Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “System control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

Machine Learning for Automated Metadata Assignment in Buildings: Cooperative Research and Development (Final Report, CRADA Number CRD-18-00767)

RealTerm Energy and NREL have identified a shared vision to evaluate opportunities to facilitate the organization and assignment of metadata to building control system (BCS) data via industry-informed machine learning (ML). Manual metadata assignment is labor intensive and costly, slowing down any Energy Management and Information System (EMIS) deployment in the building space. This project aims to develop methodologies to accurately assign this metadata and significantly decrease the level of effort associated with deploying EMIS. The objective of this project is to identify/design methodologies to assign metadata to HVAC control points automatically. The identified methodologies will be programmed in analytics algorithms so they can ingest a list of points and produce a detailed tagging following the Haystack classification nomenclature. To validate the efficacy of each methodology, tagging results will be compared utilizing a list of points extracted from RealTerm's building database-as well as data extracted from the NREL campus via the Intelligent Campus program-enabling testing against large datasets with real world challenges. The developed methodologies may leverage building manager/operator input on a limited basis to add context to the classifying algorithms. The partnership aims to advance global efforts in areas related to the DOE missions through improving operational performance of commercial buildings. It is well documented that buildings fall out of commission after they are occupied, wasting significant energy and incurring associated costs simply due to poor operational performance. Emerging EMIS technologies that perform continuous commissioning help to address this issue, yet integration of these systems can be labor intensive both for the technology vendor and the building owner/operator. This project will enable more efficient and cost-effective analytics for buildings, enabling improvement in building operations at lower cost points.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Wave Tank Testing Report for Controls Validation of a Heaving Point Absorber

The core objectives of this project is to improve the power capture of three different wave energy conversion (WEC) devices by more than 50% using an advanced control system and validate the attained improvements using wave tank and full scale testing. In parallel, we will bring along the development of a wave prediction system that is required to enable effective control and test it at full scale. The purposes of this report are to: 1. Plan and document the 1/25th scale device testing at the wave-tank facility; 2. Document the test article, setup and methodology, sensor and instrumentation, mooring, electronics, wiring, and data flow and quality assurance; 3. Communicate the testing results between the associated members; 4. Facilitate reviews that will help to ensure all aspects (risk, safety, testing procedures, etc.); 5. Provide a systematic guide to setting up, executing and decommissioning the experiment.

16 TIDAL AND WAVE POWER↗

Medium and Heavy Duty Vehicle Powertrain Electrification and Fleet Demonstration

The Contract Award Grant # EE0007513 dated 2 June, 2016 is for the design, development and demonstration of medium duty package delivery vehicles that will result in a 100% increase in fuel economy as measured in miles per gallon. The project was proposed in 3 phases over two budget periods. The Phases were: 1. Modeling and Simulation – This phase was completed and formed the basis of the specifications for the design and build of the physical systems. The modeling and simulation was conducted by AVL and used real world package delivery routes that AVL mapped. The motors, battery pack, range extender and balance of plant support systems were modeled and iterated until a system with the desired fuel economy improvement was realized. Early design of the major subsystems using the actual vehicle space constraints was also completed. This phase was successfully completed in May of 2017. 2. 1st Build and FE Confirmation - This phase was completed and resulted in the final design, release, procurement and build of all major vehicle systems for commissioning into the first vehicle. The work was a partnered effort between McLaren and AVL. McLaren built the eAxle system while AVL built the range extender and integrated the range extender, battery and balance of plant sub-systems into the first vehicle with a control system to make it operate. Prior to the end of this phase a real world HIL system test gave evidence that the fuel economy improvement would be achieved in the real world. This phase was exited with a 7 month delay due mostly to procurement and supply base issues and ended in May, 2018. 3. Final Build and Demonstration - This phase included the final build and commissioning of the four program vehicles and the operation of a demonstration on a set of routes near San Diego California. During this phase, a multitude of issues arose in different systems in the vehicle. These issue resolution exercises were quite complex and caused repeated delays but were all successfully completed. It should also be noted that an early commercialization analysis resulted in the conclusion that the complexity of the system would not make it cost effective, leading to the start of a follow-on design that used newly available component technologies to specify a more cost effective system. This design will be repurposed and put into demonstration on a separately (non-DOE) funded program. It was decided and agreed with DOE that this phase should be considered completed. The knowledge and know-how gained on this program has been incorporated into and transferred to the new program. This phase and the entire program was considered closed on June 1, 2021.

