Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “River”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

Integrated Status and Effectiveness Monitoring Program, Entiat River Status and Trend Snorkel Surveys and Rotary Smolt Trap Operations in Nason Creek, March 2007 through March 2008.

The Integrated Status and Effectiveness Monitoring Program (ISEMP-BPA project No.2003-0017) has been created as a cost effective means of developing protocols and new technologies, novel indicators, sample designs, analytical, data management and communication tools and skills, and restoration experiments that support the development of a region-wide Research, Monitoring and Evaluation (RME) program to assess the status of anadromous salmonid populations, their tributary habitat and restoration and management actions. The most straightforward approach to developing a regional-scale monitoring and evaluation program would be to increase standardization among status and trend monitoring programs. However, the diversity of species and their habitat, as well as the overwhelming uncertainty surrounding indicators, metrics, and data interpretation methods, requires the testing of multiple approaches. Thus, the approach ISEMP has adopted is to develop a broad template that may differ in the details among subbasins, but one that will ultimately lead to the formation of a unified RME process for the management of anadromous salmonid populations and habitat across the Columbia River Basin. ISEMP has been initiated in three pilot subbasins, the Wenatchee/Entiat, John Day, and Salmon. To balance replicating experimental approaches with the goal of developing monitoring and evaluation tools that apply as broadly as possible across the Pacific Northwest, these subbasins were chosen as representative of a wide range of potential challenges and conditions, e.g., differing fish species composition and life histories, ecoregions, institutional settings, and existing data. ISEMP has constructed a framework that builds on current status and trend monitoring infrastructures in these pilot subbasins, but challenges current programs by testing alternative monitoring approaches. In addition, the ISEMP is: (1) Collecting information over a hierarchy of spatial scales, allowing for a greater flexibility of data aggregation for multi-scale recovery planning assessments, and (2) Designing methods that: (a) Identify factors limiting fish production in watersheds; (b) Determine restoration actions to address these problems; (c) Implement actions as a large-scale experiment (e.g. Before After Control Impact, or BACI design), and (d) Implement intensive monitoring and research to evaluate the action's success. The intent of the ISEMP project is to design monitoring programs that can efficiently collect information to address multiple management objectives over a broad range of scales. This includes: Evaluating the status of anadromous salmonids and their habitat; Identifying opportunities to restore habitat function and fish performance; and Evaluating the benefits of the actions to the fish populations across the Columbia River Basin. The multi-scale nature of this goal requires the standardization of protocols and sampling designs that are statistically valid and powerful, properties that are currently inconsistent across the multiple monitoring programs in the region. Other aspects of the program will aid in the ability to extrapolate information beyond the study area, such as research to elucidate causal mechanisms, and a classification of watersheds throughout the Columbia River Basin. Obviously, the scale of the problem is immense and the ISEMP does not claim to be the only program working towards this goal. As such, ISEMP relies heavily on the basin's current monitoring infrastructure to test and develop monitoring strategies, while acting as a coordinating body and providing support for key elements such as data management and technical analyses. The ISEMP also ensures that monitoring programs can address large-scale management objectives (resulting largely from the ESA) through these local efforts. While the ISEMP maintains a regional focus it also returns the necessary information to aid in management at the smaller spatial scales (individual projects) where manipulations (e.g., habitat restoration actions) actually occur. The work captured in this report is a component of the overall Integrated Status and Effectiveness Monitoring Program, and while it stands alone as an important contribution to the management of anadromous salmonids and their habitat, it also plays a key role within ISEMP. Each component of work within ISEMP is reported on individually, as is done so here, and in annual and triennial summary reports that present all of the overall project components in their programmatic context and shows how the data and tools developed can be applied to the development of regionally consistent, efficient and effective Research, Monitoring and Evaluation.

13 HYDRO ENERGY↗

The Integrated Status and Effectiveness Monitoring Program : Variation (Status and Trend) of Fine Sediment in Spawning Gravel within the Entiat River Subbasin : July 2008 - October 2008.

