Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “TOURS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

The CICT Earth Science Systems Analysis Model

Contents include the following: Computing Information and Communications Technology (CICT) Systems Analysis. Our modeling approach: a 3-part schematic investment model of technology change, impact assessment and prioritization. A whirlwind tour of our model. Lessons learned.

Pell, Barney↗

Implementation of ALARA radiation protection on the ISS through polyethylene shielding augmentation of the Service Module Crew Quarters

With 5-7 month long duration missions at 51.6 degrees inclination in Low Earth Orbit, the ionizing radiation levels to which International Space Station (ISS) crewmembers are exposed will be the highest planned occupational exposures in the world. Even with the expectation that regulatory dose limits will not be exceeded during a single tour of duty aboard the ISS, the "as low as reasonably achievable" (ALARA) precept requires that radiological risks be minimized when possible through a dose optimization process. Judicious placement of efficient shielding materials in locations where crewmembers sleep, rest, or work is an important means for implementing ALARA for spaceflight. Polyethylene (CnHn) is a relatively inexpensive, stable, and, with a low atomic number, an effective shielding material that has been certified for use aboard the ISS. Several designs for placement of slabs or walls of polyethylene have been evaluated for radiation exposure reduction in the Crew Quarters (CQ) of the Zvezda (Star) Service Module. Optimization of shield designs relies on accurate characterization of the expected primary and secondary particle environment and modeling of the predicted radiobiological responses of critical organs and tissues. Results of the studies shown herein indicate that 20% or more reduction in equivalent dose to the CQ occupant is achievable. These results suggest that shielding design and risk analysis are necessary measures for reducing long-term radiological risks to ISS inhabitants and for meeting legal ALARA requirements. Verification of shield concepts requires results from specific designs to be compared with onboard dosimetry. c2004 COSPAR. Published by Elsevier Ltd. All rights reserved.

NASA Center JSC↗

Mobile Router Developed and Tested

The NASA Glenn Research Center, under a NASA Space Act Agreement with Cisco Systems, has been performing joint networking research to apply Internet-based technologies and protocols to space-based communications. As a result of this research, NASA performed stringent performance testing of the mobile router, including the interaction of routing and the transport-level protocol. In addition, Cisco Systems developed the mobile router for both commercial and Government markets. The code has become part of the Cisco Systems Internetworking Operating System (IOS) as of release 12.2 (4) T--which will make this capability available to the community at large. The mobile router is software code that resides in a network router and enables entire networks to roam while maintaining connectivity to the Internet. This router code is pertinent to a myriad of applications for both Government and commercial sectors, including the "wireless battlefield." NASA and the Department of Defense will utilize this technology for near-planetary observation and sensing spacecraft. It is also a key enabling technology for aviation-based information applications. Mobile routing will make it possible for information such as weather, air traffic control, voice, and video to be transmitted to aircraft using Internet-based protocols. This technology shows great promise in reducing congested airways and mitigating aviation disasters due to bad weather. The mobile router can also be incorporated into emergency vehicles (such as ambulances and life-flight aircraft) to provide real-time connectivity back to the hospital and health-care experts, enabling the timely application of emergency care. Commercial applications include entertainment services, Internet protocol (IP) telephone, and Internet connectivity for cruise ships, commercial shipping, tour buses, aircraft, and eventually cars. A mobile router, which is based on mobile IP, allows hosts (mobile nodes) to seamlessly "roam" among various IP subnetworks. This is essential in many wireless networks. A mobile router, unlike a mobile IP node, allows entire networks to roam. Hence, a device connected to the mobile router does not need to be a mobile node because the mobile router provides the roaming capabilities. There are three basic elements in the mobile IP: the home agent, the foreign agent, and the mobile node. The home agent is a router on a mobile node's home network that tunnels datagrams for delivery to the mobile node when it is away from home. The foreign agent is a router on a remote network that provides routing services to a registered mobile node. The mobile node is a host or router that changes its point of attachment from one network or subnetwork to another. In mobile routing, virtual communications are maintained by the home agent, which forwards all packets for the mobile networks to the foreign agent. The foreign agent passes the packets to the mobile router, which then forwards the packets to the devices on its networks. As the mobile router moves, it will register with its home agent on its whereabouts via the foreign agent to assure continuous connectivity.