33 ADVANCED PROPULSION SYSTEMS↗

Skewering the silos: using Brick to enable portable analytics, modeling and controls in buildings

Nearly all large commercial buildings have heating, ventilation and air conditioning (HVAC) systems, lighting systems, safety and other systems controlled by a computer—a dedicated server with a building energy management system (BMS). However, these BMSs are proprietary with each building’s assets (that is, fans, valves, pumps, and their setpoints) named and coded uniquely by the BMS vendor or engineer; building analytics and control algorithms are written specific to the assets and the building. Thus, any control updates or analytics to improve building performance—especially critical to reduce greenhouse emissions or improve load flexibility—are labor intensive and costly. The Brick schema was developed so the same analysis or control algorithms can work on a variety of buildings if each is digitally represented in a Brick data model. The goal of this project was to further the development of Brick to extend it beyond an academic project with demonstrated success in a small field study, to a practical choice for industrial and commercial stakeholders seeking to realize value from building data. To do this, we executed four objectives: (1) expand the Brick schema including its modeling capabilities and vocabulary, (2) develop tools for integrating Brick with existing digital technologies and representations in buildings, (3) develop an open-source analytics platform to facilitate use of Brick in delivering data value, and (4) demonstrate Brick-driven analytics and controls in real settings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Dynamic Modelling and Performance Evaluation of a Chemisorption Heat Pump for Cold Climate

Space heating is a significant contributor to the energy consumption in residential buildings, especially in cold climates where electric-driven heat pumps lose the advantage of high efficiency and conventional gas-combustion furnaces have limited efficiency. Chemical adsorption (chemisorption) heat pumps (CSHP) have the potential for producing heating with high energy efficiency under cold operating conditions. A CSHP operates intermittently between desorption and adsorption modes, and their performance is affected by system design and transient system control. This study developed a dynamic model and used it to evaluate the daily system performance under different designs and controls, particularly the buffer tank size and the controlled minimum heating power. The simulation results revealed the effects of these parameters on the system performance and helped identify the optimal design and control for the highest coefficient of performance and heating capacity.

Yang, Zhiyao↗

Design and performance of an in-vacuum, magnetic field mapping system for the Muon g-2 experiment

The Muon g - 2 experiment at Fermilab (E989) aims to measure the anomalous magnetic moment, a μ , of the muon with a precision of 140 parts-per-billion. This requires a precise measurement of both the anomalous spin precession frequency, ω α , of muons stored in a magnetic field of 1.45 T, and a precise measurement of that magnetic field in terms of the shielded proton Larmor frequency, ω' ρ . The measurement of ω' ρ with a total systematic uncertainty of 70 parts-perbillion involves a combination of various nuclear magnetic resonance (NMR) probes. There are 378 probes mounted in fixed locations that constantly monitor field drifts. A water-based, cylindrical calibration probe provides the calibration in terms of the shielded proton Larmor frequency. A crucial element for the multi-step measurement of ω' ρ is the regular mapping of the magnetic field over the muon storage region. The former experiment at Brookhaven National Laboratory (BNL) employed an in-vacuum field mapping system equipped with 17 NMR probes, which was developed by the University of Heidelberg. We have refurbished and upgraded this system with new probes and electronics. The upgrades include the addition of 16-bit, 1 MSPS digitization of the NMR signals, which replaced the hardware-implemented zero-crossing counting of the system at Brookhaven. The digitized signals offer new capabilities in the NMR frequency analysis and its related systematic uncertainties. To sustain the higher data rates, a new communication scheme with time-division multiplexing was implemented to separate the important NMR reference clock from the data communication in order to reach the specifications for the accuracy and stability of the reference clock. A new barcode reader provides more precise azimuthal position determination during the measurement and calibration. While the mechanical systems that move the field mapper inside the storage ring have been mostly refurbished from BNL, the motion control system was completely replaced with a custom-built electronics centered around a commercial Galil motion controller. Both the field mapping NMR system and its motion control were successfully commissioned at Fermilab and have been in reliable operation during the first three data taking periods of the experiment at Fermilab. Finally, this article will provide the details of the upgrades of the field mapper and its performance.