The Integrated Status and Effectiveness Monitoring Program (ISEMP - BPA project No.2003-017-00) has been created as a cost effective means of developing protocols and new technologies, novel indicators, sample designs, analytical, data management and communication tools and skills, and restoration experiments that support the development of a region-wide Research, Monitoring and Evaluation (RME) program to assess the status of anadromous salmonid populations, their tributary habitat and restoration and management actions. The most straightforward approach to developing a regional-scale monitoring and evaluation program would be to increase standardization among status and trend monitoring programs. However, the diversity of species and their habitat, as well as the overwhelming uncertainty surrounding indicators, metrics, and data interpretation methods, requires the testing of multiple approaches. Thus, the approach ISEMP has adopted is to develop a broad template that may differ in the details among subbasins, but one that will ultimately lead to the formation of a unified RME process for the management of anadromous salmonid populations and habitat across the Columbia River Basin. ISEMP has been initiated in three pilot subbasins, the Wenatchee/Entiat, John Day, and Salmon. To balance replicating experimental approaches with the goal of developing monitoring and evaluation tools that apply as broadly as possible across the Pacific Northwest, these subbasins were chosen as representative of a wide range of potential challenges and conditions, e.g., differing fish species composition and life histories, ecoregions, institutional settings, and existing data. ISEMP has constructed a framework that builds on current status and trend monitoring infrastructures in these pilot subbasins, but challenges current programs by testing alternative monitoring approaches. In addition, the ISEMP is: (1) Collecting information over a hierarchy of spatial scales, allowing for a greater flexibility of data aggregation for multi-scale recovery planning assessments, and (2) Designing methods that: (a) Identify factors limiting fish production in watersheds; (b) Determine restoration actions to address these problems; (c) Implement actions as a large-scale experiment (e.g. Before After Control Impact, or BACI design), and (d) Implement intensive monitoring and research to evaluate the action's success. The intent of the ISEMP project is to design monitoring programs that can efficiently collect information to address multiple management objectives over a broad range of scales. This includes: Evaluating the status of anadromous salmonids and their habitat; Identifying opportunities to restore habitat function and fish performance; and Evaluating the benefits of the actions to the fish populations across the Columbia River Basin. The multi-scale nature of this goal requires the standardization of protocols and sampling designs that are statistically valid and powerful, properties that are currently inconsistent across the multiple monitoring programs in the region. Other aspects of the program will aid in the ability to extrapolate information beyond the study area, such as research to elucidate causal mechanisms, and a classification of watersheds throughout the Columbia River Basin. Obviously, the scale of the problem is immense and the ISEMP does not claim to be the only program working towards this goal. As such, ISEMP relies heavily on the basin's current monitoring infrastructure to test and develop monitoring strategies, while acting as a coordinating body and providing support for key elements such as data management and technical analyses. The ISEMP also ensures that monitoring programs can address large-scale management objectives (resulting largely from the ESA) through these local efforts. While the ISEMP maintains a regional focus it also returns the necessary information to aid in management at the smaller spatial scales (individual projects) where manipulations (e.g., habitat restoration actions) actually occur. The work captured in this report is a component of the overall Integrated Status and Effectiveness Monitoring Program, and while it stands alone as an important contribution to the management of anadromous salmonids and their habitat, it also plays a key role within ISEMP. Each component of work within ISEMP is reported on individually, as is done so here, and in annual and triennial summary reports that present all of the overall project components in their programmatic context and shows how the data and tools developed can be applied to the development of regionally consistent, efficient and effective Research, Monitoring and Evaluation.

13 HYDRO ENERGY↗

The Integrated Status and Effectiveness Monitoring Program : Variation (Status and Trend) of Stream Water Temperature within th Entiat River Subbasin : January 2008 - October 2008.

