Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SITE SELECTION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

Evaluation of the NASA Artemis Regions of Interest for ISRU Water Mine Potential

The NASA Artemis Campaign has a stated goal to return to the Moon to maintain a sustainable presence; In-Situ Resource Utilization (ISRU) is a key part of sustainability. The regions of interest identified for the Artemis campaign are at Lunar the South Pole where water ice, a valuable resource for ISRU, has been identified. As such, a preliminary evaluation of the ISRU ice mining potential has been performed for of these regions of interest. A set of ground rules for this evaluation were developed to align with current assumptions for customer needs, hardware capabilities, an initially limited infrastructure, and lunar environments/terrain. These ground rules, and the evaluation of six regions of interest, are presented here. The site selections (ISRU and customer assets) and their associated traverses are notional and were intended only to provide a broad preliminary evaluation of the water ISRU potential of the regions. Evaluation of these regions are subject to change as decisions regarding utilization are made. Water ISRU is possible at all regions, though the degree to which each criterion are met is variable. The two regions near Shackleton ranked highest in this evaluation, while the de Gerlache region presented the most difficulties meeting the current criteria. The regions were not explicitly ranked due to the nuances associated with the high number of variables but evaluation summaries of each are presented. It should also be noted that all ISRU ‘mine’ sites in this analysis focused on smaller (few kilometer) size permanently shadowed regions (PSRs). This was necessary to meet proximity requirements between these PSRs and the highly illuminated regions needed for customers and ISRU processing. The areas identified in this study are meant to focus exploration and reconnaissance efforts needed to better evaluate the ISRU potential.

In-situ resource utilization↗

Evaluation of the NASA Artemis Regions of Interest for ISRU Water Mine Potential

The NASA Artemis Campaign has a stated goal to return to the Moon to maintain a sustainable presence; In-Situ Resource Utilization (ISRU) is a key part of sustainability. The regions of interest identified for the Artemis campaign are at Lunar the South Pole where water ice, a valuable resource for ISRU, has been identified. As such, a preliminary evaluation of the ISRU ice mining potential has been performed for of these regions of interest. A set of ground rules for this evaluation were developed to align with current assumptions for customer needs, hardware capabilities, an initially limited infrastructure, and lunar environments/terrain. These ground rules, and the evaluation of six regions of interest, are presented here. The site selections (ISRU and customer assets) and their associated traverses are notional and were intended only to provide a broad preliminary evaluation of the water ISRU potential of the regions. Evaluation of these regions are subject to change as decisions regarding utilization are made. Water ISRU is possible at all regions, though the degree to which each criterion are met is variable. The two regions near Shackleton ranked highest in this evaluation, while the de Gerlache region presented the most difficulties meeting the current criteria. The regions were not explicitly ranked due to the nuances associated with the high number of variables but evaluation summaries of each are presented. It should also be noted that all ISRU ‘mine’ sites in this analysis focused on smaller (few kilometer) size permanently shadowed regions (PSRs). This was necessary to meet proximity requirements between these PSRs and the highly illuminated regions needed for customers and ISRU processing. The areas identified in this study are meant to focus exploration and reconnaissance efforts needed to better evaluate the ISRU potential.

In-situ resource utilization↗

Global 3D Data Visualization and Analysis Platform With Advanced Machine Learning Capabilities in Support of Lunar Exploration