Ivancic, William D.↗

Software of Seismic Proportions Promotes Enjoyable Learning

While working for NASA, Jack Sculley and Terry Brooks had a revelation. They wanted to find a novel and unique way to present the scientific principles of NASA research to the public, so as to not only enlighten, but entertain. Suddenly, their revelation morphed into something even grander. "Why stop at NASA?" they asked themselves. With this thought, Sculley and Brooks left NASA and set out to convey voluminous scientific findings from different organizations in the form of digital, interactive media that would enhance the exploration and adventure interests of people of all ages. Sculley, a former researcher at Ames Research Center, the Jet Propulsion Laboratory (JPL), and Apple, Inc. s and LucasFilm Ltd. s multimedia labs, and Brooks, a former public information officer at JPL and an Emmy award-winning documentary film producer, founded Seismic Entertainment in 1989 to communicate their "edutainment" ideas. The two acknowledge that NASA has provided much of the inspiration and content for Seismic Entertainment over the past decade and a half. Additionally, Sculley s experience as a virtual reality and Mars specialist and Brooks s experience creating NASA public access programs were significant to the San Francisco-based company s success. Its most recent project, "Inside NASA," provides virtual tours of NASA s field centers and allows for a comprehensive focus on the broad range of NASA programs for the benefit of the general public

Source record↗

Operational thermal control of Cassini Titan flybys

The Cassini spacecraft will fly by Saturn's largest moon, Titan, forty-five times during its science tour. Twenty-five of the flybys will have a relatively low closest approach target altitude in Titan's atmosphere and are of thermal concern. The Thermal Devices Team on the Cassini Project in Mission Operations at the Jet Propulsion Laboratory has designed an operational thermal control strategy for these flybys. The challenge was to provide flyby operational thermal control that enabled science and remained within design limitations and Project constraints.

Cassini aeroheating Titan flyby thermal analysis↗

Tides in Titan

Tides raised in Titan by Saturn give rise to a static and a periodic deformation; both will be measured with Doppler tracking during the CASSINI Tour of the Saturnian System. The latter deformation is due to the significant eccentricity of Titan's orbit and has a frequency equal to the orbital angular velocity of Titan.

Tides Titan CASSINI Saturnian System↗

(abstract) Galileo Navigation: Launch to Jupiter Orbit

The Galileo spacecraft was launched on October 18, 1989. After a 3.7 billion kilometer journey lasting just over six years, the Galileo Orbiter and Probe arrived at Jupiter on December 7, 1995. The atmospheric Probe survived its atmospheric entry and successfully transmitted data to the Orbiter flying overhead. To date, the Orbiter has successfully completed the first three of the ten planned satellite encounters. Navigation for the Galileo Mission has proved to be a unique and challenging task. The challenges and results of navigating Galileo through the interplanetary transfer to Jupiter, delivery of the atmospheric entry Probe, Jupiter orbit insertion, and the orbital tour are presented in this paper.

Galileo Jupiter navigation orbits gravity assists ↗

Enhanced Decoding for the Galileo Low-Gain Antenna Mission

Due to a malfunctioning high-gain antenna, the Galileo spacecraft is transmitting all its data through a low-gain antenna, and the data rate will seldom exceed 100 bits per second during its two-year tour of Jupiter's satellites.

decoder Viterbi decoder Reed-Solomon baseline codi↗

Thermal Design of the Cassini Narrow Angle Camera

The Narrow Angle Camera (NAC) is one of two cameras in the Imaging Science Subsystem (ISS) on the Cassini Spacecraft (S/C), the second camera is a Voyager-inherited Wide Angle Camera (WAC). Cassini is currently planned to be launched in October 1997 and will arrive at Saturn for a four year tour in June 2004. The Narrow Angle Optics are a Ritchey Chretien type Optics, has a focal length of 2000 mm, a relative aperture of f/10.5, a spectral range of 200 to 1100 nm, 24 filters, a pixel field of view of 6.0 microradian/pixel, and has a field of view of 3.5 x 3.5 degrees. The sensor is a Charged Couple Device (CCD), 1024 x 1024 pixels with a pixel size of 12 x 12 um, a full well greater than 50,000 e-, on chip processing of up to 800,000 e- pixel summation, a dark current of less than 0.1 e-/pixel/sec at operating temperature, and a charge transfer efficiency of 0.99999 at operating temperature...