The Integrated Status and Effectiveness Monitoring Program (ISEMP - BPA project No.2003-017-00) has been created as a cost effective means of developing protocols and new technologies, novel indicators, sample designs, analytical, data management and communication tools and skills, and restoration experiments that support the development of a region-wide Research, Monitoring and Evaluation (RME) program to assess the status of anadromous salmonid populations, their tributary habitat and restoration and management actions. The most straightforward approach to developing a regional-scale monitoring and evaluation program would be to increase standardization among status and trend monitoring programs. However, the diversity of species and their habitat, as well as the overwhelming uncertainty surrounding indicators, metrics, and data interpretation methods, requires the testing of multiple approaches. Thus, the approach ISEMP has adopted is to develop a broad template that may differ in the details among subbasins, but one that will ultimately lead to the formation of a unified RME process for the management of anadromous salmonid populations and habitat across the Columbia River Basin. ISEMP has been initiated in three pilot subbasins, the Wenatchee/Entiat, John Day, and Salmon. To balance replicating experimental approaches with the goal of developing monitoring and evaluation tools that apply as broadly as possible across the Pacific Northwest, these subbasins were chosen as representative of a wide range of potential challenges and conditions, e.g., differing fish species composition and life histories, ecoregions, institutional settings, and existing data. ISEMP has constructed a framework that builds on current status and trend monitoring infrastructures in these pilot subbasins, but challenges current programs by testing alternative monitoring approaches. In addition, the ISEMP is: (1) Collecting information over a hierarchy of spatial scales, allowing for a greater flexibility of data aggregation for multi-scale recovery planning assessments, and (2) Designing methods that: (a) Identify factors limiting fish production in watersheds; (b) Determine restoration actions to address these problems; (c) Implement actions as a large-scale experiment (e.g. Before After Control Impact, or BACI design), and (d) Implement intensive monitoring and research to evaluate the action's success. The intent of the ISEMP project is to design monitoring programs that can efficiently collect information to address multiple management objectives over a broad range of scales. This includes: Evaluating the status of anadromous salmonids and their habitat; Identifying opportunities to restore habitat function and fish performance, and Evaluating the benefits of the actions to the fish populations across the Columbia River Basin. The multi-scale nature of this goal requires the standardization of protocols and sampling designs that are statistically valid and powerful, properties that are currently inconsistent across the multiple monitoring programs in the region. Other aspects of the program will aid in the ability to extrapolate information beyond the study area, such as research to elucidate causal mechanisms, and a classification of watersheds throughout the Columbia River Basin. Obviously, the scale of the problem is immense and the ISEMP does not claim to be the only program working towards this goal. As such, ISEMP relies heavily on the basin's current monitoring infrastructure to test and develop monitoring strategies, while acting as a coordinating body and providing support for key elements such as data management and technical analyses. The ISEMP also ensures that monitoring programs can address large-scale management objectives (resulting largely from the ESA) through these local efforts. While the ISEMP maintains a regional focus it also returns the necessary information to aid in management at the smaller spatial scales (individual projects) where manipulations (e.g., habitat restoration actions) actually occur. The work captured in this report is a component of the overall Integrated Status and Effectiveness Monitoring Program, and while it stands alone as an important contribution to the management of anadromous salmonids and their habitat, it also plays a key role within ISEMP. Each component of work within ISEMP is reported on individually, as is done so here, and in annual and triennial summary reports that present all of the overall project components in their programmatic context and shows how the data and tools developed can be applied to the development of regionally consistent, efficient and effective Research, Monitoring and Evaluation.

13 HYDRO ENERGY↗

Escapement and Productivity of Spring Chinook Salmon and Summer Steelhead in the John Day River Basin, 2005-2006 Annual Technical Report.

The objectives are: (1) Estimate number and distribution of spring Chinook salmon Oncorhynchus tshawytscha redds and spawners in the John Day River subbasin; and (2) Estimate smolt-to-adult survival rates (SAR) and out-migrant abundance for spring Chinook and summer steelhead O. mykiss and life history characteristics of summer steelhead. The John Day River subbasin supports one of the last remaining intact wild populations of spring Chinook salmon and summer steelhead in the Columbia River Basin. These populations, however, remain depressed relative to historic levels. Between the completion of the life history and natural escapement study in 1984 and the start of this project in 1998, spring Chinook spawning surveys did not provide adequate information to assess age structure, progeny-to-parent production values, smolt-to-adult survival (SAR), or natural spawning escapement. Further, only very limited information is available for steelhead life history, escapement, and productivity measures in the John Day subbasin. Numerous habitat protection and rehabilitation projects to improve salmonid freshwater production and survival have also been implemented in the basin and are in need of effectiveness monitoring. While our monitoring efforts outlined here will not specifically measure the effectiveness of any particular project, they will provide much needed background information for developing context for project-specific effectiveness monitoring efforts. To meet the data needs as index stocks, to assess the long-term effectiveness of habitat projects, and to differentiate freshwater and ocean survival, sufficient annual estimates of spawner escapement, age structure, SAR, egg-to-smolt survival, smolt-per-redd ratio, and freshwater habitat use are essential. We have begun to meet this need through spawning ground surveys initiated for spring Chinook salmon in 1998 and smolt PIT-tagging efforts initiated in 1999. Additional sampling and analyses to meet these goals include an estimate of smolt abundance and SAR rates, and an updated measure of the freshwater distribution of critical life stages. Because Columbia Basin managers have identified the John Day subbasin spring Chinook population as an index population for assessing the effects of alternative future management actions on salmon stocks in the Columbia Basin (Schaller et al. 1999) we continue our ongoing studies. This project is high priority based on the high level of emphasis the NWPPC Fish and Wildlife Program, Subbasin Summaries, NMFS, and the Oregon Plan for Salmon and Watersheds have placed on monitoring and evaluation to provide the real-time data to guide restoration and adaptive management in the region. By implementing the proposed program we have been able to address many of the goals for population status monitoring, such as defining areas currently used by spring Chinook for holding and spawning habitats and determining range expansion or contraction of summer rearing and spawning populations. The BiOp describes these goals as defining population growth rates (adult monitoring), detecting changes in those growth rates or relative abundance in a reasonable time (adult/juvenile monitoring), estimating juvenile abundance and survival rates (juvenile/smolt monitoring), and identifying stage-specific survival (adult-to-smolt, smolt-to-adult).