Introduction: The science goals for NASA’s Artemis program include: a) Understanding the character and origin of lunar polar volatiles, b) Conducting experimental science in the lunar environment and c) Investigating and mitigating exploration risks [1]. The permanently shadowed regions (PSRs) on the Lunar south pole are expected to host large quantities of water-ice and volatiles that are important for sustainable Lunar exploration [2]. There are several missions such as onboard Korea Pathfinder Lunar Orbiter (KPLO: Korean name Danuri) with onboard ShadowCam camera [3], Astrobotic Peregrine Mission One [4], and other efforts underway to obtain high resolution topographic, minerals, volatiles and other information on the moon. We envision a need in immediate future for platforms to integrate these data sets, provide rendering and visualization capabilities in the context of a 3D Lunar globe for easier information access and analysis. NASA's Celestial Mapping System (CMS) [5] is developed to address the need for 3D tools for planetary science investigations, mission planning, in-situ operations, in a 3D-first design constructed around a unified view of a planetary globe. At present CMS provides many critical functionalities that include: 1) equipment planning and optimized placement on Lunar surface 2) line-of-sight (LOS) analysis 3) powerful measurement tools based on 3D terrain with realistic 3D models to represent rovers, astronauts and equipment 4) visualization of derived mapping products (e.g. resource maps), and 5) a data engine for hosting new observations that are not available in other contemporary lunar data tools [5, 7]. Planetary Data Ingestion: CMS can consume and analyze data from locally hosted and external third party sources. It is compatible with Open Geospatial Consortium (OGC) data and file standards and currently integrates datasets from the Astrogeology Science Center of USGS. This includes global and local data acquired from NASA (LRO, Clementine, Lunar Orbiter) and JAXA (SELENE/Kaguya), with capability of integrating more datasets. In addition, users can specify other WMS-hosted data endpoints, which CMS can then query and stream data from automatically. To set-up an automated process for ingestion and accurate rendering, visualization and analysis of external 3rd party planetary datasets within CMS, we initiated the process of ingesting unique dataset of super-enhanced images of the permanently shadowed regions (PSRs) at the lunar poles which were produced by the Hyper-effective nOise Removal U-net Software (HORUS) tool [8]. This tool was developed to enhance the extremely low-light images of the interior of PSRs and provide the ability to see within these regions at and discern surface features (i.e. boulders and craters) down to 3 meters in size. We focused on the Nobile region on the Lunar south pole, selected site for VIPER mission and stitched several images to create a high-resolution map within one of the PSR of Nobile crater. Figure 1 shows the dark PSR zone form the original NAC layer of LRO as the base layer (left image) and the illuminated areas within that crater (center) which was created by ingesting and merging several of HORUS generated images. At present we employ a semi-automated process to ensure spatial accuracy and merger of several overlapping zones. However, we are in the process of completely automating this process by employing AI based techniques that would rank, sort, and stack the images based on their information density. The georectification of the images would employ selected features. Analysis on Ingested Planetary Datasets: Once an external planetary data-set is successfully ingested, georectified and merged seamlessly as a data-layer; CMS’ numerous analysis tools can be used on this data. A Line of Sight (LOS) tool has been developed for CMS which analyzes terrain profiles and obstructions to determine visibility for remote observers [5,6]. Figure 1 (right image) shows the viewshed analysis on the same PSR in the Nobile region. The yellow pin shows the observer location outside the PSR. The yellow area shows the visible part of PSR. The obstructed area with no visibility for the observer is shown in red. The Measurements tool allows the user to take area and distance measurements of features on the terrain using various shapes. Measurement type can be specified in a number of ways: Line, Path, Polygon, Circle, Ellipse, Square, Rectangle or Freehand. Once the shape is specified, elevation information can then be extracted along each of these shapes. Figure 2 (left) shows the measurements performed on a crater n illuminated PSR in Nobile region. The equipment placement tool allows the user to place a 3D equipment model at a desired location and analyze its coverage area. The equipment placement tool is coupled with LOS to determine the coverage. Figure 2 (right) shows an equipment placed on the Lunar terrain and it’s coverage area. The red rays are blocked sight lines and the green rays are non-obstructed sight lines with the cyan lines showing the point of intersection with the terrain. More details are provided in the video demonstrations in Reference 5. Overcoming Polar Distortions: 3D geospatial applications exhibit significant distortions in polar imagery due to several reasons: 1) distortions in the source imagery, 2) incompatible tessellation algorithms at the poles, and 3) map projections. We are leveraging new tessellation algorithms and reprojecting data using projections that are better suited for Lunar poles. The goal is to seamlessly switch to polar projections while maintaining 3D view and navigation.

Maps↗

Global 3D Data Visualization and Analysis Platform with Advanced Machine Learning Capabilities in Support of Lunar Exploration

