisions for the first facility included sample handling environment (vacuum vs inert gas), and instruments for making basic sample assessment, but the most difficult decision, and most visible, was stringent biosafety vs ultra-clean sample handling. Biosafety required handling of samples in negative pressure gloveboxes and rooms for containment and use of sterilizing protocols and animal/plant models for hazard assessment. Ultra-clean sample handling worked best in positive pressure nitrogen environment gloveboxes in positive pressure rooms, using cleanable tools of tightly controlled composition. The requirements for these two objectives were so different, that the solution was to design and build a new facility for specific purpose of preserving the scientific integrity of the samples. The resulting Lunar Curatorial Facility was designed and constructed, from 1972-1979, with advice and oversight by a very active committee comprised of lunar sample scientists. The high precision analyses required for planetary science are enabled by stringent contamination control of trace elements in the materials and protocols of construction (e.g., trace element screening for paint and flooring materials) and the equipment used in sample handling and storage. As other astromaterials, especially small particles and atoms, were added to the collections curated, the technical tension between particulate cleanliness and organic cleanliness was addressed in more detail. Techniques for minimizing particulate contamination in sample handling environments use high efficiency air filtering techniques typically requiring organic sealants which offgas. Protocols for reducing adventitious carbon on sample handling surfaces often generate particles. Further work is needed to achieve both minimal particulate and adventitious carbon contamination. This paper will discuss these facility topics and others in the historical context of nearly 50 years' curation experience for lunar rocks and regolith, meteorites, cosmic dust, comet particles, solar wind atoms, and asteroid particles at Johnson Space Center.

Allton, J. H.↗

Energy Transitions Initiative Partnership Project: ETIPP Technical Assistance Informational Webinar

This webinar is for prospective applicants (i.e., remote, island, and islanded communities) interested in applying to the U.S. Department of Energy's Energy Transitions Initiative Partnership Program (ETIPP) in spring of 2022. This webinar provides an overview of ETIPP and technical assistance, introduces the ETIPP regional partners, summarizes two ongoing ETIPP projects, discusses the 2022 application process, and closes with a question-and-answer session. This webinar is hosted by the National Renewable Energy Laboratory, which is part of the ETIPP partner network.

Alaska Center for Energy and Power↗

Summer Final Report

The summer of 2012 has been filled with many memorable events and activities. As an intern, I had responsibilities that had to be fulfilled. My tour of duty was completed as an administrative student trainee in the Information Technology and Communications Services Business Office (IT-A). In accordance with the Business Objectives and Agreement of the Business Office and my performance plan, I was to provide business office support, improve business, project management, and technical work processes. With this being stated, I supported a project called "The Big Move Project" (TBMP), which will take course over the next several years. The Big Move Project is the planning of the Information Technology (IT) Directorate's relocation to various buildings in the course of upcoming years, when designs and the building of Central Campus have been completed. Working directly with my supervisor and the project manager, I was responsible for gathering both administrative and operational area requirements for the Information Technology (IT) Directorate, along with its outsourced support and contractors, such as IMCS, NICS, and ACES. My first action was to create rubrics that will serve as a guideline for the information that should be given by each branch of IT. After receiving that information via a few KAITS actions, I was able to start the consolidation process, and begin working on a presentation. A SharePoint was created shortly after for others to view the progression of the project, which I managed. During the consolidation ofthis information, I would occasionally present to the IT Deputy Director and IT Chiefs. The draft of this presentation was shown to employees of Center Operations (T A) and stakeholders-IT Chief Officers and contractor managers-in the relocation of IT to make them aware of what requirements must be met that will enable IT to be accommodated appropriately in the design of Central Campus Phase 11-the time in which IT and its contractors are scheduled to be relocated. Besides supporting TBMP, I also supported the Section 508 Policy Compliance Coordinator, R. Liang. Section 508 is a policy that requires employers to implement accessibility assurance of information and technology to disabled communities. On Thursday, July 19, 2012, I was able to go to Camp Boggy Creek-a camp for disabled children-for an education outreach, in collaboration with the Education Office. We shared with them information about how astronauts live and work in space, they were able to ride hovercrafts, build paper rockets, and then launch them outside. Although this outreach was quite fun with the kids at the camp, this was a learning opportunity to gain some insight to those with cognitive and physical disabilities, the problems they typically face, and in tum, how to accommodate those with disabilities in the work environment. In the process of implementing accessibility and Section 508 compliance, I attended various teleconferences, did field runs to supply closed-caption call phones to employees with limited hearing, and helped with the development of the charter ofthe Section 508 Compliance Working Group.