13 HYDRO ENERGY↗

Oxbow Fish Hatchery Snake River Sockeye Salmon Smolt Program, 2008 Annual Report.

This contract proposal is in response to the Federal Columbia River Power System Biological Opinion Implementation Plan/Update Proposed Action (UPA) associated with increasing the number of Snake River sockeye smolts by 150,000. To accomplish this proposal the cooperation and efforts of three government entities has been planned (e.g., Idaho Department of Fish and Game (IDFG), Oregon Department of Fish and Wildlife (ODFW), and the National Marine Fisheries Service (NMFS)). Improvements at the IDFG Eagle Fish Hatchery and NMFS Burley Creek Hatchery will focus on increasing sockeye salmon captive broodstock and egg production. Improvements at the ODFW Oxbow Fish Hatchery will be made to accommodate the incubation, hatching and rearing of 150,000 sockeye salmon smolts for release into Idaho's Sawtooth Valley, Upper Salmon River near IDFG's Sawtooth Fish Hatchery and/or Redfish Lake Creek 1.4 km downstream of Redfish Lake. Modifications to Oxbow Fish Hatchery (ODFW) will include retro-fit existing pond drains so pond cleaning effluent water can be routed to the pollution abatement pond, and modifications to the abatement pond. Also included in this project as an added phase, was the rerouting of the hatchery building effluent water to meet state DEQ guidelines for the use of formalin to treat salmonid eggs. Some additional funding for the described Oxbow Hatchery modifications will come from Mitchell Act Funding. All personnel costs associated with this project will come from Mitchell Act funding. Due to heavy work load issues, being under staffed, and two emergency projects in the spring and summer of 2006, ODFW engineers were not able to complete all plans and get them out for bid in 2006. As a result of these circumstances retro-fitting pond drains and modifications to the abatement pond was carried over into fiscal year 2007-2008. A no cost time extension to the contract was approved by BPA. The format for this report will follow the standard format for Statement of Work Report (SOW), which includes sub-categories Work Element (WE), and within the WE the Milestone Titles.

13 HYDRO ENERGY↗

Wind River Watershed Restoration, 2006-2007 Annual Report.

This report summarizes work completed by U.S. Geological Survey's Columbia River Research Laboratory (USGS-CRRL) in the Wind River subbasin during the period April 2006 through March 2007 under Bonneville Power Administration (BPA) contract 26922. During this period, we collected temperature, flow, and habitat data to characterize physical habitat condition and variation within and among tributaries and mainstem sections in the Wind River subbasin. We also conducted electrofishing and snorkeling surveys to determine juvenile salmonid populations within select study areas throughout the subbasin. Portions of this work were completed with additional funding from U.S. Fish and Wildlife Service (USFWS) and the Lower Columbia Fish Enhancement Group (LCFEG). Funding from USFWS was for work to contribute to a study of potential interactions between introduced Chinook salmon Oncorhynchus tshawytscha and wild steelhead O. mykiss. Funding from LCFEG was for work to evaluate the effects of nutrient enrichment in small streams. A statement of work (SOW) was submitted to BPA in March 2006 that outlined work to be performed by USGS-CRRL. The SOW was organized by work elements, with each describing a research task. This report summarizes the progress completed under each work element.