Introduction: The science goals for NASA’s Artemis program include: a) Understanding the character and origin of lunar polar volatiles, b) Conducting experimental science in the lunar environment and c) Investigating and mitigating exploration risks. The permanently shadowed regions (PSRs) on the Lunar south pole are expected to host large quantities of water-ice and volatiles that are important for sustainable Lunar exploration. There are several missions such as onboard Korea Pathfinder Lunar Orbiter (KPLO: Korean name Danuri) with onboard ShadowCam camera, Astrobotic Peregrine Mission One [4], and other efforts underway to obtain high resolution topographic, minerals, volatiles and other information on the moon. We envision a need in immediate future for platforms to integrate these data sets, provide rendering and visualization capabilities in the context of a 3D Lunar globe for easier information access and analysis. NASA's Celestial Mapping System (CMS) is developed to address the need for 3D tools for planetary science investigations, mission planning, in-situ operations, in a 3D-first design constructed around a unified view of a planetary globe. At present CMS provides many critical functionalities that include: 1) equipment planning and optimized placement on Lunar surface 2) line-of-sight (LOS) analysis 3) powerful measurement tools based on 3D terrain with realistic 3D models to represent rovers, astronauts and equipment 4) visualization of derived mapping products (e.g. resource maps), and 5) a data engine for hosting new observations that are not available in other contemporary lunar data tools. Planetary Data Ingestion: CMS can consume and analyze data from locally hosted and external third party sources. It is compatible with Open Geospatial Consortium (OGC) data and file standards and currently integrates datasets from the Astrogeology Science Center of USGS. This includes global and local data acquired from NASA (LRO, Clementine, Lunar Orbiter) and JAXA (SELENE/Kaguya), with capability of integrating more datasets. In addition, users can specify other WMS-hosted data endpoints, which CMS can then query and stream data from automatically. To set-up an automated process for ingestion and accurate rendering, visualization and analysis of external 3rd party planetary datasets within CMS, we initiated the process of ingesting unique dataset of super-enhanced images of the permanently shadowed regions (PSRs) at the lunar poles which were produced by the Hyper-effective nOise Removal U-net Software (HORUS) tool. This tool was developed to enhance the extremely low-light images of the interior of PSRs and provide the ability to see within these regions at and discern surface features (i.e. boulders and craters) down to 3 meters in size. We focused on the Nobile region on the Lunar south pole, selected site for VIPER mission and stitched several images to create a high-resolution map within one of the PSR of Nobile crater. Figure 1 shows the dark PSR zone form the original NAC layer of LRO as the base layer (left image) and the illuminated areas within that crater (center) which was created by ingesting and merging several of HORUS generated images. At present we employ a semi-automated process to ensure spatial accuracy and merger of several overlapping zones. However, we are in the process of completely automating this process by employing AI based techniques that would rank, sort, and stack the images based on their information density. The georectification of the images would employ selected features. Analysis on Ingested Planetary Datasets: Once an external planetary data-set is successfully ingested, georectified and merged seamlessly as a data-layer; CMS’ numerous analysis tools can be used on this data. A Line of Sight (LOS) tool has been developed for CMS which analyzes terrain profiles and obstructions to determine visibility for remote observers. Figure 1 (right image) shows the viewshed analysis on the same PSR in the Nobile region. The yellow pin shows the observer location outside the PSR. The yellow area shows the visible part of PSR. The obstructed area with no visibility for the observer is shown in red. The Measurements tool allows the user to take area and distance measurements of features on the terrain using various shapes. Measurement type can be specified in a number of ways: Line, Path, Polygon, Circle, Ellipse, Square, Rectangle or Freehand. Once the shape is specified, elevation information can then be extracted along each of these shapes. Figure 2 (left) shows the measurements performed on a crater n illuminated PSR in Nobile region. The equipment placement tool allows the user to place a 3D equipment model at a desired location and analyze its coverage area. The equipment placement tool is coupled with LOS to determine the coverage. Figure 2 (right) shows an equipment placed on the Lunar terrain and it’s coverage area. The red rays are blocked sight lines and the green rays are non-obstructed sight lines with the cyan lines showing the point of intersection with the terrain. More details are provided in the video demonstrations in Reference 5. Overcoming Polar Distortions: 3D geospatial applications exhibit significant distortions in polar imagery due to several reasons: 1) distortions in the source imagery, 2) incompatible tessellation algorithms at the poles, and 3) map projections. We are leveraging new tessellation algorithms and reprojecting data using projections that are better suited for Lunar poles. The goal is to seamlessly switch to polar projections while maintaining 3D view and navigation.

Maps↗

Uptake and speciation of trace metal inputs to Wetland Soils from Illinois and South Carolina and Stream Sediments from Tennessee

Metals occur in all ecosystems, although their concentrations vary depending on their natural geologic conditions and surrounding human activities. In addition to metals intrinsically present from the geology of a particular system, metals can enter environmental systems from a wide variety of natural and anthropogenic sources, such as sediment re-suspension, mining operations, industrial processes, agricultural activities, and atmospheric deposition. While metals can be toxic at high concentrations, some metals serve as essential micronutrients for biogeochemical processes. Metal transport and availability in engineered and natural water systems depend on processes of adsorption/desorption, oxidation/reduction, dissolution/precipitation, and ligand complexation. Insights into the speciation of metals and their bioavailability will also help advance understanding of the roles of metals in the biogeochemical cycling of nutrients. We conducted batch experiments under anoxic conditions on soils and sediments collected from three different natural aquatic systems to understand their response to influxes of dissolved Cu, Ni and Zn. While soils and sediments from all sites could strongly bind added trace metals, there were substantial differences in trace metal uptake trends between different sites, especially for Cu. There was no distinct correlation between trace metal uptake and the total organic matter, iron, and sulfur content present in the samples. X-ray absorption spectroscopy indicated that the speciation of the freshly added metals taken up by the solids differs substantially from the speciation of the metals originally present in unamended samples. Cu sulfides dominated speciation at low loadings (1 µmol/g), whereas complexation to thiol groups and formation of metallic Cu governed speciation at high loadings (10 µmol/g). For Ni and Zn, adsorption to mineral surfaces and organic matter governed their speciation in materials from most sites. This study suggests that the background speciation of metals in natural aquatic systems is a poor predictor of the speciation and lability of metals introduced to terrestrial aquatic systems from anthropogenic or natural processes. Our findings imply that geochemical processes controlling trace metal speciation may vary considerably with metal loading in different natural systems. Data are provided for marsh wetland soils at Argonne National Laboratory (Marsh 1 and Marsh 2), riparian wetland soils (Riparian 1 and Riparian 2) in the Tims Branch watershed at Savannah River National Laboratory, and stream bed sediments (Stream 1 and Stream 2) from East Fork Poplar Creek near Oak Ridge National Laboratory. Data package includes the results of trace metal uptake experiments conducted on the selected sites for determining their capacity to immobilize metals under different loadings. XANES spectra for Cu, Ni, ad Zn at different loadings are included in the package. The abundance of different trace metal species obtained using linear combination fitting in ATHENA are also included in the data.