47 OTHER INSTRUMENTATION↗

Analysis of predicted mean vote-based model predictive control for residential HVAC systems

Model Predictive Control (MPC) is an advanced process control method that has attracted much attention in building heating, ventilation, and air conditioning (HVAC) systems. Here, this paper analyzes the optimal precooling performance in residential buildings using MPC with two different comfort indices, namely, temperature and predicted mean vote (PMV). It first formulates, for each comfort index, an optimization problem that accounts for different factors, such as weather, home thermal condition, prediction horizon, time-of use (TOU) utility rate, and rated cooling capacity. The problem is then solved, resulting in an MPC strategy that determines the HVAC on/off control signal and minimizes energy cost over a receding time horizon while maintaining thermal comfort. The energy performance difference between temperature-based and PMV-based MPC strategies is subsequently investigated, especially in light of the interior wall surface temperature and under different combinations of the factors. Extensive simulation results demonstrated that the proposed MPC strategies are adaptive and their performances depend primarily on weather, home thermal condition, and prediction horizon, while the impact of TOU utility rate and rated cooling capacity is relatively small. Because the PMV-based MPC strategy can take advantage of the lower interior wall surface temperature due to precooling, it resulted in 8–45% cost savings for the scenarios investigated and an average increase of 0.042–0.113 in the absolute value of the PMV index compared to the temperature-based MPC strategy.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Continuous Monitoring and Partial Water Softening for Cooling Tower Water Treatment

Cooling towers are an integral component of many refrigeration systems, providing comfort or process cooling across a broad range of applications. They are the point in the system where heat is dissipated to the atmosphere through the evaporative cooling process. Cooling towers are commonly found in industrial applications and are also often used in water-cooled chilled water plants in medium to large commercial buildings. Continuous monitoring and partial water softening for cooling towers used in medium to large commercial buildings are the focus of this paper. Cooling towers consume large amounts of water. Cooling tower-related water consumption is one of largest potable water loads within buildings in the United States, with substantial building water use associated with heating and cooling. Regional water shortages have highlighted a need to reduce water consumption; the U.S. General Services Administration (GSA) and Executive Order 13834 place priority on reducing water consumption. This priority has fueled interest in the identification, investigation, and potential broad deployment of cost-effective opportunities to reduce water use, such as alternative water treatment (AWT) technologies for cooling towers. Traditional water treatment approaches use chemicals to extend the ability of the water to hold scaling minerals in suspension, minimize corrosion, and prevent biological growth. This treatment protects the chillers and cooling tower equipment; however, even when chemicals are used regularly, a certain percentage of condenser water must be drained and made up with fresh water to maintain system water quality parameters. In addition, the use of chemicals sometimes creates a waste disposal issue and can cause building owners to incur additional fees, such as disposal or wastewater charges. To manage cooling tower water treatment, GSA typically contracts with a company specializing in conventional chemical maintenance for a fixed fee. While there are many types and vendors of AWT systems, this project assesses the effectiveness of one technology provided by Aqualogix. This system is a chilled water plant monitoring and control system aimed at optimizing system performance by reducing the blowdown occurrences used to remove mineral build-up. The technology consists of two components – continuous programmable logic control (PLC) monitoring and side-stream filtration with partial water softening. PLC monitoring calculates cycles of concentration (CoC) and determines the optimum amount of blowdown water required to satisfy all water chemistry requirements. Side-stream filtration removes suspended matter and improves biocide efficacy while precisely dispensing softened water to achieve optimal makeup water hardness. Unlike other AWT systems evaluated by GSA to date, this system does not replace the legacy treatment system but is used in addition to chemical water treatment. The vendor claims their technology will reduce water consumption, water discharge, and maintenance costs. The AWT system evaluated in this demonstration is a commercialized technology. Given its commercialized state, the system evaluated in this report is at a Technology Readiness Level 9 according to National Aeronautics and Space Administration (NASA) definitions.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Encrypted model predictive control design for security to cyberattacks

Abstract In recent years, cyber‐security of networked control systems has become crucial, as these systems are vulnerable to targeted cyberattacks that compromise the stability, integrity, and safety of these systems. In this work, secure and private communication links are established between sensor–controller and controller–actuator elements using semi‐homomorphic encryption to ensure cyber‐security in model predictive control (MPC) of nonlinear systems. Specifically, Paillier cryptosystem is implemented for encryption‐decryption operations in the communication links. Cryptosystems, in general, work on a subset of integers. As a direct consequence of this nature of encryption algorithms, quantization errors arise in the closed‐loop MPC of nonlinear systems. Thus, the closed‐loop encrypted MPC is designed with a certain degree of robustness to the quantization errors. Furthermore, the trade‐off between the accuracy of the encrypted MPC and the computational cost is discussed. Finally, two chemical process examples are employed to demonstrate the implementation of the proposed encrypted MPC design.