13 HYDRO ENERGY↗

Wind River Watershed Restoration, 2005-2006 Annual Report.

This report summarizes work completed by U.S. Geological Survey's Columbia River Research Laboratory (USGS-CRRL) in the Wind River subbasin during the period April 2005 through March 2006 under Bonneville Power Administration (BPA) contract 22095. During this period, we collected temperature, flow, and habitat data to characterize habitat condition and variation within and among tributaries and mainstem sections in the Wind River subbasin. We also conducted electrofishing and snorkeling surveys to determine juvenile salmonid populations within select study areas throughout the subbasin. Portions of this work were completed with additional funding from U.S. Fish and Wildlife Service (USFWS) and the Lower Columbia Fish Enhancement Group (LCFEG). A statement of work (SOW) was submitted to BPA in March 2005 that outlined work to be performed by USGS-CRRL. The SOW was organized by work elements, with each describing a research task. This report summarizes the progress completed under each work element.

13 HYDRO ENERGY↗

White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; Annual Progress Report, April 2007 - March 2008.

We report on our progress from April 2007 through March 2008 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW; Report A), Washington Department of Fish and Wildlife (WDFW; Report B), Columbia River Inter-Tribal Fish Commission (CRITFC; Report C), and Montana State University (MSU; Report D). This is a multi-year study with many objectives requiring more than one year to complete; therefore, findings from a given year may be part of more significant findings yet to be reported.

13 HYDRO ENERGY↗

"Research to Improve the Efficacy of Captive Broodstock Programs and Advance Hatchery Reform Throughout the Columbia River Basin." [from the Abstract], 2008-2009 Progress Report.

This project was developed to conduct research to improve the efficacy of captive broodstock programs and advance hatchery reform throughout the Columbia River Basin. The project has three objectives: (1) maintain adaptive life history characteristics in Chinook salmon, (2) improve imprinting in juvenile sockeye salmon, and (3) match wild phenotypes in Chinook and sockeye salmon reared in hatcheries. A summary of the results are as follows: Objective 1: The ratio of jack to adult male Chinook salmon were varied in experimental breeding populations to test the hypothesis that reproductive success of the two male phenotypes would vary with their relative frequency in the population. Adult Chinook salmon males nearly always obtained primary access to nesting females and were first to enter the nest at the time of spawning. Jack male spawning occurred primarily by establishing satellite positions downstream of the courting pair, and 'sneaking' into the nest at the time of spawning. Male dominance hierarchies were fairly stable and strongly correlated with the order of nest entry at the time of spawning. Observed participation in spawning events and adult-to-fry reproductive success of jack and adult males was consistent with a negative frequency-dependent selection model. Overall, jack males sired an average of 21% of the offspring produced across a range of jack male frequencies. Implications of these and additional findings on Chinook salmon hatchery broodstock management will be presented in the FY 2009 Annual Report. Objective 2: To determine the critical period(s) for imprinting for sockeye salmon, juvenile salmon were exposed to known odorants at key developmental stages. Molecular assessments of imprinting-induced changes in odorant receptor gene expression indicated that regulation of odorant expression is influenced by developmental status and odor exposure history. Expression levels of basic amino acid receptor (BAAR) mRNA in the olfactory epithelium increased dramatically during final maturation in both Stanley Basin and Okanogan River sockeye. These increases appeared to be independent of odor exposure history, rising significantly in both arginine-naive and arginine-exposed fish. However, sockeye exposed to arginine during smolting demonstrated a larger increase in BAAR mRNA than arginine-naive fish. These results are consistent with the hypothesis that odorant receptors sensitive to home stream waters may be upregulated at the time of the homing migration and may afford opportunities to exploit this system to experimentally characterize imprinting success and ultimately identify hatchery practices that will minimize straying of artificially produced salmonids. Additional analysis of Sockeye salmon imprinting and further implications of these findings will be presented in the FY 2009 Annual Report. Objective 3: Photoperiod at emergence and ration after ponding were varied in Yakima River spring Chinook salmon to test the hypothesis that seasonal timing of emergence and growth during early stages of development alter seasonal timing of smoltification and age of male maturation. Fish reared under conditions to advance fry emergence and accelerate growth had the greatest variation in seasonal timing of smolting (fall, spring and summer) and highest rates of early male maturation with most males maturing at age 1 (35-40%). In contrast, fish with delayed emergence and slow growth had the least variation in phenotypes with most fish smolting as yearlings in the spring and no age-1 male maturation. Growth (not emergence timing) altered rates of age-2 male maturation. Results of this study demonstrate that altering fry development, as is often done in hatcheries, can profoundly affect later life history transitions and the range of phenotypes within a spring Chinook salmon population. Additional work in the next funding period will determine if these rearing regimes affected other aspects of smolt quality, which may affect ultimate survival upon ocean entry.