Hoffman, Pamela↗

Galileo at Jupiter: Status and Overview (abstract)

The Galileo Orbiter spacecraft has been in Jupiter orbit since 7 December 1995. During its continuing orbital tour, Galileo is sending back a continuous stream of data about Jupiter, its magnetosphere and the Galilean satellites. Results to date include several major discoveries. The current status of the mission and plans for the final portion of the nominal mission and possible extended operations will be discussed.

Galileo↗

Cassini-Huygens maneuver automation for navigation

Many times during the Cassini-Huygens mission to Saturn, propulsive maneuvers must be spaced so closely together that there isn't enough time or workforce to execute the maneuver-related software manually, one subsystem at a time. Automation is required. Automating the maneuver design process has involved close cooperation between teams. We present the contribution from the Navigation system. In scope, this includes trajectory propagation and search, generation of ephemerides, general tasks such as email notification and file transfer, and presentation materials. The software has been used to help understand maneuver optimization results, Huygens probe delivery statistics, and Saturn ring-plane crossing geometry. The Maneuver Automation Software (MAS), developed for the Cassini-Huygens program enables frequent maneuvers by handling mundane tasks such as creation of deliverable files, file delivery, generation and transmission of email announcements, generation of presentation material and other supporting documentation. By hand, these tasks took up hours, if not days, of work for each maneuver. Automated, these tasks may be completed in under an hour. During the cruise trajectory the spacing of maneuvers was such that development of a maneuver design could span about a month, involving several other processes in addition to that described, above. Often, about the last five days of this process covered the generation of a final design using an updated orbit-determination estimate. To support the tour trajectory, the orbit determination data cut-off of five days before the maneuver needed to be reduced to approximately one day and the whole maneuver development process needed to be reduced to less than a week..

propulsion maneuvers↗

In-situ exploration of Venus on a global scale : direct measurements of origins and evolution, meterology, dynamics, and chemistry by a long-duration aerial science station

Drifting in the strong winds of Venus under benign Earth-like temperature and pressure conditions, an instrumented balloon-borne science station presents a viable means to explore, in-situ, the Venusian atmosphere on a global scale. Flying over the ground at speeds exceeding 240 km/hour while floating in the Venusian skies near 55 km altitude for several weeks, such an aerostat can conduct a 'world tour' of our neighboring planet, as it circumnavigates the globe multiple times during its flight from equatorial to polar latitudes. Onboard science sensors can repeatedly and directly sample gas compositions, atmospheric pressures and temperatures and cloud particle properties, giving unprecedented insight into the chemical processes occurring within the sulfuric clouds. Additionally, interferometric tracking via Earth-based radio observatories can yield positions and windspeeds to better than 10 cm/sec over one-hour periods, providing important information for understanding the planet's meridional circulation and enigmatic zonal super-rotation, as well as local dynamics associated with meteorological processes. As well, hundreds of GCMS spectra collected during the flight can provide measurements of noble gas compositions and their isotopes with unprecedented accuracy, thereby enabling fundamental new insights into Venus's origin and evolution.

Venus↗

Cassini / Huygens at Saturn and Titan

The Cassin/Huygens Project is a joint undertaking between NASA, the European Space Agency, and the Italian Space Agency to conduct an in-depth exploration of the Saturnian system. The spacecraft consists of an orbiter vehicle and an atmospheric probe which has completed its mission in the atmosphere and on the surface of Titan, the largest moon of Saturn. The spacecraft was launched on October 15, 1997, has completed its nearly seven years of interplanetary flight, and by the time of the 56th IAC, it will have completed 17 of its planned 75 orbits during its four-year prime orbital mission. This paper gives an overview of the mission, and describes in detail the accomplishments and events over the past year, including the spectacularly successful descent of the .European Space Agency's Huygens probe to the surface of Titan. Initial scientific results from both the Huygens mission as well as from the first one-and-a-quarter years of orbiting Saturn are summarized. The plans for the remainder of the orbiter's tour of the Saturn system and the many flybys of Titan and the smaller icy satellites are described.