54 ENVIRONMENTAL SCIENCES↗

The French Geological Repository Project Cigeo - 12023

The French Agency for Radioactive Waste Management, ANDRA, was launched by law in 1991 to perform and develop the research programme for managing high level and intermediate level long-lived radioactive waste generated by the French nuclear fleet. After a 15-year intensive research programme, including the study of alternative solutions, an overall review and assessment of the results was organized, including a national public debate. As a result, the Parliament passed a Planning Act on radioactive waste management in 2006. Commissioning of a geological repository by 2025 was one of the most important decisions taken at that time. To reach this goal, a license application must be submitted and reviewed by the competent authorities by 2015. A detailed review and consultation process is, as well, defined in the Planning Act. Beside the legal framework the project needs to progress on two fronts. The first one is on siting. A significant milestone was reached in 2009 with the definition of a defined area to locate the underground repository facilities. This area was approved in March 2010 by the Government, after having collected the opinions and positions of all the interested parties, at both National and local levels. A new phase of dialogue with local players began to refine the implementation scenarios of surface facilities. The final site selection will be approved after a public debate planned for 2013. The second one is the industrial organization, planning and costing. The industrial project of this geological repository was called Cigeo (Centre Industriel de Stockage Geologique). Given the amount of work to be done to comply with the given time framework, a detailed organization with well-defined milestones must be set-up. Cigeo will be a specific nuclear facility, built and operated underground for over a hundred years. The consequence of this long duration is that the development of the repository facilities will take place in successive operational phases. The characteristics of the first waste packages received will determine the work and the corresponding investments by 2025 on the repository site. One of the main challenges will be to accommodate both activities of mining and nuclear operations at the same time and at the same location. From the technical standpoint, ventilation and fire risk cannot be managed through a simple transposition from current nuclear industry practices. The reversibility demand also leads to concrete proposals with regard to repository management flexibility and waste package retrievability. These proposals contribute to the dialogue with stakeholders to prepare for the public debate and a future law which will determine the reversibility conditions. New design developments are expected to be introduced in the application from the current studies conducted until 2014. The possibility of optimization beyond 2015 will be kept open taking into account the one hundred years operating time as well as the capability to integrate feedback gained from the first construction and operation works. The industrial committed work aims to reach the application stage by 2015. The license application procedure was defined by the 2006 Act. Subject to authorization, the construction might begin in 2017. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Significant Roles of Surface Hydrides in Enhancing the Performance of Cu/BaTiO 2.8 H 0.2 Catalyst for CO 2 Hydrogenation to Methanol

Abstract Tuning the anionic site of catalyst supports can impact reaction pathways by creating active sites on the support or influencing metal‐support interactions when using supported metal nanoparticles. This study focuses on CO 2 hydrogenation over supported Cu nanoparticles, revealing a 3‐fold increase in methanol yield when replacing oxygen anions with hydrides in the perovskite support (Cu/BaTiO 2.8 H 0.2 yields ~146 mg/h/gCu vs. Cu/BaTiO 3 yields ~50 mg/h/gCu). The contrast suggests that significant roles are played by the support hydrides in the reaction. Temperature programmed reaction and isotopic labelling studies indicate that BaTiO 2.8 H 0.2 surface hydride species follow a Mars van Krevelen mechanism in CO 2 hydrogenation, promoting methanol production. High‐pressure steady‐state isotopic transient kinetic analysis (SSITKA) studies suggest that Cu/BaTiO 2.8 H 0.2 possesses both a higher density and more active and selective sites for methanol production compared to Cu/BaTiO 3 . An operando high‐pressure diffuse reflectance infrared spectroscopy (DRIFTS)‐SSITKA study shows that formate species are the major surface intermediates over both catalysts, and the subsequent hydrogenation steps of formate are likely rate‐limiting. However, the catalytic reactivity of Cu/BaTiO 2.8 H 0.2 towards the formate species is much higher than Cu/BaTiO 3 , likely due to the altered electronic structure of interface Cu sites by the hydrides in the support as validated by density functional theory (DFT) calculations.