13 HYDRO ENERGY↗

RIVER PROTECTION PROJECT SYSTEM PLAN

The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and disposal at the Waste Isolation Pilot Plant (WIPP) in New Mexico. (6) Deploying interim storage capacity for the immobilized high-level waste (IHLW) pending determination of the final disposal pathway. (7) Closing the SST and DST tank farms, ancillary facilities, and all associated waste management and treatment facilities. (8) Optimizing the overall mission by resolution of technical and programmatic uncertainties, configuring the tank farms to provide a steady, well-balanced feed to the WTP, and performing trade-offs of the required amount and type of supplemental treatment and of the amount of HLW glass versus LAW glass. ORP has made and continues to make modifications to the WTP contract as needed to improve projected plant performance and address known or emerging risks. Key elements needed to implement the strategy described above are included within the scope of the Tank Operations Contract (TOC). Interim stabilization of the SSTs was completed in March 2004. As of April 2009, retrieval of seven SSTs has been completed and retrieval of four additional SSTs has been completed to the limits of technology. Demonstration of supplemental LAW treatment technologies has stopped temporarily pending revision of mission need requirements. Award of a new contract for tank operations (TOC), the ongoing tank waste retrieval experience, HLW disposal issues, and uncertainties in waste feed delivery and waste treatment led to the revision of the Performance Measurement Baseline (PM B), which is currently under review prior to approval. 6 This System Plan is aligned with the current WTP schedule, with hot commissioning beginning in 2018, and full operations beginning in late 2019. Major decisions regarding the use of supplemental treatment and the associated technology, the ultimate needed capacity, and its relationship to the WTP have not yet been finalized. This System Plan assumes that the outcome of these decisions will be to provide a second LAW vitrification facility. No final implementation decisions regarding supplemental technology can be made until the Tank Closure and Waste Management Environmental Impact Statement is completed and a Record of Decision is issued by DOE. Technical solutions are being developed to mitigate the impact from substantially increased estimates of sodium to be added during pretreatment of the tank waste solids. This may involve one or more of the following options: (1) refining or modifying the flowsheet to reduce the required amount of additional sodium, (2) increasing the overall LAW vitrification capacity, (3) increasing the incorporation of sodium into the LAW glass, (4) increasing the incorporation of aluminum in the HLW glass to reduce caustic leaching requirements, or (5) implementing other technical solutions. For planning purposes, the PMB assumes that option (5) above, in the form of an ARF, will be successful in reducing the sodium required to be added during pretreatment of the tank waste.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Supplemental Groundwater Remediation Technologies to Protect the Columbia River at Hanford, WA

Nine projects have been recently selected by the US Department of Energy (EM-22) to address groundwater contaminant migration at the Hanford Site. This paper summarizes the background and objectives of these projects. Five of the selected projects are targeted at hexavalent chromium contamination in Hanford 100 Area groundwater. These projects represent an integrated approach towards identifying the source of hexavalent chromium contamination in the Hanford 100-D Area and treating the groundwater contamination. Currently, there is no effective method to stop strontium-90 associated with the riparian zone sediments from leaching into the river. Phytoremediation may be a possible way to treat this contamination. Its use at the 100-N Area will be investigated. Another technology currently being tested for strontium-90 contamination at the 100-N Area involves injection (through wells) of a calcium-citrate-phosphate solution, which will precipitate apatite, a natural calcium-phosphate mineral. Apatite will adsorb the strontium-90, and then incorporate it as part of the apatite structure, isolating the strontium-90 contamination from entering the river. This EM-22 funded apatite project will develop a strategy for infiltrating the apatite solution from ground surface or a shallow trench to provide treatment over the upper portion of the contaminated zone, which is unsaturated during low river stage.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Savannah River Site Climatology for Research Activities Conducted Onsite and in P-Area (1994-2023)