Cassini↗

Implementing Distributed Operations: A Comparison of Two Deep Space Missions

Two very different deep space exploration missions--Mars Exploration Rover and Cassini--have made use of distributed operations for their science teams. In the case of MER, the distributed operations capability was implemented only after the prime mission was completed, as the rovers continued to operate well in excess of their expected mission lifetimes; Cassini, designed for a mission of more than ten years, had planned for distributed operations from its inception. The rapid command turnaround timeline of MER, as well as many of the operations features implemented to support it, have proven to be conducive to distributed operations. These features include: a single science team leader during the tactical operations timeline, highly integrated science and engineering teams, processes and file structures designed to permit multiple team members to work in parallel to deliver sequencing products, web-based spacecraft status and planning reports for team-wide access, and near-elimination of paper products from the operations process. Additionally, MER has benefited from the initial co-location of its entire operations team, and from having a single Principal Investigator, while Cassini operations have had to reconcile multiple science teams distributed from before launch. Cassini has faced greater challenges in implementing effective distributed operations. Because extensive early planning is required to capture science opportunities on its tour and because sequence development takes significantly longer than sequence execution, multiple teams are contributing to multiple sequences concurrently. The complexity of integrating inputs from multiple teams is exacerbated by spacecraft operability issues and resource contention among the teams, each of which has their own Principal Investigator. Finally, much of the technology that MER has exploited to facilitate distributed operations was not available when the Cassini ground system was designed, although later adoption of web-based and telecommunication tools has been critical to the success of Cassini operations.

Cassini Mission↗

Solving Cassini's Data Glitch Problem during Coherency Mode Transition for Titan Radar Observations

We describe the problem of regular small telemetry losses incurred during coherency mode transitions in Cassini's telecommunication. The project did not originally plan any corrective steps for avoiding these data losses, because of 1) the disparity between the small durations of the transitions (1-2 min) and large playback capability losses (15 min) needed for bracketing the transition time spans and 2) the unpredictable content of data downlinking during the transitions. However, as the intense science data return from the tour began, it became apparent that the impact of these small losses can sometimes be significant. We provide two examples of the impact on Radar-dedicated Titan flybys.

telecommunications↗

The Cassini-Huygens Sequence Development Process

Each phase of the sequence development process had to overcome many operational challenges due to the immense complexity of the spacecraft, tour design, pointing capabilities, flight rules and software development. This paper will address the specific challenges related to each of those complexities and the methods used to overcome them during operation.

science planning↗

The Cassini-Huygens Mission Overview

The Cassini-Huygens Program is an international science mission to the Saturnian system. Three space agencies and seventeen nations contributed to building the Cassini spacecraft and Huygens probe. The Cassini orbiter is managed and operated by NASA's Jet Propulsion Laboratory. The Huygens probe was built and operated by the European Space Agency. The mission design for Cassini-Huygens calls for a four-year orbital survey of Saturn, its rings, magnetosphere, and satellites, and the descent into Titan's atmosphere of the Huygens probe. The Cassini orbiter tour consists of 76 orbits around Saturn with 45 close Titan flybys and 8 targeted icy satellite flybys. The Cassini orbiter spacecraft carries twelve scientific instruments that are performing a wide range of observations on a multitude of designated targets. The Huygens probe carried six additional instruments that provided in-situ sampling of the atmosphere and surface of Titan. The multi-national nature of this mission poses significant challenges in the area of flight operations. This paper will provide an overview of the mission, spacecraft, organization and flight operations environment used for the Cassini-Huygens Mission. It will address the operational complexities of the spacecraft and the science instruments and the approach used by Cassini-Huygens to address these issues.

mission operations↗