He, Yang↗

A new vaccine targeting RANKL, prepared by incorporation of an unnatural Amino acid into RANKL, prevents OVX-induced bone loss in mice

Highlights: • Prepared a novel vaccine targeting RANKL by incorporating a p-nitrophenylalanine into murine RANKL. • The antiserum induced by the vaccine could efficiently prevent osteoclastogenesis in vitro. • The vaccine could prevent OVX-induced bone loss in mice. Bone homeostasis is maintained by a dynamic balance between osteoblastic bone formation and osteoclastic bone resorption. The receptor activator of nuclear-κB ligand (RANKL) is essential for the function of the bone-resorbing osteoclasts, and targeting RANKL has been proved highly successful in osteoporosis patients. This study aimed to design a novel vaccine targeting RANKL and evaluate its therapeutic effects in OVX-induced bone loss model. Anti-RANKL vaccine was generated by incorporating the unnatural amino acid p-nitrophenylalanine (pNO{sub 2}Phe) into selected sites in the murine RANKL (mRANKL) molecule. Specifically, mutation of a single tyrosine residue Tyr{sup 234} (Y234) or Tyr{sup 240} (Y240) of mRANKL to pNO{sub 2}Phe (thereafter named as Y{sup 234}pNO{sub 2}Phe or Y{sup 240}pNO{sub 2}Phe) induced a high titer antibody response in mice, whereas no significant antibody response was observed for the wild type mRANKL (WT mRANKL). The antiserum induced by Y{sup 234}pNO{sub 2}Phe or Y{sup 240}pNO{sub 2}Phe could efficiently prevent osteoclastogenesis in vitro. Moreover, immunization with Y{sup 234}pNO{sub 2}Phe or Y{sup 240}pNO{sub 2}Phe could also prevent OVX-induced bone loss in mice, suggesting that selected pNO{sub 2}Phe-substituted mRANKL may pave the way for creating a novel vaccine to treat osteoporosis.

60 APPLIED LIFE SCIENCES↗

Drought Risk Modeling for Thermoelectric Power Plants Siting using an Excess Over Threshold Approach

Water availability is among the most important elements of thermoelectric power plant site selection and evaluation criteria. With increased variability and changes in hydrologic statistical stationarity, one concern is the increased occurrence of extreme drought events that may be attributable to climatic changes. As hydrological systems are altered, operators of thermoelectric power plants need to ensure a reliable supply of water for cooling and generation requirements. The effects of climate change are expected to influence hydrological systems at multiple scales, possibly leading to reduced efficiency of thermoelectric power plants. In this paper, we model drought characteristics from a thermoelectric systems operational and regulation perspective. A systematic approach to characterise a stream environment in relation to extreme drought occurrence, duration and deficit-volume is proposed and demonstrated. This approach can potentially enhance early stage decisions in identifying candidate sites for a thermoelectric power plant application and allow investigation and assessment of varying degrees of drought risk during more advanced stages of the siting process.

Bekera, Behailu B↗

Mars Mission Optimization Based on Collocation of Resources

This paper presents a powerful approach for analyzing Martian data and for optimizing mission site selection based on resource collocation. This approach is implemented in a program called PROMT (Planetary Resource Optimization and Mapping Tool), which provides a wide range of analysis and display functions that can be applied to raw data or imagery. Thresholds, contours, custom algorithms, and graphical editing are some of the various methods that can be used to process data. Output maps can be created to identify surface regions on Mars that meet any specific criteria. The use of this tool for analyzing data, generating maps, and collocating features is demonstrated using data from the Mars Global Surveyor and the Odyssey spacecraft. The overall mission design objective is to maximize a combination of scientific return and self-sufficiency based on utilization of local materials. Landing site optimization involves maximizing accessibility to collocated science and resource features within a given mission radius. Mission types are categorized according to duration, energy resources, and in-situ resource utilization. Optimization results are shown for a number of mission scenarios.

G E Chamitoff↗

PARP1-HPF1 structure and dynamics on nicked DNA suggest a mechanism for acute and localized ADP-ribosylation

PARP1 detection of DNA strand breaks allosterically leads to PARP1 synthesis of poly(ADP-ribose) modifications that signal DNA damage. HPF1 engages activated PARP1 to control modification site selection. Understanding of the mechanism of DNA break detection and catalytic activation is incomplete, due largely to limited structural information for full-length PARP1. Here, single-particle cryo-EM provides views of the full complement of PARP1 domains engaging a DNA single-strand break in the presence of HPF1 and a fragment of binding partner Timeless. Cryo-EM, single-molecule DNA dynamics, and small-angle X-ray scattering analysis indicate that PARP1 remains dynamic even when the multi-domain structure is organized on a DNA break, with the minimal catalytic region displaying high mobility relative to domains engaging damage. We propose that the organization of PARP1 domains on a DNA break releases a tethered, constitutively active catalytic region to modify molecules in a radius surrounding the DNA break site.