Makidi, Nitou↗

Plan for Scaling Up Hydrogen Production with Nuclear Power Plants

The United States (U.S.) Department of Energy’s (DOE’s) Light Water Reactor Sustainability (LWRS) Program Flexible Plant Operations and Generation (FPOG) Pathway is developing options to help U.S. nuclear power plants (NPPs) better integrate with intermittent wind and solar capacity and the recent surge of natural gas power generation. Research is focusing on improving NPP flexibility through hybrid production of electricity and other products, such as hydrogen (H 2 ) and energy storage for the purpose of shifting power production to a later time. In the case of H 2 production, the clean electrical and thermal power from an NPP can be used to split water using electrolysis. This report outlines the opportunity for NPPs to participate in a first-of-akind (FOAK) commercial nuclear H 2 project intended to bring industry partners together to create regional clean H 2 hubs. The Bipartisan Infrastructure Law (BIL) will fund at least one hub up to $1.25 billion as federal cost share totally no less than 50% to execute a nuclear H 2 project. The report discusses the set of activities that are now underway or that are planned for completion by the FPOG Pathway to reduce the economic, technical, regulatory, and safety risks of these projects. DOE cross-program activities are being coordinated to ensure success in the timeframe allowed by the BIL. Figure ES-1 shows the approximate schedule of coordinated research and development (R&D) and pilot demonstration projects leading up to the first commercial nuclear H 2 production project. Execution of this plan requires DOE and industry collaboration. DOE research accomplishments are being provided to the electric utilities or industries looking to participate in the H 2 hub proposal and project execution process.

08 HYDROGEN↗

Incorporating adaptation and resilience into an integrated watershed and coral reef management plan

Changing environmental conditions are forcing natural resource managers and communities to adapt their strategies to account for global shifts in precipitation, temperature, sea level and more, all of which are occurring in addition to local human impacts. Adapting to threats from climate change requires a fundamental shift in the practice of natural resource management through the development of forward-looking “climate-smart” goals and strategies. Here we present a proof-of-concept application of a decision-support tool to help design climate-smart management actions for the watershed and coral reef management plan for Guánica Bay watershed in southwest Puerto Rico. We also explore the connection between adaptation planning and coral reef resilience, using a recently developed Puerto Rico-wide reef resilience assessment. In the first phase of the study, we used the publicly available Adaptation Design Tool to draft initial climate-smart versions of twelve proposed management actions. In the second phase, two actions (dirt road management on steep slopes, and coral reef restoration) were further refined through consultations with local experts to make more detailed design adjustments; this included the option to use information from the coral reef resilience assessment to inform design improvements. The first phase resulted in moderately detailed assessments that broadly accounted for anticipated direct and indirect effects of climate change on the planned management actions. The second phase resulted in more site-specific technical assessments and additional important design details. The expert panel charged with discussing climate-smart reef restoration around Guánica used the reef resilience assessment to guide discussion of reef restoration, highlighting the importance of having such information available for adaptation planning. This study demonstrates how climate change impacts can be effectively incorporated into a management plan at the most granular level of planning and how a structured, formalized process can be as valuable as the resulting adaptation information.