Suryavanshi, Atharva↗

Interoperable, Inverter-Based Distributed Energy Resources (DERs) Enable 100% Renewable and Resilient Utility Microgrids

Project overcomes frequency stability and system control issues when operating distribution microgrids in a low inertia, high PV penetration environment without fossil fuel generators. The team implemented a grid-forming inverter and advanced control features at SDG&E's Borrego Springs Microgrid to demonstrate islanding and blackstart using renewable resources. Simulation and emulation in advance of deployment de-risks field operations.

battery energy storage systems↗

Chaos as the cause of randomness in tearing mode onset times in DIII-D ITER baseline scenario plasmas

The first evidence of widespread chaotic plasma dynamics relevant to the onset of disruptive tearing modes is found in DIII-D tokamak discharges. This evidence is obtained by calculating positive maximal Lyapunov exponents from Mirnov signals using the Rosenstein algorithm, implying the chaotic growth and/or rotation of magnetohydrodynamic modes in DIII-D [Luxon, Nucl. Fusion 42, 614 (2002)] plasmas. Such chaotic dynamics offer an explanation for the random tearing mode onset times previously observed in ITER baseline scenario discharges. Further, the Lyapunov timescales associated with this chaos could inhibit reliable prediction of tearing mode onset beyond the angular momentum confinement timescale; this constraint should inform the design of plasma control systems on ITER.

Chaotic dynamics↗

Clean Energy Cybersecurity Accelerator Cohort 1: Authentication and Authorization

In the 2023 National Cybersecurity Strategy, the Biden-Harris Administration defines the need for a "defensible, resilient digital ecosystem where it is costlier to attack systems than defend them." The strategy cites the Clean Energy Cybersecurity Accelerator (CECA) as an exemplary effort to bolster the security and resilience of clean energy generation. These efforts help "secure the clean energy grid of the future and [generate] security best practices that extend to other critical infrastructure sectors" and promise broad and far-reaching impacts to bridge the capabilities of private industry and the needs of energy production. Cohort 1 of CECA launched in the fall of 2022 with a focus on solutions that provide strong authentication and authorization for industrial control systems to mitigate attacks on the energy grid. Authentication and authorization verify that the identity (authentication) and permissions (authorization) of a user or device are aligned with their assigned roles. Weaknesses in either can have serious repercussions. To assess the strength of Cohort 1's solutions, CECA devised threat scenarios grounded in historical precedents: the CECA team reviewed exploits from real-world case studies of state-sponsored actors to match the assessment's attack paths and targets. Cohort 1 results provided the energy industry, product vendors, and related agencies valuable insights into the efficacy and applicability of solutions in common system configurations under realistic threat scenarios. The results of the assessment highlight points for interrogation and improvement in subsequent technology iterations. CECA's evaluations are part of an ongoing conversation and collaboration to bolster U.S. cyber resilience against adversaries today and in the future.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Design and testing of a free floating dual flap wave energy converter

With a wide variety of wave energy device archetypes currently under consideration, it is a major challenge to ensure that research findings and methods are broadly applicable. In particular, the design and testing of wave energy control systems, a process which includes experimental design, empirical modeling, control design, and performance evaluation, is of interest. This goal motivated the redesign and testing of a floating dual flap wave energy converter. As summarized in this paper, the steps taken in the design, testing, and analysis of the device mirrored those previously demonstrated on a three-degree of freedom point absorber device. The method proposed does not require locking WEC degrees of freedom to develop an excitation model, and presents a more attainable system identification procedure for at-sea deployments. The results show that the methods employed work well for this dual flap device, lending additional support for the broad applicability of the design and testing methods applied here. The aim of this paper is to demonstrate that these models are particularly useful for deducing areas of device design or controller implementation that can be reasonably improved to increase device power capture.

16 TIDAL AND WAVE POWER↗

Improving to the neutron fluence rate monitor measurement system at the Advanced Test Reactor [Poster]