This report presents a climatology of meteorological variables at the Savannah River Site (SRS) using measurements from the P-Area and Central Climatology meteorological towers to support research activities at the Savannah River Site. Key values included in this report are wind, surface pressure, temperature, relative humidity, soil moisture, cloud fraction, cloud base, lightning, atmospheric stability, and boundary layer parameters. The Central Climatology tower is useful in that it is instrumented at four levels, allowing for an examination of height dependence on some variables.

54 ENVIRONMENTAL SCIENCES↗

Savannah River Site Climatology for Research Activities Conducted Onsite and in P-Area (1994-2023)

Executive Summary This report presents a climatology of meteorological variables at the Savannah River Site (SRS) using measurements from the P-Area and Central Climatology meteorological towers to support research activities at the Savannah River Site. Key values included in this report are wind, surface pressure, temperature, relative humidity, soil moisture, cloud fraction, cloud base, lightning, atmospheric stability, and boundary layer parameters. The Central Climatology tower is useful in that it is instrumented at four levels, allowing for an examination of height dependence on some variables.

54 ENVIRONMENTAL SCIENCES↗

Five Year Comparison of Mixing Height Determinations at the Savannah River Site

Air quality dispersion modeling is performed for the Savannah River Site (SRS) to demonstrate compliance with applicable regulations. The AMS/EPA Regulatory Model (AERMOD) modeling system is an EPA recommended model for air quality applications with a data preprocessor (AERMET) to incorporate meteorological data collected on site. AERMET parameterizes or calculates meteorological variables that are not directly measured onsite. One of the parameters estimated by AERMET is the atmospheric mixing height. While the mixing height is not currently a measurement input into AERMET, SRS has the capability to measure the local mixing height. The Savannah River National Laboratory (SRNL) operates a Vaisala CL31 Lidar Ceilometer which estimates mixing height from aerosol backscatter. This study compares the parameterized mixing height from AERMET to the ceilometer estimated mixing height for the current regulatory period at SRS incorporating data from 2015-2019. Results from this study showed the average daily minimum values (morning) from AERMET were an order of magnitude lower than the commonly used Holzworth (1972) method and the ceilometer estimated mixing heights. Additionally, on average, the ceilometer exhibited a daily maximum mixing height value that occurred 1-3 hours later than the AERMET estimated maximum. This difference is likely due to the nighttime atmospheric mixing height assumptions and calculations used by AERMET. The AERMET algorithm cuts off mixing height growth at sunset while the ceilometer data show ongoing evening convection typical of the southeastern United States. These results suggest that the AERMET parametrization scheme assumptions may not be representative of a forested landscape and evening convection which could account for more mixing overnight. The results obtained in this study are significant for air dispersion modeling applications for regulatory purposes and worker safety. Mixing height can impact model estimated pollutant concentrations. A greater mixing height will provide more volume for pollutant dispersion. This report documents efforts to quantify the dependence of mixing height inputs toward a conservative estimated pollutant concentration.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Uncertainty quantification of bank vegetation impacts on the flood flow field in the American River, California, using large‐eddy simulations

Bank vegetation plays a key role in both hydrodynamics and morphodynamics of natural rivers; however, these effects are often unaccounted for in the computational flow dynamics of natural waterways. Recent studies using the large‐eddy simulation (LES), however, have attempted to gain insights into the impacts of bank vegetation on the mean flow field of the natural rivers using a vegetation model, which applies a sink term to the momentum equations of motion. This approach accounts for the effects of the vegetation and provides a practical approach to account for the complex patches of bank vegetation in large‐scale rivers. To implement the vegetation model, a drag coefficient reflecting the overall resistance of vegetal structures to the flow is needed, but due to the lack of calibrated data and range of size, density and type of vegetation, this parameter can be a significant source of uncertainty in the model results. Here, in this study, we use uncertainty quantification (UQ) to investigate the hydrodynamics and bed shear results when a bank vegetation is incorporated in an LES model. To this end, we used the polynomial chaos expansion and Monte Carlo sampling techniques to determine the uncertainties associated with the drag coefficient in the vegetation model and from uncertainties in the bed roughness and inflow discharge. The UQ analysis provided spatially varying confidence levels for the spanwise and vertical distribution of velocity magnitude and for the bed shear stress distributions. In addition, Sobol indices were computed to indicate the relative influence that each parameter had on the overall uncertainty. In general, it was found that uncertainty in flow discharge was the dominant source of uncertainty; however, the drag coefficient in the vegetation model and the bed roughness parameter also made significant contribution to the uncertainty near the banks and bed, respectively.