59 BASIC BIOLOGICAL SCIENCES↗

Energy-Storing Cryogenic Carbon Capture™ for Utility and Industrial-scale Processes (Final Report)

This project leverages work completed under funding from previous U.S. Department of Energy (DOE) projects and other sources of funding around the Cryogenic Carbon Capture Process™ (CCC). The purpose of this project is to further develop a perturbation of the CCC process that stores energy called the Cryogenic Carbon Capture™ Energy Storing (CCC-ES) process. The successful completion of the tasks in this project has prepared the CCC-ES process for scaling and developed initial plans and a feasibility analysis for an engineering-scale or small-commercial scale system that can store at least 10 MWh of energy. The specific areas of work in this project are: (1) Develop a conceptual, site-specific integrated process flow diagram: Sustainable Energy Solutions (SES) developed a conceptual, site-specific plan including a process flow diagram for integrating CCC-ES at a specific location. The proposed system was based on a typical engineering-scale CCC system designed to capture 30-50 metric tonnes of CO 2 per day (TPD), with modifications and additional changes and equipment put in place to add the energy storage element to the system. The 30-50 TPD scale corresponds to the required 10 MWh of stored energy. This task includes updating simulation software for transient analysis. SES also coordinated with the Jim Bridger Power Plant in Point of Rocks, Wyoming to get site-specific data. Using these data, SES completed site-specific preliminary process flow diagrams, estimated capital and operating costs for the CCC-ES system, and used the upgraded software package to estimate the primary figures of merit. (2) Complete a technoeconomic analysis (TEA): SES completed a full-scale TEA of the CCC-ES system to meet specific success criteria. This TEA used process information from the host site selected above. (3) Technology and data gap assessment for the CCC-ES process: As part of the technology gap assessment, SES performed an assessment of the best alternative energy storage solutions including figures of merit and operational strengths and weaknesses. SES then compared the proposed system with a discussion of how it addresses the weaknesses of alternative systems, showing for example a cost of stored energy at less than $50/MWh and with a roundtrip efficiency of greater than 95%. This assessment includes technical and other risk analyses and technology gaps with research and development needs to commercialize the process by 2030. Finally, work includes a commercialization roadmap/development pathway outlining the major milestones to move to a commercially operating CCC-ES system. (4) Phase II pre-FEED project plan: SES completed a project plan for the Phase II pre-FEED analysis using the same host site as in the Phase I conceptual study.

03 NATURAL GAS↗

Visualizing feedstock siting in biomass production: Tradeoffs between economic and water quality objectives

New domestic, renewable energy resources must be considered to increase energy security in the U.S. Ethanol production through second-generation (cellulosic) feedstocks will help the U.S. meet the legislative Renewable Fuel Standard, which mandates 36 billion gallons of renewable fuels by 2022. Yet, conversion of cropland to meet the cellulosic feedstock production goals may have unforeseen environmental consequences. Here, using Soil Water Assessment Tool (SWAT) outputs and National Agricultural Statistics Service (USDA NASS) economic data, we conducted a spatial optimization of bioenergy feedstock introduction into the Arkansas White-Red River Basin based on water quality and economic objectives, subject to constraints on total land conversion. Results displayed tradeoffs between bioenergy yield for three crops (switchgrass, sorghum and poplar) and land rent objectives. Optimal solutions tended to prioritize conversion of land in eastern AWR subbasins where yield and water quality objective improvements were greatest. A small number of subbasins contributed to basin-wide water quality improvements, whereas subbasins contributing to economic benefits were more spatially dispersed, indicating that water quality responses are more likely to constrain feedstock placement. Biomass production targets can be met vianumerous spatial arrangements, whereas marginal improvement in water quality objectives can best be achieved by selectively siting perennial feedstocks in the eastern half of the region.

09 BIOMASS FUELS↗

Comparative Analysis Between US NRC Requirements and US DOE Orders - 13402

Small modular reactor (SMR) is a nuclear reactor design approach that is expected to herald in a new era of clean energy in the U.S. These reactors are less than one-third the size of conventional large nuclear power reactors, and have factory-fabricated components that may be transported by rail or truck to a site selected to house a small nuclear reactor. To facilitate the licensing of these smaller nuclear reactor designs, the Nuclear Regulatory Commission (NRC) is in the process of developing a regulatory infrastructure to support licensing review of these unique reactor designs. As part of these activities, the NRC has been meeting with the Department of Energy (DOE) and with individual SMR designers to discuss potential policy, licensing, and key technical differences in SMR designs. It is anticipated by the NRC that such licensing interaction and guidance early in the design process will contribute towards minimizing complexity while adding stability and predictability in the licensing and subsequent regulation of new reactor designs such as SMRs. In conjunction with the current NRC initiative of developing the SMR licensing process, early communication and collaboration in the identification and resolution of any potential technical and licensing differences between NRC requirements and similar requirements applicable at DOE sites would help to expedite demonstration and implementation of SMR technology in the US. In order to foster such early communication, Savannah River Nuclear Solutions (SRNS) has begun taking the first steps in identifying and evaluating potential licensing gaps that may exist between NRC and DOE requirements in siting SMRs at DOE sites. A comparison between the existing NRC regulations for Early Site Permits and the DOE Orders was undertaken to establish the degree of correlation between NRC requirements and compliance methods in place at DOE sites. The ability to use existing data and information to expedite the development of the Environmental Report is being evaluated at the Savannah River Site as a case study for application across the DOE Complex. This paper will present areas of direct correlation as well as those where the need for site specific data for either DOE operations or NRC compliance warrant additional interaction between the agencies. Areas where further refinement of the SMR technologies may drive collaborative development of revised regulations through such means as industry consensus standards will also be highlighted. Both NRC and DOE have requirements that mandate public involvement in their processes. The importance and value of early engagement with the public as well as collaborating regulatory agencies is of critical importance when deploying new technologies. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Restoration Hydro: A Watershed Approach to Standard Modular New Hydropower