Gibbs, David A. (ORCID:0000000173898569)↗

Hydropower Role in a Power Grid with a High Proportion of Variable Renewables

The importance of hydropower increases as the power grid evolves with the higher variable renewable contribution. As conventional thermal power plants are retired, the importance of hydropower contribution increases to balance the variability of solar and wind generation. However, reservoir water resources are constrained by multiple constraints, and variability of water inflow to the reservoirs creates limitations to dam water releases for power grid needs. Coordination of multiple tools, including water resources modeling, ecological modeling, and technical and economic power grid modeling, informs dam water releases. Better representation of ecological constraints and other water use details in the suit of power grid models are required to identify the hydropower flexibility to provide multiple power grid services. Impacts of water planning and hydropower operation changes to a power grid are better understood by production cost model simulations with technical and economic data, including unserved energy, reserve failures, transmission congestion to serve load, and local marginal price increases. Similarly, PCM simulation of current and future projected power grid information, including LMP, and carbon emission rates, informs short-term water release plans and long-term investments for power plant upgrades for technical and ecological needs. Hydropower operations of several case studies are simulated to understand operation patterns, revenue, water release decisions in multiple time scales (month, day, minutes), hydropower contracts scheduling, and water variability impacts.

environmental↗

A Systems Engineering Approach to Accident Response Planning.

This paper explores the Systems Engineering structure, strategies and tools for real world scenarios involving work with accident response planning. A systems engineering approach must be taken by the technical teams to prepare for a successful response and design the technical systems in support of the operations. The scope of this project is focused on laying out the foundation of the systems engineering approach taken to help the teams develop an accident response strategy and identify new engineering designs in support of these operations for the black box systems. This Masters project involved several interdisciplinary teams & stakeholders. Identifying the proper tools to use was key to addressing the big picture needs of the multiple stakeholders. The integrated project work primarily took place over the course of eight weeks via integrated team meetings. Other work in support of this project was conducted off-line as needed by the project lead. Details on the prospective timeline, milestones, key dates and work scope can be referenced in this paper. Key systems engineering methodologies and tools used in support of this project included but is not limited to: Market Surveys and Interviews Project Charter Feasibility Study Swim Lane Diagram Knowledge Management Plan. A full suite of tools and the details regarding the application of these tools and results of this study is provided in this report.

42 ENGINEERING↗

USAID Colombia Young Leaders Workforce Training Program Action Plans: Early Adopters Work to Accelerate Electric Vehicle Transitions in Boyacá, Colombia

As part of the U.S. Agency for International Development (USAID)-National Renewable Energy Laboratory (NREL) Young Leaders Workforce Training Program in Colombia, Empresa de Energía de Boyacá (EBSA) participants leveraged their training and professional experience to develop an electric mobility and transition action plan for their organization. This case study provides and overview of the technical assistance that USAID-NREL provided to EBSA to inform their fleet transition decision making process.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Research Projects, Technical Reports and Publications

The Research Institute for Advanced Computer Science (RIACS) was established by the Universities Space Research Association (USRA) at the NASA Ames Research Center (ARC) on June 6, 1983. RIACS is privately operated by USRA, a consortium of universities with research programs in the aerospace sciences, under contract with NASA. The primary mission of RIACS is to provide research and expertise in computer science and scientific computing to support the scientific missions of NASA ARC. The research carried out at RIACS must change its emphasis from year to year in response to NASA ARC's changing needs and technological opportunities. A flexible scientific staff is provided through a university faculty visitor program, a post doctoral program, and a student visitor program. Not only does this provide appropriate expertise but it also introduces scientists outside of NASA to NASA problems. A small group of core RIACS staff provides continuity and interacts with an ARC technical monitor and scientific advisory group to determine the RIACS mission. RIACS activities are reviewed and monitored by a USRA advisory council and ARC technical monitor. Research at RIACS is currently being done in the following areas: Advanced Methods for Scientific Computing High Performance Networks During this report pefiod Professor Antony Jameson of Princeton University, Professor Wei-Pai Tang of the University of Waterloo, Professor Marsha Berger of New York University, Professor Tony Chan of UCLA, Associate Professor David Zingg of University of Toronto, Canada and Assistant Professor Andrew Sohn of New Jersey Institute of Technology have been visiting RIACS. January 1, 1996 through September 30, 1996 RIACS had three staff scientists, four visiting scientists, one post-doctoral scientist, three consultants, two research associates and one research assistant. RIACS held a joint workshop with Code 1 29-30 July 1996. The workshop was held to discuss needs and opportunities in basic research in computer science in and for NASA applications. There were 14 talks given by NASA, industry and university scientists and three open discussion sessions. There were approximately fifty participants. A proceedings is being prepared. It is planned to have similar workshops on an annual basis. RIACS technical reports are usually preprints of manuscripts that have been submitted to research 'ournals or conference proceedings. A list of these reports for the period January i 1, 1996 through September 30, 1996 is in the Reports and Abstracts section of this report.