54 ENVIRONMENTAL SCIENCES↗

Can machine learning accelerate process understanding and decision‐relevant predictions of river water quality?

Abstract The global decline of water quality in rivers and streams has resulted in a pressing need to design new watershed management strategies. Water quality can be affected by multiple stressors including population growth, land use change, global warming, and extreme events, with repercussions on human and ecosystem health. A scientific understanding of factors affecting riverine water quality and predictions at local to regional scales, and at sub‐daily to decadal timescales are needed for optimal management of watersheds and river basins. Here, we discuss how machine learning (ML) can enable development of more accurate, computationally tractable, and scalable models for analysis and predictions of river water quality. We review relevant state‐of‐the art applications of ML for water quality models and discuss opportunities to improve the use of ML with emerging computational and mathematical methods for model selection, hyperparameter optimization, incorporating process knowledge into ML models, improving explainablity, uncertainty quantification, and model‐data integration. We then present considerations for using ML to address water quality problems given their scale and complexity, available data and computational resources, and stakeholder needs. When combined with decades of process understanding, interdisciplinary advances in knowledge‐guided ML, information theory, data integration, and analytics can help address fundamental science questions and enable decision‐relevant predictions of riverine water quality.

54 ENVIRONMENTAL SCIENCES↗

A New Stochastic Modeling of 3-D Mud Drapes Inside Point Bar Sands in Meandering River Deposits

The environment of major sediments of eastern China oilfields is a meandering river where mud drapes inside point bar sand occur and are recognized as important factors for underground fluid flow and distribution of the remaining oil. The present detailed architectural analysis, and the related mud drapes' modeling inside a point bar, is practical work to enhance oil recovery. This paper illustrates a new stochastic modeling of mud drapes inside point bars. The method is a hierarchical strategy and composed of three nested steps. Firstly, the model of meandering channel bodies is established using the Fluvsim method. Each channel centerline obtained from the Fluvsim is preserved for the next simulation. Secondly, the curvature ratios of each meandering river at various positions are calculated to determine the occurrence of each point bar. The abandoned channel is used to characterize the geometry of each defined point bar. Finally, mud drapes inside each point bar are predicted through random sampling of various parameters, such as number, horizontal intervals, dip angle, and extended distance of mud drapes. A dataset, collected from a reservoir in the Shengli oilfield of China, was used to illustrate the mud drapes' building procedure proposed in this paper. The results show that the inner architectural elements of the meandering river are depicted fairly well in the model. More importantly, the high prediction precision from the cross validation of five drilled wells shows the practical value and significance of the proposed method.

42 ENGINEERING↗

Estimating the economic value of hydropeaking externalities in regulated rivers

Hydropower is a flexible form of electricity generation providing both baseload and balancing power to accommodate intermittent renewables in the energy mix. However, hydropower also generates various externalities. This study investigates individuals' preferences for policies aiming to reduce short-term regulations (i.e., hydropeaking in regulated rivers) while accounting for associated externalities with a discrete choice experiment. This is the first valuation study focusing on hydropeaking that considers both negative and positive externalities. The results imply that most individuals prefer stronger restrictions on short-term regulations to mitigate local environmental impacts. Individuals especially value improvements in recreational use, fish stocks, and the ecological state. On the other hand, potential increases in CO 2 emissions are linked with a clear disutility. The estimated benefits obtained from an improved state of the river environment due to such restrictions exceed the disutility caused by increased CO 2 emissions. Furthermore, the results also reveal unobserved preference heterogeneity among individuals, which should be accounted for in the willingness-to-pay (WTP) estimation using a model specification with correlated utility coefficients. Overall, the findings can inform policy-makers and environmental managers on the economic value of hydropeaking externalities and further guide the sustainable management of rivers regulated for hydropower generation.

13 HYDRO ENERGY↗