The objectives of FOA DE- FOA-0001836- “Standard Modular Hydropower” included designing a standardized, modular, and environmentally compatible hydropower schematic for implementation in greenfield sites that generate up to 10 MW of capacity. Utilizing funds competitively awarded under DOE’s Water Power Technologies Office, the Natel Energy team developed a concept for modular new stream reach (NSR) hydropower that incorporates multi species upstream and downstream fish passage, improved river channel connectivity, and recreational modules. The in-stream design of the collective modules minimized site specific design and maximized the opportunities for modularity. Financial data was also presented using actual costs from regional suppliers, with figures provided in 2022 dollars. While the project team did not address potential permitting process improvements, the site selection criteria did consider established barriers to hydropower development such as tribal and preserved lands, interconnection proximity, and endangered species to exclude or deprioritize. The project’s design schematic met the objectives of the FOA, and presented a unique solution that targets alluvial pockets as natural features for sustainable development. Natel’s concept also incorporated the company's fish-safe Restoration Hydro Turbine for safe downstream passage, while featuring a rock arch that integrates fish passage, water, recreation, and grade control modules (including sediment). Alignment with the Department of Energy Office of Energy Efficiency and Renewable Energy (EERE) “Innovative Design Concepts for Standard Modular Hydropower and Pumped-Storage Hydropower” Program: According to the Hydropower Vision (DOE, 2016), approximately 16 GW of hydropower growth is possible with the development of technology solutions that balance efficiency, economics, and environmental sustainability. The desired outcome of the SMH program is transformational innovation specifically in the site identification, conceptual, and detailed design phases of technology development lifecycles (DOE, 2018). In developing the SMH design schematic, the team aimed to address the opportunities outlined in the Vision through an inverted design philosophy; rather than singularly prioritizing efficiency and power production, the team focused on integrating hydropower with restoration of degraded streams to optimal ecosystem function and provision of exceptional recreation value as design criteria. To achieve this, Restoration Hydro incorporates the principles of nature-based engineering (WWAP, 2018) and biomimicry (Biomimicry NL.) to strategically deploy complementary combinations of permanent, semi-permanent, and ephemeral low-head structures - such as natural and engineered log jams - that harness geomorphological and hydrological processes at the landscape-scale. Primary applications of Restoration Hydro include: 1) restoration of degraded watersheds’ natural ecological function and enhancement of hydrological connectivity; and 2) creation of associated co-benefits to hydro production, including increased groundwater recharge, improved sediment transport and management, improved water security and water quality. Restoration Hydro projects build upon proven watershed restoration engineering techniques by integrating hydropower turbines into low-head structures using innovative and evolving civil works concepts that facilitate fish and sediment passage, and in some cases create additional revenue-generating recreational opportunities. Powering low-head structures creates a directly monetizable layer of economic value in the form of flexible, reliable, renewable energy on top of the already high-value water, environmental and recreational benefits of watershed and river restoration. The approach aims to create a virtuous, self-reinforcing cycle whereby Restoration Hydro projects support the scaling of ecosystem restoration activities, creating a water-energy-carbon multiplier effect that, through the principles of adaptive change management: 1) improves the resilience of landscapes and downstream population centers for changing hydrological cycles; 2) creates a reliable energy resource that facilitates the integration of intermittent renewable power sources into grids; and 3) supports climate change mitigation through grid decarbonization and enhanced ecosystem carbon capture and retention.