The existing fluence monitor wire scanning system at the Advanced Test Reactor (ATR) was designed and installed for use in the Engineering Test Reactor (ETR) when it began operation in 1958. The wire scanner was operated in ETR for over 20 years until ATR began operation, when it was moved to the ATR west canal area in 1971 and subsequently moved to the west canal in 2006 where it presently resides. With a continued service life of 65 years the system is well beyond the typical design life of 20 years for these types of systems. The need to update the data acquisition and control system was identified, and the benefits of replacing the existing sodium iodide (NaI) detector with an electronically cooled high-purity germanium (HPGe) detector are discussed. The wirescanner system in the ATR canal is utilized after every reactor cycle by the ATR Radiation Measurements Laboratory (RML) to assess the activation of cobalt and nickel dosimeter wires during the cycle. These wires become activated through exposure to thermal and fast neutrons respectively during the irradiation cycle and are highly radioactive upon shutdown. It is for this reason that the wirescanner is used in the ATR canal rather than transporting the dosimeters to another facility. A scoping study was performed to develop a base-line design to ensure that existing capabilities could be replaced with a new system. The new hardware will enable automated measuring of several flux monitor holders without necessitating the removal of the flux wires. In this way, flux wire measurements will be performed with minimal dose to the technicians and will not be limited by canal operations as is presently the case. The new control and acquisition software will be based on commercially available and supported systems that have a wide user-base to provide long-term stability. An electronically cooled HPGe detector will be used to provide high-resolution gamma-ray measurements, an improvement from the low-resolution sodium-iodide detector that is presently deployed. The electronic cooler eliminates the need for liquid nitrogen to cool the detector head. A new collimator has been designed to house the new detector and allow for sufficient counting rates.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

XPS guide: Charge neutralization and binding energy referencing for insulating samples

This guide deals with methods to control surface charging during XPS analysis of insulating samples and approaches to extracting useful binding energy information. Furthermore, the guide summarizes the causes of surface charging, how to recognize when it occurs, approaches to minimize charge buildup, and methods used to adjust or correct XPS photoelectron binding energies when charge control systems are used. Additionally, there are multiple ways to control surface charge buildup during XPS measurements and examples of systems on advanced XPS instruments are described. There is no single, simple, and foolproof way to extract binding energies on insulating material, but advantages and limitations of several approaches are described. Because of the variety of approaches and limitations of each it is critical for researchers to accurately describe the procedures that have been applied in research reports and publications.

47 OTHER INSTRUMENTATION↗

Calibration and Measurement techniques in the LLRF systems of the Fermilab PIP-II Linac

he PIP-II Accelerator is an 800 MeV superconducting Linac in the injection chain of the Fermilab accelerator complex. The LLRF systems are a based on two different hardware platforms controlling a variety of cavity types and resonance control systems including temperature, pneumatic and piezzo tuners. The various calibrations required prior to beam operation include, signal power, gradient, amplifier characterization, cavity Q measurement and detune constants. Measurements such as piezzo capacitance, cavity piezo transfer function help in determining tuner health and in devising microphonics control strategies. These measurement and calibration methods of the PIP-II LLRF system are discussed here.

Varghese, P.↗

Current Status of the Synroc Waste Treatment Facility - 20263

Construction of the Synroc Waste Treatment Facility is well underway at ANSTO. This plant has been designed to treat intermediate level liquid waste arising from the production of Mo-99 within the newly constructed ANSTO Nuclear Medicine (ANM) precinct [1]. The facility utilises ANSTO Synroc technology that has been tailored to the chemical, physical, and radiological properties of the waste. The result is a highly durable wasteform with a significant reduction in the final volume of the treated waste. This paper presents the construction status of the Synroc Waste Treatment Facility and the status of the associated technology maturation plan. Construction of the building is scheduled for completion in late 2020 followed by process installation and commissioning. A key component of the technology maturation plan has been the construction of an Inactive Engineering Demonstrator [2]. This has aided in the mitigation of risks with respect to technology selection, process integration, and process nuclearisation. Furthermore, the demonstration facility has provided an environment for the design and development of the instrumentation and control philosophy resulting in a seamlessly integrated plant control system. Successful demonstration of the technology by the inactive engineering demonstrator has significantly reduced the associated risks. Details of the Synroc Waste Treatment Facility project progress will also be presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Open-Loop Control Co-Design of Semisubmersible Floating Offshore Wind Turbines Using Linear Parameter-Varying Models

Here, this paper discusses a framework to design elements of the plant and control systems for floating offshore wind turbines in an integrated manner using linear parameter-varying models. Multiple linearized models derived from aero-elastic simulation software in different operating regions characterized by the incoming wind speed are combined to construct an approximate low-fidelity model of the system. The combined model is then used to generate open-loop, optimal control trajectories as part of a nested control co-design strategy that explores the system’s power production and stability using the platform pitch tilt as a proxy in the context of crucial plant and control design decisions. The radial distance between the central and outer columns and the diameter of the outer columns of the semisubmersible platform are the plant design variables. The platform stability and power production are studied for different plant design decisions. The effect of plant decisions on subsequent power production and stability response of the floating wind turbine is quantified in terms of the levelized cost of energy. The results show that the inner-loop constraints and the plant design decisions affect the turbine’s power and, subsequently, the cost of the system.

17 WIND ENERGY↗