Oliger, Joseph↗

Results for Gamma-Ray Spectroscopy Characterization of Residual Radioactivity on Personal Protective Clothing

In early 2019, Health Physics Services (HPS) personnel put together a test plan to use the shielded gamma-ray spectroscopy instruments in the Health Physics Services Technical Laboratory (HPSTL) to perform a series of measurements on laundered personal protective clothing used in radiological areas at the Savannah River Site (SRS). That test plan describes the methodology used to determine the quantities of laundry to be obtained from operational facilities, the methods for quality control checking the instruments throughout the measurement period, and the physical arrangement of samples in the counting shields. The test plan is documented in SRNS-J6700-2019-00037 (Reference 1).

61 RADIATION PROTECTION AND DOSIMETRY↗

CARETS: A prototype regional environmental information system. Volume 13: Utility of CARETS products to local planners; an evaluation

The Metropolitan Washington Council of Governments (MWCOG) in cooperation with and under contract to the U.S. Geological Survey, conducted an evaluation of the utility of remote-sensor derived land use data produced by the USGS Central Atlantic Regional Ecological Test Site (CARETS) project. Investigators invited representatives of Washington, D.C. metropolitan area planning agencies to a workshop, introduced them to the CARETS products, and asked them to evaluate the products. In follow-up interviews, planners from 12 participating agencies reported general support for the fulI spectrum of CARETS products but gave more positive responses towards products with which they had some familiarity. Planners considered some products of limited utility because of (1) insufficient detail, (2) too small a scale, or (3) lack of technical capability to incorporate the information and products into the current planning process. Some planners expressed doubt about the application of CARETS products in most day-to-day planning activities , which involve specific rezoning requests or site development plans requiring highly localized data. The greatest potential of the CARETS products was in the identification of broad development patterns at the county or regional level. An appendix documents the results of an inventory of local government decisions relating to land use.

Land use planning↗

Assessment of the NASA AvSTAR Project Plan

This report is a preliminary evaluation of NASA's proposed Aviation System Technology Advanced Research (AvSTAR) Program during the early stages of its definition, in the first half of the year 2001. This evaluation focuses on how well the program goals address the needs of the U.S. National Airspace System, the technical feasibility of the program goals, and the logistical feasibility of the program plan. This report also provides recommendations on how the AvSTAR program could be strengthened and improved. This document has two appendices.

Ulrey, Michael L.↗

Feasibility Investigation on the Development of a Structural Damage Diagnostic and Monitoring System for Rocket Engines

The research activity for this project is mainly to investigate the necessity and feasibility to develop a structural health monitoring system for rocket engines, and to carry out a research plan for further development of the system. More than one hundred technical papers have been searched and reviewed during the period. We concluded after this investigation that adding a new module in NASA's existing automated diagnostic system to monitor the healthy condition of rocket engine structures is a crucial task, and it's possible to develop such a system based upon the vibrational-based nondestructive damage assessment techniques. A number of such techniques have been introduced. Their advantages and disadvantages are also discussed. A global research plan has been figured out. As the first step of the overall research plan, a proposal for the next fiscal year has been submitted.

Shen, Ji Y.↗