13 HYDRO ENERGY↗

Solar vs. Fission Surface Power for Mars

A multi-discipline team of experts from the National Aeronautics and Space Administration (NASA) developed Mars surface power system point design solutions for two conceptual missions. The primary goal of this study was to compare the relative merits of solar- versus fission-powered versions of each surface mission. First, the team compared three different solar power options against a fission power system concept for a sub-scale, uncrewed demonstration mission. The 4.5 meter (m) diameter pathfinder lander's primary mission would be to demonstrate Mars entry, descent, and landing techniques. Once on the Martian surface, the lander's In Situ Resource Utilization (ISRU) payload would demonstrate liquid oxygen propellant production using atmospheric resources. For the purpose of this exercise, location was assumed to be at the Martian equator. The three solar concepts considered included a system that only operated during daylight hours (at roughly half the daily propellant production rate of a round-the-clock fission design), a battery-augmented system that operated through the night (matching the fission concept's propellant production rate), and a system that operated only during daylight, but at a higher rate (again, matching the fission concept's propellant production rate). Including 30% mass growth allowance, total payload masses for the three solar concepts ranged from 1,116 to 2,396 kg, versus the 2,686 kg fission power scheme. However, solar power masses are expected to approach or exceed the fission payload mass at landing sites further from the equator, making landing site selection a key driver in the final power system decision. The team also noted that detailed reliability analysis should be performed on daytime-only solar power schemes to assess potential issues with frequent ISRU system on/off cycling. Next, the team developed a solar-powered point design solution for a conceptual four-crew, 500-day surface mission consisting of up to four landers per crewed expedition mission. Unlike the demonstration mission, a lengthy power outage due to the global dust storms that are known to occur on Mars would pose a safety hazard to a crewed mission. A similar fission versus solar power trade study performed by NASA in 2007 concluded that fission power was more reliable-with a much lower mass penalty-than solar power for this application. However, recent advances in solar cell and energy storage technologies and changes in operational assumptions prompted NASA to revisit the analysis. For the purpose of this exercise a particular landing site at Jezero Crater, located at 18o north latitude, was assumed. A fission power system consisting of four each 10 kW Kilopower fission reactors was compared to a distributed network of Orion-derived Ultraflex solar arrays and Lithium ion batteries mounted on every lander. The team found that a solar power system mass of about 9,800 kg would provide the 22 kilowatts (kW) keep-alive power needed to survive a dust storm lasting up to 120-days at average optical depth of 5, and 35 kW peak power for normal operations under clear skies. Although this is less than half the mass estimated during the 2007 work (which assumed latitudes up to 30o) it is still more than the 7,000 kg mass of the fission system which provides full power regardless of dust storm conditions.

Rucker, Michelle A.↗

Sap Velocity Data for East River Watershed Sites (2023-2025)

This dataset includes sap velocity measurements for aspen (populus tremuloides), fir (abies lasiocarpa), spruce (Engelmann spruce) and lodgepole pine (pinus contorta) trees at nine sites in the East River Watershed near Gothic, CO. This dataset was generated following a similar method as a previous dataset (Dataset. doi:10.15485/1647654) but was conducted at different sites in the area and now includes lodgepole pine. Site selection was done to explicitly improve understanding of topographic controls of tree water use. The data collection began in June 2023 and we provide data until December 2025 - though data collection is ongoing. The sap flux data were collected using ICT SFM1 sensors and are presented in both units of cm h^-1 and as kg h^-1 by multiplying the sap flux by the sapwood area of the tree. All sap flow data has been been corrected using estimates of wounding diameter, water content of wood and sap wood depth. We also provide a normalized sap velocity estimate by subtracting each measurement from that trees' annual minimum and dividing by that trees' annual maximum. This provides data for each tree and year on a 0-1 scale. This data entry contains one CSV file that includes all available sap flow data. The timestamps are provided in local time as year, day of year and hour and each measurement contains an associated latitude, longitude and site number which can be used to identify trees in a given stand. Each species is given a numeric value as: 1= populus tremuloides, 2=Engelmann spruce, 3=abies lasiocarpa and 4=pinus contorta.

abies↗

A phased workflow to define permit‐ready locations for large volume CO 2 injection and storage

Abstract To‐date, only two UIC Class VI permits have been issued by the US Environmental Protection Agency. We illustrate a four‐phase workflow to first identify regional storage resources and then down‐select sites to yield permit‐ready locations that can accept and store large volumes of CO 2 . Specific permit requirements should guide objectives and define deliverables of respective workflow phases. In the first phase we used available regional data and screened structure and injection zones to locate resources that match CO 2 volumes planned to be captured. Available data were also used to assess presence and depth of usable groundwater, the key resource being protected via permitting. We then used advanced, closed‐form, analytical solutions (EASiTool) to estimate CO 2 injectivity into each hydrologically connected injection compartment. In the second phase we acquired and conditioned additional wireline logs and leased available seismic datasets. We interpreted the depositional systems from wireline well‐log character and mapped sandbody geometry to interpolate injection and confining‐zone distribution. Using available data, we mapped faults and locations of freshwater and overpressure (or other capacity‐limiting geologic parameters) in more detail. In the third phase, we used the augmented geologic data to develop a static model for the selected area, extracted the areas of highest interest, and generated and ran dynamic (flow) models. In a fourth phase, we reduced major uncertainties identified in earlier phases. Our case study indicates that to complete preparation of a permit application requires (1) improved lithologic characterization information (thicknesses and horizontal and vertical connectivity) and (2) better definition of poorly defined local faults. © 2023 The Authors. Greenhouse Gases: Science and Technology published by Society of Chemical Industry and John Wiley & Sons Ltd.

58 GEOSCIENCES↗